HomeMy WebLinkAbout18000100065001_Variances_08-04-2005Variances
2
Barcode 128
0Q1oi|2oos
OFFICE OF COUNTY RECORDER
OTTER TAIL MINNESOTA
I hereby certify thatoQ/4 this instrument #_ f
was fiied/recorded^ this office
for rec^ on the 7 rfay of___2005 atl:Z^^m
Wendy LJVlefcaif^ouiity ^0f^r
----------------_weii certificate
981627
THE ABOVE SPACE IS RESERVED FOR THE COUNTY RECORDER
APPLICATION FOR VARIANCE
COUNTY OF OTTER TAIL
GOVERNMENT SERVICES CENTER
540 WEST FIR, FERGUS FALLS, MN 56537
(218) 998-8095
Otter Tail County’s Website: www.co.ottertail.mn.us
e o
Application Fee
jy^3HlCOMPLETE THIS APPLICATION IN BLACK INK Receipt Number
Accepted By / Date /ndpy %/o3
A/95^T A.
9JZ U. r*7A^ 3
DAYTIME PHONE 7&G- J3qPPROPERTY OWNER
MAILING ADDRESS
LAKE NUMBER ' Z.S~J LAKE NAME
TOWNSHIP / ^ / RANGE ^^ TOWNSHIP NAME
_____LAKE CLASS G ^
/-AysL9.SECTION
E-911
ADDRESS
PARCEL
NUMBER 1 yynz,ISoo^ / Q Q o QQ /
LEGAL DESCRIPTIONf]> <s~ s. Co/C Gz. J
Jrrv/Jb
t C 3
TYPE OF VARIANCE REQUESTED (Please Check)
structure Setback X Structure Size Cluster Misc.Sewage System Subdivision
SPECIFY VARIANCE REQUESTED
70 isu!c.d a
^/O ''o c.
I UNDERSTAND THAT I HAVE APPLIED FOR A VARIANCE FROM THE REQUIREMENTS OF THE SHORELAND
MANAGEMENT ORDINANCE/SUBDIVISION CONTROLS ORDINANCE OF OTTER TAIL COUNTY.
I ALSO UNDERSTAND THAT OTHER PERMITS MAY BE REQUIRED, IT IS MY RESPONSIBILITY TO CONTACT LAND &
RESOURCE MANAGEMENT REGARDING THIS MATTER.
•7- /y—
SIGNATURE OF PROPERTY OWNER DATE
APPLICANT MUST BE PRESENT AT THE HEARING
(Applicant Will Receive Notification As To The Date/Time Of Hearing)
Time/Qu.quu-^ yDate Of Hearing I?
Motion
Margaret A Blumer- Approved as modified. (8:12 p.m.)
After discussion and consideration, Steve Schierer made a motion, second by Cecil Femling and unanimously carried,
to approve a variance of 25’ from the required ordinary high water level setback of 75’ for the purpose of constructing
a single story dwelling with an attached garage 50’ from the ordinary high water level. The Board noted that the
variance as approved should provide the applicant with a reasonable use of the property and does not directly or
indirectly grant any other variances. Hardship is a substandard lot of record.
_____Cfeatffnan/Otter Tail County Board of Adjustment
Permit(s) required from Land & Resource Management
:X Yes (Contact Land & Resource Management)
No
Copy of Application Mailed to Applicant, Co. Assessor and the MN DNR
bk 0903t001
315,694 • Victor Lundeen Co., Printers • Fergus Falls. Minnesota
. • August 4, 2005 1
Page # 3
Jeff and Connie Mackner - Denied. (7:30 p.m.)
Jeff and Connie Mackner, part of Government Lot 4, Section 21 and part of Government Lot 5, Section 20
of Edna Township by McDonald Lake, requested a variance of 50’ from the required ordinary high water
level setback of 100’ for the construction of a 27’ by 58’ three stall garage/storage building 50’ from the
ordinary high water level. The audience was polled with Richard Dubord, Van Kalinoski and David Brandt
speaking against the variance as requested. A letter from Rosemary Borgerding opposing the variance as
requested was read for the record. After discussion and consideration, Randall Mann made a motion,
second by Paul Larson and unanimously carried, to deny the variance as requested as no adequate
hardship unique to the property had been shown that would allow for the granting of the variance as
requested and the applicants have a reasonable use of their property without the granting of the requested
variance.
Scott and Christie Lindemann - Denied. (7:50 p.m.)
Scott and Christie Lindemann, Sub Lot 2 of Government Lot 4, Section 23 of Rush Lake Township by Rush
Lake, requested the following: Current Cluster Development will be subdivided into two lots. Lot 1 of new
subdivision will remain a cluster development for the existing resort and will need variances approved for
side setbacks for three existing cabins and one garage. Cabin one will be six feet from the existing
property line. The garage will be ten feet from the new lot line. Cabin three will be 23’ from the new lot line
and Cabin four will be 20’ from the new lot line. The required side lot line setback for cluster developments
is 50’. The audience was polled with no one speaking for or against the variance as requested. After
discussion and consideration, Paul Larson made a motion, second by Cecil Femling and carried with Rod
Boyer abstaining, to deny the variance as requested as no adequate hardship unique to the property had
been shown that would allow for the granting of the variance as requested and granting the requested
variance would make an existing substandard situation more substandard.
Greg Krueger - Approved the variance as requested with a condition. (8:03 p.m.)
Greg Krueger, Lots 8 and 9 Block 1 Pike Beach, Tamarac Lake in Scambler Township, requested a
variance of 50’ from the required ordinary high water level setback of 100’ for the construction of an
attached 28’ by 30’ garage 50’ from the ordinary high water level. The applicant changed the requested
garage size to 26’ by 30’. The audience was polled with no one speaking for or against the variance as
requested. After discussion and consideration, Steve Schierer made a motion, second by Michael Conlon
and unanimously carried, to approve the construction of an attached 26’ by 30’ garage being no closer to
the ordinary high water level than the existing dwelling which is assumed to be 50’ from the ordinary high
water level with the condition that the garage addition must be at least 10’ from the septic tank. It was
noted that the proposed garage will continued on the same building line as the existing dwelling as noted
orUhe drawing submitted with the variance application. Hardship is a substandard lot of record.
Margaret A Blumer - Approved as modified. (8:12 p.m.)
Margaret A Blumer, part of Government Lot 3, Section 10 of Eagle Lake Township by Eagle Lake,
requested a variance of 35’ from the required ordinary high water level setback of 75’ for the purpose of
constructing a replacement dwelling with an attached garage 40’ from the ordinary high water level. The
audience was polled with Larry Peck and John Bemis speaking for the variance as requested. After
discussion and consideration, Steve Schierer made a motion, second by Cecil Femling and unanimously
carried, to approve a variance of 25’ from the required ordinary high water level setback of 75’ for the
purpose of constructing a single story dwelling with an attached garage 50’ from the ordinary high water
level. The Board noted that the variance as approved should provide the applicant with a reasonable use
of the property and does not directly or indirectly grant any other variances. Hardship is a substandard lot
of record.