HomeMy WebLinkAbout32000320227000_Conditional Use Permits_04-06-1998676173
APPLICATION FOR CONDITIONAL USE PERMIT-
Shoreland Management Ordinance
Otter Tail County
Fergus Falls, Minnesota 56537
Application Fee $Rec. No. _19fiP ■Date:rr*h 1 4
Legal description of land: Lake No. 56-387 Sec._3i Twp. 1 37 Range 4fl Twp. Name Hnh;^ r f
Recreational DevelopmentSybilLake ClassLake Name
KlA£ Fire No.Legal Description:
Government Lot 6, in Section 32 of Township 137 (Hobart), Range 40
r'
►-it-
Parcel Number:.’-32-000-32-0227-000
Project Description:
To build a road to the lake for private use. The road is expected to be
approximately 12' wide, but no wider than 16' wide at any point. The road will
begin at point A on the attached drawing, which is where the existing road also
begins. From point A, road will go approximately 150'
toward the lake diagonally following the ravine approximately 300'.
will then turn East for approximately 300'.
straight east/west in direction,
be about 75' back from the lake.for picnics in the past. (labeled B on the attached drawing),
is a permit to fill in a low area 50
fill from the road project.
west, then northerly
The road
This last 300' will be basically
Also, this easterly portion of the road will
This will end in the area which has been used
Also requested
X 100' southeast of the picnic area with
(Labeled C on attached drawing.)The fill in this
★ ★In order to properly evaluate the situation, please provide as much supplementary information as possible, such as: maps, plans,
information about surrounding property, etc. APPV.\C\MiT SHALL BE PRESENT AT THE SCHEDULED HEARING.cont'd
onbackAddress:^ f-
Veraas, Mn.
Home Ph. IUCY/ - "7 Bus. Ph.
Boy 43R.*_L
56587Owner: Wpnzpl R, Florence Boland
Applicant Signature^^^J^j^''-^ J>^
?y3o ? »Time:, 19Date of hearing:
Conditional Requirements:Tabled awtit Hay 4, 19SS Lohzn othoA mmboAA the. Planyiing CommCi^ton
oAe able to go and vtew the paopeAty.Aa pea. aeqiaeiit by applteant- tabled
to June 1, 19S8.
Vented 6-1-SB oa paeAented boAed on queAttonable Atabtltty ti cutttng altoMed tnto the httl,
and tt doeA not {\aX tnto the contouA of) the aaea.
This application is hereby recommended for approval by the Otter Tail County Planning Advisory Commission.
Chairman
19Approved by the Board of County Commissioners of Otter Tail County this day of
- (p- ^ ^
Chairman
Special Use Permit issued in accordance with compliance with existing Conditional Requirements and Special Regulations and
Minnesota Commissioner of Natural Resources notified this ,19day of
CONDITIONAL USE PERMIT NO.
MKL-0871-01-01 Malcolm K. Lee, Shoreland Administrator
Otter Tail County, Minnesota220707@
VICTOK LUNOECN CO.. PRINTERS. PCR6U8 PALLS. MINN.
Also, if no adequate toparea is expected to average about 4 feet in depth,
soil is available from the road project, we would like to haul in black dirt
in order to seed grass in the filled area.
oJb
Office of County ffecorder (W)ty of C^r Tail
I hMby ctnily the wMn nstru-twrt wa DM m Im ofta tor nstui
Mtot . f3 JLUID.
* 0 w F<P . * P-^— ■'tintii
_ZL.il. M «B dmr UcroIRMtf a
K'lAVO^ 13o3DEPARTMENT OF THE ARMY
ST. PAUL DISTRICT, CORPS OF ENGINEERS
1135 U.S. POST OFFICE S CUSTOM HOUSE
ST. PAUL. MINNESOTA 5510M479 8. resourceland
(51 ^)REPLY TO
ATTENTION OF
Construction-Operations
Regulatory Functions
Uj
V ^37// ^
/;///t
Having reviewed the Information we have received concerning your project,
we believe that you will need a Department of the Army permit for the activity
referenced above. We are enclosing application materials. The orange
booklet (EP-1145-2-1) gives background about our program and instructions
for preparing the application.
Because we must provide notice of your project to certain other agencies,
and provide them a reasonable opportunity to comment on your proposal, our
public interest review for most projects may take at least 60 days,
help us to review your application as quickly as possible if you -
You can
Fill out the application completely and specifically.
Instructions on pages 10 and 11 of the oreuige booklet.
Note the
Send accurate drawings. See the check list on pages 14 and 15 and
the examples on pages 16 and 17 of the booklet. Following these
examples will help ensure that your drawings will be accurate and
usable.
Please describe any alternatives to the project as planned that you
have considered. This consideration should Include other potential
sites and other methods of accomplishing the desired result. Federal
laws and rules often prevent Issuauice of permits where there are less
environmentally-damaging alternatives available. For Instance, if
the project involves placing fill In a water or wetland there may be
alternatives that would accomplish the project purpose but would not
require filling, or would not require as much fill in as large an area.
If your project will Include any temporary placement of excavated or
fill material into a waterbody or wetland, you may also need authorization
for that work. Be sure to include that Information in your permit applica
tion. You may also need state, county, and/or city permits. It’s a good
Idea to make inquiries of other agencies early in your planning process.
If you have any questions, write or call -j
at the Corps, (612) ^9.0 - o2>^l
Sincerely,
Wopat fj 'y^^ief. Regulatory Functions Branch
f Construction-Operations DivisionEnclosures