HomeMy WebLinkAbout46000990919000_Conditional Use Permits_11-04-1987Conditional Use Permits
Barcode 128
-e
OTTER TAIL COUNTY f «
Conditional Use Permit CUP^ 3s'7Z^
]?o^4 TKvel_______________________
lun NW A- Rx'K'y
L«OC£ltlOn! Lake No!^2>f7<Sec. ^Twp. ^4 Range 3^Twp
^ ______________________________________________________ ___________________________ /
LO^*> ^ OjhrVul (44^ C.
Issued I |-i^ 19 11 , Expires 19_^
Work Autfinrized -/o Ji^il leve-l ^q- sp£?t
■fVvdii-i^ \o (XHtmwM of lo'wide -l-btif^ ^'-(yvH laXe-Ha-q^
(K r dt|>fes$(0r\- Shu^LO'-^^^ ktCe W/ dl\ ftl(-
wUl (oUi VoH Wwot -<L^(tucHovU:
OWNER’S NAME:
Address
OUsurlcct I. Name
NOTE: This card shall be placed in a conspicous place not more than 4 feet above grade on the premises on which work is
to be done, and shall be maintained there until completion of such work.MANAGEMENT, TELEPHONE (218) 739-2271 WHEN AUTHORIZED WOt^R HAs BEEN COMFLE1
OTTER TAIL COUNTY, MINNESOTA
Board of County Commissioners
I
JZIjMINISTRATOR, Land and Resource Management Apt. I*-'Ann I(&1. Earthmoving shall be done between
2. Entire area shall be stabilized within 10 days of the completion of any earthmoving.
3. Owner is legally responsible for all surface water drainage that may occur.
cP
bbS7t)8
-APPLICATION FOR CONDITIONAL USE PERMIT -
Shoreland Management Ordinance
Otter Tail County
Fergus Falls, Minnesota 56537
^44-77El.Rec. No.Application Fee $
Legal description of land: Lake No:/ Sec. ^ ^ Twp.} ^ ‘~f~ Range ^ Twp. Name jj /
~J^c. ^ ^ f / O ^
19Date:
OrT(/ticL,i Lake ClassLake Name
Fire No. Q T ‘jRl VVU
/4 c/r^f
Legal Description:
c luJ&/Ze/croL, /lor ri //
^ L.,.-
0 4. j/
Parcel Number:
Project Description:
flo^/ /<J^A (hJc^Lor/)£.Fi )\ 4.->
r
/
Cue7 'o/
~/~o '=f4////j /oL<j ___
s/iof^/me-. mc^Jt t^hc/ .
-/FfeT-e- <^/'// ie <^<Pc^A fy// ^
In order to properly evaluate the situation, please provide as much supplementary information as possible, such as: maps, plans,
information about surrounding property, etc. APPL\C\ANT SHALL BE PRESENT AT THE SCHEDULED HEARING.
/6/7 ///V .ZI/S7'
<£% nA>/^rirJ/i/z.jh. //In <^7o7 /
Address:
'/e ziOwner:
Home P,Applicant Signature:
oJo10:;ic3 Ccurtv T:-'- ■
Co/.'/ cf C'-::'- ", 19_ll.'^:qo (>■u MTime:Date of hearing:
I hgrejv ' - ■:ri>
to m :Conditional Requirements: AppiLOV&d to {^lUL Izvzl &XCept ^OA a that ts
a mtyujviMn 10 ^e.et ootde. a.nd b&tng 40 {^zot ^Aom thz t^kz ha.vtng a. 1
dzpAZiii,loYi; miut stag 20 ^zzt iAom thz lakz with all ^lll.
crd
AO. <:://.-k
:. :'J 2S669758
3z-5S-•:*r.r
This application is hereby recommended for approval by the Otter Tail County ^nning Advisory Commission.------
ScJut/c
10^7
Chairman
tAMApproved by the Board of County Commissioners of Otter Tail County this day of
Chairman
Special Use Permit issued in accordance with compliance with existing Conditional Requirements and Special Regulations and
Minnesota Commissioner of Natural Resources notified this , 19day of
3si/CONDITIONAL USE PERMIT NO./
idalcoim k. Lee, Shoreland AdministratorMKL-0871-01-01
Otter Tail County, Minnesota
220707 @ VICTOH LUNOCEN CO.. PRiMTEIIt. FEMCUl fALLS. UtNN.
s3« 0 feet/inches GRID PLOT PLAN SKETCHING FORMScale: Each grid equals
i
Dated:19 Signature
Please sketch your lot indicating setbacks from road right-of-way, lake and sideyard for each building currently
on lot and any proposed structures.
(C y I
21598 7@MKL-0871-029 VICTOR LUNOeCN CO . PRINTERS. FERGUS FALLS. MINN.
RECEIVED
lAND & RESOURCE
DEPARTMENT OF THE ARMY
ST. PAUL DISTRICT. CORPS OF ENGINEERS
1135 U.S. POST OFFICE & CUSTOM HOUSE
ST. PAUL, MINNESOTA 55101*1479
F ^^'Oo33REPLY TO
ATTENTION OFConstruction-Operations
Regulatory Functions
JlcJL
/‘-F
JjLC. T.
/V. uo.jun M. ^■Re:/3ySost
sCFygti
i
We have learned that you are considering conducting the activity
referenced above. It appears that you will need a Department of the Army
permit for this work. We are enclosing application materials. We can process
your application more quickly if you fill out tie application completely and
specifically. Also include several color photos of the worksite.
i
t
Complete the needed information as soon as you can. Because we must
obtain recommendations from several agencies, our processing for most projects
takes about 60 d£^s.
The temporary placement of fill material into ai^ waterbody/wetland for
purposes such as temporary stream crossings, bypass roads, cofferdam
construction, or storage sites m^ require a Department of the Army permit.
If your project will, or may, include any temporary placement of fill
material, please include that information in your permit application.
I
i
Since issuance of your Federal permit depends on State approval, it is
important that you promptly provide the State enough information to evaluate
your application. You may also need county and/or city permits. It would be
advisable to make inquiries early in your planning process. If your project
includes placement of dredged or fill material into public waters, you must
apply to the responsible State agency for water quality certification.
If you have any questions, call
(612) 725- IFSl
at the Corps,
Sincerely,
■Chief, Regulatory Functions Branch
Construction-Operations Division