HomeMy WebLinkAbout32000230165000_Variances_05-03-2001Variances
Barcode 128
5 3 Zoo \
881688 OFFtCE OF COUNTY RECORDER
OTTER TAIL MINNESOTA
I hereby certify that
this instrument # SST
was filed/recorded in this office
for record on the _d_day of
-----—------2001 at/oy^^m
ndy L Metbalf, County Recorder
__well certificate
by:
y
THE ABOVE SPACE IS RESERVED FOR THE COUNTY RECORDER
APPLICATION FOR VARIANCE
COUNTY OF OTTER TAIL
COURTHOUSE, FERGUS FALLS, MN 56537
(218) 739-2271
*** COMPLETE THIS APPLICATION IN BLACK INK ISO^Application Fee
/3 Z7V?Receipt Number
DAYTIME PHONE Xl<t '9^7-
Ijlck/ ___________________
PROPERTY OWNER
ADDRESS 3c>l‘i~P Hu/^
LAKE NUMBER “-3^ 3
SECTION I'S
-f-
,JtLAKE NAME
TOWNSHIP I 1, ~7 RANGE W ^ TOWNSHIP NAME
PARCEL NUMBER /- ~S7. t)bb V .'^ol4>'T Qt?C>
____LAKE CLASS
A/g<. .1-r 1"
^96,7 7 Rit-cFIRE/LAKE I.D. NUMBER
Uoirki.
LEGAL DESCRIPTION
UoV ^ c;^ T<' -*• L.oX~ "L,
TYPE OF VARIANCE REQUESTED (Please Check)
structure Setback Structure Size Sewage System Subdivision Cluster Misc.
SPECIFY VARIANCE REQUESTED /? a r / 9 ..'v;h^ tj Vc fi-i ^«A «L-vy
. fifro y S"7 '«_tL k“P-A. d.A L*. UiAs »-*- '-'V 'T^ ^
, f 7^ '*7 • 5 ^ bo IV-K- ,o .MtA •s*-^ '•I
I UNDERSTAND THAT I HAVE APPLIED FOR A VARIANCE FROM THE REQUIREMENTS OF THE SHORELAND
MANAGEMENT ORDINANCE/SUBDIVISION CONTROLS ORDINANCE OF OTTER TAIL COUNTY.
I ALSO UNDERSTAND THAT OTHER PERMITS MAY BE REQUIRED, IT IS MY RESPONSIBILITY TO
CONTACT LAND & RESOURCE MANAGEMENT REGARDING THIS MATTER.
NATURE OF PROPERTY OWNER DATE
APPLICANT MUST BE PRESENT AT THE HEARING(Applicant Will Receive Notification As To The Date/Time Of Hearing)
Ay^-
ff. <iJ^i4'YVUMay 3, 2^1
Page 3Jt'j
/f^
/0.-L C / J
/1/e ^
^4v' y V
/J -f-t CL^iCaJ
0 i^^i
/ol
%!ziLOlAccepted By Land & Resource
L & R Official/Date
l-3o /’■^./y)Ai^TimeDate Of Hearing
/
Motion
Dallas and Mary Flynn - Approved with condition.
Motion was made by Steve Schierer, second by David Holmgren and carried, with Randall Mann and Joe Maske
voting no, to approve a variance of 143’ from the required ordinary high water level setback of 200’ to allow the
existing placement a 1985/1986 cabin 57’ from the ordinary high water level with the condition that no other site
permits can be issued for this property until the existing structure is either removed or placed in a location which
complies with the requirements of the Shoreland Management Ordinance. It was noted that the existing structure is
not visible from the lake.
ATOT^^^sion and consideration, a motion was made by Steve Schierer, second by David Holmgren and carried, with Joe
Maske voting no, to amend the previously granted motion to read as follows: to approve a variance of 143' from the required
ordinary high water level setback of 200’ for the placement of a 1985/1986 cabin 57’ from the ordinary high water level with the
condition that no site permits can be issued for newly constructed structures on this property until the existing structure is either
removed or placed in a location which complies with the requirements of the Shoreland Management Ordinance. It should be
noted that the applicant must obtain an after the fact site permit for any structures which existed prior to the granting of the
variance and for which a site permit would have been required had the site permit been obtained before the construction of the
structure.
dfiairman/Otter'tail County Board of Adjustment
Permitj^ required from Land & Resource Management \/^ Yes (Contact Land & Resource Management)
No
Applicant And the MN DNR 0/Copy of Application 'R Offidal/Date
bk 0198-001
291,306 • Victor Lundeen Co., Printers • Fergus Falls. Minnesota
May 10, 2001
Page 4
Mark Lee McColIough - Denied unless a letter authorizing the Board to table the request is received by
May 18, 2001.
Mark Lee McColIough, Wyoming, MN, requested a variance to expand our dwelling. We are in a cluster
development, which only allows us to expand back, and up. We propose to add 10’ back and complete a 2"'^ story
to the structure. The entire project will be completed with the least intrusive means possible. The roof pitch will be
kept to a maximum of 4/12 pitch. No part of the structure will be added toward the lake and the impact on the area
should be nil. It should be noted that the proposed development would be less than 100’ from the lake. The
property is described as part of Government Lot 2, Section 23 of Leaf Lake Township by East Leaf Lake. April 12,
2001 Meeting - The audience was polled with no one speaking for or against the request. After discussion and
consideration, motion was made by David Holmgren, second by Rod Boyer and unanimously carried, as per the
applicant’s verbal request, to table the applicant’s variance hearing until the May 10, 2001 meeting of the Board of
Adjustment. May 10, 2001 Meeting - The applicant was not in attendance. After discussion and consideration,
motion was made by Steve Schierer, second by Mark Steuart and carried with Joe Maske abstaining, to deny the
variance as requested unless a letter is received by May 18, 2001 granting the Board permission to table the
applicant’s request until the June 7, 2001 meeting. It was noted that this action is being taken due to applicant’s
failure to appear at the public hearing.
Sean & Cheryl Kelly - Withdrawn
After discussion and by the general consent of the Board of Adjustment the review of this variance request as
order by the District Court has been tabled per the applicant’s verbal request, to the May 10, 2001 meeting of the
Board of Adjustment. On April 30, 2001 a letter from was received from Charles Krekelberg, Attorney, withdrawing
the Sean and Cheryl Kelly variance application. The letter noted that Sean and Cheryl Kelly would voluntarily
’■emove the dormer from the boathouse and replace the glass sliding doors with wooden doors. It was noted that
this proposal had been discussed with both David Hauser and Bill Kalar and had been found acceptable. After
discussion and consideration, motion was made by Randall Mann, second by Steve Schierer and carried with Joe
Maske abstaining, to accept the letter withdrawing the variance application as submitted by Mr. Krekelberg on
behalf of Sean and Cheryl Kelly.
Clarification -
□alias and Mary Fiynn - Approved with condition on May 3, 2001
After discussion and consideration, a motion was made by Steve Schierer, second by David Holmgren and
carried, with Joe Maske voting no, to amend the previously granted motion to read as follows:
to approve a variance of 143’ from the required ordinary high water level setback of 200’ for the placement of a
1985/1986 cabin 57’ from the ordinary high water level with the condition that no site permits can be issued for
newly constructed structures on this property until the existing structure is either removed or placed in a location
which complies with the requirements of the Shoreland Management Ordinance. It should be noted that the
applicant must obtain an after the fact site permit for any structures which existed prior to the granting of the
variance and for which a site permit would have been required had the site permit been obtained before the
construction of the structure.
May 3, 2001
Page 2
Charles E and Barbara B Keeler - Approved as modified with condition.
Charles E and Barbara B Keeler, Maple Grove, MN, requested a variance of 3.5’ from the required side lot line
setback of 10’ for the placement of a 30’ by 34’ garage 6.5’ from both side lot lines. The property is described
as Lot C North of the Easterly 43’ of Lot 17, Shirley Beach, Otter Tail Lake in Amor Township. The audience
was polled with no one speaking for or against the request. After discussion and consideration, motion was
made by David Holmgren to approve a 4’ variance from the required side lot line setback of 10’ for the
placement of a 22’ by 36’ garage 6’ from both side lot lines. This motion died for lack of a second. After
additional discussion and consideration, motion was made by Steve Schierer, second by Joe Maske and
unanimously carried, to grant a 5’ variance from the required side lot line setback of 10’ for the placement of a
garage 5’ from one of the side lot line with the condition that a 10’ setback must be maintained from the other
side lot line. The applicants must decide which side lot line will have the 5’ setback and which side lot line will
maintain the required 10’ setback. It was noted that the size of the garage does not matter so long as it fits
within the granted variance, it does not require any additional variances and so long as it does not result in
more than 25% of the total lot area being covered with impervious surfaces. Hardship is the substandard
width of the lot. It was noted that the lot proposed for development does have a significant amount of depth.
Dallas and Mary Flynn - Approved with condition.
Dallas and Mary Flynn, Detroit Lakes, MN, requested a variance of 143’ from the required ordinary high water
level setback of 200’ to allow an existing cabin, built in 1985/1986, to remain in its present location, which is
approximately, 57’ from the ordinary high water level (lake). The property is described as part of Government
Lot 1 and all of Government Lot 2, Section 23 of Hobart Township by Rice Lake. The audience was polled
with no one speaking for or against the request. After discussion and consideration, motion was made by
Steve Schierer, second by David Holmgren and carried, with Randall Mann and Joe Maske voting no, to
approve a variance of 143’ from the required ordinary high water level setback of 200’ to allow the existing
placement a 1985/1986 cabin 57’ from the ordinary high water level with the condition that no other site
permits can be issued for this property until the existing structure is either removed or placed in a location
which complies with the requirements of the Shoreland Management Ordinance. It was noted that the existing
structure is not visible from the lake.
James L and Laura Allen - Approved setbacks for the dwelling as requested and denied the variance
for the installation of the sewage system.
James L and Laura Allen, Russell, MN, requested a variance of 25’ from the required 75’ setback for the
placement of a sewage system 50’ from the lake, a variance of 10’ from the required ordinary high water level
setback of 100’ and a variance of 5’ from the required side lot line setback of 10’ for the replacement of an
existing dwelling with a new dwelling 90’ from the ordinary high water level and 5’ from the side lot line. The
property is described as Sub Lot 1 of Government Lot 6, Section 36 of Girard Township by East Battle Lake.
The audience was polled with no one speaking for or against the request. Letters from Elaine Hanson and Bill
and Marcella Stone in support of the applicants’ request were read for the record. After discussion and
consideration, motion was made by Randall Mann, second by Cecil Femling and unanimously carried, to deny
the variance as requested for placement of a sewage system 50’ from the lake, to approve a variance of 10’
from the required ordinary high water level setback of 100’ and to approve a variance of 5’ from the required
side lot line setback of 10’ for the replacement of an existing dwelling with a new dwelling 90’ from the ordinary
high water level and 5’ from the southeast side lot line with the condition that the proposed development
cannot result in impervious surface coverage of more than 25% of the total lot area.
f
'■'■'V
/6f’S d^i^4>
Ma/3,2bbi
Psge3 4Cc <4^
/■ 'v.-/■f
/ly-5 AJlO f
/
^j- c ' 3
\
Mt \§ t V. / %0 ^ 4
,/Ol
J^jyf aH-A4
^ /O^j
o(Accepted By Land & Resource
L & R Official/Dale
4 41^/TimeDate Of Hearing
/
Motion
Dallas and Mary Flynn - Approved with condition.
Motion was made by Steve Schierer, second by David Holmgren and carried, with Randall Mann and Joe Maske
voting no, to approve a variance of 143' from the required ordinary high water level setback of 200’ to allow the
existing placement a 1985/1986 cabin 57’ from the ordinary high water level with the condition that no other site
permits can be issued for this property until the existing structure is either removed or placed in a location which
complies with the requirements of the Shoreland Management Ordinance. It was noted that the existing structure is
not visible from^he lake.A^r^^issio^^-------nd consideration, a motion was made by Steve Schierer, second by David Holmgren and carried, with Joe f
Maske voting no, to amend the previously granted motion to read as follows: to approve a variance of 143' from the required * ordinary high water level setback of 200' for the placement of a 1985/1986 cabin 57' from the ordinary high water level with the 'I
condition that no site permits can be issued for newly constructed structures on this property until the existing structure is either [
removed or placed in a location which complies with the requirements of the Shoreland Management Ordinance. It should be ' '
noted that the applicant must obtain an after the fact site permit for any structures which existed prior to the granting of the
variance and for which a site permit would have been required had the site permit been obtained before the construction of the
structure.
//
CTTairman/Otter'fail County Board of Adjustment
Permit^ required from Land & Resource Management
\/^ Yes (Contact Land & Resource Management)
Copy of Application
bk 0198-001
291.306 • Victor Lundecn Co.. Printers • Fergus Falls. Minnesoii
““ alL.
mg
tion
i--t r t ^r
r/30 feet, or 1feet.inch(es) equals.grid(s) equalsScale:'
Please use this sheet for the required scale drawing of your proposal. Be sure to include lot dimension, water
frontage, and setbacks from RW, lake, lot lines, sewage system, top of bluff, existing structures and all imper
vious surface.
Required impervious surface coverage calculation (See definition in Shoreiand Management Ordinance)
::rn
lQtari.qt:AT:ea;;•« -»•i$urraGs:G)nate• • • •
*:
1-800-34e-4870Fergus Fails. MNVtctor Lurtdeen Co.. Printers300.816