Loading...
HomeMy WebLinkAbout46000310115006_Variances_07-09-2015 (2)Variances 2 Barcode 128 t 1161267 Date Stamp CAROL SCHMALTZ OTTER TAIL COUNTY RECORDER FERGUS FALLS, MN RECORDED ON 07/14/2015 1:45PMreceded JUN 1 6 2015 land & RESOURCE COt-jn ~ “ CO CO FEE: 46.00 PAGES 6 WELL CERTIFICATE REC'D: No ■ ■ 'CO L&R Initial THE ABOVE SPACE IS RESERVED FOR THE COUNTY RECORDER APPLICATION FOR VARIANCE COUNTY OF OTTER TAIL GOVERNMENT SERVICES CENTER, 540 WEST FIR, FERGUS FALLS, MN 56537 (218) 998-8095 Otter Tail County’s Website: www.co.ottertail.mn.us Sop • DPApplication Fee Receipt Number O'- Vot Accepted By / Date COMPLETE THIS APPLICATION IN BLACK INK Christensen Vacation Holdings LLC Steffen & Janice Christensen 701-361-6068DAYTIME PHONEPROPERTY OWNER 1325 Elm Circle North Fargo, ND 58102MAILING ADDRESS Otter Tail GD56-242 LAKE CLASSLAKE NAMELAKE NUMBER 3931TOWNSHIP 46000990153000 46000990154000 46000310115006 46000310115007 Otter TailRANGETOWNSHIP NAMESECTION E-911 ADDRESS PARCEL NUMBER 28589 State Hwy. 78 Battle Lake, MN 56515 LEGAL DESCRIPTION Lots 9 & 10, Balmoral Beach and part of Government Lot 2. (See Trustee's Deed Document No. 1117076) TYPE OF VARIANCE REQUESTED (Please Check) structure Size Sewage System Subdivision Cluster WECS Misc.Structure Setback SPECIFY HOW YOUR PROJECT VARIES FROM ORDINANCE REQUIREMENTS. PLEASE BE BRIEF AS THIS WILL BE USED FOR PUBLIC NOTIFICATION. We are requesting permission to relocate our concrete driveway currently providing access from State Hwy. 78 to our lake home on Otter Tail Lake. This driveway is also used to access the Monk residence southwesterly of our home. We are proposing to keep the current access on the highway the same but realign the driveway from the northwesterly right of way hne southwesterly across our property to the southerly line of our property and then running northwesterly along our southerly property line to the existing concrete driveway which runs behind our home. For safely concerns we beheve the realignment is necessary to prevent further damage from vehicles sliding down the existing driveway and crashing into our home, or the possibility of striking someone outside or our home, or seriously injuring someone within the vehicle. (Continued on the back of this page) I UNDERSTAND THAT I HAVE APPLIED FOR A VARIANCE FROM THE REQUIREMENTS OF THE SHORELAND MANAGEMENT ORDINANCE/SUBDIVISION CONTROLS ORDINANCE / SANITATION CODE / SETBACK ORDANAND AN/OR WECS ORDINANCE OF OTTER TAIL COUNTY. I ALSO UNDERSTAND THAT OTHER PERMITS MAY BE REQUIRED; IT IS MY RESPONSIBILITY TO CONTACT LAND & RESOURCE MANAGEMENT REGARDING THIS MATTER. TYSDAL CONSTUCTION INC. JERAMETYSDAL 218-862-2972 IGNATURE OF PROPERTY OWNER / AGENT FOR OWNER DATE APPLICANT MUST BE PRESENT AT THE HEARIN ^ SCAlu^i-0(Applicant Will Receive Notification As To The Date/Time Of Hearing) 346.194 • Victor Lundeen Co.. Punters * Fergus Falls, Minnesota The new driveway will be a 10 foot wide concrete surface identical with our existing driveway. The realignment is 225 feet long and will run through approximately 90 feet of bluff We are estimating 2475 cubic yards of excavation and 10 cubic yards of fill with a 0 to 75 foot width of cut and a maximum depth of cut of 0 to 16 feet. We have submitted a soil stabilization and erosion control plan provided by Christensen Construction of Battle Lake, MN. Erosion control measures will be in place prior to and during the length of the project. Once the project is complete we have projected our impervious surface percentage to be 20% across our entire property. Upon approval of the new driveway, the 10 foot wide concrete along the old driveway will be removed and the excavated material from the new driveway construction will be used as fill to restore the original bluff area along either side and across the old driveway site. The remaining excavated material from the new driveway project will be hauled offsite. The existing driveway runs through a bluff area at a slope of approximately 17% and is in line with the center of our lake home. The new driveway will have a slope through the bluff area of approximately 13% and will be in line with the green area between our lake home and the Monk '7olr f’rr,15-Date Of Hearing Time . Motion Christensen Vacation Holding LLC — Variance application approved as requested with a modification. (7:08 p.m.) After discussion and consideration, Ward Uggerud made a motion, second by Paul Larson and carried with Thomas Lee voting no, to approve the variance as requested in the application dated June 16, 2015 and as represented in drawing number 7946, which was submitted with the variance application with the understanding that the Planning Commission will be responsible for determining the final placement of the proposed project and the extent of the work to be completed within the bluff area. The variance as approved will permit work within the bluff area and is granted to provide relief for known safety concerns. The members of the Board of Adjustment expressed their desire to have the existing area stabilized and reestablished. Chairman^^er Tail Count/Board of Adjustment Permit(s) required from Land & Resource Management X Yes (Contact Land & Resource Management) No 7//3//5Copy of Application Mailed to Applicant, Co. Assessor and the MN DNR L R Official/Date bk 072011-001 Mark R. and Barbara Steuart - Continued. (7:02 p.m.) Granting this variance will give owner of the substandard lot, to which the newly created back lot would be attached, the same rights and privileges as other owners on Lillis Drive. A registered survey will be provided creating the 100’ by 100’ back lot. Proposed new Lot B remains attached to Lots 9 and 10. Keith Monson, proposed purchaser, appeared with the applicants at the public hearing. The audience was polled with no one speaking for or against the variance as requested. After discussion and consideration, Paul Larson made a motion, second by Richard Gabe and unanimously carried, to approve the proposed subdivision as described in the variance application dated June 16, 2015 and as depicted on the drawings submitted with the variance application with the condition that a registered surv'eyor’s drawing must be presented at the time of conveyance and with the condition that the area within the back lot cannot be used when calculating impervious surface coverage for front lot development. The variance as approved will provide the proposed purchaser of this back lot with the ability to enjoy the same rights and privileges as others in this immediate area. It was noted that the approval is consistent with past actions of the Board of Adjustment. The variance as approved does not directly or indirectly grant any other variances for future development. Christensen Vacation Holding LLC — Variance application approved as requested with a modification. (7:08 p.m.) Christensen Vacation Holdings LLC, Lots 9 and 10 Balmoral Beach and part of Government Lot 2, Section 31 of Otter Tail Township by Otter Tail Lake requested the following: .arc rc<|WCStiiig p«crrr%istsU»»i tc> relocate mur coocretc Uriwerrary cur j ently* prcrvicliog; aoces* trora Svarle- Mwy. to our lake hott <Mi Onee Tall Lake. Thts driveway 1& also lascd to access the Motile rcaidenoe southwesterly of out hoisie. We are priaposing uj keep the current access uo the Kiy^way the saofie feat realign the drtveway from the twurthwcsteety light odf way line southwesterty swaross out property to the southerly line of crur property and then runmlTig aurth'iresterty along *i«» souchetty property Itivc to the existing cottcrete driveway which runs fcehmd out home. For safely coocems we belfeve the realigtrsment is roeceaiiiay to prevrutt fiiTthcT darrrage froen vehiclet. slttlling down the existing driveway and eraslwng into our hotne. or the p**>ssiilvility of str-ikfng sameoeie outside or our home, or sfieriosiaiy injuring sooses^le wlth.30 tlsc vchsclc. TKe new driveway will l>e a lO wide concrete surface ideoticaJ with otir existing driveway "I Ke realiguTnen.! is 22S feet long and will run thruujjh apTri-uxittsalely SO feet of bltiW. We are e5*ima.ting Z475 cxihic yards of excavation and tO fubic yards irf'itU with a O to 73 foot wsdth of cut and a maximum depth of cut of O to Ib feet. We have submitted a soil stabiltaaitian and croesion coniml plan provided by Oiclstcnaen ConstTUction of Battle- Lakec MM- hrusiun control oeeasurtt; will be in place prUw tu and during the length of the proyect. CJnee the pro^ct la eowjplete we have prelected our imyervioe iiarface percentage to be 20^t- aerrsss our entire properly. U^puci approval of the nevs* driveway, the tO foot wide concrete alon^ the old lirtveway will be removed and the excarated rrsaterial Frorn the new driveway cutistrucLion will be tased aes fill to restore the original bluff area along either side atiii acros the old drivew^ay site. The remaining excavated material from the new driveway pno^ct trill be hauled off site. The existing driveway runs through a bluff area at a slope of apprmcimalely 17^ and is in line with the ccnler of our lal home. The new driveway -wiJt have a slope through iJte bluff area of approximately 13'iii and -will be in line nHth ihe jp-et area berweeu our lalte home and the Monk Jerame Tysdal, Contractor and Glenn Howe, Surveyor appeared with Steffen and Janice Christensen the applicant’s representatives. The audience was polled with no one speaking for or against the variance as requested. A letter from Donald Monk in support of the variance as requested was read for the record. After discussion and consideration. Ward Uggerud made a motion, second by Paul Larson and carried with Thomas Lee voting no, to approve the variance as requested in the application dated June 16, 2015 and as represented in drawing number 7946, which was submitted with the variance application with the understanding that the Planning Commission will be responsible for determining the final placement of the proposed project and the extent of the work to be completed within the bluff area. The variance as approved will permit work within the bluff area and is granted to provide relief for known safety concerns. The members of the Board of Adjustment expressed their desire to have the existing area stabilized and reestablished. July 9,2015Pa.ee 3 I support the plan to relocate the shared entrance driveway we use with Steffen & Jan Christensen. This driveway has been and is a safety concern for those of us who use it. By improving the grade and relocating the bottom of the driveway my hope is that we could eliminate those safety concerns. I agree with allowing the Christensen’s to remove some trees and re-grade parts of my property as described in the plans for the purpose of moving the driveway. Sincerely Donald Monk //- Z9-- K ^ tr t B4CXLOT - nU9K 9 OMLOmM * B*an.erT - &urr l. l. -MtitOt - nutcti4 BAiatLOT - hc»t( nvi^r > mma. ■nay^tinjfinn 4BACKUrr . LAMOeBB TBUBT . PvmtL TBUBT - AUtCA.ML 4 $UBAM 9 mjBAMm LT^ger y Date • by 11 f vm;: PROFBSKMAL lAND $U 6 lAND DEVOOPMEKT CONSULTANTS DRANING NUMBERTOM9Hl^ • 0TT09 TAtL GiBm HOUfB PrefBBBicnol Lend Strvfyvr tiinrmoio Li 313 SOUTH MIU. mEET. FERGUS FAUS, MN 56537 (31S) 73M266 FAX 018) 739-S461 (800) 30l>9376 \S£C~TNP-RC I REVtSfON>3/-/34-3<? IBABctL NO. - mecomm4oeo, meooatomeo?, meoamaBaoee, Moeoatotoeoa AND TO THE OTTER TAIL COUNTY BOARD OF ADJU^MENTS.7946m Aoatao • mm sr«rr -mum no. »No. ITBX BALMORAL BEACH CHRISTENSEN CUP AND VARIANCE APPLICATION For safety concerns uie are requesting permission to relocate our concrete drlveuiay currently providing access from State Trunk. Hlghuiay No, T8 to our lake home on Otter Tall Lake, This drlveuiay Is also used to access the Monk residence southwesterly of our lake home, UJe are proposing to keep the current access on the highway the same but realign the driveway from the northwesterly right of way line of State Trunk Highway No, T8 southwesterly across our property toward the southerly line of our property and then running northwesterly paralleling our southerly property line to the existing concrete driveway which runs behind our lake home. For safety concerns we believe the realignment Is necessary to prevent further damage from vehicles sliding down the existing driveway and crashing Into our lake home, or the possibility of striking someone outside of our home, or seriously Injuring someone within the vehicle. The new driveway will be a \0 foot wide concrete surface Identical with our existing driveway. The realignment Is 224 feet long and will run through approximately 82 feet of bluff, UJe are estimating 2200 cubic yards of excavation and lOO cubic yards of fill with a O to Tl foot width of cut and a maximum depth of cut of O to \6> feet. Approximately 4500 square feet of disturbance will occur within the bluff and approximately 4TOO square feet of disturbance will occur outside of the bluff during construction of the new driveway. The existing driveway runs through a bluff area at a slope of approximately \~\% and Is In line with the center of our lake home. The new driveway will have a slope through a bluff area of 13% and Is In line with the open green space between our lake home and the Monk residence. MONK CABIN IUle have submitted a soil stabilization and erosion control plan provided by Christensen Construction of Battle Lake, MN, Erosion control measures will be Inplace prior to and during the length of the project. Once the project Is complete, we have projected our Impervious surface percentage to be 20% across our entire property. Upon approval and during construction of the new driveway, the lO foot wide concrete section of old driveway will be removed and excavated material from the new driveway construction will be used as fill to restore and revegetate the original bluff area along either side and across the old driveway site, UJe are estimating approximately lOOO cubic yards to restore and revegetate the bluff. Soil stabilization and erosion control measures will be In place during and after this restoration. The remaining excavated material from the new driveway project will be hauled offsite. Temporary access to the Christensen and Monk residences during construction will be provided through a neighbor's driveway. EROSION CONTROL PLANOUJNER CHRISTENSEN VACATION HOLDINGS LLC STEFFEN P. AND JANICE A. CHRISTENSEN I32S ELM CIRCLE NORTH FARGO, ND 58102 TOI-3fel-feOfe8 Christensen Construction John Christensen MN STORM UJATER DESIGN 4 INSTALL CERTIFIED EXPIRES 1/1/20 Ife CONTRACTOR JERAME TrSDAL OF TYSDAL CONSTRUCTION INC. 28201 N MIDWAY PARK DRIVE BATTLE LAKE, MN 68515 2I&.882-23T2 OFFICE 218-TI0.4930 CELL Sequence ot events for excavation and erosion control: -Upon receiving approval uje ujill located all utilities, and relocate them out of our ujorklng area, -Trees uiill be cut and removed and hauled auiay, -Stumps ujill be dug out and hauled away, -All topsoil from work, site will be salvaged for replacement, this work, will be done in stages from top to bottom to minimize the disturbance and to leave ground cover as long as possible to prevent erosion, -Excavation will begin at the upper elevations working East to UUest towards the lake always leaving a safety berm ahead of us to help in the event of a catastrophic rain, /Some excavated material will be used to fill the existing driveway cut this material will be p\aceci and stabilized immediately. Balance of excavated material will be hauled off site, -Before final breakthrough at the bottom of hill we will place topsoil and stabilize both side slopes with hydro-seeding and tack, -Before final breakthrough we will place silt fence on the West /Lake sldeJ of concrete driveway, upon breakthrough we will place I yard Husco barrier sand bags acrois> the bottom driveway cut to ensure that all erosion stops at that point, -At this point concrete driveway work will begin at bottom and work its way to the top working from the Lake side up to State Hwy 18, -UJe will preserve all bluff outside our excavation to ensure Its natural stability Is maintained. CONTROL PLAN FOR: STEFFEN CHRISTENSEN FIELD BOOK ALS-203/42 CONTRACT NO,FOLDER DRAUJN BY% 328-14 328-14 GEH/LIBLEGAL DESCRIPTION LOTS 9 < lO, BALMORAL BEACH AND PART OF GOVERNMENT LOT 2, SECTION 31, TOWNSHIP 134, RANGE 39, OTTER TAIL COUNTY, MINNESOTA DESCRIBED IN TRUSTEE'S DEED DOCUMENT NO. IIITOTS FIELD CREUJNDER50N LAND SURVEYING, INC,CHECKED BYCRD FILEDUJG FILE 328-14 EROSIONPLAN JAK GEH328-14 PROFESSIONAL LAND SURVEYORS « LAND DEVELOPMENT CONSULTANTS 313 SOUTH MILL STREET, FERGUS FALLS, MN 5853T (2\a) T33-5288 FAX f2l8J T39-5481 fSOOJ 300-32T8 TOWNSHIP • OTTER TAIL DRAIUING NUMBER REVISION:SEC-TUJP-RGPARCEL NO. = 46000990154000, 46O0O3IOII5OOT, 46000990153000, 460003IOII5006 184SE911 ADDRESS » 2S5SS STAT^ TRUNK HIGHUiAY NO. 18 31-134-38 1341.0 SCALE IN FEET SCALE: I INCH ~ 20 FEET BEARINGS ARE BASED ON OTTER TAIL COUNTT COORDINATES 20n ADJUSniENT AS DETERtllNED BY THE MNDOT CORS/VRS NEThlORK. • DENOTES IRON nONUIIENT FOUND. O DENOTES IRON tIONUtlENT SET tlARKED ’PIS 13620 4 I7&25’.'DAI A 4/^0) ^ I U/~\L.IVI\^I \/-\L. DENOTES SOriE OF THE SPOT ELEVATIONS TAKEN..r-A/'^l /ON a/27/OT AND IN NOVEMBER, 2014 CHAVD 8B DATUtlJ DENOTES ONE FOOT CONTOUR INTERVALS BASED ON SPOT ELEVATIONS TAKEN ON 3/27/OR AND IN NOVEMBER, 2014 CNAVD 33 DATUMJ DENOTES FIVE FOOT CONTOUR INTERVALS BASED ON SPOT ELEVATIONS TAKEN ON 3/27/OR AND IN NOVEMBER, 2014 (NAVD 33 DATUM) DENOTES ThIO FOOT CONTOUR INTERVALS BASED ON- 1356 ——SPOT ELEVATIONS TAKEN ON 3/27/OR AND SHOhIN ON ANDERSON LAND SURVEYING CERTIFICATE OF SURVEY NO. 6233 PREPARED SEPTErmER 23, 200R. 1328.3 ONNER-. BENDAL DAVIS TRUST /1600Cai0ll50l2 OhINER CHRISTENSEN VACATION HOLDINGS LLC STEFFEN P. AND JANICE A. CHRISTENSEN 1325 ELM CH^LE NORTH FARGO, ND 53102 701-361-6063 CONTRACTOR JERAME TYSDAL OF TYSDAL CONSTRUCTION INC. 2320! N MIDMAY PARK DRIVE BATTLE LAKE, MN 565152I3-362-2R72 OFFICE 2I3-770-4RR0 CELL EROSION CONTROL NOTES: 0 Design end implementcdlon of storm-weter pollution control devices shall be done prior to beginning any construction reiated activities an this site. 2) items addressed shall include, but not be limited to, the foUowings A) Proper erosion control measures, such as silt fence protection orranged to prevent sedknents from leaving the construction site installed prior to construction activities and then shall be monitored periodically to ensure that they are effective and kept in good repair. B) Other measures may be necessary to minimize erryVICINITY AND OMNERSNIP ITAP BALMORAL BEACN 4 GOV'T LOT 2 SECTION 3I-I34-3<=I NOT TO SCALE potential for sheet flaw across exposed areas during construction. C) Construction activities will be scheduled in such a nnamer as to minimize the site area disturbed and exposed at SEE ALS CERTIFICATE OF SURVEY NO. 6283any one tine.FOR COMPLETE BOUNDARY INFORMATION.D) Construction personnel must minimize soil erosion by mulcting, seeding and replanting creas of disturbance as soon as possible. DINNER #/.- LOT 12 4 BACKLOT - MARK 4 DARLENE DRAGAN - PARCEL 44601X7^10156000 4 4600CBI0II50I0 OhINER 42: LOT II 4 BACKLOT - GARY L. 4 SHARON L. RENIER - PARCEL 446000WI55000 4 4600CSI0II5003 OhINER m: LOT 3 4 BACKLOT - MONK TRUST - PARCEL 446000T40I52000 4 46000310115011 OhINER 44: LOT 7 4 BACKLOT - LANDERS TRUST - PARCEL 446000330151000 4 46OOCBIOII5O03 OhINER 45: LOT 6 4 BACKLOT - LANDERS TRUST - PARCEL 446000330150000 4 460003I0II5002 OhINER 46: LOT 5 4 BACKLOT - CHARLES hi. 4 SUSAN D. MILLER - PARCEL 446000330143000 4 460003101150CS OhINER 47: LOT 4 4 BACKLOT - CHARLES H. 4 SUSAN D. MILLER - P/VRCEL 446000330143000 4 4600(BI0115004 STEFFEN CHRISTENSENErosion control measures shall remain in place until revegetated areas have recovered. (CERTIFICATE / hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a Professional Land Surveyor licensed under the laws of the State of Minnesota. Dated this 13th day of November, 2014. SOIL TYPES SOILS - USDA, SOIL CONSERVATION SERVICE HAS CLASSIFIED THE FOLLOhUNG SOIL TYPES ON THIS PROPERTY: 1120 - RUSHLAKE-HANGAARD COMPLEX II35B - SYBIL-EAGLEVIEhl COMPLEX, 2 TO 3 PERCENT SLOPES LEGAL DESCRIPTION LOTS 3 4 !0, BALMORAL BEACH AND PART OF GOVERNMENT LOT 2, SECTION 31, TOhINSHIP 134, RANGE 33, OTTER TAIL COUNTY, MINNESOTA DESCRIBED IN TRUSTEE'S DEED DOCUMENT NO. III7076 TOhINSHIP - OTTER TAIL PARCEL NO. - 46000330154000, 4600CBI0II5007, 46000330153000, 4600C3I0IIS006 E3II ADDRESS - 23533 STATE TRUNK HIGHhIAY NO. 73 CHRISTENSEN TRACT CONTAINS56,733 S.F.± FIELD BOOK AL5-203/42 CONTRACT NO. 326-14 FOLDER 326-14 DRANN BY GEH/LIB FIELD CREH JAKNDERSON LAND SURVEYING, INC.CHECKED BY GEN CRD FILE 326-14 DHG FILE 326-14 THIS SURVEY IS INTENDED TO PROVIDE ASSISTANCE FOR A SUBMITTAL TO THE OTTER TAIL COUNTY PLANNING COMMISSION AND TO THE OTTER TAIL COUNTY BOARD OF ADJUSTMENTS. PROFESSIONAL LAND SURVEYORS & LAND DEVaOPMENT CONSULTANTS 313 SOUTH MIU STREET. FERGUS FALLS, MN 56537 (218) 739-5268 FAX (218) 739-5461 (800) 300-9276 DRAINING NUMBERGlenn Nowe Professional Land Minnesota License No. 17325 REVISION:5EC-TNP-RG 3I-I34-3T 7946veyor <0 O' NCsi rnrn Ul 13^5........13^5 1360 :.....:I360■QC EXISfl^'- GROUNDft,N s|S3 1355:.I J355+ 2!+ 1350:.1350 5B «)<n ^5 1345:.1345 ft Uj ^U4 ft5ift si 1340:.1340 CROSS SECTIONStoo VC 1335:.IX 1335-I3X 40 30 20 to O 10 20 30 40CENTERLINE GRADES 1+25 ■M IflvS rnrn N COB601360%-4 k 10"^%Ic rnrn(non 1340 13401365....1365ftftCQ.I1335 13351360:...1360 ^1 LISTING: GROUNDexisting: ground 1330v4^13301355:.1355in0.;1325 13251350:..: 1350 40 30 20 O 10 20 30 40lO13551355s1345:..:I345 2+25 (SE EDGE OF EXISTING CONCRETES'1340:..:I3400 ^ O' ID j 0^<T1<?1335:..: 1335 rnrn40 30 20 20 30 4010O 10 rn<Ti(0^1350 13501+00,V^ft 1345-A 1345 VS'ij 1350 mo-A 1350 'existing: ground1340 1340cviifi in'vrrnrn 1335 133513601360S> o 1330 133013551355C- BCISTING GROUND.O:c 1325 132513501350 40 30 20 lO O 10 20 30 40■rN.1345 1345Q 2+00AT:l%proposed PR I vein ay1345 xe 1345GvNEH•s.1340 1340\-0%rnoo40 30 20 10 O to 20 30 40 vr vs-4 oN.0+75 xtnornrnVJ1360 1360vsvX-^5X. \-jO1355 1355cs-4 rr)-.Ocs O'vaTVVXC5x: V \ X ■Z-.1350 1350EXISTING: GROUNDArnrn23±1355 13551- 1340 1340 1345 1345Xft:c 1350 1350ft!t.X 1340 1340X.1345: .^J^T!N^.1345k.k 1335 1335SiCfo.1340 1340-4 X 1330 1330CD40 30 20X !0 O !0 20 30 40 40 30 20 to O lO 20 30 40k0+50 1+75k13351335tnrq'tryk XX vax;rnrn mx1355Nfk1355birnrn1365 1365 1350 1350 1360 1360 Existing'.GROLffiD13451345X^v ft1355 13553Z±EXISTING GROUND.ft1340I13401330XP-1330 1350 1350 1335 1335 1345 134540 30 20 10 10 20 30 40O0+750+50 1+000+25 1+25 1+750+00 1+50 2+00 2+25 0+25 1340 1340LSM EDGE OF EXISTING CONCRETE (SE EDGE OF EXISTING CONCRETEHORIZONTAL SCALE / INCH = 20 FEET 1335 1335VSV9 40 30 20 10 O 10 20 30 40XX1+50rnrn13551355 1350 1350 1345 1345 existing GROUNb1340 1340 1335 1335 40 30 20 !0 10 20 30 40O 0+00 CSM EDGE OF EXISTING CONCRETE 5 5 6 PROJECTED VOLUMES ASSOCIATED MITN THE NEH DRIVEHAY CONSTRUCTION FROM TNE SH EDGE OF EXISTING CONCRETE TO SE EDGE OF EXISTING CONCRETE CUT VOLUITE OF 2475 C.Y. FILL VOLUtlE OF HJ C.r. c.'L CONCRETE SURFACE SHEET 2 OF 2 CERTIFICATE OF SURVEY FOR:HNEN CONSTRUCTION STARTS ON TNE NEH DRIVEHAY SOTIE OF TNE EXCAVATED TIATERIAL HILL BE USED TO FILL IN TNE OLD DRIVEHAY AND RESTORE TNE BLUFF IN THAT AREA. TNE EXCESS MATERIAL HILL TNEN BE NAULED OFFSITE. THIS SURVEY IS INTENDED TO PROVIDE ASSISTANCE FOR A SUBMITTAL TO THE OTTER TAIL COUNTY PLANNING COMMISSION AND TO THE OTTER TAIL COUNTY BOARD OF ADJUSTMENTS. TYPICAL SECTION OF TNE PROPOSED CONCRETE DRIVEHAY STEFFEN CHRISTENSEN SURVH'TCPR'S CHRT/F/CATH / hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a Professional Land Surveyor licensed under the laws of the State of Minnesota. Dated this 18th day of November, 2014. FIELD BOOK AL5-203/42 CONTRACT NO. 326-14 DRAHN BY GEH/UB FOLDER 326-14 % FIELD CREH JAKNDERSON LAND SURVEYING, INC.CHECKED BY QEH CRD FILE 326-14 DHG FILE 326-14I PROFESSIONAL LAND SURVEYORS & LAND DEVELOPMENT CONSULTANTS 313 SOUTH MILL STREET, FERGUS FALLS, MN 56537 (218) 739-5268 FAX (218) 739-5461 (800) 300-9276 DRAHING NUMBERGlenn Howe ' Professional L Minnesota License No. I7&25 REVISION^5EC-THP-RG 3I-I34-3H 7946Surveyor Notice of Hearing for Variance otter Tail County Government Services Center 510 Fir Ave W Fergus Falls, MN 56537 Phone - (218) 998-8030/998-8041 Email -wstein@co.ottertail.mn.us Web Address - www.co.otter-tail.mn.usOTTfUTIIII79«t*T«ia»f»«Ta Applicant and/or applicant’s representative must be present at the scheduled hearing. To Whom It May Concern: Christensen Vacation Holdings LLC Steffen and Janice Christensen 1325 Elm Circle North Fargo, ND 58102 has/have made application to the Otter Tail County Board of Adjustment for a variance as per requirements of the Otter Tail County Shoreland Management Ordinance, the Otter Tail County Set Back Ordinance and/or the Subdivision Controls Ordinance. The Otter Tail County Board of Adjustment will assemble for this hearing on Thursday, July 9, 2015 at 6:30 p.m. in the Commissioners’ Room of the Otter Tail County Government Services Center, Fergus Falls, MN. (Please use the public entrance located on the northeasterly side of the Government Services Center. The second left off Fir Ave.) Individuals requiring special accommodations should contact the County Auditor’s office prior to the date of the public hearing. The property concerned in the application is legally described as Lots 9 and 10 Balmoral Beach and part of Government Lot 2, Property Address - 28589 State Highway 78 Section 31, Township 134, Range 39 - Township Name - Otter Tail Lake No. 56-242, Lake Name - Otter Tail, Class - GD The variance requested is - Wc mre- re<{ueatliig pcrmIssMm <«► r<4oc«t«! ow carecrctc drivewaty^ curraotly pnorvUlirag, aooe** fewn SiaJie- Hwy. 7B Qi*r fatkur Ivocem: on Over Tatil This drlwway Is also naedi to acceai the JMonk retridence stnithxostcriy of onr bonne. We are pircifKMcinK to keep the current acces* on the Hlgfneay Ube aame but realign the drtveway frotn the rkorthwesterly light of way line sciuthwesterly across onr property to »hc southerly line of our property and then running northweeterly along otir southerly property line to the exlstlog ctmcrcte driveway which runs behind out honae- For safely concerns we believe the realigcnntent is isecessary to prevent furtlser damage from vehicles aUMltng down the existing drivewary and crashing into otur home. or tfse possibility of striking someone outside or our honse. or seriountly injuring someone within the vehicle. The new driveway will be a lO foot wide conorele surface sdentlcal with taor existing driveway. The realignmesrt is 2»S feet long and will run through approximately 9<l feet of bluJff. We are estimating 2475 cubic yards of excavation and lO cubic yturds of (ItU with a 0 to 75 foot Width of cut and a maximiiKm depth of cut of U to lb feet. Wc have mibmlttcd a soil stablllzatiaci and croeioei control plan provided by dhrist««iiscti Oanstruction of Battle Loike. MM. Erosion control meairurca Will be in place prior to and during the length of the prophet. t>nce the protect la complete wc have projected our imaerviotut surface percentage to be 205b across our entire property. flpon approval of the new drrvicway, the iO fotrt wide concrete along the old driveway will be removed and the cxcaraled material from the new driveway construction will be used as fU1 1o restoce the original bisdf area along either tUde and acroas the old driveway atte. The rcmakinlng excavated material Procn the new driveway pro^kJCt will be hatiled off site. The existing driveway runs Ihrov^Jl a bluff orca at a slope of approotlsnaiely i75S and is In line with the center ofocir lake home. Tbe new driveway will have a slope through the bUtff area of approxlmidely 13% and will be in Line with Ihe green area between our lake home and the Monk 'Wayne Stein Board of Adjustment Secretary June 19,2015 r / ’ OTTER TAIL COUNTY Fergus Falls, Minnesota State of Minnesota ) )SS County of Otter Tail) I, Wayne Stein, Secretary for the Board of Adjustment for Otter Tail County, Minnesota, do hereby certify that on the 22nd, day of June, 2015 the attached Notice of Hearing for Variance was duly served upon the individuals listed below and/or included in the attachment; Christensen Vacation Holdings, 1325 Elm Cir N, Fargo, ND 58102 2749 Tysdal Construction, 28201 N Midway Park Dr, Battle Lake, MN 56515 Bradley Childs, Twp Clerk of Ottertail, 45679 Lamplight Drive, Ottertail, MN 56571 Otter Tail Lake Assoc., OTLPOA, PO Box 21, Battle Lake, MN 56515 Otter Tail County Cola, % John Matteson, 23674 W Silver Lake Rd, Battle Lake,MN 56515 Richard West, OTC HWY Engineer, 505 S. Court St. Suite #1 Fergus Falls, MN 56537 Julie Aadland, DNR Eco & Water Resources, 1509 1st Ave N, Fergus Falls, MN 56537 Board of Adjustment: Paul R. Larson, 21283 County Highway 65, Henning, MN 56551-9573 Richard S. Schierer, 32117 260th Ave, Erhard,MN 56534 Thomas (Tom) Lee, 15600 Cty Hwy 118, Elizabeth, MN 56533-9559 Ward Uggerud, 933 E Cavour Ave, Fergus Falls, MN 56537 Jodi L Sazama, 650 Third Ave SE, Ste 4, Perham, MN 56573 Richard Gabe, 25826 County Highway 20, Detroit Lakes, MN 56501 by placing a true and correct copy thereof in a sealed envelope, postage prepaid, and depositing the same in the United States Mail at Fergus Falls, MN, property addressed to each of the individuals listed above and/or listed in the attachment. Dated: June 22, 2015 Wayne Stein, Secretary Otter Tail County Board of Adjustment By: Vi Manderud HERBFjRT V CHRISTENSEN JR 28879 STATE HIGHWAY 78 BATTLE LAKE, MN 56515 9688 CHRISTENSEN VACATION HOLDINGS 1325 ELM CIR N FARGO, ND 58102 2749 BENDA L DAVIS TST 28647 STATE HIGHWAY 78 BATTLE LAKE, MN 56515 9688 MARK & DARLENE DRAGAN 22620 SWEENEY LN LAKEVILLE, MN 55044 4460 BARBARA GAIL 1317 LINWOOD CT FERGUS FALLS, MN 56537 1230 DECCA PROPERTIES 2202 12TH ST N FARGO, ND 58102 1804 CHARLES W & SUSAN D MILLER PO BOX 51949 CASPER, WY 82605 1949 LANDERS TST 723 8TH ST S FARGO, ND 58103 2719 DANIEL & LORETTA GREENWALDT 1503 CHET DR BRECKENRIDGE, MN 56520 1838 THOMAS EARL SCHMIDT PO BOX 36 WAHPETON, ND 58074 36 GARY L& SHARON LRENIER 5451 HARVEST ST S GILBERT, AZ 85298 4603 MONK TST 28583 STATE HIGHWAY 78 BATTLE LAKE, MN 56515 9688