Loading...
HomeMy WebLinkAbout37000040026005_Variances_09-10-2008AD ’cH8 .'<1796 Office of County Recorder Couftty of Otter Tail I h*Tiby ofrtiTy 8i#t the wittiin Instrument was filed fw rvwed in tins office on the /7 —5'fp-f An 19 ‘7k ■nd WM duly Microfilmed as Doc. _____day of SEP 18 MS County Wecorder .Deiputy THE ABOVE SPACE IS RESERVED FOR THE COUNTY RECORDER APPLICATION FOR VARIANCE \COUNTY OF OTTER TAIL COURTHOUSE, FERGUS FALLS, MN 56537 (218) 739-2271 . *** COMPLETE THIS APPLICATION IN BLACK INK (£>d>OC>Application Fee Receipt Number '*■ PHONE I^R^i 6^/Q^ U^juu±^j\ yhjo ^c4’AAyi^jQjLylc} PROPERTY OWNER ADDRESS /eS-LAKE NUMBER LAKE NAME LAKE CLASS IdL RANGE TOWNSHIP NAMESECTIONTOWNSHIP |.A/flPARCEL NUMBER FIRE / LAKE I.D. NUMBER LEGAL DESCRIPTION ;t7t> SI 3 73^ ^JuyyijdVt£: J TYPE OF VARIANCE REQUESTED (Please Check)V^^'^^cture Size____Sewage System Structure Setback Subdivision____ Ciuster Misc. SPECIFY VARIANCE REQUESTED , . 0 I UNDERSTAND THAT I HAVE APPLIED FOR A VARIANCE FROM THE REQUIREMENTS OF THE SHORELAND MANAGEMENT ORDINANCE/SUBDIVISION CONTROLS ORDINANCE OF OTTER TAIL COUNTY. I ALSO UNDERSTAND THAT OTHER PERMITS MAY BE REQUIRED, IT IS MY RESPONSIBILITY TO CONTACT LAND & RESOURCE MANAGEMENT REGARDING THIS MATTER. DATESIGNATURE OF PROPERTY OWNER APPLICANT MUST BE PRESENT AT THE HEARING(Applicant Will Receive Notification As To The Date/Time Of Hearing) rifL 3 ^/'(POO e? / - ^oy Qf ~eP03 yit-c £ /-/O ^ - 0>03 a.^-cc)^ ^0> ( ' /QC S £^Cb. /^^■^cpo ^C'A(^?,7 -(yo 0 mh!Accepted By Land & Resource L & R Official/bate 9- /o'TimeDate Of Hearing Motion James and Marcia Vavricka - Approved Motion was made by Randall Mann, seconded by Cecil Femling and unanimously carried to approve a variance of 32’ from the required ordinary high water level setback of 100’ for the construction of a 24’ by 24’ garage and for a 32’ by 26’ dwelling 68’ from the ordinary high water level. It should be noted that the applicants’ proposed development I would substantially improve the existing situation. f^l . ^ lA.Gh^rman/Otter Tail County Board of Adjustment Permit(s) required from Land & Resource Management ^ Yes (Contact Land & Resource Management) No Copy of Application Mailed to Applicant And the MN DNR L R Official/Date bk 0198-001 291,306 • Victor Lundeen Co.. Ptintars • Fergus Falls. Minnesota October 5, 2000 Page 5 Other Business - Richard Ressler - Pat Eckert, Land and Resource Management presented a request from Richard Ressler for consideration as a modification to the variance as previously granted on Thursday, September 2, 1999. Mr. Ressler was requesting a change in the size of the proposed structure. After consideration and discussion, motion was made by Mark Steuart, second by Randall Mann and unanimously carried, not to modify the previously granted variance noting that his revised request is significantly different from the request previously considered and noting that the appropriate course of action for Mr. Ressler is to submit a variance application for consideration by the Board of Adjustment at a future meeting date. James and Marcia Vavricka - On Thursday, September 10, 1998, a variance of 32’ from the required ordinary high water level setback of 100’ for the construction of a 24’ by 24’ garage and for a 32’ by 26’ dwelling 68’ from the ordinary high water level was granted. The size of the dwelling was not correctly stated in the hearing notice and was not discovered at the hearing. James and Marcia Vavricka are ready to proceed with their building project and have just recently learned of the dwelling size, which was stated in the notice and subsequently in the motion approving the variance as requested. The secretary of the Board of Adjustment is requesting on their behalf whether or not the size of the dwelling is significant to the motion as previously granted. By general consent the Board indicated that the size of the dwelling did not matter so long as the variance as previously granted is not affected and so long as no other setbacks or ordinance requirements are violated by the increased size. Ralph R. Heidorn - Mr. Heidorn had forwarded to the County Auditor’s office a proposed variance application for consideration by the Board of Adjustment. Mr. Heidorn was requesting preliminary review of this application since an earlier application had been deny by the Board. Mr. Heidorn felt that this new variance application addressed the Board’s concerns and he was interested in their opinion of his new request. By general consent the Board did not indicate a strong positive position as it related to his new request, but indicated that if Mr. Heidorn decided to submitted a formal application for consideration they would review his property again, consider his request and listen to his position, but until such time would not make a decision regarding his proposed variance application. With no further business Randall Mann, Chairman, declared the meeting adjourned. JLcp^ Wayne Sre/n, Secretary September 10,1998 Page 2 James and Marcia Vavricka - Approved James and Marcia Vavricka, Wolverton, MN, requested a variance of 32’ from the required ordinary high water level setback of 100’ for the construction of a 24’ by 24’ garage and for a 32’ by 26’ dwelling 68’ from the ordinary high water level. The property is described as part of Lot 2 and all of Lot 3, Sunset Lodge in Government Lot 8, Section 4 of Lida Township by Lake Franklin. The audience was polled with no one speaking for or against the request. After consideration, motion was made by Randall Mann, seconded by Cecil Femling and unanimously carried to approve a variance of 32’ from the required ordinary high water level setback of 100’ for the construction of a 24’ by 24’ garage and for a 32’ by 26’ dwelling 68’ from the ordinary high water level. It should be noted that the applicants’ proposed development would substantially improve the existing situation. John Johnston - Denied John Johnston, Fargo, ND, requested a variance of 7’ from the required side lot line setback of 10’ and a variance of 5’ from the required holding tank setback of 10’ for the construction of a 24’ by 12’ extension to an existing bath house 3’ from the side lot line and 5’ from the septic tank. The property is described as Lot 24, Broadwater Beach, Pelican Lake in Dunn Township. The audience was polled with no one speaking for or against the request. A letter from William O. Folendorf in support of the applicant’s request was read for the record. After consideration, motion was made by John Everts, seconded by Frank Lachowitzer and unanimously carried, to deny the variance as requested as no adequate hardship had been shown, an alternative site not requiring a variance does exist and the applicant’s project as proposed would be considered a second dwelling. James R. and Mary F. Cook -Tabled James R. and Mary F. Cook, Wahpeton, ND, requested a variance “to remove the existing deck (8 ft. x 2314 ft.) and use that space for an addition the same size. We want to add a wrap around deck - 4 ft. wide along the south side of cabin and 6 ft. across the front. Being 4’ 10” from the north lot line and 5’ 1” from the south lot line. “ The property is described as the North Half of Lot 4, Clearmont Beach, Otter Tail Lake in Everts Township. The applicants were not in attendance at the scheduled public hearing. After consideration, motion was made by John Everts, seconded by Cecil Femling and unanimously carried to table the applicant’s request until the October 8, 1998 Bd^rd of Adjustment meeting. Stephen F. Boedigheimer-Approved Stephen F. Boedigheimer, Perham, MN, requested a variance of 27’ from the required ordinary high water level setback of 150’ for the construction of a structure 123’ from the ordinary high water level. The property is described as the North 250’ of the East 785.8’ of the Northwest Quarter of the Northeast Quarter, Section 18 of Otto Township by the Otter Tail River. The audience was polled with no one speaking for or against the request. After consideration, motion was made by Cecil Femling, seconded by Frank Lachowitzer and unanimously carried to approve construction of the proposed structure being at least 20’ from the road right-of-way and with the south side of the proposed construction being no closer to the river than the south side of the existing garage (note the applicant’s drawing). It was noted that the distance from the south side of the proposed development to the river will vary, but where the new construction joins the existing garage on the south side the distance will be approximately 123’. Hardship is a substandard lot of record. GRID PLOT PLAN feet SKETCHING FORMgrid(s) equals feet, or/Scale:jnch(es) equals ^ -//, 19 ■Dated: Signature Please sketch your lot indicating setbacks from road right-of-way, lake, sideyard and septic tank and drain- field for each building currently on lot and any proposed structures. /n'jrsay i-0 ^x' y.36>'V N \ • )c2.^ 0 ti- y. @ ISO- f^A/vk{L(tO H%ec — iX /(Jo — /_6 /// 4<c/a73 281,949 • Victor Lundeer^ Co, Printers • Fergus Falls. MN • i-800-346-4870MKL — 0871 — 029