HomeMy WebLinkAbout55000110078000_Variances_10-07-1982White — Office
Yellow — Owner
Pink — Township
APPLICATION FOR VARIANCE
FROM
Otter Tail County, Minnesota Rec. 1452
532-7320Owner: Braun Tim Phone No
Last Name MiddleFirst
5hS7?PpI 1 ran Pap-iHs CitvRt-. 2 MN
Zip No.Street & No.State
Sublot L of GL 1 (6th cabin south of Bob Creek).
Lake No. 56-786 Lake Name Pelican Lake Class __GDLegal Description;
11 ScamblerRange 43Twp._137Sec.Twp. Name.
EXPLAIN YOUR PROBLEM HERE:
Would like to place part of drainfield in CSAR #9 right-of-way
to meet separation distance requirements from well.
In order to properly evaluate the situation, please provide as much supplementary information as possible, such as: maps,
plans, information about surrounding property, etc.
82September 20Application dated.19./Signature of Applicant
— DO NOT USE SPACE BELOW—
October 7 19 82 Time 7 iOOPm.Date of hearing
Court House, Fergus Falls, MN. 56537
19___WlTH THE POLL OWINGday otDEVIATION APPROVED this_____
(OR ATTACHED) REQUIREMENTS:
Signature.
Choirmon
Otter Tail Board of Adjustrr^ent[Review baiue lake Minnesota
1
■f Adjustment October- 7, I'j:;;-'r ■'
'ulj, Henning, MN, represented by his Attorney, John Scott, requested per-
i i ,sioii t-o construct a 16' x 12' boathouse, recessed into high bank area, 16'
: / Ml
liom liigh water mar,k on Lot 11 of Hursh's 1st Add'n to Linden Park., Girard Township.
After consideratiort, motion was made by Craig Anderson, seconded by John Everts and
carried, to approve contingent upon combining Lots 10 and 12 into one 100 foot lot.
liu I tor- lluql i , Fergus Falls, MN, requested^ permission to replace existing 6' x 10'
X 16' enclosed deck on on of Lot 15 and part of Lot 16,
After discussion, motion was made by Craig Anderson,
' . ndud by Tom Stringer and carried, to apply what is termed the "string test",
I niiing a line from the nearest neiglibor on the one side, and tire second near-r.'sl.
'i)or on the other side, being the Jotm on house, and build out no closer to
pi ll (.lor'cti with a 14
I M/ll Beach, Everts Township,
fe ttian said line., approved.
Mnas, Wahpeton, ND,requested permission to place holding tank 47'7' from well,
lot Z, Subdiv. of Lot 9, Block 2, Crystal Lida Beaches, Lida Township. AFter
di'.^cussion, motion was made by George Walter, seconded by Frank Lachowitzer and
c.iri'ied with Tom Stringer voting "no", to approve as best possible location on lot
lor a bad problem.
'^I'M iir.iun, Pelican Rapids, MN, requested permission to place part of drainfield in
ii.y road right-of-way, on Sublot L of GL 1, Section 11, Scambler Township.
/',M;r discussion, motion was made by Tom Stringer, seconded by Craig Anderson andf
carried, to table, on the assumption complaints will be filed on violations of
neighbors with abatement notices being served, until problems in the area have been
resolved.
I /! i I
ii.M'v(.‘y Scliuinacher, Fargo, ND, requests permission to allow a small "A" frame building
t:i lomain 30' from lake, on Lot 23, Block 3, Crystal Hills, Lida Township. After
consideration, motion was made by George Walter, seconded by Craig Anderson and car-
I it' !, to grant variance, hardship being ‘jei.t.ing equipment up and down steep enibank-
With no further business, Llie Criairman adjourned the meeting at
IICA
¥Seefniitary, Board of justment
DENNIS D. BEREND, P.E.
COUNTY HIGHWAY ENGINEER
TELEPHONE 218/739-2271
OTTER TAIL COUNTY
HIGHWAY DEPARTMENT
FERGUS FALLS, MINNESOTA 56537
September 24, 1982
Otter Tail County
Board of Adjustment
Sylvia Bergerud, Secretary
Re: Notice of Hearing Variance
Tim Braun, Rt. 2 Pelican Rapids, MN 56572
TO WHOM IT MAY CONCERN:
I have received notice of hearing variance for a variance
involving a request to place a portion of a sewer system on-
County Highway Right of Way.
Enclosed are two photographs of the area in question,
wants to place the drain field in the flower garden.
Mr. Braun
As the County Highway Engineer, 1 do not think this is a good
idea because the right of way is intended for highway purposes
and is needed to properly maintain the highway both now and in
the future.
However, there ,is no objection to any underground utilities
being placed up to the right of way line. In many cases, this
is all that is needed. If there is not sufficient room to do
this, then alternative action should be taken.
Sin^rely,
Dennis D. Berend
County Highway Engineer
DDB:cd
ends.