HomeMy WebLinkAbout17000991281000_Variances_10-01-1992^38379
APPLICATION FOR VARIANCE
FROM
OTTER TAIL COUNTY, MINNESOTA Receipt No.
Application Fee $
D t%vFirst if
^63 ~ 347 /tu dOwner:Phone:
MiddleLast Name
VAi ih tiniLAki
Street & No.City State Zip No.
Pn4iv/ ic /1 ISSC- ys‘^Lake ClassLake No.Lake Name
Pc^N AJ1377^1 Twp.Twp. NameSec.Range
L1721Legal Description:Fire No. or Lake ID it
)A55BS' oF loF S 4 qII 3k 6 i/,0h
17- oco-7'i - I?, Si-cooParcel Number
'll9,.Coc£j.VARIANCE REQUESTED IS:aJ
yaP
Office of Couniy Recorder
County of Otter Tail
I hertfy certify that the within Instrument was filed
for recort In this office on the day of----Ji!lfi4_A.O. fd^ at ^ M
and was duly Microfilmed as Doc.^«i~ >83 79
Vn-) -6/WxLu. /'^V\ o4y(JL^
Oaputy
In order to properly evaluate the situation, please provide as much supplementary Information as possible, such as: maps, plans,
Information about surrounding property, etc. APPLICANT SHALL BE PRESENT AT THE SCHEDULED HEARING.
I understand that I have applied for a variance from the requirements of the Shoreland Management Ordinance of Otter Tail
County. I understand I must contact my township in order to determine whether or not any additional variance and/or permits
are required by the township for my proposed project.
19 . XApplication dated
Signature 01 Applicant
7/>.19 . Time:/O’ /Date of hearing:____
MOTION AS FOLLOV/S:
Motion was made by John Everts, seconded by Bert Olson and unanimously carried to table the
applicant’s request until the November 1992 meeting.
M
Motion was made by Dan Oehler, seconded by Cecil Femling and unanimously carried to deny the
variance request as the applicant was originally scheduled for the October meeting and had been
rescheduledfor both the November and December meetings and has not made an appearance at any
of these hearingsnor has the applicant responded to the correspondence sent from the Auditor's
Office
Chairman
Otter Tail County Board of Adjustment
NOPermlt(s) from Land & Resource Management required:YES
\AJ mailed copy of Application to Applicant.(Datk/lnitlal)
MKL — 0483-001
258,371 — Victor Lundeen Co.. Printers, Fergus Falls, Minnesota
I
Page 2
December 3th, 1992
Young Life Campaign - Approved
Young Life Campaign, Detroit Lakes, MN, requested a variance of 10' from the required setback
of 30' for an existing building located 20’ from the bluff. The property is described as part of
Government Lot 1, Sections 2 and 3 of Dunn Township on Pelican Lake. A letter from Tim and
Chyrll Sparks opposing this request was read for the record. The audience was polled with no
one speaking for or against the request. After consideration, motion was made by John Everts,
seconded by Craig Anderson and unanimously carried, to approve a variance of 10' from the
required setback of 30' for an existing building located 20' from the bluff with the condition
that a berm will be installed by the applicant in the sensitive area. The structure encroaches
very little(about ^0 square feet) in the bluff impact area and the applicant has already made
some accommodations to handle runoff. The applicant is attempting to comply and conform with
the Americans with Disabilities Act.
i
1
James Jr. and Daniel Bucholz - Approved
James Jr. and Daniel Bucholz, Perham, MN, requested a variance to split off two parcels of less
than 2.5 acres from an existing parcel. Parcel A as described on the surveyor’s drawing would
be ,87 acres and Parcel B as described on the surveyor’s drawing would he .OB'T acres, A
surveyor's drawing is on file for review. The balance of the original parcel would be in excess
of 2.5 acres. The property is described as the East 1 /2 of NE 1 and Government Lots I and 2,
except part platted as Sunny Beach, Section 25 of Gorman Township on Little Pine Lake. The
audience was polled with no one speaking for or against the request. After consideration, motion
was made by Cecil Femling, seconded by Dan Oehler and unanimously carried, to approve the
variance as requested with the provision that a surveyor's drawing will be provided. Hardship
being the common ownership of the land. The two parcels meet the lot width for platted back
lots and Parcel A has approximately 37,897 square feet of area and Parcel B has approximately
38,507 square feet of area.
Joanine Donaldson - Tabled
Jeanine Donaldson, Pelican Rapids, MN, requested a variance of 6'8" from the required side lot
line setback of 1 O' for the construction of a 20' by 24' garage . The property is described as Lot
5, 2nd Addition to Outlet Beach, Lake Lida in Lida Township. After consideration, motion was
made by Bert Olson, seconded by John Everts and unanimously carried, to table this variance
until the next scheduled meeting per the request of the applicant.
Dorothy Pender - Denied
Dorothy Pender, Pelican Rapids, MN, requested a variance to construct a 14' by 18' 6" garage
33' from the center of the township road. The required setback from the road right of way is
20’, The property is described as Lot 9, Henrys Hill, Franklin Lake in Dunn Township. After
consideration, motion was made by Dan Oehler, seconded by Cecil Femling and unanimously
carried to deny the variance request as the applicant was originally scheduled for the October
meeting and had been rescheduled for both the November and December meetings and has not
made an appearance at any of these hearings nor has the applicant responded to the
correspondence sent from the Auditor's Office,
1
i
-» .Scale: Eactt grid equals feet/inches GRID PLOT PLAN SKETCHING FORM
T-iAA'19 ■Dated:
Signature
Please sketch your lot indicating setbacks from road right-of-way, lake and sideyard for each building currently
on lot and any proposed structures.
PT
tZvyOit
:I !i ;4^:\i
h
r
L r1i
r 'iI
-f T i
f ■r
r 0r
I•• ^\I1I
^ -X,\i0'I
I-r
-■r
' • ^iL-_
t
/L{t> ^I
-i
r
I
I ; 1 ' !-!0
; f rtI1
f------
- f:th
~X-Vd^
;-i-.r f!
;
«
t )IT..
i i-TI 1
L a
nT ItT
J^_cuX 21598 7®MKL-0871-029
VICTOR LUNOeCN CO.. PRINTERS. FERCUS fALLS. UINN.