HomeMy WebLinkAbout17000991503000_Variances_06-10-2004OFFICE OF COUNTY RECORDER
OTTER TAIL MINNESOTA
I hereby certify that JJ50247
this instrument #
was fiied/recorded in this office for record on the Ka day of
. lUfu/ M04 at
bounty Recorder
Deputy
Wen
:oo.recording fee
.weil certificate
Lit
THE ABOVE SPACE IS RESERVED FOR THE COUNTY RECORDER
APPLICATiON FOR VARiANCE
COUNTY OF OTTER TAIL
GOVERNMENT SERVICES CENTER
540 WEST FIR, FERGUS FALLS. MN 56537
(218) 998-8095
Otter Tail County’s Website: www.co.ottertail.mn.us
MAY 1 0 2004
oO
Application Fee
COMPLETE THIS APPLICATION IN BLACK INK Receipt Number_
Accepted By / Date
ejcj-------
'Pahl 'Zo<iA
PROPERTY OWNER DAYTiME PHONE<3/\
MAILING ADDRESS
LAKE NUMBER LAKE NAME
J.^7 RANGE C VJ TOWNSHIP NAME i A t)/O'O
LAKE CLASS
SECTION 0,Ci TOWNSHIP
/\ /70cCj<^9PARCEL
NUMBER
E-911
ADDRESS Z S ^ 7 T)
LEGAL DESCRIPTION -ex ^/y 2-o'11 e, ei.
”^e5 Lo-I- Cs(>-l(>l)
Lo4 ^ ~Slk S
4 Z,/
TYPE OF VARIANCE REQUESTED (Please Check)
^ ClusterStructure Setback Structure Size____Sewage System Subdivision Misc.
SPECIFY HOW YOUR PROJECT VARIES FROM ORDINANCE REQUIREMENTS. PLEASE BE BREIF AS
THIS WILL BE USED FOR PUBLIC NOTIFICATION.
vdXo-£yt'a^oLdid‘ltiJ) uv
zr
07b
■(L.hj-^jii th bh
od ruzi^
j •
I UNDERSTAND T^T I HAVE APPLIED FOWA VARIANCE FROM THE REQUIREMENTS OF THE SHORELAND
MANAGEMENT ORDINANCE/SUBDIVISION CONTROLS ORDINANCE OF OTTER TAIL COUNTY.
I ALSO UND^ST^D THAT OTH^ PERMITS MAY^E REQUIRED, IT IS MY RESPONSIBILITY TO CONTACT LAND &
RESOURCE management REGARDING THl&lSiATTER.
j
sic^NATURE OF PROPERT DATE
APPLICANT MUST BE PRESENT AT THE HEARING
(Applicant Will Receive Notification As To The Date/Time Of Hearing)
H-ih1-1 C(Q hi'S 5iL bd ( U IS/6Pd I \davn n S£fLS5
Rt^5 ^
'Ik^/5
eryUt^
U^=fcSL^_e^^ J
cm&<^'^Noy'-hh i\s_
C<f /Rg5_
I "-19 ^
/RR3
l>j^^
\ ^95
^,c <997
I Soodju^
dtfmb
9/(i? -
/e?oi
16od^
16^)30/5
)(p-000
n '001 I b206/ju_^
1 S3( ctu^
I 30)O^Date Of Hearing TimeAQijima
o
Motion
Gordon Berg - Approved the variance as requested. (7:05 p.m.)
After discussion and consideration, Steve Schierer made a motion, seconded by Randall Mann and unanimously
carried, to declare Lot 5 Block 5, Pelican Heights Subdivision a buildable lot for residential development. The Board
noted that the variance as approved would provide the applicant with a reasonable use of his property, will provide the
applicant with the ability to enjoy the same rights and privileges as others in this immediate area and is consistent with
past actions of the Board.
5
z
^h^marl^Ofter fail County^Board of Adjustment
Permit(s) required from Land & Resource Management
Yes (Contact Land & Resource Management)
No
L R Official/Date
Copy of Application Mailed to Applicant, Co. Assessor and the MN DNR
bk 0204-001
317,340 • Victor Lundecn Co., Primers • Fergus Falls, Minnesota
June lu,
Page # 2
Clark Dietz - Approved the variance as requested. ( 6:55 p.m.)
Clark Dietz, part of Lot 15, Beauty Beach, Deer Lake in Everts Township, requested a variance of 50’ from
the required ordinary high water level setback of 100’ for the placement of a structure 50' from the ordinary
high water level. Charles Dietz appeared along with applicant. Chairman Mann polled the audience with
Janet Berg speaking for the variance as requested. Letters from Janet Berg, Gayle and Sharon Platt and
Chester Neese in support of the variance as requested were read for the record. After discussion and
consideration, Cecil Femling made a motion, seconded by Paul Larson and unanimously carried, to
approve a variance of 50' from the required ordinary high water level setback of 100’ for the placement of a
structure 50’ from the ordinary high water level. The Board noted that the proposed development as
completed is within the same footprint except for the new addition, is not within the shore impact zone and
substantially cleanup and improved the property.
Gordon Berg - Approved the variance as requested. (7:05 p.m.)
Gordon Berg, Lot 5 Block 5, Pelican Heights Subdivision, Little Pelican Lake in Dunn Township, requested
a variance to have a substandard back lot (Lot 5 Block 5, Pelican Heights Subdivision) declared a buildable
lot for residential development. Lot 5 Block 5, Pelican Heights Subdivision was a lot of record as of
October 1975, but due to a rule change regarding back lots in 1992, this lot is now substandard in size.
Chairman Mann polled the audience with no one speaking for or against the variance as requested. After
discussion and consideration, Steve Schierer made a motion, seconded by Randall Mann and unanimously
carried, to declare Lot 5 Block 5, Pelican Heights Subdivision a buildable lot for residential development.
The Board noted that the variance as approved would provide the applicant with a reasonable use of his
properly, will provide the applicant with the ability to enjoy the same rights and privileges as others in this
immediate area and is consistent with past actions of the Board.
Susan Van deStreek - Approved the variance as modified. (7:10 p.m.)
Susan Van deStreek, Lot 3 Block 1, Echo Ranch Riviera, Long Lake in Otter Tail Township requested a
variance of 23' from the required ordinary high water level setback of 100' and a variance of 2' from the
required side lot line setback of 10’ for the placement of a 14’ by 14’ addition 77’ from the ordinary high
water level and 8’ from the side lot line. Also, requesting a variance of 16’ and a variance of 5T from the
required side lot line setback of 65' for the placement of a 12’ by 12’ gazebo 14’ from the north property line
and 49’ from the south property line. Chairman Mann polled the audience with no one speaking for or
against the variance as requested. After discussion and consideration, Steve Schierer made a motion,
seconded by Cecil Femling and unanimously carried, to approve a variance of 23’ from the required
ordinary high water level setback of 100’ for an addition to the existing dwelling located 77’ from the
ordinary high water level and to deny the side lot line requests for both the proposed addition and the
gazebo.
David Todd and Kimberly Ann Connell - Approved the variance as requested. (7:13 p.m.)
David Todd and Kimberly Ann Connell, Lot 5 Sandy Shore Development, Otter Tail Lake in Everts
Township, requested a variance to have Lot 5 Sandy Shore Development declared a buildable back lot for
repairing an existing roof. Chairman Mann polled the audience with no one speaking for or against the
variance as requested. An email from Ray and Peggy DeBoever in support of the variance as requested
was read for the record. After discussion and consideration, Steve Schierer made a motion, seconded by
Joe Maske and unanimously carried, to declare Lot 5 Sandy Shore Development a buildable back lot. The
Board noted that the proposed project is normal structure maintenance. The Board also noted that the
variance as approved does not grant directly or indirectly any other variances.
(Break 7:18 p.m. through 7:30 p.m.)
Ul 1 LK lAIL CCXJN I T i" =pi»os AREL Vio5A inserted theren
Developer
HOWARD OLSON
St Ftaul, Minn
FVepored By ;
ROBERT B OSLUND S ASSOC
Fergus Foils, Mnn
I}
!
■f
^ S, Dedicoted
,sr
- y;f'T
t
r
Scale Signature Date
2.5-<i^7 Vc.L/ XJ.
22^-4»>y ^AJ
s Z^/
!
1
\
\
<s:M"T!
/v»•f^ous^
l^C)(id'«
M
t
2.S'<*J2.
€
I
k
7Tv^^
~T>a,A/ 7Za>^J
fi
f
!
I
i
r
IiII
i
MAY 1 0 2004
c r"'■virEL'
BK — 0403 313.987 • Victor Lundeen Co.. Printers • Fergus Falls. MN • 1-800-346-4870