Loading...
HomeMy WebLinkAbout22000130100002_Variances_05-04-2000OFFICE OF GGIJISitV RECORDER i OTTER TAIL; MINNESOTA j I hereby certify, that this instrument # oo5<w75 865275 i was filed/recorded in this office ! for record on the iQ day of ___June [ 2000 at 10 ^r^m Wendy L^^tcalf.JC^nty Recorder i by:; ]^^snrt/a Tecording ffifl __ well certificate Deputy I THE ABOVE SPACE IS RESERVED FOR THE COUNTY RECORDER APPLICATION FOR VARIANCE COUNTY OF OTTER TAIL COURTHOUSE, FERGUS FALLS, MN 56537 (218) 739-2271 *** COMPLETE THIS APPLICATION IN BLACK INK *** Application Fee Receipt Number ^^3 I Ant ^<^0. ^ . Liudr C .DAYTIME PHONE 7o/n^PiTAA] -AeijJefrr LfKd^ PROPERTY OWNER ADDRESS LAKE NUMBER 5^"'^77 LAKE NAME _TOWNSHIP \i‘-( RANGE V5 TOWNSHIP NAME lEUZ-AAr^/'f PARCEL NUMBER l/^t R 1^ f LAKE CLASS D 13SECTION /VJ7SCFIRE / LAKE I.D. NUMBER b/' /Y^/7 59 LEGAL DESCRIPTION y^/ac CO /u’cFco/^ r~ ( ~z A^OT^T'^t i- G- L. 1 T~ 6- ^ TYPE OF VARIANCE REQUESTED (Please Check) Sewage System }( 'SubdivisionStructure Setback Structure Size Cluster ___ Misc. SPECIFY VARIANCE REQUESTED JeeAfi/k!^ /rtMS Variances requested: 1. Septic system setback from the property line located between Loven and Kapitan: a. Septic Tank setback b. Mound absorption area 2. Mound absorption area from wetland ~3 feet 0 feet ~35 feet I UNDERSTAND THAT I HAVE APPLIED FOR A VARIANCE FROM THE REQUIREMENTS OF THE SHORELAND MANAGEMENT ORDINANCE/SUBDIVISION CONTROLS ORDINANCE OF OTTER TAIL COUNTY. ND plAT OTHER PERMITS MAY BE REQUIRED, IT IS MY RESPONSIBILITY TO ReIoURCE management regarding this MATTER.I ALSO UNDEI CONTACPIJC £/ / JzT) APPLICANT MUST BE PRESENT AT THE HEARING yuiPorpROPERTYOWNER DATE -/ (Applicant Will Receive Notification As To The Date/Time Of Hearing) fior-th ^;horc fixrk 8-12-^ June 8, 2000 Qx:jr) I ~3 \/ Page i (3 iCO-CVl ^7 7^cUji^ '^7 w9^IhOs 4 s VaU^ Accepted By Land & Resource L & R Official/Date l:2<b9-Q(XO TimeDate Of Hearing Motion James C. and Janet E. Kapitan - Approved with modification. Motion was made by Randall Mann, second by David Holmgren and unanimously carried, to approve a variance of 7’ from the required lot line setback of 10’, a variance of 7' from the required mound absorption area setback of 10’ and a variance of 15’ from the required wetland setback of 50’ for the placement of a septic tank 3’ from the lot line and for the placenient of the mound absorption area 3’ from the lot line and 35’ from the wetland. It was noted that the variance is being approved because of the accommodations made by the applicants for the pipeline project, which rendered their previous system useless and because the wetland area will no longer exist after the installation of the culverts. It was also noted that Arden Loven, the neighbor adjacent to the septic tank and mound system, has giveip permission for the variance and a properly installed mound absorption system will not adversely impact the adjacent property. airman/otter Tail County Board of Adjustment Managem'lrit'y ‘ ‘ ^ ^ t PermLt(s) required from Land & Resource y Yes (Contact Land & Resource Management) No Copy of Application Mailed to Applicant And the MN DNR L R Official/Date bk 0198-001 291.306 • Victor Lundeen Co.. Printers • Fergus Falls. Minnesota '1^ / V § un LOSjtAl70■H -<M r ■t, Z'-5'MpAf PAfOA^X \\l€LLS ^1 ■: U' ^z- uy ^5; io2>‘ c^isrA/^E vierLAtOb SB' b£EP ^SS' ,v I C- t:' .r May 10, 2000 To; Otter Tail County Board of Adjustments vV. .The following is a request for variances regarding items pertaining to the construction of a house, garage, and septic system on property located on Jewett Lake owned by Jim and Janet Kapitan. The existing cabin will be removed once new house is built. Variances requested; 1. Septic system setback from the property line located between Loven and Kapitan; a. Septic Tank setback b. Mound absorption area 2. Mound absorption area from wetland Reasons for applying for variances; 1. Proposed construction of garage 06’X 24’) as shown on drawing 2. By constructing mound where shown on drawing it will allow for expansion of this mound or construction of another in the:event of failure 3. Ensures 50’ setback from the lake drainage pipeline installed last Fall 4. Less than 50’ from wetland is only choice 5. Ensure setback of 50* for placement of new well Attached is a letter from Arden Loven, adjacent property owner, giving permission for mound to be constructed as proposed. Thank you for your consideration. '-J ~3 feet ; V0 feet ~35 feet-• , • •-< ; -