Loading...
HomeMy WebLinkAbout46000310116004_Conditional Use Permits_11-08-2000Conditional Use Permits Barcode 128 \l-8'2000 OTTER TAIL COUNTY Conditional Use Permit # ______ Owner’s Name EJ ^ f^i^eSCWr 'To^jlX Location: Lake No.'^^y^ec. 31 Twp. Range 3^ Twp. Name{eoJL- /IL-00^ 1 ^io~ooo-3\- Ol/L'O^^ OOO '^^- dM-000 1 i Work Authorized: Ag m ^lU jo l-k)' ia/ kxo(o w^xM j4U^d€J~^J- 63//gcf < proper <r(m(/K\ Goii?oFM fO 0t1ouj rioj-M woy^K S-klS -PaM i7 xancf ancf Resource Management Official 6^ Ar^€»^i AtoiccCKQ€x '»a lh^-0(Expires;Issued: ^ ^ c4f)\/g^&1. Earthmoving shall be done between 2. Entire area shali be stabilized within 10 days of the completion of any earthmoving. 3. Owner is iegally responsible for all surface water drainage that may occur. 4. No fill shall enter or be taken from the beds of a public water without a valid permit from the State of Minnesota Department of Natural Resources. 5. If the terms of this permit are violated the entire permit may be revoked and the owner may be subject to legal prosecution. 6. This card shall be placed in a conspicuous place not more than 4 feet above grade on the premises on which work is to be done, and shall be maintained there until completion of such work. 7. NOTIFY DEPARTMENT OF LAND AND RESOURCE MANAGEMENT,TELEPHONE (218) 739-2271, WHEN AUTHORIZED WORK HAS BEEN COMPLETED. ; ! ;BK-1099-046 296.111 • Vlelof Lgnd««n Co.. PiW« • Forgo* Fail. MN • 1-800>346>4870 'V .•••• .’i 873430 sss,‘,r.'’S“'”“I hereby certify that this instrument #_ was filed/recorded in this office for record on the ___day of 873430 'Sbrlf. fecording fea^ Wend by;^QeptrtyL9, well certificate tiJL- THE ABOVE SPACE IS RESERVED FOR THE COUNTY RECORDER APPLICATION FOR CONDITIONAL USE PERMIT COUNTY OF OTTER TAIL COURTHOUSE, FERGUS FALLS, MN 56537 (218) 739-2271 *** COMPLETE THIS APPLICATION IN BLACK INK***Application Fee $150.00 13 13-1 I 218-864-5484 847-540-6543 Receipt Number Ed Prescher/Cheryl Prescher Zosel 28335 State Highway 78, Battle Lake, MN 56515 ADDRESS 3 Yale Court, Hawthorn Woods, IL 60047______ River No. LAKE NUMBER 56-242 PROPERTY OWNER DAYTIME PHONE 56-TR River Name Blanche Otter Tail GD/TRLAKE CLASS Otter Tail LAKE NAME 6 000-99-0184-000 RANGE31SECTION TOWNSHIP NAME Across Road fromFIRE/LAKE I.D. NUMBER Coif CoursePARCEL NUMBE^>^ (^"46-000-31-0116-029 LEGAL DESCRIPTION Midway Park COM SW COR SEC 31, S 89, DEG E 83.59' N35 dEG E 24.72 to NWLY R/W HWY 4, 5, 6, 7, 8, & 19; Blk 1 Prescher's Corrected PlatN57 DEG W50' PT lots 3 ^5^ EXPLAIN YOUR REQUEST To be allowed to bring in fill to bring property to the level of the adjoining property to the north and east, which would provide for correct and proper drainage of the property and to make site conform to surrounding existing property. Legal Description Sect/Twn/Range 31 Plat 00975 Lot/Block PT LOTS 3, 4, 5, 6, 7, 8&19 BLK 1 PRESCHER'S CORRECTED PLAT COM SW COR SEC 31 S 89 DEG E 83.59' N 35 DEG E 2472' N 57 DEG W 50 gal Description CD Sect/Twn/Range 3iLeLegal Description^? Sect/Twn/Range 31 Plat 134 039MIDWAY PARK134 039 ----- , , , DeededS'gE'I'™ S» cor |K DEG E 83-E9' N 35 hWV“ 8’ “fC S.i°„ I?4' TO BO N 6? dIg 5.100' s”5 DEG « 313' 134 039 Lot/Block PT GL 3 COM SW COR SEC ? 1 c do deg E 83.59' N 35 DEG E 2477 deg W 50' TO NWLY R/W HWY #78 S 35 DEG W 134' N 67 DEC W 100' S 35 DEG W 7^ TO BG f 35TO NWLY R/W HWY I UNDERSTAND THAT APPROVAL OF THIS REQUEST APPLIES ONLY TO THE USE OF THE LAND. I ALSO UNDERSTAND THAT OTHER PERMITS MAY BE REQUIRED, IT IS MY RESPONSIBILITY TO CONTACT LAND & RESOURCE MANAGEMENT REGARDING THIS MATTER. October 12, 2000 7 SIGNATURE^F PROPERTY OWNER DATE RECEIVED APPLICANT MUST BE PRESENT AT THE HEARING OCT 1 3 2000(Applicant Will Receive Notification As To The Date/Time Of Hearing) BK-0299-006 294.913 • Victor Lundeen Co.. Printer • Fergus FaHs. Mirtnesota LAND & RESOURCE \ >V lC:rAccepted By Land & Resource L & R Official/Date Date Of Planning Commission Hearing Time Planning Commission Motion November 8. 2000 Motion: A motion by Estes, second by Lachowitzer to approve as requested, may do the work this fall with approval from the Land & Resource Management Office. / Chairman/Otter Tail C Planning Commission ) County Board Action Approved As Recommended ____Denied As Recommended 7" ■ i V other 4 Date of Final ActionChai^an/Otter Tail County Board of Commissioners I UlsajoD L & R Official/Date ^ *CONDITIONAL USE PERMIT # Permit(s) required from Land & Resource Management Yes (Contact Land & Resource Management)No Copy of Application Mailed to Applicant And MN DNR y L & R Official/Date LUO q:ZDo LUce Qz2 4 received OCT 13 2000To: Members of the Planning Commission RE; Conditional Fill Permit - Tom and Cheri Zosel Property and New Home lands resource The current grade and fill permit allows for 300 cubic yards of fill to be utilized in new construction. Cheri (Prescher) and Tom Zosel request that an additional 2000 yards be allowed to provide for better site drainage management, frost control for the foundations and footings, and for appearance purposes. An additional 300 yards is requested for Ed and Bette Prescher’s property, so that the two sites can be blended together. 1. For Cheri and Tom Zosel to build on this property, the Otter Tail Board of Adjustments required the removal of 21 trailers from the two new sites that were created, from the homestead of Ed and Bette Prescher. In addition, the Board required the removal of a 20’ x 12’ block cabin and a 20’ x 12’ boat house. The Board felt that there would be a significant improvement in appearance and environmental impact with two new homes being built versus the 21 trailers. 2. A typical 2,500-square-feet, foot print house will provide approximately 830 cubic yards of excavated materials that could be used to balance the site. The majority of the building site is only 2’ above the high water mark. Due to the low site level only 40 cubic yards will be reclaimed. The floor of the house has to be a minimum of three feet above the high water mark/level. Therefore, the 300 cubic feet of “allowed” fill is just the minimum for frost protection. 3. As a result, the house to be constructed would look like a tower sticking up out of the ground. The proposed site plan consists of the following:4. A planting berm will be created to provide a double drainage barrier between the house and the river. a. Between the house and the lake, fill will be added, but will be designed so that roof water will not drain toward the lake. There currently is a natural barrier in place, which will be maintained. b. The north side of the new house will be filled and a gradual slope will meet the adjoining property and a slope towards the back northeast comer will be created so that the drainage moves away from the lake and river. c. On the east side of the house and garage (toward the Prescher homestead), the site will be raised and sloped away from the house. Additional fill will be placed on the adjoining property (Ed and Bette Prescher’s) for which they have given permission so that the two sites can be blended together. A combined application for additional fill is being made with this application. d. Fill is requested to be used to raise a portion of Ed and Bette Prescher’s homestead property. It currently has two distinct levels. A retaining wall divides the two levels and there is no easy access to this lower level, plus it is unusable in its current state. This wall use to separate the trailer park from the homestead. By pulling down the retaining wall and blending the Prescher and Zosel properties, it will significantly improve the appearance and usability of the homestead property. There will be a swale created to move the combined drainage to the northeast comer, again away from the river and the lake. At the southwest comer of Ed and Bette Prescher’s property, a catch basin area will be created to retain the ground water and a 4” tile implaced to drain the water to the north and east, away from the river. e. The south side of the house, towards the river will have fill, but will have no fill closer than 50’ from the river except the area retained by the planting berm. f Naturalized plantings and grasses will be used adjacent to the river for appearance and ground water retention. We are prepared to use dirt filtration material until the site is sodded, seeded, and stabilized. The driveway will be raised an average of 16” and raises to 3’ above grade in front of the garage doors. The parking area in front of the garage (south) will be constructed of paving block with sand fill allowing for most water to seep through and not run off In this area, the house is 100’ plus away from the river; therefore, there is no drainage issue. The driveway will be slightly sloped away from the river and water will move to the catch basin described in “e.” above. g- There will be some fill south of the driveway to assist in maintaining and supporting the driveway, but will be gradually sloped away toward the river, but far enough back so that there is no run off going into the river. Until vegetation is in place, a dirt filter will be provided. The house has a minimum of gutters and will be site drained. There are no drainage tiles that lead to the lake or river. h. 18^mO om038<roc mooom Ol o O) o o SURVEY LINECO O 7)N> mm7s Q CJl C71 O ■1^slope CDCO mslopeL5,ro CDhO>CJ) O a> <2» o73 mm . ^ c.2 ca■oc3 oBack Fill Li. O