Loading...
HomeMy WebLinkAboutBoard of Commissioners – Supporting Documents Compiled – 11/03/2026Board of Commissioners & Drainage Authority Supporting Documents OTTER TAIL COUNTY – MINNESOTA BOARD OF COMMISSIONERS’ MEETING & DRAINAGE AUTHORITY MEETING SUPPORTING DOCUMENTS November 3, 2026 | 8:30 a.m. BOARD OF COMMISSIONERS’ SUPPORTING DOCUMENTS 2.1 BOC Minutes for October 27, 2026 2.2 Warrants/Bills for November 3, 2026 2.3 Amazon Warrants/Bills for November 3, 2026 2.4 Human Services Warrants/Bills for November 3, 2026 2.5 Warrants/Bills, as Approved for Payment, by the County Auditor-Treasurer 2.6 Sponsoring Agency LRIP Resolution – Everts Township 5.0 Resolution Establishing Subordinate Service District for the Pelican Rapids Emergency Medical Services Primary Service Area 6.0 Waste Disposal Agreement with Big Dipper Enterprises 7.0 LRIP Resolution of Support - City of Fergus Falls 7.0 Design Engineering Services Contract with Houston Engineering, Inc. - CSAH 38 8.0 Award Recommendation and Contracts & Bonds - Phelps Mill Park - Phase Two DRAINAGE AUTHORITY SUPPORTING DOCUMENTS 2.1 Drainage Authority Minutes for October 27, 2026 3.0 Ditch 28 - Beaver Dam Between Indian Lake & Stone Bridge 3.0 Ditch 29 - Highwater Issue 3.0 Ditch 55 - Beaver Dam Long Lake Outlet Control Structure OTTERTAIL COUNTY-MINNESOTA > > > > > > > > > > > > > > > Board of Commissioners’ Meeting Minutes October 27, 2026 Page 1 of 11 OTTER TAIL COUNTY – MINNESOTA BOARD OF COMMISSIONERS’ MINUTES Government Services Center, Commissioners’ Room & Via Livestream 515 West Fir Avenue, Fergus Falls, MN October 27, 2026 | 8:30 a.m. CALL TO ORDER The Otter Tail County Board of Commissioners convened at 8:30 a.m. Tuesday, October 27, 2026, at the Government Services Center in Fergus Falls, MN. Commissioners Robert Lahman, Chair; Dan Bucholz, Vice Chair; Wayne Johnson, Kurt Mortenson and Sean Sullivan were present. APPROVAL OF AGENDA Chair Lahman called for approval of the Board Agenda. Motion by Sullivan, second by Mortenson and unanimously carried to approve the Board of Commissioners’ Agenda of October 27, 2026, with the following changes: Removed Design Engineering Services Contract Change to Warrants/Bills for October 27, 2026 APPROVAL OF CONSENT AGENDA Motion by Johnson, second by Mortenson and unanimously carried to approve the consent agenda items as amended: 1. October 13, 2026, Board of Commissioners’ Meeting Minutes 2. Warrants/Bills for October 27, 2026 (Exhibit A) 3. Amazon Warrants/Bills for October 27, 2026 (Exhibit A) 4. Human Services and Public Health Warrants/Bills for October 27, 2026 (Exhibit A) 5. Warrants/Bills, as Approved for Payment by the County Auditor-Treasurer, for October 9 & 16, 2026 6. Approved of the issuance of a County Purchasing Card for Deputy Sheriff Colton Odash, with a 30- Day Limit of $1,000.00, as requested by County Sheriff Barry Fitzgibbons 7. Approved Resolution Sponsoring Agency LRIP – City of Perham COURT APPOINTED ATTORNEY CONTRACTS Motion by Mortenson, second by Sullivan and unanimously carried to authorize appropriate County Officials’ signatures to execute Court Appointed Attorney contracts between Otter Tail County and Brian Geis and Otter Tail County and 29th & Law, P.C. for Legal Services in Children in Need of Protection or Services, Permanency, and Termination of Parental Rights Cases and Legal Services in Hospitalization Commitment Proceedings, Certain Guardianship/Conservatorship, Paternity, and Order to Show Cause Proceedings, with all four contracts effective January 1, 2027 through December 31, 2027. RECESS & RECONVENE At 8:37 a.m., Chair Lahman declared the meeting of the Otter Tail County Board of Commissioners recessed for a short break. The Board of Commissioners meeting was reconvened at 8:40 a.m. OTTERTAIL COUNTY -MINNESOTA Board of Commissioners’ Meeting Minutes October 27, 2026 Page 2 of 11 LG230 APPLICATION TO CONDUCT OFF-SITE GAMBLING ABATE OF MN OTTER TAIL COUNTY RESOLUTION NO. 2026-81 WHEREAS the responsibility for the regulation of lawful gambling and the issuance of licenses and permits for the conduct of lawful gambling lies with the Minnesota Gambling Control Board; and WHEREAS ABATE of MN, will be submitting to the Gambling Control Board an LG230 Application to Conduct Off-Site Gambling on March 6, 2027, at the Silver Moon Lounge & Steakhouse, which is located at the 1117 W Main St, Perham Township of Otter Tail County; and WHEREAS the Otter Tail County Board of Commissioners is aware of no reason to oppose the conduct of lawful gambling on March 6, 2027, by ABATE of MN at the Silver Moon Lounge & Steakhouse, which is located at the 1117 W Main St, Perham Township of Otter Tail County. NOW, THEREFORE, BE IT RESOLVED, that the Otter Tail County Board of Commissioners hereby approves the conduct of lawful gambling by ABATE of MN on March 6, 2027, at the Silver Moon Lounge & Steakhouse which is located at the 1117 W Main St, Perham Township of Otter Tail County, provided the applicant meets all the necessary criteria for the licenses and permits as required by the Gambling Control Board. IT IS FURTHER RESOLVED, that notice of this application and approval shall be provided to the Township of Perham by sending them a copy of this resolution. The motion for the adoption of the foregoing resolution was introduced by Commissioner Bucholz, duly seconded by Commissioner Johnson and, after discussion thereof and upon vote being taken thereon, passed unanimously. Adopted at Fergus Falls, MN this 27th day of October 2026. OTTER TAIL COUNTY BOARD OF COMMISSIONERS Dated: November 3, 2026 By: _________________________________________ Attest: _______________________________ Robert Lahman, Board of Commissioners Chair Nicole Hansen, Clerk RECESS & RECONVENE At 8:42 a.m., Chair Lahman declared the meeting of the Otter Tail County Board of Commissioners recessed for a short break. The Board of Commissioners meeting was reconvened at 8:45 a.m. LONG RANGE STRATEGIC PLAN UPDATE Community Development Director Amy Baldwin provided updates on Long Range Strategic Plan progress under the Element Economy with a focus on Supporting Workforce Development. Baldwin highlighted engagement and participation in the Empowered Worker Program, a county-initiated program that provides training, job placement, and navigation services to individuals, and spoke about grant funding through the Minnesota Department of Employment and Economic Development. OPERATION GREEN LIGHT FOR VETERANS 2026 PROCLAMATION OTTER TAIL COUNTY RESOLUTION NO. 2026-82 WHEREAS, the residents of Otter Tail County have great respect, admiration and the utmost gratitude for all the men and women who have selflessly served our country and this community in the Armed Forces; and OTTERTAIL COUNTY · MINNESOTA Board of Commissioners’ Meeting Minutes October 27, 2026 Page 3 of 11 WHEREAS, the contributions and sacrifices of those who served in the Armed Forces have been vital in maintaining the freedom and way of life enjoyed by our citizens; and WHEREAS, Otter Tail County seeks to honor individuals who have made countless sacrifices for freedom by placing themselves in harm’s way for the good of all; and WHEREAS, veterans continue to serve our community in the American Legion, Veterans of Foreign Wars, religious groups, civil service, and as County Veterans Service Officers in 29 states to help fellow former service members access more than $52 billion in federal health, disability and compensation benefits each year; and WHEREAS, approximately 200,000 service members transition to civilian communities annually; and WHEREAS, active military service members transitioning from military service are at a high risk for suicide during their first year after military service; and WHEREAS, the National Association of Counties encourages all counties, parishes and boroughs to recognize Operation Green Light for Veterans; and WHEREAS, Otter Tail County appreciates the sacrifices of our United States military personnel and believes specific recognition should be granted. NOW THEREFORE BE IT RESOLVED THAT, with designation as a Green Light for Veterans County, Otter Tail County hereby declares November 4-11, 2026, as a time to salute and honor the service and sacrifices of those transitioning from active service; and BE IT FURTHER RESOLVED, that in observance of Operation Green Light, Otter Tail County will light its buildings green; and BE IT FURTHER RESOLVED, that Otter Tail County encourages its citizens in patriotic tradition to recognize the importance of honoring all those who made immeasurable sacrifices to preserve freedom by displaying green lights in a window of their place of business or residence from November 4-11, 2026. The motion for the adoption of the foregoing resolution was introduced by Commissioner Johnson, duly seconded by Commissioner Sullivan and, after discussion thereof and upon vote being taken thereon, passed unanimously. Adopted at Fergus Falls, MN this 27th day of October 2026. OTTER TAIL COUNTY BOARD OF COMMISSIONERS Dated: November 3, 2026 By: _________________________________________ Attest: ______________________________ Robert Lahman, Board of Commissioners Chair Nicole Hansen, Clerk RECESS & RECONVENE At 8:57 a.m., Chair Lahman declared the meeting of the Otter Tail County Board of Commissioners recessed for a short break. The Board of Commissioners meeting was reconvened at 9:00 a.m. OTTERTAIL COUNTY · MINNESOTA Board of Commissioners’ Meeting Minutes October 27, 2026 Page 4 of 11 PLANNING COMMISSION RECOMMENDATIONS Barry D. Bacheller Revocable Living Trust Motion by Mortenson, second by Bucholz and motion carried with Johnson abstaining to approve a Conditional Use Permit, as recommended by the Planning Commission, for Barry Bacheller Revocable Living Trust, for a re-grade of a previously altered bluff area with a revised grading plan to reduce the hill to an approximate elevation of 1,340, off-site soil export to approximately 3,715 cubic yards, and additional erosion and sediment control measures, a haul rout and temporary traffic control plan, landscaping and irrigation plans to reestablish vegetation, provide screening, and to protect North Lida Lake and neighboring properties with the following conditions: 1) a preconstruction meeting to be held involving Land & Resource Management staff, professional engineer (PE) and contractor, and 2) a professional engineer or their designated representative need be present onsite during construction to oversee compliance with the approved plans. This proposal is located at south of 42273 Lida View Lane, Vergas, MN 56587, Section 23, Lida Township, Lida Lake (56-747) GD. Kimps Kamp LLC Motion by Sullivan, second by Bucholz and motion carried with Johnson abstaining to approve a Conditional Use Permit, as recommended by the Planning Commission, for Kimps Kamp LLC, to convert the existing resort property to a residential Common Interest Community (CIC) consisting of 12 existing dwelling units and 6 new dwelling units, for a total of 18 dwelling units with G-Units 1-14 proposed for garages, storage, and boat/trailer parking, G-Unites 1-12 shall be exclusive to the owners of residential Units 1-12 within the CIC and provide accessory storage and parking for those units, and G-Units 13 & 14 shall be available for purchase exclusively by owners within the CIC, subject to the following conditions: 1) Centralized dock system: boat slips shall be provided through a centralized dock system, with no more than 18 slips permitted, 2) Dwelling unit expansions: Expansion of any existing dwelling unit shall require approval from the Board of Adjustment, 3) Dwelling unit types: Changes to dwelling unit types that are acceptable to the office shall not require an additional Conditional Use Permit and 4) Impervious surface limits: Each unit shall not exceed 25% impervious surface coverage, except Units 4, 6 and 7, which shall not exceed their existing impervious surface coverage. This proposal is located at 38267 White Haven Rd, Dent, MN 56528, Section 08, Dead Lake Township, Dead Lake (56-383) NE and Unnamed Lake (56-1538) NE. Barky’s Resort Motion by Bucholz, second by Mortenson and unanimously carried to approve a Conditional Use Permit, as recommended by the Planning Commission, for Ryan Draeger, to convert an existing commercial resort to a residential development with 11 units, 5 docks and 11 slips, with the following conditions: 1) a dock system consisting of 5 docks with no more than 11 slips permitted and 2) expansion of any existing dwelling unit shall require approval from the Board of Adjustment. This proposal is located at 28484 County Highway 145, Battle Lake, MN 56515, Section 32, Amor Township, Otter Tail Lake (56-242) GD. Woodlands Beach Resort Association Motion by Mortenson, second by Sullivan and unanimously carried to approve a Conditional Use Permit, as recommended by the Planning Commission, for Woodlands Beach Resort Association, to replace an existing camper and addition to a stick-built structure with the condition that the proposed stick-built dwelling shall not exceed 16 feet by 40 feet and shall be limited to a single story. This proposal is located at 26477 State Highway 78, Battle Lake, MN 56515, Section 02, Everts Township, Otter Tail Lake (56-242) GD. SET PUBLIC HEARING Motion by Johnson, second by Mortenson and unanimously carried to schedule a Public Hearing for the Renewable Energy Ordinance Revisions on Tuesday, November 17, 2026 at 10:00 a.m. during the regular Board of Commissioners meeting. OTTERTAIL COUNTY -MINNESOTA Board of Commissioners’ Meeting Minutes October 27, 2026 Page 5 of 11 COMMUTING WITH COUNTY VEHICLES Motion by Bucholz, second by Johnson and unanimously carried to authorize Highway Department Acting Group Leaders to use county vehicles for commuting for the remainder of 2026 through the 2026/2027 snow and ice season as presented by County Engineer Jodi Teich. OUT-OF-STATE TRAVEL Motion by Johnson, second by Sullivan and unanimously carried to approve out-of-state travel for the County Engineer to travel to Washington, DC from February 17-21, 2027 to attend the National Association of County Engineers (NACE) Legislative Fly In and travel to Cleveland, OH from April 3-8, 2027 to attend the National Association of County Engineers Annual Conference. NACE will cover travel costs for the Legislative Fly In and costs for the NACE Annual Conference are included in the 2027 budget. RECESS & RECONVENE At 9:19 a.m., Chair Lahman declared the meeting of the Otter Tail County Board of Commissioners recessed for a short break. The Board of Commissioners meeting was reconvened at 9:25 a.m. CHILDREN’S MENTAL HEALTH LOCAL ADVISORY COUNCIL REPORT Tamara Uselman, Courtney Rooney, and Samantha Line with the Children’s Mental Health Local Advisory Council presented their FY 2027 Report to the Board. They spoke about Otter Tail County children’s mental health programming and highlighted youth feedback, gaps, and priorities for strengthening and expanding children’s mental health programming within Otter Tail County. MEDICARE ADVANTAGE PLANS Deputy Administrator Lynne Penke Valdes and Human Services Financial Assistance Supervisor Lisa Baumgart informed the Board that the changes to Medicare Advantage Plans have impacted some Otter Tail County residents. Though Medicare plans are not administered through Otter Tail County, the Health and Human Services team has been providing information and resources to those seeking information. ADJOURNMENT At 9:53 a.m., Chair Lahman declared the Otter Tail County Board of Commissioners meeting adjourned with a closed session to follow. The next regular Board meeting is scheduled at 8:30 a.m. on Tuesday, November 3, 2026, at the Government Services Center in Fergus Falls and via livestream. CLOSED SESSION At 10:00 a.m., Chair Lahman declared the Board of Commissioners meeting closed to the public. The closed session is authorized under Minnesota Statute 13D.05, Subd. 3(b) for Attorney-Client Privilege for an MCIT Insurance Claim. Those present were Commissioners Bob Lahman, Kurt Mortenson, Dan Bucholz, Wayne Johnson and Sean Sullivan, County Administrator Nicole Hansen, County Attorney Michelle Eldien, Deputy Administrator Nick Leonard, Deputy Administrator Lynne Penke Valdes, Deputy Administrator Liz Mickelson, IT Director Rick Kelsven, and Board Secretary Hannah Anderson. The closed session ended at 10:18 a.m. OTTER TAIL COUNTY BOARD OF COMMISSIONERS Dated: November 3, 2026 By: _________________________________________ Attest: _______________________________ Robert Lahman, Board of Commissioners Chair Nicole Hansen, Clerk OTTERTAIL COUNTY · MINNESOTA Board of Commissioners’ Meeting Minutes October 27, 2026 (Exhibit A) Page 6 of 11 Vendor Name Amount 210 TIRES & TOWING LLC 545.00 A~OX WELDING SUPPLY CO INC 153.95 A&A RECYCLING LLC 1,720.00 ACKERSON/JEFF 180.00 ACME TOOLS 1,199.95 ADVANCED FIRST AID INC 169.65 AFFORDABLE SOLUTIONS 12.93 ALEX PRO FIREARMS LLC 3,300.00 ALLSTAR CONST'RUCTION FARGO 1,966.67 ANOKA CO TREASURY OFFICE 16,276.80 AQUATIC ECOSOLUTIONS INC 3,350.00 ASSOCIATION OF MN COUNTIES 100.00 AVT FERGUS FALLS 153.00 BAKER EXCAVATING 340.00 BALLARD SANITATION INC 2,880.00 BEN HOLZER UNLIMITED WATER LLC 92.00 BENGTSON/STEVEN 128.61 BERG'S WELDING & REPAIR LLC 4,571.11 BRANDON COMMUNICATIONS INC 3,470.99 BRASEURYAN 32.89 BRAUN VENDING INC 51.00 BREITKREUTZ/DOUG 220.40 BUREAU OF CRIMINAL APPREHENSION 5,080.00 BYTESPEED LLC 6,015.00 CAROLINA SOFTWARE INC 2,500.00 CASEY /ROBERT 18.26 CERTIFIED AUTO REPAIR 625.00 OHS INC 2,246.91 CLEAN SWEEP COMMERCIAL SERVICES 525.00 COATINGS UNLIMITED 5,925.00 CODE 4 SERVICES INC 1,928.92 COLE PAPERS INC 1,423.56 COLUMN SOFTWARE PBC 3,233.51 COMPANION ANIMAL HOSPITAL 37.56 CONCEPT CATERING 362.65 COOPER'S OFFICE SUPPLY INC 3,122.41 CULLIGAN OF DETROIT LAKES 54.00 CULLIGAN OF ELBOW LAKE 58.50 CUSTOM TRUCK ONE SOURCE LP 275.51 D&. T VENTURESLLC 385.88 DACOTAH PAPER CO 42.36 DAKOTA WHOLESALE TIRE INC 1,476.00 Board of Commissioners’ Meeting Minutes October 27, 2026 (Exhibit A) Page 7 of 11 Vendor Name Amount DEANS DISTRIBUTING 234.43 DEM-CON MATERIALS RECOVERY LLC 2,582.56 DENZEL'S REGION WASTE INC 238.68 DOW CARLA 339.98 DONOHO/MICHAEL 400.72 DUENOW/MELISSA 76.37 DUNCAN/JESSE 10.08 EAGLE EYES SEARCH INC 650.00 EGGE CONSTRUCTION INC 2,000.00 ERGOMETRICS INC 186.71 EZ OPEN GARAGE DOOR 195.00 FACTORY MOTOR PARTS 514.56 FARGO LINE-X INC 270.00 FASTENAL COMPANY 128.93 FERGUS FALLS AREA CHM'1BER OF COM 816.00 FERGUS FALLS/CITY OF 2,400.00 FERGUS HOME & HARDWARE INC 5,700.67 FERGUS POWER PUMP INC 26,192.15 FERGUS TIRE GENTER INC 796.40 FIDLAR TECHNOL:OGIES CNC 15,256.40 FISCHER/JU DD 241.56 FORUM COMMUNICATIONS COMPANY 1,417.02 FRANK'S AUTO BODY OF PERHAM INC 6,820.88 FRAZIER/BRENT 289.44 GALLSLLC 662.75 GEORGESON/ANTHONY 203.68 GIRARD'S BUSINESS SOLUTIONS INC 1,143.00 GLENDE-NILSON FUNERAL HOME 1,000.00 GOPHER STATE ONE CALL 31.05 GOVERNMENT FORMS & SUPPLIES 2,131.65 GRUNEWAUD FAMILY REV LIVING TST 27,484.62 GUARDIAN RF ID 175.00 HAHTHUN/TH ENT 3.82 HASEMAN/LOGAN 11,750.00 HAWES SEPTI C TANK PUMPING LLC 395.00 HILL YARD INC 426.36 HOTSY MINNESOTA 694.65 HOUSTON ENGINEERING INC 354.75 IMAGING SPECIAL TIES LLC 1,650.00 JAKE'S JOI, NS LLC 650.00 JK OUTDOORS ULC 1,375.00 JK SPORTS INC 497.00 Board of Commissioners’ Meeting Minutes October 27, 2026 (Exhibit A) Page 8 of 11 Vendor Name Amount JOHNSON CONTROLS FIRE PROTECTIO(\ 1,314.57 JOHNSONJD ENA 118.88 JOHNSO /MARK T 385.52 KNOWBE4 INC 10,317.33 KNUTSON ELECTRIC REBUILDING 60.00 LAKE REGION HEAL THCA:RE 37.50 LAKE :REGION HEAL THCA:RE 70,704.64 LAKE SHIELD LLC 16,725.00 LAKES COMMUNITY COOPERATIVE 950.59 LAKES COUNTRY SERVICE COOPERATIV 6,434.00 LANGLIE/STEVEN 1,133.76 LARKIN HOFFMAN PUBLIC AFFAIRS INC 5,000.00 LARRY OTT INC 8,550.00 LAYMAN EXCAVATING 21,351.23 LEE!THOMAS 369.48 LEXISNEXIS 840.00 LIBERTY TIRE SBRVICES LLC 30,868.29 M-R SIGN CO INC 18,914.93 MARCO TECHNOLOGIES LLC 536.00 MARK SA:ND & GRAVEL CO 6,884.48 MAR1HALERffERENCE 319.84 MARTINN ALERIE 210.40 MAlliENYIBENJAMIN 380.00 MEYBR/GEORGE 152.00 MINNESOTA MOTOR COMPANY 1,987.64 MINNESOTA NATIVE LANDSCAPES 875.00 MINNKOTA ENVIRO SERVICES INC 189.60 MN BWSR 1,680.65 MN DEPT OF NATURAL RESOURCES -O"' 120.00 MNCCC L:OCKBOX 435.00 MNDRIVERSMANUALS.COM 97.03 MOORE ENGlNEERING INC 394.25 MORICAL BROTHERS INC 12,019.90 MOTOROLA SOLUTIONS CONNECTIVITY I 4,083.33 NAPA CENTRAL 355.30 NATURE'S CALL SEPTIC SERVICE 205.00 NELSON/CHAD 14.05 NORTH CENTRAL INC 17,312.00 NORTHLAND FIRE PROTECTION 1,2n.80 NORTHWEST TIRE INC 779.08 NYHUS FAMILY SALES INC 1,200.93 OFFICE OF MNIT SERVICES 3,578.89 Board of Commissioners’ Meeting Minutes October 27, 2026 (Exhibit A) Page 9 of 11 Vendor Name OLSON! TIRE & OIL OLYMPIC SALES INC OTTBR EXPRESS JOINT POWERS BOARD OTTBR TAIL CO SOLID WASTE OTTBR TAIL CO TREASURER OTTBR TAIL POWER COMPANY OTTBRTAIUCITY OF OUTDOOR RENOVATIONS LANDSCAPE & PALER/WALTER PARK REGION CO OP PARKERS PRAIRIE/CITY OF PDQ.COM PEBBLE LAKE AUTO PEMBERTON LAW PLLP PERHAM AREA EMS PH I LLIPPI/DR JAY PIEPER/JORDAN PLUNKETTS VARMENT GUARD POPE DOUGLAS SOLID WASTE MANAGEr PRECISE MRM LLC PRO AG FARMERS CO OP PRODUCTIVE AL TEHNATIVES INC PSICK CAPITOL SOLUTIONS INC PUBLIC GROUP LLClTHE PYE-BARKER FIRE & SAFETY LLC RDO EQUIPMENT CO RINKER MATERIALS ROCHOWJOSHUA RODER/BETSY ROSENGREN/,RUTH SAMUELSON/HEIDI SCHEMPP JR/BOBBY SCHMITZ/DUANE SC HORNACK/DAVID SIGN GUYS LLC SIMENGAARDIPAUL SONSTEBO/CHASE STAPLES BUSINESS CREDIT STEVE'S SANITATION INC STONEBROOKE ENGINEERING INC STRAND/JOHN SUMMIT FOOD SERVICE LLC Amount 399.10 160.88 27,500.00 93.54 770.74 5,264.49 18,073.33 425.00 164.16 260.30 130.00 9,800.00 75.55 4,258.50 8,973.83 475.00 140.00 232.96 729.30 3,100.00 364.16 37.14 3,916.66 3,080.00 389.00 1,555.59 1,800.00 1.33 90.00 180.88 90.00 237.76 1,100.00 301.60 1,287.00 88.46 331.28 244.84 22,547.41 20,002.15 161.25 11,278.75 Board of Commissioners’ Meeting Minutes October 27, 2026 (Exhibit A) Page 10 of 11 Vendor Name SUNSET LAW ENFORCEMENT LLC SUPER SEPTIC INC SWANSTON EQUIPMENT CORP SYSTEM S TECHNOLOGY TAG-UP THOMSON REUTERS -WEST TRITES!DAVID TSCHID/VCRAIG TYLER TECl,NOLOGIES INC TYSDAL CHIROPRACTIC LLC ULINE UNLIMITED AUTOGL.ASS CNC US FARM INNOVATIONS USIC LOCATING SERVICES LLC VANSTEENBURGIJEFFREY VARITECI, INDUSTRIES INC VESTIS VESTIS VESTIS VISUAL GOV SOLUTIONS LLC WADENA ASPHALT INC WELDWERX LLC WELLER'S GARAGE WELLPATH LLC WELLS FA:RGO WICKERIJASON WILKIN CO Sl,ERIFF WILSON/WARREN R Wl 1,ALL CO INTERIOR SERVICE WM CORPORA TE SERVICES INC WSB & ASSOCIATES INC Final Total: Vendor Name AMAZON CAPITAL SERVICES INC AMAZON CAPITAL SERVICES INC Final Total: Amount 2,791.05 149.00 87.69 275.00 24.50 4,315.46 287.16 101.08 1,500.00 220.00 4,664.16 413.41 1,925.00 467.21 252.20 805.75 68.91 641.84 118.75 675.31 11,680.00 215.62 82.93 57,837.66 38.00 500.00 40.00 257.52 990.00 52,785.08 73,184.83 811,303.80 Amount 2,128.99 626.40 2,755.39 Board of Commissioners’ Meeting Minutes October 27, 2026 (Exhibit A) Page 11 of 11 Vendor Name ADAMS/MEGAN BRENDLEJMERAN COOPER'S OFFICE SUPPLY INC COUNTIES PROVIDING TECHNOLOGY DAHL.EN/HALLE DNA DIAGNOSTICS CENTER INC FERGUS TIRE CENTER INC GIBBS/ANN HAATAJA CONTRACTING, INC HEGLUND/EMILY HOEPER/ANDREA LAKES COUNTRY SERVICE COOPERATIV LEEHY/JANET MAHLJBE-OTWA CAP INC MINNESOTA MOTOR COMPANY MINNKOTA ENVIRO SERVICES INC MN BUREAU OF CRIMINAL APPREHENSIC MN CORRECTIONS ASSOCIATION MN DEPT OF HLJMAN SERVICES OTTBR TAIL CO ATTORNEY'S OFFICE OTTBR TAIL POWER COMPANY OYSTER/JENNIFER PREMIER BIOTECH INC PREMIER BIOTECH LABS LLC QUALITY TOYOTA RARICK/JESSICA RUPP/MARY SCHOOL DIST 550 -UNDERWOOD SEIM/LACEY SPRABARY/ANDREA VAUGHAN/KAYLEE VICTOR LUNDEEN COMPANY WI, IPPL:E/V ANESSA Final Total: Vendor Name INDEPENDENT CONTRACT SERVICES OF LAKE REGION HEALTHCARE LAKELAND AUTO REPAIR LLC LEIGHTON MEDIA -FERGUS FALLS MINNKOTA ENVIRO SERVICES INC MNCCC l..OCKBOX OTTER EXPRESS JOINT POWERS BOARD SANOFI PASTEUR INC SCHMIDT/JANE Final Total: Amount 13.91 66.76 2,754.00 261.00 17.22 232.00 969.03 90.48 48,374.95 459.56 20.00 16,956.75 20.00 58,634.72 232.22 160.80 600.00 150.00 5,107.68 7,705.00 75.53 47.52 1,663.75 978.35 280.14 98.07 46.26 80,000.00 10.69 51.89 100.03 331.40 62.51 226,572.22 Amount 6,084.89 2,000.00 66.44 250.00 44.40 8,392.24 1,050.00 3,764.25 58.87 21 ,711.09 COMMISSIONER'S VOUCHERS ENTRIES10/29/2026 Kpolejewsk N N D 4 N Otter Tail County Auditor Audit List for Board Page 1 Print List in Order By: Save Report Options?: Type of Audit List: on Audit List?: Paid on Behalf Of Name Explode Dist. Formulas?: D - Detailed Audit List S - Condensed Audit List 1 - Fund (Page Break by Fund) 2 - Department (Totals by Dept) 3 - Vendor Number 4 - Vendor Name 10:47:32AM r.:1 INTtGRATCO 11:;:.1 FINANCIAL SYSTEMS COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:47:32AM10/29/2026 Kpolejewsk General Revenue Fund Copyright 2010-2026 Integrated Financial Systems 01-061-000-0000-6171 20,000.00 ACCT 10193571 VIRTUAL TRAINING 1101182624 Tuition And Education Expenses Y 01-061-000-0000-6342 1,021.00 ACCT OT16 C131933-01 AR2123054 Service Agreements N 50-000-000-0120-6859 2,626.06 ELECTRONIC DISPOSALS 10/23/26 5061 Electronic Disposal N 01-201-000-0000-6491 53.79 ACCT AA822 OXYGEN 0012047284 General Supplies N 01-205-000-0000-6273 13,500.00 CUS-0000203 ME FEE Q3 2026 CINV26-011419 Coroner Expense N 01-205-000-0000-6273 525.00 CUS-0000203 ADMIN FEE CINV26-011419 Coroner Expense N 10-303-000-0000-6369 15,995.00 WETLAND DELINEATION 26I1004BE Miscellaneous Charges N 10-304-000-0000-6565 107.91 ACCT #5000 - OIL 137114087 Fuels - Diesel N 10-304-000-0000-6572 153.72 ACCT #14300167 - PARTS 143035058 Repair And Maintenance Supplies N 01-122-000-0000-6304 449.50 TOW 2019 SIERRA K1500 10/21 P-32286 Repair And Maintenance N 18037 ACCENTURE LLP 20,000.0018037 5549 ADVANCED BUSINESS METHODS INC 1,021.005549 14813 ALBANY RECYCLING CENTER 2,626.0614813 765 AMERICAN WELDING & GAS INC 53.79765 5244 ANOKA CO TREASURY OFFICE 14,025.005244 16459 AQUATIC ECOSOLUTIONS INC 15,995.0016459 15996 AUTO VALUE MILLS 107.9115996 410 AUTO VALUE PERHAM 153.72410 17112 AVT FERGUS FALLS 449.5017112 Page 2Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 1 Transactions 1 Transactions 2 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions ACCENTURE LLP ADVANCED BUSINESS METHODS INC ALBANY RECYCLING CENTER AMERICAN WELDING & GAS INC ANOKA CO TREASURY OFFICE AQUATIC ECOSOLUTIONS INC AUTO VALUE MILLS AUTO VALUE PERHAM AVT FERGUS FALLS Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:47:32AM10/29/2026 Kpolejewsk General Revenue Fund Copyright 2010-2026 Integrated Financial Systems 01-002-000-0000-6240 120.00 EMS PUBLIC HEARING NOTICE 47408 Publishing & Advertising N 50-000-000-0120-6278 1,292.50 GROUNDWATER SVCS 7/20-10/02 23561055.03-4 Engineering & Hydrological Testing N 50-399-000-0000-6306 6,207.88 REPAIRS TO ROLL OFF #018 003218 Repair/Maint. Equip Y 50-399-000-0000-6306 6,154.97 REPAIRS TO ROLL OFF #906 003219 Repair/Maint. Equip Y 01-112-101-0000-6342 80.00 FLOWER BED MAINTENANCE 7/30/26 112113 Service Agreements Y 01-112-101-0000-6342 80.00 FLOWER BED MAINTENANCE 9/14/26 112128 Service Agreements Y 10-304-000-0000-6315 6,939.82 ACCT #O2740 - UNIT #415 & #416 INV-43178 Radio Repair Charges N 01-480-000-0000-6330 123.12 MILEAGE FPL 12/15/2026 Mileage N 10-304-000-0000-6572 395.37 ACCT #100330 - PARTS 085024 Repair And Maintenance Supplies N 10-304-000-0000-6306 67.25 ACCT #100330 - REPAIR 085040 Repair/Maint. Equip N 10-304-000-0000-6306 1,648.78 ACCT #100330 - REPAIR 085062 Repair/Maint. Equip N 10-304-000-0000-6572 4,384.80 ACCT #100330 - TIRES 085073 Repair And Maintenance Supplies N 10-304-000-0000-6572 39.60 ACCT #100330 - PARTS 085095 Repair And Maintenance Supplies N 10-304-000-0000-6572 134.40 ACCT #100330 - TIRES 085124 Repair And Maintenance Supplies N 10-304-000-0000-6572 165.34 ACCT #100330 - PARTS 085133 Repair And Maintenance Supplies N 10-304-000-0000-6306 69.92 ACCT #100330 - REPAIR 085141 Repair/Maint. Equip N 50-399-000-0000-6304 698.18 ACCT 100331 SERVICE 085209 Repair And Maint-Vehicles Y 50-399-000-0000-6304 1,146.61 ACCT 100331 SERVICE 085215 Repair And Maint-Vehicles Y 11932 BARNESVILLE RECORD REVIEW 120.0011932 5765 BARR ENGINEERING CO 1,292.505765 6573 BERG'S WELDING & REPAIR LLC 12,362.856573 17814 BLOOM BAR LLC/THE 160.0017814 24 BRANDON COMMUNICATIONS INC 6,939.8224 18201 BREITKREUTZ/DOUG 123.1218201 3423 BUY-MOR PARTS & SERVICE LLC Page 3Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 2 Transactions 2 Transactions 1 Transactions 1 Transactions BARNESVILLE RECORD REVIEW BARR ENGINEERING CO BERG'S WELDING & REPAIR LLC BLOOM BAR LLC/THE BRANDON COMMUNICATIONS INC BREITKREUTZ/DOUG Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:47:32AM10/29/2026 Kpolejewsk Solid Waste Fund Copyright 2010-2026 Integrated Financial Systems 14-302-000-0000-6687 68.80 UNIT 314 INSTALL LIGHT 12124 Maintenance Equipment- Current Year N 01-112-108-0000-6485 458.36 ACCT 60429710 SUPPLIES 10783234 Custodian Supplies N 01-112-101-0000-6485 442.04 ACCT 60429710 SUPPLIES 10783236 Custodian Supplies N 02-815-000-0000-6369 600.00 APPLES FOR EMPLOYEES 3380 Miscellaneous Charges N 50-399-000-0000-6565 129.51 ACCT 4200 DEF BULK 266038 Fuels N 01-002-000-0000-6333 42.00 SNACKS 10/13/2026 Meeting/Event Costs N 23-705-000-7001-6828 2,863.75 2025 TIF REPORTING INV107871 Site Development (TIF)N 01-063-000-0000-6344 37.66 ACCT 33240 BALLOTS CARLISLE CD2168320 Programming, Support, Warranty N 01-063-000-0000-6344 896.02 ACCT 33240 TEST BALLOTS CD2168808 Programming, Support, Warranty N 50-399-000-0000-6300 2,760.00 SERVICE CALL & ADJUST DOOR 771941-2 Building And Grounds Maintenance Y 8,750.253423 9087 CODE 4 SERVICES INC 68.809087 14999 COLE PAPERS INC 900.4014999 14207 COUNTRY BLOSSOM FARM LLC 600.0014207 9672 DEANS DISTRIBUTING 129.519672 11391 DOUBLE A CATERING 42.0011391 5485 EHLERS & ASSOCIATES INC 2,863.755485 2581 ELECTION SYSTEMS & SOFTWARE LLC 933.682581 14552 EZ OPEN GARAGE DOOR 2,760.0014552 18488 FARGO LINE-X INC Page 4Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 10 Transactions 1 Transactions 2 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 2 Transactions 1 Transactions BUY-MOR PARTS & SERVICE LLC CODE 4 SERVICES INC COLE PAPERS INC COUNTRY BLOSSOM FARM LLC DEANS DISTRIBUTING DOUBLE A CATERING EHLERS & ASSOCIATES INC ELECTION SYSTEMS & SOFTWARE LLC EZ OPEN GARAGE DOOR Otter Tail County Auditor FRYBERGER BUCHANAN SMITH & FEDERICK PA FILE25156.000000-DFB COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:47:32AM10/29/2026 Kpolejewsk Capital Improvement Fund Copyright 2010-2026 Integrated Financial Systems 14-303-000-0000-6687 7,510.00 UNIT 363 ACCESSORIES 34335 Engineering Equipment - Current Year N 10-304-000-0000-6572 94.00 ACCT #010048 - PARTS 066429 Repair And Maintenance Supplies N 01-112-102-0000-6572 1,699.99 REFREIGERATOR-JAIL BREAK ROOM 29628 Repair And Maintenance/Supplies N 10-302-000-0000-6500 49.99 ACCT #6199 - MAILBOX - JOB #40 223225 Supplies N 50-000-000-0000-6674 934.98 10/08 FRIDGE/MICROWAVE 30243 2022A Bond Eligible Expenses N 50-000-000-0170-6291 9,100.00 HAULING CHARGES 58990 Contract Transportation N 50-000-000-0120-6291 1,700.00 HAULING CHARGES 59036 Contract Transportation N 50-000-000-0120-6291 1,700.00 HAULING CHARGES 59036 Contract Transportation N 50-000-000-0170-6291 7,150.00 HAULING CHARGES 59036 Contract Transportation N 50-399-000-0000-6291 2,490.00 HAULING CHARGES 58990 Contract Transportation N 50-399-000-0000-6291 3,735.00 HAULING CHARGES 59036 Contract Transportation N 01-112-000-0000-6304 32.00 10/23 LAWN MOWER FLAT REPAIR 419172 Repair And Maintenance-Vehicle N 02-103-000-0000-6369 4,170.93 ACCT 27-2711103 LAREDO SEP2026 0244963-IN Miscellaneous Charges N 23-706-000-0000-6290 372.00 GENERAL MATTERS JUL 1-SEP 30 Contracted Services Y 01-201-000-0000-6426 40.90 ACCT 1002151493 TOURNIQUET 036492825 Uniform Allowance N 01-201-000-0000-6426 82.59 ACCT 1002151493 PUBLIC SAFETY 036496114 Uniform Allowance N 7,510.0018488 8321 FELLING TRAILERS INC 94.008321 5322 FERGUS HOME & HARDWARE INC 2,684.965322 2153 FERGUS POWER PUMP INC 25,875.002153 35018 FERGUS TIRE CENTER INC 32.0035018 13636 FIDLAR TECHNOLOGIES INC 4,170.9313636 18035 372.0018035 392 GALLS LLC Page 5Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 3 Transactions 6 Transactions 1 Transactions 1 Transactions 1 TransactionsFRYBERGER BUCHANAN SMITH & FEDERICK PA FARGO LINE-X INC FELLING TRAILERS INC FERGUS HOME & HARDWARE INC FERGUS POWER PUMP INC FERGUS TIRE CENTER INC FIDLAR TECHNOLOGIES INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:47:32AM10/29/2026 Kpolejewsk General Revenue Fund Copyright 2010-2026 Integrated Financial Systems 01-201-000-0000-6426 59.07 ACCT 1002151493 SS POLO 036496116 Uniform Allowance N 01-201-000-0000-6426 39.71 ACCT 1002151493 KNIT CAP 036504529 Uniform Allowance N 01-201-000-0000-6426 226.78 ACCT 1002151493 SS POLOS 036534876 Uniform Allowance N 01-201-000-0000-6426 215.00 ACCT 1002151493 BOOTS 036542307 Uniform Allowance N 10-302-000-0000-6331 6.46 MEAL REIMBURSEMENT 10/7/2026 Travel Expenses N 10-302-000-0000-6331 13.24 MEAL REIMBURSEMENT 9/30/2026 Travel Expenses N 02-612-000-0000-6330 266.00 AIS INSPECTOR MILEAGE 08/29/2026 Mileage Y 01-480-000-0000-6330 139.84 MILEAGE-MDH STANDARDIZATION 10/23/2026 Mileage N 09-507-510-0000-6300 1,050.00 FINAL PAYMENT MILL REPAIRS ADA 2150 Building And Grounds Maintenance N 09-507-510-0000-6300 1,250.00 FINAL PAYMENT MILL REPAIRS ADA 2151 Building And Grounds Maintenance N 09-507-510-0000-6300 1,937.50 FINAL PAYMENT MILL REPAIRS ADA 2152 Building And Grounds Maintenance N 10-304-000-0000-6572 289.84 ACCT #1012 - PARTS 84029 Repair And Maintenance Supplies N 01-112-101-0000-6572 1,508.00 REPLACE CHILLER PUMP 5/4 &5/12 14192 Repair And Maintenance/Supplies N 10-302-000-0000-6331 9.65 MEAL REIMBURSEMENT 10/7/2026 Travel Expenses N 664.05392 8560 GOERDT/STEPHEN 19.708560 15941 GONTAREK/JONAH 266.0015941 18163 HALVORSON/ALEX 139.8418163 18434 HAUCK HANDYMAN SERVICES LLC 4,237.5018434 5615 HAUKOS SALES LLC 289.845615 17798 IDEAL SERVICE INC 1,508.0017798 5617 JENNEN/ADRION 9.655617 Page 6Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 6 Transactions 2 Transactions 1 Transactions 1 Transactions 3 Transactions 1 Transactions 1 Transactions 1 Transactions GALLS LLC GOERDT/STEPHEN GONTAREK/JONAH HALVORSON/ALEX HAUCK HANDYMAN SERVICES LLC HAUKOS SALES LLC IDEAL SERVICE INC JENNEN/ADRION Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:47:32AM10/29/2026 Kpolejewsk Parks and Trails Copyright 2010-2026 Integrated Financial Systems 09-507-570-4001-6369 897.00 GRAPHICS FOR KIOSKS IN VERGAS 26527 Miscellaneous Charges N 09-507-570-4004-6369 448.00 GRAPHICS FOR KIOSKS IN VERGAS 26527 Miscellaneous Charges MAPLEWOOD N 01-201-000-0000-6426 140.00 CLOTHING & EMBROIDERY SVC 98855 Uniform Allowance N 10-304-000-0000-6572 157.08 ACCT #174818 - PARTS 104956135 Repair And Maintenance Supplies N 10-304-000-0000-6572 95.91 ACCT #174818 - PARTS 104960200 Repair And Maintenance Supplies N 10-304-000-0000-6572 210.12 ACCT #174818 - PARTS 104960402 Repair And Maintenance Supplies N 02-286-000-0000-6276 7,716.33 PERSONNEL EXPENSES 03/27/2026 Professional Services N 02-286-000-0000-6276 7,995.16 PERSONNEL EXPENSES 04/10/2026 Professional Services N 02-286-000-0000-6276 9,084.99 PERSONNEL EXPENSES 04/24/2026 Professional Services N 02-286-000-0000-6276 7,162.29 PERSONNEL EXPENSES 05/08/2026 Professional Services N 02-286-000-0000-6276 8,783.39 PERSONNEL EXPENSES 05/22/2026 Professional Services N 02-286-000-0000-6276 6,744.86 PERSONNEL EXPENSES 06/05/2026 Professional Services N 02-286-000-0000-6276 8,145.30 PERSONNEL EXPENSES 06/18/2026 Professional Services N 02-286-000-0000-6276 6,824.31 PERSONNEL EXPENSES 07/17/2026 Professional Services N 02-286-000-0000-6276 8,346.60 PERSONNEL EXPENSES 07/31/2026 Professional Services N 02-286-000-0000-6276 4,902.03 PERSONNEL EXPENSES 08/14/2026 Professional Services N 02-286-000-0000-6276 4,531.74 PERSONNEL EXPENSES 08/28/2026 Professional Services N 02-286-000-0000-6276 2,280.46 PERSONNEL EXPENSES 09/11/2026 Professional Services N 10-302-000-0000-6500 19.99 ACCT #040416 - SUPPLIES 1636 Supplies N 10-304-000-0000-6572 0.66 ACCT #040416 - PARTS 2402 Repair And Maintenance Supplies N 10-304-000-0000-6572 17.97 ACCT #040416 - SUPPLIES 38537 Repair And Maintenance Supplies N 10-304-000-0000-6406 25.48 ACCT #040416 - SUPPLIES 38612 Office and Garage Supplies N 14323 JH SIGNS & DESIGNS INC 1,345.0014323 39324 JK SPORTS INC 140.0039324 1002 KIMBALL MIDWEST 463.111002 16360 LAKE REGION HEALTHCARE 82,517.4616360 10350 LAKES COMMUNITY COOPERATIVE 64.1010350 17932 LE-AST SERVICES COUNSELING Page 7Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 2 Transactions 1 Transactions 3 Transactions 12 Transactions 4 Transactions JH SIGNS & DESIGNS INC JK SPORTS INC KIMBALL MIDWEST LAKE REGION HEALTHCARE LAKES COMMUNITY COOPERATIVE Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:47:32AM10/29/2026 Kpolejewsk General Revenue Fund Copyright 2010-2026 Integrated Financial Systems 01-201-000-0000-6433 180.00 RETAINER FEE SEP 2026 2209 Special Medical 6 50-399-000-0000-6290 520.00 MOWING SEP 2026 2438 Contracted Services.Y 50-399-000-0000-6300 4,150.00 10/18 CONCRETE LABOR 2439 Building And Grounds Maintenance Y 01-201-000-0000-6171 186.96 MILEAGE - SUPERVISORY TRAINING 10/22/2026 Tuition And Education Expenses N 01-201-000-0000-6171 13.72 MEALS - SUPERVISORY TRAINING 10/22/2026 Tuition And Education Expenses N 50-000-000-0120-6858 21,060.90 ACCT 56530 TIRE DISPOSALS 3344188 Tire Disposal N 50-000-000-0130-6858 2,272.48 ACCT 56532 TIRE DISPOSALS 3344189 Tire Disposal N 50-000-000-0120-6858 1,780.00 ACCT 56530 TIRE DISPOSAL 3347795 Tire Disposal N 50-000-000-0110-6858 25,511.88 ACCT 56531 TIRE DISPOSALS 3347796 Tire Disposal N 50-399-000-0000-6453 371.58 ACCT 23-52A28 GLOVES 0330035-IN Ppe & Safety Equip.&Supplies N 10-302-000-0000-6515 258.81 SIGNS 232823 Signs And Posts N 10-302-000-0000-6515 548.15 SIGNS 232824 Signs And Posts N 10-302-000-0000-6515 3,058.90 SIGNS 232825 Signs And Posts N 10-302-000-0000-6515 359.05 ADOPT A HIGHWAY SIGNS 232825 Signs And Posts N 01-061-000-0000-6342 2,149.33 ACCT OT00 CN115529-08 INV15877698 Service Agreements N 01-112-109-0000-6342 700.00 ACCT 101028 WEED CONTROL 7/6 2859 Service Agreements N 180.0017932 5677 LEE PROPERTY CARE 4,670.005677 7011 LEE/ASHLEY 200.687011 10094 LIBERTY TIRE SERVICES LLC 50,625.2610094 41638 LOCATORS & SUPPLIES INC 371.5841638 511 M-R SIGN CO INC 4,224.91511 2721 MARCO TECHNOLOGIES LLC 2,149.332721 13995 MINNESOTA NATIVE LANDSCAPES Page 8Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 2 Transactions 2 Transactions 4 Transactions 1 Transactions 4 Transactions 1 Transactions LE-AST SERVICES COUNSELING LEE PROPERTY CARE LEE/ASHLEY LIBERTY TIRE SERVICES LLC LOCATORS & SUPPLIES INC M-R SIGN CO INC MARCO TECHNOLOGIES LLC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:47:32AM10/29/2026 Kpolejewsk General Revenue Fund Copyright 2010-2026 Integrated Financial Systems 50-000-000-0150-6379 15.00 CERTIFICATION RENEWAL-MOUNTS 10/08/2026 Miscellaneous Charges N 50-000-000-0150-6379 15.00 CERTIFICATION RENEWAL-BUCHANAN 10/08/2026 Miscellaneous Charges N 50-000-000-0150-6379 15.00 CERTIFICATION RENEWAL-GERFSRUD 10/08/2026 Miscellaneous Charges N 50-000-000-0150-6379 15.00 CERTIFICATION RENEWAL-BENGTSON 10/08/2026 Miscellaneous Charges N 50-000-000-0150-6379 15.00 CERTIFICATION RENEWAL-MEIS 10/08/2026 Miscellaneous Charges N 50-000-000-0150-6379 15.00 CERTIFICATION RENEWAL-PALER 10/08/2026 Miscellaneous Charges N 10-304-000-0000-6572 1,058.73 ACCT #1013254 - PARTS 90010578 Repair And Maintenance Supplies N 10-304-000-0000-6572 63.16 ACCT #1013254 - PARTS 90010682 Repair And Maintenance Supplies N 02-214-000-0000-6342 1,600.00 ACCT 1209628214 VESTA SAAS 1D 8471006537 Service Agreements N 02-214-000-0000-6342 4,000.00 ACCT 1209628214 VESTA SAAS 1D 8471006544 Service Agreements N 02-612-000-0000-6330 452.20 AIS INSPECTOR MILEAGE 08/11/2026 Mileage N 02-612-000-0000-6330 263.72 AIS INSPECTOR MILEAGE 09/11/2026 Mileage N 01-112-109-0000-6485 1,175.00 10/14 6V DEEP CYC BATT/ LABOR 252216 Custodian Supplies Y 01-112-101-0000-6342 395.00 ACCT CLNOTTGSB520 RE-CERT 69441 Service Agreements N 01-112-108-0000-6342 395.00 ACCT CLNOTTGSB520 RE-CERT 69442 Service Agreements N 01-112-104-0000-6342 395.00 ACCT CLNOTTGSB520 RE-CERT 69443 Service Agreements N 01-112-104-0000-6342 503.50 ACCT OTTCTYJAIL -SERVICE 70423 Service Agreements N 700.0013995 1576 MN POLLUTION CONTROL AGENCY 90.001576 9693 MONROE TOWMASTER LLC 1,121.899693 12030 MOTOROLA SOLUTIONS CONNECTIVITY INC 5,600.0012030 17367 NORDSTROM/KRIS 715.9217367 16774 NORTHERN SAFETY LLC 1,175.0016774 14257 NORTHLAND FIRE PROTECTION 1,688.5014257 Page 9Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 6 Transactions 2 Transactions 2 Transactions 2 Transactions 1 Transactions 4 Transactions MINNESOTA NATIVE LANDSCAPES MN POLLUTION CONTROL AGENCY MONROE TOWMASTER LLC MOTOROLA SOLUTIONS CONNECTIVITY INC NORDSTROM/KRIS NORTHERN SAFETY LLC NORTHLAND FIRE PROTECTION Otter Tail County Auditor POPE DOUGLAS SOLID WASTE MANAGEMENT COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:47:32AM10/29/2026 Kpolejewsk Road And Bridge Fund Copyright 2010-2026 Integrated Financial Systems 10-304-000-0000-6572 496.85 ACCT #BP0010422 - PARTS PSO345048-1 Repair And Maintenance Supplies N 10-304-000-0000-6572 385.76 ACCT #BP0010422 - PARTS PSO345048-2 Repair And Maintenance Supplies N 10-304-000-0000-6306 5,634.80 ACCT #BP0010422 - REPAIR SWO084260-1 Repair/Maint. Equip N 10-304-000-0000-6306 5,013.23 ACCT #BP0010422 - REPAIR SWO085438-1 Repair/Maint. Equip N 01-201-000-0000-6304 60.00 UNIT 2307 OIL CHANGE 10/27/2026 Repair And Maintenance N 50-399-000-0000-6304 814.22 PARTS FOR MAINTENANCE 16972 Repair And Maint-Vehicles N 01-201-000-0000-6304 529.77 UNIT 2202 OIL CHANGE 48285 Repair And Maintenance N 50-399-000-0000-6306 1,515.00 BLAST & REPAINT ROLL OFF #126 1113 Repair/Maint. Equip Y 01-201-000-0000-6396 263.25 CONFISCATED DRUGS JUN 26 28715 Special Investigation N 01-063-000-0000-6369 295.43 ACCT 907554 SCALE FEES 09/24/2026 Miscellaneous Charges N 50-000-000-0000-6981 10.50 ACCT 1000 SCALE FEES SEP2026 Organic Grant Expense N 01-043-000-0000-6232 24,000.00 POSTAGE-TAX STATEMENTS 30487 Printing N 10104 NUSS TRUCK & EQUIPMENT 10,759.1210104 3758 OLSON TIRE & OIL 60.003758 4233 OLYMPIC SALES INC 814.224233 45464 PEBBLE LAKE AUTO 529.7745464 7145 PETE'S AUTOBODY LLC 1,515.007145 10214 263.2510214 11107 PRAIRIE LAKES MUNICIPAL SOLID WASTE 305.9311107 17958 PRIMADATA LLC 24,000.0017958 9166 RDO EQUIPMENT CO Page 10Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates - 4 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 2 Transactions 1 Transactions POPE DOUGLAS SOLID WASTE MANAGEMENT NUSS TRUCK & EQUIPMENT OLSON TIRE & OIL OLYMPIC SALES INC PEBBLE LAKE AUTO PETE'S AUTOBODY LLC PRAIRIE LAKES MUNICIPAL SOLID WASTE PRIMADATA LLC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:47:32AM10/29/2026 Kpolejewsk General Revenue Fund Copyright 2010-2026 Integrated Financial Systems 01-112-000-0000-6687 66.29 ACCT 0313001 PARTS P7949749 Equipment- Current Year N 01-112-000-0000-6687 47.46 ACCT 0313001 PARTS RETURNED P7949749 Equipment- Current Year N 10-304-000-0000-6572 206.18 ACCT #99227 - PARTS 857029FX1 Repair And Maintenance Supplies N 10-304-000-0000-6572 227.76 ACCT #99227 - PARTS 858128FX3 Repair And Maintenance Supplies N 10-304-000-0000-6572 115.99 ACCT #99227 - PARTS 858659FX1 Repair And Maintenance Supplies N 10-304-000-0000-6572 76.23 ACCT #99227 - PARTS 858698FX1 Repair And Maintenance Supplies N 10-304-000-0000-6572 438.26 ACCT #99227 - PARTS 858702F Repair And Maintenance Supplies N 10-304-000-0000-6572 702.93 ACCT #99227 - PARTS 858808F Repair And Maintenance Supplies N 10-304-000-0000-6572 60.46 ACCT #99227 - PARTS 858808FX1 Repair And Maintenance Supplies N 10-304-000-0000-6572 67.56 ACCT #99227 - PARTS 858808FX2 Repair And Maintenance Supplies N 10-304-000-0000-6572 31.84 ACCT #99227 - PARTS 858989F Repair And Maintenance Supplies N 10-304-000-0000-6572 1,260.25 ACCT #99227 - PARTS 859090F Repair And Maintenance Supplies N 10-304-000-0000-6572 253.17 ACCT #99227 - PARTS 859236F Repair And Maintenance Supplies N 10-304-000-0000-6572 280.36 ACCT #99227 - PARTS 859247F Repair And Maintenance Supplies N 10-304-000-0000-6572 50.30 ACCT #99227 - PARTS 859536F Repair And Maintenance Supplies N 10-304-000-0000-6572 20.79 ACCT #99227 - PARTS 859538F Repair And Maintenance Supplies N 10-304-000-0000-6572 100.78 ACCT #99227 - PARTS 859538FX1 Repair And Maintenance Supplies N 10-304-000-0000-6572 41.30 ACCT #99227 - PARTS 859733F Repair And Maintenance Supplies N 10-304-000-0000-6572 376.04 ACCT #99227 - PARTS 859733FX1 Repair And Maintenance Supplies N 10-304-000-0000-6572 884.18 ACCT #99227 - PARTS 859988F Repair And Maintenance Supplies N 10-304-000-0000-6572 91.69 ACCT #99227 - PARTS 859988FX1 Repair And Maintenance Supplies N 10-304-000-0000-6572 1,603.14 ACCT #99227 - PARTS 860072F Repair And Maintenance Supplies N 10-304-000-0000-6572 308.70 ACCT #99227 - PARTS 860089F Repair And Maintenance Supplies N 10-304-000-0000-6572 79.14 ACCT #99227 - PARTS 860096F Repair And Maintenance Supplies N 10-304-000-0000-6572 32.88 ACCT #99227 - PARTS 860097F Repair And Maintenance Supplies N 10-304-000-0000-6572 508.17 ACCT #99227 - PARTS 860136F Repair And Maintenance Supplies N 10-304-000-0000-6572 32.88 ACCT #99227 - PARTS 860172F Repair And Maintenance Supplies N 10-304-000-0000-6572 128.31 ACCT #99227 - PARTS CM856047F Repair And Maintenance Supplies N 10-304-000-0000-6572 128.31 ACCT #99227 - PARTS CM856618F Repair And Maintenance Supplies N 10-304-000-0000-6572 138.00 ACCT #99227 - PARTS CM857593F Repair And Maintenance Supplies N 10-304-000-0000-6572 138.00 ACCT #99227 - PARTS CM858659F Repair And Maintenance Supplies N 10-304-000-0000-6572 276.00 ACCT #99227 - PARTS CM859090F Repair And Maintenance Supplies N 10-304-000-0000-6572 32.88 ACCT #99227 - PARTS CM860172F Repair And Maintenance Supplies N 18.839166 8622 RDO TRUCK CENTERS LLC 7,009.488622 Page 11Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates - 2 Transactions - - - - - - 31 Transactions RDO EQUIPMENT CO RDO TRUCK CENTERS LLC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:47:32AM10/29/2026 Kpolejewsk General Revenue Fund Copyright 2010-2026 Integrated Financial Systems 01-601-000-0000-6270 128,750.00 ACCT 5007218 Q3 2026 MOA YD 0300040433 Misc Professional-Educator N 01-149-000-0000-6369 61.00 PROFESSIONAL SERVICES 420891 Miscellaneous Charges Y 01-061-000-0000-6680 73,012.00 ACCT 1079757 HARDWARE B21836560 Computer Hardware N 01-061-000-0000-6680 2,252.00 ACCT 1079757 HP CARE PACKS B21837998 Computer Hardware N 01-149-000-0000-6354 1,881.52 UNIT 407 REPLACEMENT & PARTS 15441 Insurance Claims N 10-303-000-0000-6278 10,706.77 SERVICE 49629 Engineering Consultant N 01-112-000-0000-6310 1,626.89 ACCT OTCGOV MAINT ICE MACHINE 35314 Outside Vendor Services N 01-149-000-0000-6354 80.00 CHIP REPAIR UNIT 97 15710 Insurance Claims N 10-302-000-0000-6572 460.38 ACCT #000019 - PARTS IN060-2007735 Repair And Maintenance Supplies N 50-000-000-0000-6290 53.29 ACCT 160002035 SERVICES 2520850519 Contracted Services N 50-000-000-0120-6290 70.87 ACCT 160002806 SERVICES 2530593109 Contracted Services.N 50-390-000-0000-6290 53.29 ACCT 160002035 SERVICES 2520850519 Contracted Services.N 9547 REGENTS OF THE UNIVERSITY OF MN 128,750.009547 10842 RINKE NOONAN LAW FIRM 61.0010842 10001 SHI INTERNATIONAL CORP 75,264.0010001 17410 TARPS R USS 1,881.5217410 14637 TERRACON CONSULTANTS INC 10,706.7714637 7726 TWEETON REFRIGERATION INC 1,626.897726 14162 UNLIMITED AUTOGLASS INC 80.0014162 2909 VARITECH INDUSTRIES INC 460.382909 13620 VESTIS Page 12Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 2 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions REGENTS OF THE UNIVERSITY OF MN RINKE NOONAN LAW FIRM SHI INTERNATIONAL CORP TARPS R USS TERRACON CONSULTANTS INC TWEETON REFRIGERATION INC UNLIMITED AUTOGLASS INC VARITECH INDUSTRIES INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:47:32AM10/29/2026 Kpolejewsk Solid Waste Fund Copyright 2010-2026 Integrated Financial Systems 50-399-000-0000-6290 106.59 ACCT 160002035 252085025 Contracted Services.N 01-112-108-0000-6342 118.75 ACCT 890331400 SERVICE 2520850489 Service Agreements N 50-000-000-0120-6306 34.32 ACCT 3842300 COOLANT-ENGINE IN002626835 Repair/Maint. Equip N 284.0413620 18284 VESTIS 118.7518284 2086 ZIEGLER INC 34.322086 562,938.14 Page 13Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 4 Transactions 1 Transactions 1 Transactions Final Total ............78 Vendors 183 Transactions VESTIS VESTIS ZIEGLER INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES10:47:32AM10/29/2026 Kpolejewsk Solid Waste Fund Copyright 2010-2026 Integrated Financial Systems Page 14Audit List for Board Otter Tail County Auditor Community Development Authority Amount 281,055.32 General Revenue Fund 1 93,870.31 General Fund Dedicated Accounts 2 5,582.50 Parks and Trails 9 65,374.85 Road And Bridge Fund 10 7,578.80 Capital Improvement Fund 14 3,235.75 23 106,240.61 Solid Waste Fund 50 562,938.14 NameFundRecap by Fund All Funds Total Approved by,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10/29/2026 Kpolejewsk N N D 4 N Otter Tail County Auditor Audit List for Board Page 1 Print List in Order By: Save Report Options?: Type of Audit List: on Audit List?: Paid on Behalf Of Name Explode Dist. Formulas?: D - Detailed Audit List S - Condensed Audit List 1 - Fund (Page Break by Fund) 2 - Department (Totals by Dept) 3 - Vendor Number 4 - Vendor Name 11:06:28AM MANUAL WARRANTS/VOIDS/CORRECTIONS r.:1 INTtGRATCO 11:;:.1 FINANCIAL SYSTEMS Account/Formula 11:06:28AM10/29/2026 Kpolejewsk General Revenue Fund Copyright 2010-2026 Integrated Financial Systems 01-061-000-0000-6406 14.72 WIRELESS MOUSE 13L1-H6LW-WH6H Office Supplies 23 N 01-061-000-0000-6406 127.56 SURGE PROTECTORS 1L47-G9LW-43FD Office Supplies 2 N 01-061-000-0000-6406 150.88 LAMINATOR MACHINE AND SHEETS 1PQF-7M97-3WHC Office Supplies 1 N 01-112-000-0000-6572 51.11 EYE WASH SPRAY STATION 1DLN-YKPJ-4PJX Repair And Maintenance/Supplies 3 N 01-112-000-0000-6572 70.03 MAINTENANCE SUPPLIES 1RHX-THDJ-PTWJ Repair And Maintenance/Supplies 24 N 01-112-000-0000-6672 285.58 SUPPLIES 1VJP-R66V-1WLV Remodeling Supplies 4 N 01-121-000-0000-6406 100.65 OFFICE SUPPLIES 1YHW-3NKF-LG4M Office Supplies 5 N 01-201-000-0000-6677 666.96 CURVED MONITOR/STAND/KEYBOARD 191D-1R3P-7N4W Office Furniture And Equipment-Minor 39 N 01-201-000-0000-6389 409.95 DRONE SUPPLIES 1C9W-DFC6-NKL1 Drone Team 25 N 01-201-000-0000-6406 305.97 PORTABLE SCANDISK & LABELS 1CDN-7PXW-1LVL Office Supplies 34 N 01-201-000-0000-6406 51.15 FILE FOLDERS & LABELS 1CWF-Q6DD-6GWR Office Supplies 35 N 01-201-000-0000-6406 114.91 OFFICE SUPPLIES 1FXR-9YGR-D7WN Office Supplies 36 N 01-201-000-0000-6406 138.13 OFFICE SUPPLIES 1HNR-XRHP-9MP3 Office Supplies 32 N 01-201-000-0000-6406 76.32 OFFICE SUPPLIES 1KFP-TDTQ-VJYT Office Supplies 33 N 01-201-000-0000-6680 332.82 THUMB DRIVES 1PQH-17FV-K47F Computer Hdwe And Disks 40 N 01-201-000-0000-6406 29.43 MICROFIBER TOWELS/ENVELOPES 1RRL-DPGG-T3Y7 Office Supplies 31 N 01-201-000-0000-6677 99.98 HEATED CHAIR PADS 1X9N-MWHV-QCLJ Office Furniture And Equipment-Minor 37 N 01-201-000-0000-6677 794.97 CURVED MONITORS AND STAND 1XYV-CR97-3CPR Office Furniture And Equipment-Minor 38 N 10-304-000-0000-6487 59.59 MECHANIC TOOL BOXES 1L7H-FFLJ-CN11 Tools & Minor Equipment 21 N 11-406-000-0000-6406 231.69 SPECIMEN PAN,BINDERS,KLEENEX 1RRP-3VCV-3V7L Office Supplies 6 N 11-407-200-0022-6488 56.94 NITRILE EXAM GLOVES 1X7J-RRWF-4RJ3 Phn Program Supplies - Wic 9 N 11-407-300-0071-6488 46.92 BANDAGES AND ALCOHOL PADS 1X7J-RRWF-4RJ3 Imz Program Supplies 8 N 11-407-600-0090-6406 36.02 OFFICE SUPPLIES-PENS 1X7J-RRWF-4RJ3 Office Supplies 7 N 11-420-601-0000-6406 10.49 IPHONE CASES 14RG-M9HR-RP4N Office Supplies 18 N 11-420-601-0000-6406 5.78 AA BATERIES 1DVY-XGCQ-4HMT Office Supplies 14 N 11-420-601-0000-6677 8.43 CASE AND SCREEN PROTECTOR 1F79-MHRL-RQRN Office Furniture And Equipment - Im 12 N 11-420-601-0237-6171 16.99 FILE FOLDERS 1FQT-YQKR-V7HC Tuition And Education Expenses 22 N 11-420-601-0000-6677 8.50 MOUSEPADS 1K64-WK3W-3RJ7 Office Furniture And Equipment - Im 16 N 11-420-601-0000-6406 9.87 TAPE/NOTE PADS 1VC7-WLRV-6KWC Office Supplies 10 N 11-430-700-0000-6406 19.48 IPHONE CASES 14RG-M9HR-RP4N Office Supplies 19 N 11-430-700-0000-6406 10.74 AA BATERIES 1DVY-XGCQ-4HMT Office Supplies 15 N 11-430-700-0000-6677 15.65 CASE AND SCREEN PROTECTOR 1F79-MHRL-RQRN Office Furniture And Equipment - Ss 13 N 11-430-700-0000-6677 15.79 MOUSEPADS 1K64-WK3W-3RJ7 Office Furniture And Equipment - Ss 17 N 11-430-700-0000-6406 18.32 TAPE AND NOTEPADS 1VC7-WLRV-6KWC Office Supplies 11 N 50-000-000-0000-6406 12.89 PENS 161J-67WG-6JTK Office Supplies 28 N 50-000-000-0000-6406 40.53 OFFICE SUPPLIES 17LM-CNCW-6DQN Office Supplies 27 N 50-000-000-0000-6333 9.98 DISPOSABLE PLATES 1X7J-RRWF-7TML Meeting/Event Costs 26 N 14386 AMAZON CAPITAL SERVICES INC Page 2Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates Otter Tail County Auditor MANUAL WARRANTS/VOIDS/CORRECTIONS Account/Formula 11:06:28AM10/29/2026 Kpolejewsk Solid Waste Fund Copyright 2010-2026 Integrated Financial Systems 50-399-000-0000-6406 168.82 VEHICLE INSPECTION REPORT 25PK 1M4D-CLJG-4HK1 Office Supplies 29 N 51-000-000-0000-6491 150.25 8PK RTV SILICONE GASKET MAKER 1M1V-VGCD-D9V9 Operating Supplies 20 N 51-000-000-0000-6491 45.99 TWISTGUARD TEST LEADS 1WT1-T1TN-1WQD Operating Supplies 30 N 4,820.7814386 4,820.78 Page 3Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 40 Transactions Final Total ............1 Vendors 40 Transactions AMAZON CAPITAL SERVICES INC Otter Tail County Auditor MANUAL WARRANTS/VOIDS/CORRECTIONS Prairie Lakes Municipal Sw Authority 11:06:28AM10/29/2026 Kpolejewsk Copyright 2010-2026 Integrated Financial Systems Page 4Audit List for Board Otter Tail County Auditor MANUAL WARRANTS/VOIDS/CORRECTIONS Prairie Lakes Municipal Sw Authority Amount 3,821.12 General Revenue Fund 1 59.59 Road And Bridge Fund 10 511.61 Health and Wellness Fund 11 232.22 Solid Waste Fund 50 196.24 51 4,820.78 NameFundRecap by Fund All Funds Total Approved by,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMISSIONER'S VOUCHERS ENTRIES10/29/2026 Apanderson Y N D 4 N Otter Tail County Auditor Audit List for Board Page 1 Print List in Order By: Save Report Options?: Type of Audit List: on Audit List?: Paid on Behalf Of Name Explode Dist. Formulas?: D - Detailed Audit List S - Condensed Audit List 1 - Fund (Page Break by Fund) 2 - Department (Totals by Dept) 3 - Vendor Number 4 - Vendor Name 11:26:21AM r.:1 INTtGRATCO 11:;:.1 FINANCIAL SYSTEMS COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 11:26:21AM10/29/2026 Apanderson Health and Wellness Fund Copyright 2010-2026 Integrated Financial Systems 11-430-700-0000-6330 53.96 Mileage SS 10/21/2026 Mileage - Ss Adm 9 N 10/21/2026 10/21/2026 11-430-700-0000-6331 19.52 Meal 10/06/2026 Travel Expense - Ss Adm 10 N 10/06/2026 10/06/2026 11-405-000-0000-6262 68.00 JUV Monitoring 0926538 Juvenile Ream Electronic Monitoring 4 6 09/01/2026 09/30/2026 11-406-000-0000-6261 1,325.00 ADU Monitoring 0926537 Ream Electronic Monitoring 3 6 09/01/2026 09/30/2026 11-406-000-0000-6435 55.00 Testing Confirmations DT0926129 Drug Testing 1 6 09/01/2026 09/30/2026 11-406-000-0000-6304 96.86 Oil Change & Tire Rotation 916726 Motor Vehicle Repair 12 N 10/26/2026 10/26/2026 11-430-000-0000-6379 1,200.00 Consulting-Sauer Grant INV. #26-01 Miscellaneous Charges 14 Y 07/01/2026 08/29/2026 11-430-000-0000-6379 1,950.00 Consulting-Sauer Grant INV. #26-02 Miscellaneous Charges 13 Y 09/01/2026 09/30/2026 11-430-700-0000-6304 79.11 Acct #9988150 6352000 Motor Vehicle Service And Repair 6 N 10/21/2026 10/21/2026 11-420-640-0000-6297 118.00 Case#20261265/Party001 10/18/2026 Iv-D Sheriff's Costs 8 N 17793 HEGLUND/EMILY 53.9617793 15130 KLOEK/ASHLEY 19.5215130 8089 MIDWEST MONITORING & SURVEILANCE 1,448.008089 42863 MINNESOTA MOTOR COMPANY 96.8642863 16996 MOHS/MEGHAN KELLEY 3,150.0016996 43227 NELSON AUTO CENTER INC 79.1143227 44010 OTTER TAIL CO SHERIFF Page 2Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 3 Transactions 1 Transactions 2 Transactions 1 Transactions HEGLUND/EMILY KLOEK/ASHLEY MIDWEST MONITORING & SURVEILANCE MINNESOTA MOTOR COMPANY MOHS/MEGHAN KELLEY NELSON AUTO CENTER INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 11:26:21AM10/29/2026 Apanderson Health and Wellness Fund Copyright 2010-2026 Integrated Financial Systems 10/18/2026 10/18/2026 11-406-000-0000-6435 1,487.50 UA Cups 2385397 Drug Testing 11 N 10/21/2026 10/21/2026 11-430-700-0000-6304 78.30 Acct #139 6208328 Motor Vehicle Service And Repair 7 N 10/21/2026 10/21/2026 11-406-000-0000-6083 2,190.00 September Services September 2026 Opioids Settlement Grant Expenses 2 N 09/01/2026 09/30/2026 11-430-700-0000-6331 14.98 Meal 10/05/2026 Travel Expense - Ss Adm 5 N 10/05/2026 10/05/2026 118.0044010 5853 PREMIER BIOTECH INC 1,487.505853 46006 QUALITY TOYOTA 78.3046006 17543 REWIND INC 2,190.0017543 17766 RUPP/MARY 14.9817766 8,736.23 Page 3Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions Final Total ............11 Vendors 14 Transactions OTTER TAIL CO SHERIFF PREMIER BIOTECH INC QUALITY TOYOTA REWIND INC RUPP/MARY Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES11:26:21AM10/29/2026 Apanderson Health and Wellness Fund Copyright 2010-2026 Integrated Financial Systems Page 4Audit List for Board Otter Tail County Auditor Amount 8,736.23 Health and Wellness Fund 11 8,736.23 NameFundRecap by Fund All Funds Total Approved by,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ACCT #11210 - GAR #20 TELEPHON ANDERSON BROTHERS CONST CO OF BRAINERD N N N N N N N N N N N N N N N N csteinbach 10/23/2026 9:39:16AM10/23/2026 Copyright 2010-2026 Integrated Financial Systems BLCK Auditor Warrants 82,639.46 10-303-000-0000-6651SAP 056-608-032 EST #2 13399 1,414.22 01-061-000-0000-6200ARVIGACCT 3007612 10/6/26 30480 1,276.66 01-061-000-0000-6200ACCT 41292 10/6/26 30480 128.45 10-304-000-0000-6200 30480 959.90 50-000-000-0120-6200ACCT 41344 10/6/26 30480 245.89 50-000-000-0130-6200ACCT 41344 10/6/26 30480 245.68 50-000-000-0150-6200ACCT 2575721 10/6/26 30480 110.00 01-122-000-0000-5152BENSON/ROBERTA PERMIT APPLICATION REFUND 205646554 999999000 110.00 01-122-000-0000-5152BRIARD/LANCE PERMIT APPLICATION REFUND 203061240 999999000 20.50 01-250-000-0000-5579BRUESTLE/JOHN JAIL FEE OVERPAYMENT 85-01 6571 90,997.00 10-303-000-0000-6651CENTRAL SPECIALTIES INC SAP 056-682-014 EST #3 143 110.00 01-122-000-0000-5152CONNOR/JOSH PERMIT APPLICATION REFUND 202030915 999999000 29,797.16 12-000-000-0000-2374DELTA DENTAL OF MN ACCT 907578 NOV 2026 CNS0002296577 3020 110.00 01-122-000-0000-5152GJOVIK/HUNTER PERMIT APPLICATION REFUND 202670956 999999000 847,527.74 10-303-000-0000-6651GLADEN CONSTRUCTION INC SAP 056-635-042 EST #9 17485 32.24 10-304-000-0000-6251GREAT PLAINS NATURAL GAS CO ACCT #762 517 1689 0 - GAR #6 7001 82,639.46 203818 4,270.80 203819 110.00 203820 110.00 203821 20.50 203822 90,997.00 203823 110.00 203824 29,797.16 203825 110.00 203826 847,527.74 203827 Page 1ApprovedWARRANT REGISTERWarrant Form Auditor's Warrants From Date To Date PO #Invoice #Account Number On-Behalf-of-NameOBO# Description AmountVendor NameVendor # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Otter Tail County Auditor Pay Date Tx ASSESS-MN BOARD OF ASSESSORS N N N N N N N N N N N N N N N N INDEPENDENT EMERGENCY SERVICES LLC csteinbach 10/23/2026 9:39:16AM10/23/2026 Copyright 2010-2026 Integrated Financial Systems BLCK Auditor Warrants 110.00 01-122-000-0000-5152HERITAGE HOMES PERMIT APPLICATION REFUND 186833598 999999000 86.16 01-061-000-0000-6200ACCT 91 E911 SERVICES OCT 2026 OCT2026 4024 110.00 01-122-000-0000-5152INGEBRETSON/EMILEE PERMIT APPLICATION REFUND 201016169 999999000 200.00 01-122-000-0000-5152JOHNSON/WAYNE PERMIT APPLICATION REFUND 204098026 18495 200.00 01-122-000-0000-5152PERMIT APPLICATION REFUND 203628584 18495 110.00 01-122-000-0000-5152LESLIE/DALE PERMIT APPLICATION REFUND 198009991 999999000 110.00 01-122-000-0000-5152MARTIN/JUSTIN PERMIT APPLICATION REFUND 204573542 999999000 110.00 01-122-000-0000-5152METRY/COLLIN PERMIT APPLICATION REFUND 205633337 999999000 611,168.02 12-000-000-0000-2378MN PEIP STMT 459000 NOV 2026 1674124 5387 110.00 01-122-000-0000-5152MORKEN/JONATHAN PERMIT APPLICATION REFUND 182263060 999999000 110.00 01-122-000-0000-5152MORSTAD/TRISTA PERMIT APPLICATION REFUND 204573542 999999000 865.47 01-002-000-0000-6331OTTER TAIL CO TREASURER HA-LODGING 10/23/2026 16678 10.32 01-002-000-0000-6333HA-BOC OPEN HOUSE SNACKS 10/23/2026 16678 332.28 01-031-000-0000-6331NH-LODGING 10/23/2026 16678 160.00 01-044-000-0000-6242BS-TRAINING 10/23/2026 16678 81.72 01-044-000-0000-6242 10/23/2026 16678 32.24 203828 110.00 203829 86.16 203830 110.00 203831 400.00 203832 110.00 203833 110.00 203834 110.00 203835 611,168.02 203836 110.00 203837 110.00 203838 Page 2ApprovedWARRANT REGISTERWarrant Form Auditor's Warrants From Date To Date PO #Invoice #Account Number On-Behalf-of-NameOBO# Description AmountVendor NameVendor # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Otter Tail County Auditor Pay Date Tx RK-GEOTRUST CARD/LICENSE RENEW N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N csteinbach 10/23/2026 9:39:16AM10/23/2026 Copyright 2010-2026 Integrated Financial Systems BLCK Auditor Warrants 382.87 01-044-000-0000-6331OTTER TAIL CO TREASURER BH-LODGING & MEALS 10/23/2026 16678 621.59 01-061-000-0000-6331RK-LODGING & PARKING 10/23/2026 16678 2,070.00 01-061-000-0000-6342 10/23/2026 16678 300.00 01-061-000-0000-6369RK-TRAINING 10/23/2026 16678 305.00 01-091-000-0000-6249RR-REGISTRATION 10/23/2026 16678 561.83 01-091-000-0000-6281SU-FILING FEES 10/23/2026 16678 325.00 01-091-000-0000-6281ATTORN-FILING FEES 10/23/2026 16678 550.00 01-091-000-0000-6281SU-REFUND FILING FEES 10/23/2026 16678 263.47 01-091-000-0000-6331ME-LODGING 10/23/2026 16678 272.07 01-091-000-0000-6331ATTORN-LODGING 10/23/2026 16678 410.92 01-091-000-0000-6331RR-LODGING & MEALS 10/23/2026 16678 153.01 01-101-000-0000-6331LL-LODGING 10/23/2026 16678 209.56 01-101-000-0000-6406LL-GRAPHICS 10/23/2026 16678 29.94 01-112-000-0000-6572DC-TOOLS 10/23/2026 16678 438.13 01-112-101-0000-6572WN-TOOLS/SUPPLIES 10/23/2026 16678 142.78 01-112-104-0000-6572FAC-TOOLS 10/23/2026 16678 137.89 01-121-000-0000-6304RE-OIL CHANGE 10/23/2026 16678 727.08 01-121-000-0000-6331RE-LODGING 10/23/2026 16678 4.30 01-122-000-0000-6243CL-NOTEBOOK SUBSCRIPTION 10/23/2026 16678 4.30 01-122-000-0000-6243AB-NOTEBOOK SUBSCRIPTION 10/23/2026 16678 937.38 01-122-000-0000-6331AB-REFUND FLIGHT 10/23/2026 16678 1,525.59 01-122-000-0000-6331CL-LODGING 10/23/2026 16678 2,163.88 01-122-000-0000-6331AB-FLIGHTS 10/23/2026 16678 79.00 01-125-000-0000-6369HRA-TRAINING 10/23/2026 16678 2,000.00 01-127-000-0000-6331GIS-GIS TRAINING 10/23/2026 16678 40.00 01-127-000-0000-6342GIS-CLAUDE SUB 10/23/2026 16678 86.02 01-201-000-0000-6171ZE-MEALS 10/23/2026 16678 350.00 01-201-000-0000-6171JK-TRAINING 10/23/2026 16678 142.75 01-201-000-0000-6171AS- LODGING & MEALS 10/23/2026 16678 399.00 01-201-000-0000-6171RR-TRAINING 10/23/2026 16678 Page 3ApprovedWARRANT REGISTERWarrant Form Auditor's Warrants From Date To Date PO #Invoice #Account Number On-Behalf-of-NameOBO# Description AmountVendor NameVendor # - - Otter Tail County Auditor Pay Date Tx ECON DEV-QR CODE/SUBSCRIPTION N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N csteinbach 10/23/2026 9:39:16AM10/23/2026 Copyright 2010-2026 Integrated Financial Systems BLCK Auditor Warrants 300.00 01-201-000-0000-6171OTTER TAIL CO TREASURER AS-TRAINING REFUND 10/23/2026 16678 514.65 01-201-000-0000-6171SHERIFF-LODGING & MEALS 10/23/2026 16678 21.62 01-201-000-0000-6171CB-MEALS 10/23/2026 16678 159.99 01-201-000-0000-6171KF-CONTINUED EDUCATION 10/23/2026 16678 10.00 01-201-000-0000-6304BF-CAR WASH 10/23/2026 16678 128.26 01-201-000-0000-6385CB-MEALS 10/23/2026 16678 99.00 01-201-000-0000-6389JB-DRONE MEMBERSHIP 10/23/2026 16678 52.19 01-201-000-0000-6396BF- MEALS 10/23/2026 16678 114.17 01-201-000-0000-6396JA-MEALS 10/23/2026 16678 383.10 01-201-000-0000-6396CD- LODGING CF26033903 10/23/2026 16678 147.31 01-201-000-0000-6396MH-MEALS CF26033903 10/23/2026 16678 101.94 01-201-000-0000-6396SD-SHIPPING/EVIDENCE 10/23/2026 16678 267.53 01-201-000-0000-6481CB-RIFLE EQUIPMENT 10/23/2026 16678 27.00 01-201-000-0000-6560SB- FUEL 10/23/2026 16678 83.65 01-201-000-0000-6560BF-FUEL 10/23/2026 16678 95.14 01-204-000-0000-6406AL-OFFICE SUPPLIES 10/23/2026 16678 575.00 01-250-000-0000-6171EB-TRAINING 10/23/2026 16678 47.99 01-250-000-0000-6224RB-MEALS 10/23/2026 16678 78.35 01-250-000-0000-6453PB-GAME BALLS 10/23/2026 16678 496.08 01-280-000-0000-6331PW-LODGING 10/23/2026 16678 299.00 01-705-000-0000-6241NL-LICENSING 10/23/2026 16678 187.50 01-705-000-0000-6242ECON DEV-TRAINING 10/23/2026 16678 645.09 01-705-000-0000-6243 10/23/2026 16678 355.81 01-705-000-0000-6331NL-LODGING & MEALS 10/23/2026 16678 782.00 01-705-000-0000-6369NL-SHIPPING FEES 10/23/2026 16678 177.61 01-705-000-0000-6560NL-PARKING & FUEL 10/23/2026 16678 161.14 01-705-000-1011-6290NL-GODADDY/CYBERSPROUT 10/23/2026 16678 33.82 02-214-000-0000-6171GS-MEALS 10/23/2026 16678 75.76 02-214-000-0000-6491JKD-TOOLS 10/23/2026 16678 215.40 02-219-000-0000-6369LW-FOOD FOR TRAINING 10/23/2026 16678 Page 4ApprovedWARRANT REGISTERWarrant Form Auditor's Warrants From Date To Date PO #Invoice #Account Number On-Behalf-of-NameOBO# Description AmountVendor NameVendor # - Otter Tail County Auditor Pay Date Tx CN - BATTLE LAKE STANDARD - ER JT - MN TRANSPOR - REGISTRATIO JT - MSP AIRPORT PARKING - TRA CF - U OF M CONTLEARNING - J.H CP - FERGUS FALLS MOTOR CTR - CP - HARBOR FREIGHT - PRY BAR HWY - GRANDSTAY - LODGING K.E. HWY - GRANDSTAY - LODGING K.E. JR - HOME DEPOT - CONCRETE MIX DL - FLEET FARM - GOPHER TRAPS CN - HOMEDEPOT.COM - AIR HOSE N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N csteinbach 10/23/2026 9:39:16AM10/23/2026 Copyright 2010-2026 Integrated Financial Systems BLCK Auditor Warrants 111.98 02-815-000-0000-6369OTTER TAIL CO TREASURER ATTORN-HEALTHY SNACKS 10/23/2026 16678 189.33 02-815-000-0000-6369KC-HEALTHY SNACKS 10/23/2026 16678 19.27 10-301-000-0000-5990 16678 2.40 10-301-000-0000-5990CP - BLUE LINE CAFE - MEAL TIP 16678 110.00 10-301-000-0000-6242 16678 94.41 10-301-000-0000-6331 16678 236.51 10-301-000-0000-6331JT - COUNTRY INN & SUITES - J. 16678 647.00 10-301-000-0000-6331JT - WASHINGTON PLAZA - D.B. L 16678 647.00 10-301-000-0000-6331JT - WASHINGTON PLAZA - J.T. L 16678 647.00 10-301-000-0000-6331JT - WASHINGTON PLAZA - W.J. L 16678 70.00 10-302-000-0000-6242 16678 7.31 10-302-000-0000-6331CP - CASEY'S - MEAL 16678 14.66 10-302-000-0000-6331CP - JERSEY MIKE'S - MEAL 16678 15.98 10-302-000-0000-6331CP - BLUE LINE CAFE - MEAL 16678 10.77 10-302-000-0000-6331CP - KWIK TRIP - MEAL 16678 5.11 10-302-000-0000-6369 16678 20.49 10-302-000-0000-6500CN - FLEET FARM - BATTERIES 16678 11.26 10-302-000-0000-6500CP - HILLTOP LUMBER - DRILL ST 16678 7.99 10-302-000-0000-6500 16678 17.42 10-302-000-0000-6565DL - SKY CREW SERVICES - FUEL 16678 56.51 10-303-000-0000-6331 16678 429.36 10-303-000-0000-6331 16678 7.97 10-304-000-0000-6406CN - HOME DEPOT - WASP SPRAY 16678 59.30 10-304-000-0000-6406 16678 29.18 10-304-000-0000-6406 16678 34.76 10-304-000-0000-6572CN - AICPARTS - FOOT PEDAL 16678 44.56 10-304-000-0000-6572 16678 29.47 11-000-000-0000-2026KD - FRAUD CREDIT 10/23/2026 16678 29.62 11-000-000-0000-2026KD - FRAUD CREDIT 10/23/2026 16678 29.62 11-000-000-0000-2026KD - FRAUD ITEM 10/23/2026 16678 Page 5ApprovedWARRANT REGISTERWarrant Form Auditor's Warrants From Date To Date PO #Invoice #Account Number On-Behalf-of-NameOBO# Description AmountVendor NameVendor # - - - Otter Tail County Auditor Pay Date Tx AZ-TEEN LEADERSHIP/DRIVERS ED ACCT #1149969 STREET LIGHT ELE N N N N N N N N N N N N N N N N N N N N csteinbach 10/23/2026 9:39:16AM10/23/2026 Copyright 2010-2026 Integrated Financial Systems BLCK Auditor Warrants 340.00 11-406-000-0000-6050OTTER TAIL CO TREASURER 10/23/2026 16678 284.78 23-705-000-0000-6331ECON DEV-TRAINING 10/23/2026 16678 10,496.42 23-706-807-0000-6685AB-COUNTER TOPS 10/23/2026 16678 685.92 50-000-000-0000-6331SD-LODGING 10/23/2026 16678 105.00 50-000-000-0000-6333NY-REGISTRATION FEE 10/23/2026 16678 19.95 50-000-000-0000-6978MD-ACCOUNT RENEWAL 10/23/2026 16678 152.59 50-000-000-0120-6200MD-PHONE CHARGES 10/23/2026 16678 153.97 50-000-000-0120-6487JH-TOOLS 10/23/2026 16678 229.00 50-399-000-0000-6487BA-TOOLS 10/23/2026 16678 42.00 51-000-000-0000-6243SD-GOOGLE WOKSPACE 10/23/2026 16678 10,158.88 01-112-108-0000-6250OTTER TAIL POWER COMPANY ACCT 1092204 10/14/26 15009 2,707.52 01-112-109-0000-6250ACCT 1117759 10/14/26 15009 27.00 23-706-000-0000-6250ACCT 20148172 10/8/26 15009 8.82 10-302-000-0000-6250OTTER TAIL POWER COMPANY ACCT #20090820 STREET LIGHT EL 44271 9.81 10-302-000-0000-6250ACCT #20090785 STREET LIGHT EL 44271 9.72 10-302-000-0000-6250ACCT #20090880 STREET LIGHT EL 44271 8.34 10-302-000-0000-6250 44271 38.19 02-815-000-0000-6369SERVICE FOOD SUPER VALU K1170 HEALTHY SNACKS 10/19/26 19005 2,500.00 01-122-000-0000-5152VAREBERG/TROY PERMIT APPLICATION REFUND 201469981 999999000 110.00 01-122-000-0000-5152ZELLMANN/DAVID PERMIT APPLICATION REFUND 199673065 999999000 36,059.16 203839 12,893.40 203840 36.69 203841 38.19 203842 2,500.00 203843 110.00 203844 1,719,786.52BLCK 142 Page 6ApprovedWARRANT REGISTERWarrant Form Auditor's Warrants From Date To Date PO #Invoice #Account Number On-Behalf-of-NameOBO# Description AmountVendor NameVendor # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Total...Warrant # Warrant Form Total...Transactions Otter Tail County Auditor Pay Date Tx csteinbach 10/23/2026 9:39:16AM10/23/2026 Copyright 2010-2026 Integrated Financial Systems BLCK Auditor Warrants 1,719,786.52 142 Page 7ApprovedWARRANT REGISTERWarrant Form Auditor's Warrants Total...Transactions Otter Tail County Auditor Pay Date Final r.:1 INTIGRATCO 11:;:.1 FINANCIAL SYSTEMS csteinbach 10/23/2026 9:39:16AM10/23/2026 Copyright 2010-2026 Integrated Financial Systems BLCK Auditor Warrants Page 8ApprovedWARRANT REGISTERWarrant Form Auditor's Warrants Otter Tail County Auditor Pay Date 1,719,786.52 203844 10/23/2026BLCK 27 203818 1,719,786.52 WARRANT RUN WARRANT STARTING DATE OF DATE OF FORM WARRANT NO.PAYMENT APPROVAL PPD CTX COUNT AMOUNT COUNT AMOUNTWARRANT NO. ENDING INFORMATION TOTAL INITGRATCD Fl A CIAL SYSTEM csteinbach 10/23/2026 9:39:16AM10/23/2026 Copyright 2010-2026 Integrated Financial Systems BLCK Auditor Warrants Page 9ApprovedWARRANT REGISTERWarrant Form Auditor's Warrants Otter Tail County Auditor Pay Date 1 2 10 11 12 23 50 51 General Fund Dedicated Accounts Community Development Authority Prairie Lakes Municipal Sw Authority 39,703.45 General Revenue Fund 39,703.45 664.48 664.48 1,024,494.78 Road And Bridge Fund 1,024,494.78 310.53 Health and Wellness Fund 310.53 640,965.18 Insurance Reserve Fund 640,965.18 10,808.20 10,808.20 2,797.90 Solid Waste Fund 2,797.90 42.00 42.00 1,719,786.52 1,719,786.52 RECAP BY FUND FUND AMOUNT NAME ACH AMOUNT NON-ACH AMOUNT - - - - - - - - TOTAL TOTAL ACH TOTAL NON-ACH- Sponsoring Agency Resolution Everts Township LRIP Application OTTER TAIL COUNTY RESOLUTION NO. 2026----- WHEREAS, Everts Township has requested Otter Tail County sponsor their Local Road Improvement Program (LRIP) project since non-state aid cities and townships must have a county sponsor, AND WHEREAS, Everts Township understands that it will be responsible for all costs not covered by LRIP including but not limited to consultant engineering, right of way acquisition, construction administration and inspection, utility construction, as well as construction costs above the LRIP award, AND WHEREAS, Everts Township has agreed to maintain such improvements for the lifetime of the improvements, AND NOW THEREFORE Otter Tail County agrees to sponsor Everts Township for a Local Road Improvement Program (LRIP) project identified as 355th Avenue and 265th Street between CSAH 83 & CSAH 72. Sponsorship includes acting as the fiscal agent, keeping the project on schedule, and ensuring that all program documentation and requirements are met, with compliance of all applicable laws, rules and regulations. BE IT ALSO RESOLVED, Jodi Teich, P.E., County Engineer, is hereby authorized to act as agent on behalf of this applicant. The motion for the adoption of the foregoing resolution was introduced by Commissioner ---- duly seconded by Commissioner _____ and, after discussion thereof and upon vote being taken thereon, passed unanimously. Adopted at Fergus Falls, MN this 3rd day of November 2026. OTTER TAIL COUNTY BOARD OF COMMISSIONERS By: ______________ _ Attest: __________ _ Robert Lahman, Board of Commissioners Chair Nicole Hansen, Clerk STATE OF MINNESOTA ) ) COUNTY OF OTTER TAIL ) I, Nicole Hansen, the County Administrator, do hereby certify that the foregoing resolution is a true and correct copy of the resolution presented to and adopted by Otter Tail County at a duly authorized meeting therefore held on the 3rd day of November 2026. Nicole Hansen, Clerk 4 •• ) 7 !J 2 ~,-I= 01 '1;'.('.i 5'111 St ;;, .. -I 25..!?!b., I i _--l(,.~~~~~---L--•-11(111~ Amor ~If HJ Otter Tail Lake PROJECT LIMITS Establishing a County Subordinate Service District for the Pelican Rapids Emergency Medical Services Primary Service Area Otter Tail County Resolution No. 2026 - Commissioner ______________________ offered the following and moved its adoption: WHEREAS, Ringdahl Ambulance currently holds the Primary Service Area (PSA) license for Pelican Rapids Emergency Medical Services as set forth by the Office of Emergency Medical Services (OEMS) pursuant to Minnesota Statute §144E; and WHEREAS, Ringdahl Ambulance provided notice to OEMS that it does not intend to renew its PSA license, which expires on or about March 31, 2027; and WHEREAS, a county may provide general ambulance services as set forth under Minnesota Statute §471.476; and WHEREAS, a county can establish a Subordinate Service District to finance county services not otherwise already available under Minnesota Chapter 375B; and WHEREAS, the county is establishing this Subordinate Service District to ensure continued access to emergency medical response in the Pelican Rapids area; and WHEREAS, it is critically important that residents, visitors, businesses, and communities have access to reliable, timely, and high-quality emergency medical services for their health, safety, and well-being. WHEREAS, the Pelican Rapids Primary Service Area, which is the legal primary service area as designated by OEMS, includes the following: Townships: T134NR41W – sections 4 through 9, and the W ½ of 3 and 10 T134NR42W – sections 1 through 12 T134NR43W – sections 1 through 12 T134NR44W – sections 1 through 12 T135NR41W – sections 3 through 11, 15 through 22, 27 through 34, 2 (only government lot 2), 12 (only government lots 3 and 4), 14 (excluding government lots 9 and 10) T135NR42W T135NR43W T135NR44W T136NR41W – sections 4 through 9, 16 through 21, 28 through 33, 3 (only government lots 1, 2, 3, and 4), 10 (only government lot 1) T136NR42W T136NR43W T136NR44W T137NR41W – sections 1 through 34, 35 (excluding government lots 8 and 9), 36 (except government lot 7) T137NR42W T137NR43W WHEREAS, in accordance with Minnesota Statute Section 375B.09, the budget appropriations for the operation of the district including, as appropriate, either a property tax levied only on property within the boundaries of the district or a leavy of a service charge against the users of the service within the district, or any combination of a property tax and service charge will be included in the next annual budget; and WHEREAS, it is recognized that one section of the Pelican Rapids Primary Service Area is located within Wilkin County as described as T135NR45W, sections 25, 36, and is not included in a Subordinate Service District, and the county will reach an agreement with the City of Rothsay for continued EMS services within this section; WHEREAS, as required by Chapter 375B, a Public Hearing was held on October 12, 2026. NOW, THEREFORE, BE IT RESOLVED, that the Subordinate Service District is hereby established as follows: 1. The general description of the territory is as established by OEMS and as indicated above. 2. The funding mechanism and financing will be determined following the establishment of the Subordinate Service District as described above and provided in Chapter 375B. 3. That the County Administrator, or designee, is responsible for supervising the provision of the service. 4. That Otter Tail County will make application for the PSA license through OEMS and contract with an emergency medical services provider through a request for proposal process. NOW, THEREFORE, BE IT RESOLVED, that this resolution is effective thirty days after its publication absent a petition of five percent (5%) of the qualified voters in the Subordinate Service District. Commissioner _______________________ seconded the motion and YEAS and NAYS are as follows: Board Members For Against Absent Dan Bucholz Wayne D. Johnson Kurt Mortenson Robert Lahman Sean Sullivan Adopted at Fergus Falls, Minnesota, this 13th day of October 2026. OTTER TAIL COUNTY BOARD OF COMMISSIONERS Dated: October 13, 2026 By: Attest: ___________________________________ Robert Lahman, Chair Nicole Hansen, Clerk MEMORANDUM Date: October 28, 2026 To: Board of Commissioners Cc: Nick Leonard, Deputy Administrator Jeff Haugen, Landfill and Transfer Station Supervisor From: Chris McConn, P.E., Solid Waste Director RE: Disposal Services Agreement with Big Dipper Enterprises, Inc. I. BACKGROUND The County processes about 22,000 tons per year of MSW at the Perham Resource Recovery Facility. The County landfills about 11,000 tons/year at the Dakota Landfill in Gwinner, North Dakota. County has a three-year landfilling agreement (expires 1/1/2027) with Big Dipper Enterprises, Inc. (Landfill owner). Solid Waste Department has received a contract for renewal. The following was discussed at the Economic Growth and Community Investment Committee: II. ANALYSIS Below is a summary of the terms of the existing and proposed agreements Terms 2024 Agreement 2027 Agreement (proposed) Tipping Fee $46.40 $44.00 Annual Escalator 4% minimum Same Host Fee $1.68/ton $1.88/ton Waste Water Management 14.5% 18.9% Energy surcharge Same, varies on market. Currently $3.20/ton Total (in 2027) $58.18/ton $57.29/ton III. RECOMMENDATION The Department respectfully requests authorization to execute the agreement renewal. I:\Board Actions\2026\Waste Management Gwinner LF\M Disposal Agreement 10282026 BOARD.docx 218-998-8950 @ SOLID WASTE Solid Waste Administration/Recycling Center 1115 North Tower Road Fergus Falls, MN 56537 OTTER TAIL COUNTY IS AN EQUAL OPPORTUNITY EMPLOYER @ ottertailcounty.gov Michael Fox Area Sales Director Jan. 1, 2027 Date Otter Tail County Department of Solid Waste 1115 North Tower Road Fergus Falls, MN 56537 Chris McConn, P.E. Solid Waste Director 36 months Date INDUSTRIAL WASTE & DISPOSAL SERVICES AGREEMENT COMPANY: Big Dipper Enterprises, Inc (Dakota Landfill) CUSTOMER: A WM COMPANY Address: W132 N10487 Grant Drive Address: City/State/Zip: Germantown, WI 53022 City/State/Zip: Signed: Signed: Authorized Signature Authorized Signature Name: Name: Title: Title: Effective Date: Initial Term: AGREEMENT This INDUSTRIAL WASTE & DISPOSAL SERVICES AGREEMENT, consisting of the terms and conditions set forth herein, and Exhibit A, and/or Confirmation Letter(s) and the Profile Sheet(s) entered into from and after the date hereof from time to time (all of the foregoing being collectively referred to as the "Agreement"), is made as of the Effective Date shown above by and between the Customer named above, on its and its subsidiaries and affiliates behalf (collectively, "Customer") and the WM entity named above ("the Company"). TERMS AND CONDITIONS 1. SERVICES PROVIDED. The Company and/or its affiliates will provide Customer with collection, management, transportation, disposal, treatment and recycling services ("Services") for Customer's non-hazardous Solid Waste, Special Waste, Hazardous Waste, and/or Recyclables, as described on Exhibit A and/or Confirmation Letter(s) and/or applicable Profile Sheets (collectively "Industrial Waste"), and Company shall have the exclusive right to manage all such Industrial Waste. "Solid Wasteff means garbage, refuse and rubbish including those which are recyclable but excluding Special Waste and Hazardous Waste. "Special Wasteff includes polychlorinated biphenyl ("PCB") wastes, industrial process wastes, asbestos containing material, petroleum contaminated soils, treated/de-characterized wastes, incinerator ash, medical wastes, demolition debris and other materials requiring special handling in accordance with any applicable federal, state, provincial or local laws or regulations. "Hazardous Wasteff means any hazardous, toxic, or radioactive substances, as such terms are defined by any applicable federal, state, provincial or local laws or regulations. "Nonconforming Waste• means waste that (a) is not in conformance with waste descriptions given by Customer under this Agreement, in an Exhibit A, Confirmation Letter(s) or the Profile Sheet incorporated herein; (b) is prohibited from being received, managed or disposed of at a transfer, storage or disposal facility used hereunder by federal, state or local law, regulation, ordinance, permit or other legal requirement; (c) is non-hazardous Solid Waste that contains regulated Special Waste or Hazardous Waste; (d) is or contains any infectious waste, radioactive, volatile, corrosive, flammable, explosive, biomedical, biohazardous material, regulated medical or hazardous waste or toxic substances, as defined pursuant to or listed or regulated under applicable federal, state or local law, except as stated on Exhibit A, the Profile Sheet or Confirmation Letter; or (e) contains information protected by federal, state or local privacy or data security laws, including but not limited to the Health Insurance Portability and Accountability Act of 1996, as amended ("HIPAA"). 2. CUSTOMER WARRANTIES. Customer hereby represents and warrants that all Industrial Waste collected by or delivered to the Company shall be in accordance with waste descriptions given in this Agreement and shall not be or contain any Nonconforming Waste. When the Company handles Special or Hazardous Waste for Customer, Customer will provide the Company with a Generator's Waste Profile Sheet ("Profile Sheet") describing all Special or Hazardous Waste, and provide a representative sample of such waste on request. In the event this Agreement includes transportation by the Company, Customer shall, at the time of tender, provide to the Company accurate and complete documents, shipping papers or manifests as are required for the lawful transfer of the Industrial Waste under all applicable federal, state or local laws or regulations. Tender or delivery shall be considered nonconforming if not in accordance with this Section. Customer further represents and warrants that it will comply with all applicable laws, ordinances, regulations, orders, permits or other legal requirements applicable to the Industrial Waste. Customer shall provide the Company and its Subcontractors a safe work environment for Services performed on any premises owned or controlled by Customer. 3. TERM OF AGREEMENT. The Initial Term of this Agreement shall be as set forth above and if no such term is set forth above, it shall be 36 months, commencing on the Effective Date set forth above. This Agreement shall automatically renew thereafter on a month-to-month basis ("Renewal Term", with "Initial Term," collectively, the "Term") unless either party gives to the other party written notice of termination at least thirty (30) days prior to the termination of the then-existing term; provided however, that the terms and conditions of this Agreement shall remain in full force and effect, in accordance with its terms, with respect to any uncompleted or unfinished Services provided for in an Exhibit A, Confirmation Letter and/or Profile Sheet until such Services are completed. Notice of termination received at any other time will be considered ineffective and the Agreement will be considered automatically renewed upon completion of the then-existing term. 4. INSPECTION; REJECTION OF WASTE. Title to and liability for Nonconforming Waste shall remain with Customer at all times. Company shall have the right to inspect, analyze or test any waste delivered by Customer. If Customer's Industrial Waste is Nonconforming Waste, Company can, at its option, reject Nonconforming Waste and return it to Customer or require Customer to remove and dispose of the Nonconforming Waste at Customer's expense. Customer shall indemnify, hold harmless (in accordance with Section 9) and pay or reimburse Company for any and all costs, damages and/or fines incurred as a result of or relating to Customer's tender or delivery of Nonconforming Waste or other failure to comply or conform to this Agreement, including costs of inspection, testing and analysis. Company also may impose volume limitations on inbound deliveries, reject any Industrial Waste that could adversely impact the receiving facility, or Company may terminate the Agreement or the applicable Exhibit A related to such Industrial Waste. 5. SPECIAL HANDLING; TITLE. If Company elects to handle, rather than reject, Nonconforming Waste, Company shall have the right to manage the same in the manner deemed most appropriate by Company given the characteristics of the Nonconforming Waste. Company may assess and Customer shall pay additional charges associated with delivery of Nonconforming Waste, including, but not limited to, special handling or disposal charges, and costs associated with different quantities of waste, different delivery dates, modifications in operations, specialized equipment, and other operational, environmental, health, safety or regulatory requirements. Title to and ownership of acceptable Industrial Waste shall transfer to Company upon its final acceptance of such waste. 6. COMPANY WARRANTIES. Company hereby represents and warrants that: (a) Company will manage the Industrial Waste in a safe and workmanlike manner in full compliance with all valid and applicable federal, state and local laws, ordinances, orders, rules and regulations; and (b) it will use Revised March 14, 2023 © 2023 WM Intellectual Property Holdings, L.L.C. disposal and recycling facilities that have been issued permits, licenses, certificates or approvals required by valid and applicable laws, ordinances and regulations necessary to allow the facility to accept, treat and/or dispose of Industrial Waste. Except as provided herein, Company makes no other warranties and hereby disclaims any other warranty, whether implied or statutory. 7. LIMITED LICENSE TO ENTER. When a Customer is transporting Industrial Waste to a Company facility, Customer and its subcontractors shall have a limited license to enter a disposal facility for the sole purpose of off-loading Industrial Waste at an area designated, and in the manner directed, by Company. Customer shall, and shall ensure that its subcontractors, comply with all rules and regulations of the facility, as amended. Company may reject Industrial Waste, deny Customer or its subcontractors entry to its facility and/or terminate this Agreement in the event of Customer's or its subcontractors' failure to follow such rules and regulations. 8. CHARGES AND PAYMENTS. Customer shall pay the rates ("Charges") set forth on Exhibit A or a Confirmation Letter, which may be modified as provided in this Agreement. Company reserves the right, and Customer acknowledges that it should expect Company to increase, add, or modify the Charges payable by Customer hereunder during the Term. The Charges may be adjusted by Company to account for: any changes or modifications to, or differences between, the actual equipment and Services provided by Company to Customer and those specified on Exhibit A; any increase in or to recoup all or any portion of, disposal, transportation, processing, energy and fuel costs or environmental compliance fees or costs, or recovery of the Company's and affiliates' costs associated with host community fees, waste disposal taxes and similar charges paid to municipal or other governmental authorities or agencies to engage in recycling and waste collection, transfer, processing, disposal and treatment; any change in the composition, amount or weight of the Industrial Waste collected by Company from Customer's service location(s) from what is specified on Exhibit A (including for container overages or overflows) of the Industrial Waste; increased costs due to uncontrollable circumstances, including, without limitation, changes (occurring from and after three (3) months prior to the Effective Date) in local, state, federal or foreign laws or regulations (or the enforcement, interpretation or application thereof), including the imposition of or increase in taxes, fees or surcharges, or acts of God such as floods, fires, hurricanes and natural disasters. Company also reserves the right to charge Customer additional charges for Services provided by Company to Customer, whether requested or incurred by Customer, including, but not limited to, dig out, minimum load charges, profile approval charges, all at such rates that Company is charging its customers at such time The Company may also increase the charges by an amount equal to the average percentage increase for the previous twelve-month period in the Consumer Price Index for Water & Sewer & Trash Collection Services, as published by the U.S. Department of Labor, with the amount of the increase based on the most current information available from the U.S. Department of Labor 30 days prior to the date of the increase, unless the parties have otherwise agreed to a different CPI as stated in an Exhibit A. Without limiting the foregoing, Company also reserves the right to adjust all pricing provided in an Exhibit A at any time with ten (10) days' advance written notice to Customer. Changes to the Charges payable under this Agreement may be agreed to orally, in writing or by other actions and practices of the parties, including, without limitation, electronic or online acceptance or payment of the invoice reflecting such changes, and written notice to Customer of any such changes and Customer's failure to object to such changes, which shall be deemed to be Customer's affirmative consent to such changes. Increases to Charges as specified in this Section may be applied singularly or cumulatively and may include an amount for Company's operating or profit margin. Customer acknowledges and agrees that any increased Charges under this section are not represented to be solely an offset or pass through of Company's costs. All Charge adjustments as provided above and in Section 5 shall take effect upon notification from Company to Customer. Customer shall pay the rates in full within thirty ( 30) days of the invoice date. Company shall send all invoices for Charges and any required notices to Customer under this Agreement to Customer's billing address specified at the top of the Agreement. Unless specifically agreed to in writing by Company and subject to such additional costs that Company may charge, in its discretion, Company shall not be required to bill Customer using Customer's or any third party billing portal or program. In no event shall the use by Company of Customer's or any third party billing portal or program, or any terms thereof, operate to amend or supplement the terms and conditions of this Agreement, which will remain binding in accordance with its terms. Customer shall pay all invoiced Charges within thirty (30) days of the invoice date, by check mailed to Company's payment address on Customer's invoice. Payment by any other method or channel, including in person, online or by phone, shall be as allowed by Company and subject to applicable convenience fees and other costs charged by Company, from time to time. Any Customer invoice balance not paid within thirty (30) days of the date of invoice is subject to a late charge, and any Customer check returned for insufficient funds is subject to a non-sufficient funds charge, both to the maximum extent allowed by applicable law. Customer acknowledges that any late charge charged by Company is not to be considered as interest on debt or a finance charge, and is a reasonable charge for the anticipated loss and cost to Company for late payment. If payment is not made when due, Company retains the right to suspend Services until the past due balance is paid in full. In addition to full payment of outstanding balances, Customer shall be required to pay a reactivation charge to resume suspended Services. If Services are suspended for more than fifteen (15) days, Company may immediately terminate this Agreement for default and recover any equipment and all amounts owed hereunder, including liquidated damages under Section 14. Page 1 of 2 9. INDEMNIFICATION. The Company agrees to indemnify, defend and save Customer harmless from and against any and all liability (including reasonable attorneys' fees) which Customer may be responsible for or pay out as a result of bodily injuries (including death), property damage, or any violation or alleged violation of law, to the extent caused by Company's breach of this Agreement or by any negligent act, negligent omission or willful misconduct of the Company or its employees, which occurs (1) during the collection or transportation of Customer's Industrial Waste by Company, or (2) as a result of the disposal of Customer's Industrial Waste, after the date of this Agreement, in a facility owned by a subsidiary or affiliate of the Company provided that the Company's indemnification obligations will not apply to occurrences involving Nonconforming Waste. Customer agrees to indemnify, defend and save the Company harmless from and against any and all liability (including reasonable attorneys' fees) which the Company may be responsible for or pay out as a result of bodily injuries (including death), property damage, or any violation or alleged violation of law to the extent caused by Customer's breach of this Agreement or by any negligent act, negligent omission or willful misconduct of the Customer or its employees, agents or contractors in the performance of this Agreement or Customer's use, operation or possession of any equipment furnished by the Company. Neither party shall be liable to the other for consequential, incidental or punitive damages arising out of the performance of this Agreement except for third party claims related to violations of law. 10. UNCONTROLLABLE CIRCUMSTANCES. Except for the obligation to make payments hereunder, neither party shall be in default for its failure to perform or delay in performance caused by events beyond its reasonable control, including, but not limited to, strikes, riots, imposition of laws or governmental orders, fires, acts of God, and inability to obtain equipment, permit changes and regulations, restrictions (including land use) therein, and the affected party shall be excused from performance during the occurrence of such events. 11. RECYCLING SERVICES. The following shall apply to the collection and recycling of fiber and non-fiber recyclables ("Recyclable Materials"). Special terms and conditions, if any, with respect to such Services shall be set forth on an exhibit to this Agreement and shall be incorporated herein. Single stream Recyclable Materials ("Single Stream") will consist of Customer's entire volume of uncoated office and writing paper, magazines, pamphlets, mail, newspaper; flattened, uncoated cardboard, paperboard boxes; aluminum food and beverage containers, tin or steel cans; glass food and beverage containers, and rigid container plastics #1, #2 and #5, excluding all types of plastic film. Any material not specifically set forth above, including but not limited to foam, film plastics, plastic bags, napkins, tissue, paper towels, or paper that has been in contact with food, is unacceptable. Glass may not be accepted at all locations. All Single Stream must be clean, dry, unshredded, empty, loose and unbagged. Source-separated wastepaper, cardboard, plastics and metals shall consist of Customer's entire volume of such materials and be provided in accordance with the most current ISRI Scrap Specifications Circular and any amendments thereto or replacements thereof. All other Recyclable Materials will be delivered in accordance with industry standards or such specifications communicated to Customer by the Company from time-to-time. The Company reserves the right, upon notice to Customer, to discontinue acceptance of any category of Recyclable Materials as a result of market conditions related to such materials and makes no representations as to the recyclability of the materials. Collected Recyclable Materials for which no commercially reasonable market exists may be landfilled at Customer's cost. Notwithstanding anything to the contrary contained herein, Recyclable Materials may not contain Nonconforming Waste, Hazardous Waste, Special Waste or other materials that are deleterious or capable of causing material damage to property, personnel or the public or materially impair the strength or the durability of structures or equipment (all "Excluded Materials"). The Company may reject in whole or in part, or may process, in its sole discretion, Recyclable Materials not meeting the specifications. Customer may be charged a contamination fee for increased handling, processing, transportation and disposal, including profit margin, related to such non-conforming Recyclable Materials and any Recyclable Materials which contain Excluded Materials. Recycling Services are subject to a Recyclable Material Offset (RMO) charge to the extent that (a) the Company's processing cost per ton, including costs of disposal for contamination and profit margin, exceeds (b) an amount equal to recyclables value per ton minus an amount for profit margin. The RMO charge, including profit margin, processing and disposal costs and recyclable value shall be determined by the Company from time-to-time, in its sole discretion, based on applicable operating data and market information. If recyclables value exceeds processing costs, plus profit margin, a RMO credit may apply, at the Company's sole discretion. 12. ASSIGNMENT & SUBCONTRACTING. This Agreement shall be binding on and shall inure to the benefit of the parties and their respective successors and assigns. Customer acknowledges and agrees that the Company may utilize unaffiliated subcontractors that are not affiliates of Company to provide the Services to Customer. Customer may not broker the disposal of Industrial Waste through third parties under this Agreement without Company's express written consent. 13. ENTIRE AGREEMENT. This Agreement and its exhibits and attachments represent the entire understanding and agreement between the parties relating to the Services and supersedes any and all prior agreements, whether written or oral, between the parties regarding the same; provided that, the terms of any national service agreement or lease agreement for compactors or specialty equipment between the parties shall govern over any inconsistent terms herein. 14. TERMINATION; LIQUIDATED DAMAGES. Company may immediately terminate this Agreement, (a) in the event of Customer's breach of any term or provision of this Agreement, including failure to pay on a timely basis, or (b) if Customer becomes insolvent, the subject of an order for relief in bankruptcy, receivership, reorganization dissolution, or similar law, or makes an assignment for the benefit of its creditors or if Company deems itself insecure as to payment ("Default"). Notice of termination shall be in writing and deemed given when delivered in person or by certified mail, postage prepaid, return receipt requested. In the event Customer terminates this Agreement prior to the expiration of the Initial or Renewal Term ("Term") for any reason other than as set forth in Section 3, or in the event Company terminates this Agreement for Customer's default, Customer shall pay the following liquidated damages in addition to the Company's legal fees, if any: (a) if the Initial Term under this Agreement is six (6) or more months, Customer shall pay the average of its six (6) most recent monthly Charges (or, if the Effective Date is within six (6) months of Company's last invoice date, the average of all monthly Charges) multiplied by six (6); or (b) if the remaining Initial Term under this Agreement is less than six (6) months, Customer shall pay the average of its six (6) most recent monthly Charges multiplied by the number of months remaining in the Term. Example 1: if Customer terminates the Agreement fourteen (14) months before the expiration of the Initial Term, and Customer's most recent six (6) invoices averaged $200 per month in monthly Charges, the liquidated damages due would be $1,200. Example 2: if Customer terminates the Agreement four (4) months prior to the expiration of the Initial Term, and Customer's most recent six (6) invoices average $200 per month in monthly Charges, the liquidated damages owed by Customer would be $800. Customer acknowledges that the actual damage to Company in the event of termination is impractical or extremely difficult to fix or prove, and the foregoing liquidated damages amount is reasonable and commensurate with the anticipated loss to Company resulting from such termination and is an agreed upon charge and is not imposed as a penalty. Collection of liquidated damages by Company shall be in addition to any rights or remedies available to Company under this Agreement or at law. In addition to and not in limitation of the foregoing, Company shall be entitled to recover all losses, damages and costs, including attorneys' fees and costs, resulting from Customer's breach of any other provision of this Agreement in addition to all other remedies available at law or in equity. 15. EQUIPMENT. All equipment furnished by Company shall remain its property; however Customer shall have care, custody and control of the equipment and shall be liable for all loss or damage to the equipment and for its contents while at Customer's service location(s) or otherwise under its care, custody and control. Customer will not overload, move or alter the equipment, or allow a third party to do so, and shall use it only for its intended purpose. At the termination of this Agreement, Company's equipment shall be in the condition in which it was provided, normal wear and tear excepted. Customer shall provide safe and unobstructed access to the equipment on the scheduled collection day. Company may suspend Services or terminate this Agreement in the event Customer violates any of the requirements of this provision. Customer shall pay, if charged by Company, any additional Charges, determined by Company in its sole discretion, for overloading, moving or altering the equipment or allowing a third party to do so, and for any service modifications caused by or resulting from Customer's failure to provide access. Customer warrants that Customer's property is sufficient to bear the weight Revised March 14, 2023 © 2023 WM Intellectual Property Holdings, L.L.C. of Company's equipment and vehicles and agrees that Company shall not be responsible for any damage to Customer's pavement or any other surface resulting from the equipment or Services. 16. CONFIDENTIALITY. Except as required by law, the parties agree that the rates set forth on Exhibit A, a Confirmation Letter, including any adjustments thereto, and any other pricing information shall be considered confidential and shall not be disclosed to third parties without the other party's written approval. 17. MISCELLANEOUS. (a) The prevailing party will be entitled to recover reasonable fees and court costs, including attorneys' and expert fees, in enforcing this Agreement. In the event Customer fails to pay Company all amounts due hereunder, Company will be entitled to collect all reasonable collection costs or expenses, including reasonable attorneys' and expert fees, court costs or handling fees for returned checks from Customer; (b) The validity, interpretation and performance of this Agreement shall be construed in accordance with the law of the state in which the Services are performed; (c) If any provision of this Agreement is declared invalid or unenforceable, then such provision shall be deemed severable from and shall not affect the remainder of this Agreement, which shall remain in full force and effect; (d) Customer's payment obligation for Services and the Warranties and Indemnification made by each party shall survive termination of this Agreement; ( e) Company shall act as an independent contractor pursuant to this Agreement and nothing herein shall create a partnership, joint venture or any other relationship between the parties. Page 2 of 2 Exhibit A OƩer Tail County Department of Solid Waste 1115 North Tower Road Fergus Falls, MN 56537 1. Disposal Rates for the Dakota Landfill. Municipal Solid Waste (MSW). $44.00 per ton- 3-ton minimum charge per load3- tontrucƟon/DemoliƟon Waste(C&D). $44.00 per ton- 3-ton minimum charge per load 2. Other Charges a. Taxes, Fees and Host Fees. The above disposal rates do not include federal, state, county, city, or local taxes, fees and host fees. Taxes, fees and host fees will also be charged as applicable. Currently $1.77 per ton will be charged for the Township School – City Host Fee. This rate will be adjusted to reflect any changes to the host fees, taxes, and fees. b. Waste Water Management and Disposal Energy Surcharges. All loads shall be subject to the Company’s waste water management charge (WWMC) and disposal energy surcharge. i. The waste water management charge is 18.9%. The WWMC is applied to the disposal charges. ii. The disposal energy surcharge can change weekly based on fuel prices, see www.wm.com/fec for the current rate. The disposal energy surcharge is applied to the disposal rate. c. Annual Rate Increases. The disposal rates shall be increased each year on the anniversary of the date of this Agreement by the 12-month rolling average percentage change in the Water, Sewer, Trash CollecƟon Consumer Price Index (WST CPI) (not seasonally adjusted, all areas) with a minimum increase of 4%. d. Bulky Items. Loads containing bulky items (such as maƩresses and couches/sofas) will also be charged $17/each per bulky item, in addiƟon to the MSW disposal charge, WWMC, energy surcharge and applicable taxes/fees and host fees. e. Dig Out Charges. Company may but is not required to assist Customer in digging out Solid Waste. Customer will be responsible for the Company’s standard charges for assisƟng in offloading all Solid Waste delivered for disposal. The Company shall not be responsible for any damage to Customer’s vehicles or equipment resulƟng from the Company providing such services. The work contemplated by this Exhibit A is to be done in accordance with the terms and condiƟons of the Industrial Waste & Disposal Services Agreement between the parƟes dated January 1, 2027. Company: CUSTOMER: Big Dipper Enterprises, Inc. OƩer Tail County Department of Solid Waste By: By: Name: Name: Title: Title: Date: Date: Resolution of Support City of Fergus Falls LRIP Application OTTER TAIL COUNTY RESOLUTION NO. 2026 ----- WHEREAS, the City of Fergus Falls has indicated their intent to apply for a Local Road Improvement Program (LRIP) grant for the construction of a roundabout at the intersection of Tower Road/CSAH 1 and College Way, AND WHEREAS, the proposed project would involve construction along an Otter Tail County State Aid Highway, AND WHEREAS, this intersection has been identified as a high-priority intersection in the county's Safety Action Plan, AND WHEREAS, the city and county have received numerous requests for a roundabout at this location because of the crash rate, AND WHEREAS, intersection improvements at this location are listed in the county's transportation plan. NOW THEREFORE Otter Tail County strongly supports the City of Fergus Falls' application for Local Road Improvement Program (LRIP) funding to construct a roundabout at the intersection of Tower Road and College Way. BE IT ALSO RESOLVED, that Otter Tail County commits to partnering with the city and sharing in local costs related to the construction of the aforementioned roundabout. The motion for the adoption of the foregoing resolution was introduced by Commissioner ___ _ duly seconded by Commissioner _____ and, after discussion thereof and upon vote being taken thereon, passed unanimously. Adopted at Fergus Falls, MN this 3rd day of November 2026. OTTER TAIL COUNTY BOARD OF COMMISSIONERS By: ______________ _ Attest: Robert Lahman, Board of Commissioners Chair STATE OF MINNESOTA ) ) COUNTY OF OTTER TAIL ) -----------Nicole Hansen, Clerk I, Nicole Hansen, the County Administrator, do hereby certify that the foregoing resolution is a true and correct copy of the resolution presented to and adopted by Otter Tail County at a duly authorized meeting therefore held on the 3rd day of November 2026. Nicole Hansen, Clerk TO: FROM: DATE: MEMORANDU M Board of Commissioners Jodi Teich, County Engineer October 27, 2026 HIGHWAY 505 South Court Street, Suite 1 Fergus Falls, MN 56537 SUBJECT: Design Engineering Services Contract with Houston Engineering for CSAH 38 Reconstruction Recommended Action: • Approve entering into an agreement with Houston Engineering, Inc. for design services for the reconstruction of CSAH 38 at a cost not to exceed $414,433.00. Background Information: The county is planning to reconstruct CSAH 38 between CSAH 5 and Urbank in 2029. While the county is in the process of dedicating staff to more in-house design we are in a transition period and staff is committed to other design work so would be unable to complete the design themselves in a timely manner. Proposals were solicited and the county received eight proposals. The proposals were ranked based on qualifications, project understanding, proposed delivery schedule, past experience with the firm/references and cost. The cost proposals ranged from $315,717 to $577,530. Houston's overall proposal and level of effort ranked the highest of the eight proposals. 218-998-8470 @ LIVE YOUR best life HERE. @ ottertailcounty.gov U TON engineering, inc. Maple Grove Office 7550 Meridian Cir N, Suite 120 Maple Grove, MN 55369 P: (763) 493-4522 Email: ContractNotices@houstoneng.com CLIENT/OWNER SERVICES AGREEMENT PROJECT NAME: CSAH 38 Reconstruction HOUSTON JOB NO.: R005197-0058 HOUSTON PROJ. MGR.: Jeff Langan.jlangan@houstoneng.com CLIENT/OWNER NAME: Otter Tail County Highway Department CLIENT/OWNER ADDRESS: 505 South Court Street, Suite 1. Fergus Falls. MN 56537-2757 CLIENT/OWNER PHONE NO.: 218-998-8497 CLIENT/OWNER CONTACT: Jodi Teich. County Engineer This Client/Owner Services Agreement ("Agreement") is made and entered into effective as of this 21st day of October , 20~, ("Effective Date") by and between HOUSTON ENGINEERING, INC. ("Houston") and Otter Tail County Highway Department ("Client"). Recitals A. Client has requested Houston to perform certain professional services in connection with a project generally referred to as CSAH 38 Reconstruction ("Project"). B. Houston desires to provide the professional services requested by Client in accordance with this Agreement. NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, Houston and Client agree as follows: 1. Services. Houston shall perform the services set forth in Attachment A ("Services") in accordance with the terms and conditions of this Agreement. 2. Term of Agreement. This Agreement shall commence on the date first stated above, and Houston is authorized to commence performance of the Services as of that date. This Agreement shall terminate on December 31 , 20.l§.., unless terminated earlier pursuant to the terms and conditions of this Agreement. 3. Attachments. The Attachments below, which have been marked for inclusion, are hereby specifically incorporated into and made a part of this Agreement: iZJ ATTACHMENT A -TECHNICAL & COST PROPOSAL FOR PROFESSIONAL ENGINEERING SERVICES FOR CSAH 38 RECONSTRUCTION DATED 09.18.2026. (Houston assumes no responsibility to perform any services not specifically listed.) 1ZJ ATTACHMENT B • GENERAL TERMS AND CONDITIONS □ ATTACHMENT C ·------------------------------- □ ATTACHMENT D • ------------------------------- IZJ FEE SCHEDULE· DATED 2027. □ AL TA/NSPS LAND TITLE SURVEY RIDER 4. Compensation. $ ______ Lump Sum Fee • Based on the Services defined herein $ 414.433.00 Estimated Fee -Client invoiced on an hourly basis commensurate with the attached Fee Schedule $ Percentage of Estimated Construction Cost $ Other-________________________________ _ IN WITNESS WHEREOF, the parties have caused this Agreement to be executed as of the date first above written: CLIENT/OWNER BY: AUTHORIZED REPRESENTATIVE TITLE: ______________ _ PLEASE SIGN AND RETURN ONE COPY TO HOUSTON AT THE U.S. MAIL OR ELECTRONIC MAIL ADDRESS ABOVE Client/Owner Services Agreement-Form Version 9/30/24 HOUSTON . . . engineering, inc. Lw.rul -Project Comdor & Vertical Curve Design Does Not Meet 45 mph Design Grant in Aid Groomed Snowmobile Trail; Balance Vehicle Access with Snowmobile Safety Consider 50 mph Alignment Alternatives Wetlands, Project Must Balance Wetlands and Drainage Interests Federal Owned Land; Avoidance Alternatives Analysis Required Technical Proposal for ATTACHMENT A Otter Tail County Highway Department 9.18.2026 Design Engineering Services for CSAH 38 Reconstruction SAP 056-638-XXX Table of Contents Contact Information ................................................. 1 Cost Proposal ....................... Included Separately Experience ................................................................ 1 Staffing ...................................................................... 3 Project Approach ...................................................... 6 County Deliverables ................................................. 10 6 l HOUSTON engineering. inc. VIA Email: hwy@ottertailcounty.gov September 18, 2026 Otter Tail County Highway Department 505 South Court Street, Suite 1 Fergus Falls, MN 56537 Fargo Office ___ 7_01_.237.5065 j 1401 21st Avenue North I Fargo, ND 58102 Subject: Design Engineering Services for CSAH 38 Reconstruction, SAP 056-638-XXX Dear Selection Committee: We are very excited about this opportunity to work with the County on this highway reconstruction project, this scope in particular. This segment, along with the one to the west to TH 78, is in need of work. I recently visited the corridor, reviewed the adjacent landscape and use, and drove the roadway with a 1-ton pickup and utility trailer to get an overall impression of the corridor's character, highway use, operation's needs, and safety concerns. I have a vision that will serve the commuter driver, local user, agricultural economy, recreational community, and regulatory groups. Our team continues to grow in skill, experience, capacity, and service quality awareness and we believe our product is second to none. We have learned and grown through every product we have developed for Otter Tail County, starting with my first project on CSAH 18 at Crooked Lake, and are very excited to display this development through the CSAH 38 reconstruction project. The team we have assembled exemplifies this excitement, progress, and experience. Erik and I have both served as County Engineers and will team up to lead this project. I will serve as the Project Manager confirming the deliverable's quality, objectives, cost, schedule, and incremental project accomplishments are consistently in your view and on target. Erik will serve as the Project Engineer overseeing that the design and contract documents are developed coordinating the interests of all engineering services (roadway design, survey and right-of-way, environmental, utilities, and public interests). Serving Otter Tail County has been a significant part of my professional life. I am both personally and professionally committed to representing the County's leadership in a great light to the community. All departments and the County Board, although it changes throughout the years, have been great supporters of Houston Engineering, Inc., which we recognize and will never take it for granted. Thanks for another great opportunity. Sincerely, HOUSTON ENGINEERING, INC. Pro Direct: 763.321 .3894 jlangan@houstoneng.com ou toneng.com I l. desig and n nu ou" projects Contact Information Company Name Company Contacts for you, including road reconstructions, trans, lake outlets, drainage improvements, and bridges. Through these projects, I have developed a strong l.llldeBtmndlng of the County's project development prnctices and expectations, constituent needs, and regulal°"J r;Mjuirements. We have learned from our challenges and continuously improved the services Houston Engineering, Inc. (HEI) Company Address 1401 21st Avenue North Fargo, ND 58102 Experience Nelson Lake Outlet Otter Tail Ongoing Otter Tail County, Minnesota County Jeff Langan, PE Project Manager ~ 763 321 3894 we ~de with El;8ch project. ~ur project t. i • • dedicated to HM .. your best mlerests. @I jlangan@houstoneng.com Erik Hove, PE Project Engineer ~ 701.732.3342 @I ehove@houstoneng.com I X f X l Ix I >< I X I I I X Jeff Langan, Adam Ruud, Benjamin Hengel Project Description: The project included raising approximately 0.8 miles of CSAH west of Parker's Prairie to prevent overtopping through Nelson Lake. The roadway was raised 1.5 feet and incorporated riprap to protect the slope. Impacts to Nelson Lake required significant coordination with regulatory agencies to navigate the permitting process. Norman County CSAH 24 and 63 and CH163 Intersection Improvements Northeast of Ada, MN Norman County Highway Department Ongoing X X X X X Erik Hove, Adam Ruud, Josiah X I Erickson, Benjamin Hengel, Erik Jones, Jim Schlieman Project Description: HEI provided engineering services associated with the reconstruction of two closely spaced intersections located northeast of Ada, MN. CSAH 24 acts as the primary north-south roadway in the area and is intersected by both CSAH 63 and CSAH 24 on a curve. HEI worked with the Highway Department to further develop alternatives, and provided environmental documentation, performing survey work, and preparation construction plans. CSAH 2 Reconstruction from I Stearns County 421st Streetto CSAH 1 Highway 2025 X X X X X X Jeff Langan, Adam Ruud Steams County, MN I Department Project Description: HEI provided professional engineering services for the reconstruction of CSAH 2 from 421 st Street to CSAH 1 in Stearns County, a 1.5-mile minor arterial roadway. The project addressed safety, capacity, and geometric deficiencies by correcting a substandard horizontal cuNe, widening the roadway to meet Minnesota State Aid standards, providing adequate clear zones, and designing a 10-ton pavement structure to support agricultural, residential, school bus, and commuter traffic. CSAH 3 Overlay and Pipe Replacements Roseau County, Minnesota Roseau County Highway Department 2024 X X X X Erik Hove, Jeff Langan, Benjamin Hengel, Erik Jones Project Description: Pipe replacements included a hydrologic and hydraulic analysis of more than 50 culverts as well as all centerline, approach road, private crossings, and county ditch crossings. The analysis incorporated delineation of many interconnected drainage areas in an agricultural setting. For major culverts, hydrology was calculated using US Geological Survey regression analysis with hydraulics analyzed through the Federal Highway Administration's HY-8. Two of the structures were on the County's bridge inventory and were replaced with box culverts. All centerline culverts included a backfill taper treatment to ensure a good pavement ride. Due to the project utilizing federal funds, the schedule was accelerated. Design Engineering Services for CSAH 38 Reconstruction Staffing Organizational Chart ~ OTTERTAIL COUNTY-MINNESOTA Team Lead= Bold Jeremy McLaughlin, MBA, PE Principal-in-Charge Jeff Langan, PE Project Mangager Survey; LIDAR; and Right-of-Way l Jim Schlieman, PLS Survey and Right-of-Way Plats Lead Dustin Buchholtz, CST Right-of-Way Plats Chad Qualley LiDAR Lead N.F. Field Abstract Company, LLC • Right-of-Way Jeff Langan, PE Project Manager Education BS in Civil Engineering, UND Registration Professional Engineer Minnesota: 22805 Professional Experience HEI: 2005-Present Minnesota County Engineer: 1994-2005 Total Experience: 38 Years Roadway Design; Easement Acquisition Support Adam Ruud, PE Roadway DesigP Lead r Josiah Erickson, PE Roadway Design Dave Marshall Roadway Design Gunnar Cowing, PE Roadway Design Utility Coordination Erik Hove, PE Utility Coordinahon Lead ' L Josiah Erickson, PE Utility Coordination Hydrology and Hydraulics Erik Jones, MS, PE !: : . ~ j ~ L Ted Rud, PE Public Engagement Lead Erik Hove, PE F. Leao Environmental Permitting Benjamin Hengel, MS, CMWP Geotechnical Investigation Alex Sprunk, PE• Geo technical Investigation Jeff has more than 35 years of experience nationwide for various highway agencies from the local to federal levels. He served as a Minnesota County Highway and Drainage Engineer between 1994 and 2005, and since then he has served as a Project Manager and Project Engineer for HEI. Jeff has a thorough understanding of the critical planning, design, construction, and maintenance elements of our rural CSAH and county road roadways in Minnesota. As Project Manager/Project Engineer, he has directed the design and construction of Minnesota Department of Transportation (Mn DOT) State Aid and trunk highway projects in rural areas and small rural communities throughout the state. He has also managed and designed several complicated drainage projects in Minnesota related to highway operations and has developed a history of success engaging and working with local stakeholders, regulatory staff, and the general public. • CSAH 34 Reconstruction and Heart of the Lakes Trail, Otter Tail County Highway Department, MN. Project Manager for the full depth reclamation, reconstruction, subgrade and muck excavation, new alignments, auxiliary lanes, intersection lighting, multiuse sidepath, and upgraded bridge railing for the reconstruction of a 7-mile segment of CSAH 34. Services include survey, platting, regulatory and env document, public engagement, right-of-way assistance, preliminary and detail design, drainage design, guardrail design, final construction contract documents • CSAH 2 Reconstruction, Stearns County, MN. Project Manager for the full depth reclamation, reconstruction, subgrade and muck excavation, horizontal and vertical curve re-alignments, for the reconstruction of a 2-mile segment of CSAH 2. Services include survey, regulatory and env document preparation, public engagement, right-of-way assistance, preliminary and detail design, drainage design, and final construction contract documents. "Jeff has supported you for nearly 20 years on projects ranging from lake outlets to road reconstructions. He understands local priorities and constituents' expectations and will continue to prioritize highway operations, maintenance, and taxpayers' interests." Design Engineering Services for CSAH 38 Reconstruction 2 Erik Hove, PE Project Engineer; Utility Coordination Lead; Public Engagement Lead Education BS in Civil Engineering, UNO Registration Professional Engineer MN: 53661 Professional Experience HEI: 2022-Present Minnesota County Highway Engineer: 2016-2022 Total Experience: 15 Years Adam Ruud, PE Roadway Design Lead Education BS in Civil Engineering, NDSU Registration Professional Engineer MN: 55094 Professional Experience HEI: 2011-Present Total Experience: 15 Years Erik Jones, MS, PE Hydrology and Hydraulic Lead Education MS in Civil Engineering, NDSU Registration Professional Engineer MN:41161 Professional Experience HEI: 1996-Present Total Experience: 30 Years Benjamin Hengel, MS,CMWP / Environmental Permitting Lead Education MS and BS in Natural Resource Management, NDSU Registration Certified Minnesota Wetland Professional: 1382 Professional Experience HEI: 2019-Present Total Experience: 8 Years Erik will use his experience as a Minnesota County Engineer and extensive knowledge of the Minnesota State Aid system and process to bring success to this project. He understands the challenges you face and knows firsthand how project elements can have a lasting impact on owners that have to maintain them into the future. • CSAH 3 Overlay and Pipe Replacements, Roseau County Highway Department, MN. Project Manager for pavement rehabilitation with culvert replacements for a 7-mile segment of CSAH 3. Pipe replacements included a hydrologic and hydraulic analysis of all centerline and approach pipes. • Norman County CSAH 24/63 and CH 163 Intersection Improvements, Norman County Highway Department, MN. Project Manager. Norman County retained HEI to improve safety and traffic operations at two closely spaced rural intersections along CSAH 24, CSAH 63, and CH 163 northeast of Ada, MN. This project was funded through federal Highway Safety Improvement Program funding and included roadway realignment, free-flow right-turn movements, enhanced drainage, and intersection lighting to reduce crash risks along the corridor. Adam will lead roadway design tasks. He brings an in-depth understanding of the technical requirements laid out by county, state, and federal agencies while never losing focus of the practical needs of residents and businesses. • CSAH 34 Reconstruction, Otter Tail County Highway Department, Perham, MN. Design Engineer for the reconstruction of CSAH 34 and installation of shared-use path north of the roadway from Mallard Loop to just west of Perham. • CSAH 10 Reconstruction, Norman County Highway Department, MN. Lead Design Engineer for the reconstruction of CSAH 10 from CSAH 39 to CSAH 25. The project improved and widened an existing narrow gravel roadway section to a paved section meeting State Aid Standards. Due to the high agricultural and sugar beet hauling traffic, the pavement structure was an important element in the design. Erik will oversee hydraulic analysis for the project. With extensive experience, he has sized hundreds of road crossings at township, county, state, and federal levels. • Otter Tail County Bridge Replacements, Otter Tail County Highway Department, MN. Hydraulic Lead on multiple bridge replacement projects including, County Road 143 over the Leaf River, Moccasin Road over the Wing River, CSAH 37 over the Pomme de Terre River, and CSAH 11 over an unnamed tributary to Judicial Ditch 2. • Little and Big Pine, Rush, and Otter Tail Lakes, East Otter Tail Soil and Water Conservation District, Perham, MN. Principal-in-Charge and Quality Control. Our team completed hydraulic modeling was completed to show that the proposed design would not alter lake levels along with the design of the rapid's structures. The project included rock arch rapids installation at the outlet of each lake. Benjamin brings a balanced understanding of how to produce results in both the field and the office. He prepares many environmental documents such as delineation reports, monitoring reports, permits, environmental assessment worksheets, National Environmental Policy Act (NEPA) documents, and wetland banking documents. • Heart of the Lakes Trail, Pelican Rapids to Maplewood State Park to CSAH 34, Otter Tail County Highway Department, MN. Environmental Scientist and Lead Author for a multiuse trail from Pelican Rapids Maplewood State Park to CSAH 34 in Otter Tail County. These 34-mile segments will be a part of the Regional Trail System from Perham to Pelican Rapids. • Bridge 91554 Replacement, Otter Tail County Highway Department, MN. Environmental Scientist. Benjamin completed environmental documentation and assisted in submitting Wetland Conservation Act permits and Minnesota Department of Natural Resources permits. Design Engineering Services for CSAH 38 Reconstruction 3 Survey and Right-of-Way Plats Lead Education BS in Land Surveying/Mapping Science, SCSU Registration Professional Land Surveyor MN: 44867 Professional Experience HEI: 2002-Present Total Experience: 24 Years Education Chad Qualley LiDAR Lead BS in Natural Resource Management, UMN Crookston Registration FAA Remote Pilot Exam for Small Unmanned Aircraft Systems (sUAS)-3927528 Professional Experience HEI: 2003-Present Total Experience: 28 Years Alex Sprunk, PE Geotechnical Investigation Education BS in Civil Engineering, NDSU Registration Professional Engineer MN: 56553 Professional Experience Total Experience: 13 Years Jim will oversee surveying efforts. Jim leads HEl's surveying services companywide and will make sure that the right people, with the right tools, are on site to accurately gather the information needed to support informed and successful design choices. • Heart of the Lakes Trail, Pelican Rapids to Maplewood State Park, Otter Tail County Highway Department, Perham, MN. Survey Project Manager for a multiuse trail from Pelican Rapids Maplewood State Park to CSAH 34 in Otter Tail County. These segments, totaling 34 miles, will be a part of the Regional Trail System from Perham to Pelican Rapids. • Glacial Edge Trail, Otter Tail County Highway Department, Maplewood State Park, MN. Survey Project Manager. HEI partnered with the County and the Minnesota Department of Natural Resources to complete a 2.3-mile-long segment from the intersection of CSAH 3 and CSAH 24 north to Isle View Drive. Chad leads mobile and aerial drone LiDAR collection for HEl's clients, benefitting you with the innovative survey deliverables this project warrants. • Otter Tail County Trail: Maplewood State Park Segment, Otter Tail County Highway Department, Pelican Rapids, MN. LiDAR Collection Coordinator. HEl's team developed a layout, performed preliminary and detail design, prepared plans, and specifications, and will provide construction engineering for a 7.2-mile off roadway combined-use paved trail running from the west limits of the Maplewood State Park at CSAH 3 to the north limits of the park at TH 108. • Glacial Edge Trail, Otter Tail County Highway Department, MN. LiDAR Collection Coordinator. HEI partnered with the County and the Minnesota Department of Natural Resources to complete a 2.3-mile-long segment from the intersection of CSAH 3 and CSAH 24 north to Isle View Drive. The trail will parallel CSAH 3 to offer unique scenic opportunities within Maplewood State Park. HEl's tasks have included project concept planning, permitting and environmental review, hydrology and hydraulics, survey, and trail design and plans. Alex has more than 13 years of experience working with the soft, deep lacustrine deposits associated with glacial Lake Agassiz, as well as the glacial till and alluvial soils encountered across eastern North Dakota, northeastern South Dakota, and north central Minnesota. • Street and Utility Improvements, Detroit Lakes, MN. Alex served as the project engineer for geotechnical engineering services for numerous street rehabilitation (pavements and underground utilities) projects around the city of Detroit Lakes, MN. His responsibilities included developing and directing the field exploration and laboratory testing program, performing engineering analysis, and authoring the geotechnical engineering report which included pavement thickness recommendations. • Street Rehabilitations, Moorhead, MN. Served as the project engineer for geotechnical exploration services for numerous street rehabilitation projects around the city of Moorhead, MN. Responsibilities included developing and directing the field exploration and laboratory testing programs, examination of pavement cores, and authoring the geotechnical exploration reports. Design Engineering Services for CSAH 38 Reconstruction 4 Project Approach Project Tasks Project Management Jeff Langan, PE I Project Manager e driven CSAH 38 from TH 78 to Urbank and understand the corridor's needs, as well as how focal landowners and regulatory agencies are likely to respond to our desi approach. Jeff will continue to communicate with Jodi and Bob in a transparent, consistent, and proactive manner, keeping project objectives related to quality, cost, and schedule at the forefront of all decisions. Jeff will also coordinate production communications between HEI and the County. Weekly internal and biweekly meetings will maintain project progress and focus. Public Engagement Erik Hove will lead the public engagement efforts under the direction and advisement of Jeff and the designated County Project Manager. Individual site visits will be used where most effective, an approach that proved successful on the Heart of the Lakes Trail project. Erik will facilitate all discussions with identified stakeholders to verify goals and objectives of the project, minimize impacts and conflicts, and manage stakeholder input. If desired, he can use online public engagement tools such as Social Point to streamline communication and maximize public input. One in-person public input meeting using an open house format will be completed after the 30% design is complete. Gaining landowner support, including early coordination with the US Fish and Wildlife Service (USFWS), will be critical to the success of the project. Because right-of-way acquisition will be required along the entire corridor, adjacent landowners will be the primary audience. We will build landowner support through clear, plain-language communication Design Engineering Services for CSAH 38 Reconstruction that facilitates efficient right-of-way acquisition and permitting. Topographic Survey Chad Qualley will lead the collection of drone LiDAR, aerial imagery, and ground survey data for all existing ground features, which we have used with great success on several grading projects in Otter Tail County. Quality control of data collection and point file development and it continues to improve with each project. The proposed schedule is to collect all data immediately upon notice to proceed and before snow cover in 2026, allowing for preliminary design to begin early on to potentiaHy accelerate project delivery. Geotechnical Investigation and Soils HEI will coordinate with the County to review all available data to determine the appropriate scope of soil exploration. The existing roadway is currently subject to a 7-ton spring load restriction. For this proposal, it is assumed that Terracon will complete soil borings at intervals of approximately 1,000 feet along the project corridor. Because no significant grade changes are anticipated, the borings are expected to be advanced to approximately 8 feet below the existing pavement surface. Upon completion of the subsurface investigation and associated laboratory testing, Terracon will prepare a geotechnical engineering report. The report will include subgrade preparation recommendations and a 10-ton bituminous pavement design. It is assumed that the County will provide the traffic data required to complete the pavement design in accordance with State Aid pavement design guidelines. Roadway Design and Plans Roadway Design Approach Adam Ruud will lead the detailed design efforts and work closely with other task leads and the design team to prepare both preliminary and final construction documents, including Division S special provisions. All design work will be completed in accordance with the requirements 5 of the State Aid Manual and Minnesota State Aid Rules 8820.9920 for rural reconstruction projects on the state aid system. HEl's established working relationship with Otter Tail County provides a strong understanding of proven design elements used successfully on past County projects, including sub cutting poor soils and providing culvert frost treatments. We will place quality embankment material within the top 2 feet of roadway subgrade to improve long-term pavement performance and reduce frost-related distress. T lYPE SP 9 5 MAANG COURSE M!)I; !SPWEA)40CJ 3" TYPE SP \2 5 \ill'E.AIONG OOUASE UIICjSPWE~) frltOOREGATl;;B,,\SEC()I..RSE CV,S86, 5U8CUT1.0'ASSHOINNON~6Pf'QFU AAOX-3Et:'TX»i9.~Lvvmt!UTA8l.f; NA'lER:W.FltOMAOJ,\CENTCUTS Example of a typical section utilizing 2-foot sub cut. LEGEND: O•~°""'4Efffc<l"IIOUNOl"W'E llll•WlU>EFtlit:OFl'ft-M::.,f $ • OUTSCllt """'-0,: PIP!i,AACH Example of a centerline culvert frost treatment detail. Existing Conditions CSAH 38 is classified as a major collector and a scenic byway with an existing traffic volume of approximately 575 annual average daily traffic. The project corridor is characterized by rolling terrain, significant horizontal curvature, multiple depressional wetlands, and public waters located adjacent to the roadway. The existing section has minimal to no shoulder width and non-uniform steep in slopes. Based on the USGS soil survey, the corridor consists primarily of American Association of State Highway and Transportation Officials A-6, A-7, and some A-8 (muck) soils, which generally provide fair to poor highway subgrade conditions. These soils exhibit poor subgrade characteristics and Design Engineering Services for CSAH 38 Reconstruction significant frost susceptibility. We will evaluate embankment material selection, soil blending, and potential borrow sources with our geotechnical subconsultant to optimize performance. HEI provided planning, environmental review, and legal surveying and platting services for the 5.5-mile reconstruction of CSAH 34 from US 10 to CSAH 35 , supporting final design, construction plans, and the engineer's estimate. Existing Roadway Geometry As part of the preliminary evaluation, the existing roadway geometry found the following: • The existing vertical alignments meet or exceed the requirements for a 45-mph design speed for stopping sight distance, with the exception of the intersection of CSAH 38 and CSAH 87 and the sag curve immediately west of Urbank. It is anticipated minor adjustments will be required to correct the vertical alignment at these locations. Due to the locations of the existing driveways, there are also challenging intersection sight distances throughout the corridor. During the preliminary layout, the existing profile will be evaluated based on sight distance standards for 45 mph and recommended improvements will be presented for consideration. • All curves meet a 45-mph design speed; however, four require 6.0% superelevation. Preliminary design will evaluate increasing curve radii to reduce superelevation and improve driver comfort. Maximum superelevation rates are most critical within curves that include intersecting roadways and driveways, particularly during winter conditions. We will address these operational 6 concerns through sound design practices and careful coordination of roadway geometry. From a preliminary review, increasing the radii of the first two horizontal curves west of the intersection with CSAH 87 to approximately 1,000-foot (5.4% superelevation for 45-mph design speed, 5.9% superelevation for 50 mph) may be feasible while limiting the shift in the roadway centerline to approximately 30-foot. Increasing the radii of the first two horizontal curves east of CSAH 5 will be more impactful due to the near 90-degree alignment deflection. Increasing the radii to 1 000 feet at these two locations results in ' nearly a 100-foot shift in the centerline alignment. Vertical Profile and Typical Section It is assumed that the proposed vertical alignment will generally match existing conditions, with minor profile adjustments anticipated to optimize earthwork balance as well as to correct areas with design speeds less than 45 mph and insufficient sight distances. The project includes widening of the existing roadway to provide 4-foot paved and 1.5-foot gravel shoulders, which has potential to impact adjacent features, including: • Mailboxes • Utilities (gas, electric, fiber, and telephone) • Private fences A 15-foot clear zone is required along the corridor based on State Aid standards. Right-of-Way Considerations in Design Substantial right-of-way acquisition is anticipated to achieve a consistent 120-foot right-of-way width along the corridor. Within Urbank, there are existing right-bf-way encroachments along the south side of the roadway. Early coordination with the Otter Tail Power Company will be essential to avoid delays in right-of-way acquisition. Additional design consideration will be required near the residence north of CSAH 38 approximately 1,550 feet west of CSAH 87 due to the proximity of existing structures and Design Engineering Services for CSAH 38 Reconstruction potential curve realignment impacts. During initial project layout, alternatives will be evaluated to minimize impacts while also meeting the objectives of th~ project. Alternatives may include slight adjustments to the horizontal alignment to minimize right-of-way takes from sensitive properties or considerations for buried pipes to eliminate ditching and needed right-of-way widths. Construction Sequencing There are several private properties and fields that will require access throughout the duration of construction, including popular summer destinations such as Inspiration Peak Camp. We will develop construction plans that minimize impacts and maintain access throughout construction. This will require careful evaluation of sequencing and potential temporary widening and graveled areas to maintain local traffic. Constructible Designs As the construction industry increasingly relies on GPS machine control, the importance of accurate, high-quality surface models has become critical. Our deliverables will include detailed surface models and final electronic design files prepared to the County's construction staking standards. Early coordination with County construction staff will support efficient machine-controlled construction, improve field accuracy, and reduce construction staking requirements. Safety Considerations Our review of 10 years of crash data identified nine crashes along the corridor. Five crashes involved vehicles leaving the roadway, and all three injury crashes involved roadway departures. Potential improvements include widened shoulders, edge-line rumble strips, enhanced curve signing, and curve realignment where feasible. Environmental Review and Permitting Because no federal funding is anticipated, a formal CA TEX declaration document is not expected. However, because right-of-way 7 acquisition may affect federal lands and wetlands, a formal Environmental Assessment (EA) may be required to demonstrate that no significant impacts to the Waterfowl Production Area will occur. On past Otter Tail County projects, the local USFWS refuge manager prepared the EA internally and issued a Finding of No Significant Impact. This process will occur concurrently with right-of-way acquisition and may take six to nine months. We will support the agency by providing the information needed to efficiently complete the determination. HEI will complete a desktop review to identify required permits and regulatory requirements. The deliverable will include a memo identifying environmental impacts and the measures needed to avoid or minimize them. These Early coordination mitigation measures will be incorporated into the preliminary design and 30% plans for County review and approval before proceeding with permit applications and final design. As part of our cursory review of the project, we anticipate the following items to be notable: • Northern Long-Eared Bat-Standard Avoidance and Minimization Measures anticipated • Three areas of Minnesota Biological Survey Sites of Biodiversity significance • Five public water basins along the corridor • No known cultural resources were identified in the project area • Project location is not within MS4 boundary or Watershed District • No public drainage systems or impaired waters are present along the project corridor Stormwater BMPs will be incorporated to address water quality and we expect only limited design effort beyond preparing a compliant Stormwater Pollution Prevention Plan (SWPPP) and meeting permit requirements. Hydrology and Hydraulic Modeling Erik Jones will lead the hydraulic analysis for all centerline culverts larger than 24 inches. The Design Engineering Services for CSAH 38 Reconstruction deliverable will include a drainage memo documenting existing and proposed drainage features and the contributing drainage area for each structure. Culvert sizing will be based on hydraulic performance and acceptable head loss through the highway, consistent with CSAH design standards. Hydrology will be developed using regression equations, and hydraulic analysis will be completed with HY-8 or HydroCAD modeling software. Because all structures are less than 48 inches in diameter, individual hydraulic reports are not expected to be needed. Utility Coordination Erik will lead utility coordination efforts, with production support from Josiah Erickson. HEI will submit the Gopher One Call ticket for both a field locate and mapped location documentation. HEI will review the utility information provided, coordinate with utility companies to verify the accuracy of survey data and base maps and request additional information as needed to resolve data gaps. After the 30% construction plans are complete, HEI will hold a virtual utility identification meeting to confirm that utility ownership and location is shown correctly on the plan sheets. Utility conflicts will be identified during 60% plan development, and coordination meetings will be conducted to verify conflicts and communicate relocation or protection-in-place requirements. Two utility design meetings are anticipated: one virtual meeting and one on-site meeting. During the on-site utility meeting, HEI will be prepared to stake proposed design features and proposed right-of-way limits to help utility companies develop relocation plan strategies. Relocation plans will occur during the development of 90% plans and completion of right-of-way acquisition. Utility companies will prepare and submit final relocation plans to the County for review and approval. 8 Right-of-Way This right-of-way scope will consist of preparing a right-of-way plat for approximately 5 miles of CSAH 38 in Otter Tail County. It is understood that this project is anticipated to impact approximately 42 existing parcels (including several trusts), and that the surveyor will obtain their own access permissions from landowners. HEI has extensive experience working with Otter Tail County staff on recent corridor projects involving right-of-way platting and acquisitions, including several segments of the Heart of the Lakes and Glacial Edge trail systems, spanning more than 30 linear miles of right-of-way work. Upon notice to proceed, HEI will compile survey, ownership, and title information, obtain property access permissions, and coordinate preliminary legal and vesting reports. All available information, including but not limited to corner records, subdivision plats, Certificates of Survey, highway easements, highway plats, and General Land Office survey data, will be compiled for use throughout the course of the project. Simultaneously with the initial research, we will begin the process of acquiring landowner permissions to access impacted properties as needed. A spreadsheet will be created to compile landowner information and track the status of access permission for all parcels along the project corridor. We will work with N.F. Field Abstract Company, LLC (N.F. Field) to have preliminary legal and vesting reports prepared for impacted parcels, to ensure we have accurate ownership information for each parcel. The initial field work will involve searching for and obtaining accurate data for existing Public Land Survey System (PLSS) monumentation, existing highway alignment and right-of-way monumentation, existing parcel monumentation, and any other items related to boundary evidence available to be collected. Once this initial field survey is completed, theoretical positions for monuments that were not found as part of the initial search will be computed, and Design Engineering Services for CSAH 38 Reconstruction an additional field search will be completed if deemed necessary. Once initial field work is completed, a master boundary drawing for the project footprint and surrounding area will be prepared in Civil 3D. This drawing will provide the basis for identification of right-of-way needs and platting as the project progresses. The drawing will include PLSS section linework, existing highway alignment and right-of-way linework, and existing boundary linework for parcels within the project footprint. Following determination of right-of-way acquisition needs, linework for the acquisition limits will be added to the master boundary drawing, and a preliminary plat will be prepared clearly showing the extents of existing highway right-of-way and the limits of the proposed new acquisition parcels. Any possible turnback parcels identified during the process will also be shown on the preliminary right-of-way plat. As part of this project, Certificates of Location of Government Corner will be prepared as needed and filed with the County Recorder's Office. Following negotiations between Otter Tail County and impacted landowners, a final right-of-way plat will be prepared reflecting any changes that may have become needed throughout the negotiation process. Prior to the right-of-way plat being finalized, N.F. Field will provide updates, as applicable, to previously provided legal and vesting reports, to show current ownership contact information at the time of plat filing. Following plat finalization, monumentation will be set for highway alignment, right-of-way, and abutting parcel boundaries at an appropriate time to verify monument preservation following construction. All right-of-way platting work will be conducted in accordance with Otter Tail County Highway Platting Procedures, dated August 14, 2026. We have incorporated costs for mylars in our proposal, as required in past projects. 9 Project Schedule Tasks Notice to Proceed and Kick-off Meeting Collect Field Survey Data (Legal, Utility, and Tooographic), Weather Permitting Environmental Desktop Review with Findings Memorandum Geotechnical Field Exploration and Final Geotechnical Report with Pavement Design Recommendations 30% Plan Deliverable 30% Plan Review Meeting with County Drainage Report with Recommended Culvert Sizes Early Outreach with Regulatory Agencies Utility Identification Meeting (virtual) Public Input Meeting (In Per.;on) Utility Conflict Meeting (Virtual) 60% Plan Deliverable Utility Conflict Meeting (On Site) 60% Plan Review Meeting with County Final Construction Limits Roll Plot Deliverable Final Right-of-Way Plat Deliverable County to Complete Right-of-Way Acquisition • HEI to Assist with Preparing Exhibits and Supporting Materials for Landowner Meetings, As Needed 90% Plans Deliverable 90% Plan Review Meeting with County Submit Permit Applications Submit Plans to District State Aid Engineer Supplemental Wetland Delineation (If Applicable) Bid Opening Construction Begins County Deliverables HEl's Project Deliverables - • Agenda and minutes for all meetings • Display and outreach materials for the public information meeting • Exhibits and supporting materials for landowner meetings • Construction plans • Drainage report for culvert sizing • Engineer's estimate • Geotechnical report with pavement design • Right-of-way plat • Environmental review memo • Prepare permits: MPCA, Joint Application (WCA/USACE), and MPARS • Division S special provisions (construction item-specific) • State Aid submittal items • Plan review checklist • State Aid lab request form • Utility coordination plans clearly identifying conflicts • Shop drawing review • Digital files for construction Design Engineering Services for CSAH 38 Reconstruction • -• - • • • • • • County's Project Deliverables • Wetland delineation report approved by the Technical Evaluation Panel (TEP) • Wetland delineation shapefiles for use in calculating impacts and preparing permit applications • Traffic data for pavement design • Approve pavement design recommendations or alternatives • Prepare full bid proposal and facilitate bidding • Approve the utility relocation plans and permits • Prepare easement documents and complete all right-of-way acquisition 10 HOUS ON . . . eng I neen ng, 1 nc. houstoneng.com ~ 1111 o· a X HOUSTON . . . eng I neen ng, 1 nc. Cost Proposal for Otter Tail County Highway Department 9.18.2026 Design Engineering Se rv ices for CS AH 38 Reconstruction SAP 056-638-XXX III ii l ·= ~ ~--= I .. i ~! -I ·• -1= ! ii " .,, i ·: • •ll ,.J_ f.1-1..-+-lf+-+---l---+---J-,l--l-!4'1---1-1 j ~ • ~ ·• .. I .. I= I. -:: n · . -i ,. (i ~-.. I . I I ~ -~ I- •• i-, ' !~ ~ ~-. I I ,! la .·, ! ·• l •• I ' • ;i e ~ ·• . j • = ·• • ' 11 ·• . ·r .,. . . .I .. l ;.J I ·I . . " I I' • ·= ~ =~ =l .. ., ·= .~ ;;:z ~· g5 ·- I J' i~ I la ,1 • ·! ·~ ., !I~ !~ ·• ! 'i rf i~ • . -+-+t+,--!--1-1-1--f+H----l+lill---1--1-+-Hl---l+H---+-++1 --l-l•H --1--+-~-l--1-1-1-i:l-+1-11-+-+-+ll+I ' ~ h .. ·• I•• ·• .I -] • ' • . ,! ·• I -,! . Ii j 1t • l:L...Hfl-+-+--r--+H--+-+---l-l-+---++&--++~+-+--l-+-1!1--1-1-19----+-i-t---++H-+--+--l-l-l~H-ld--,.H!l-l-l--l-l--U-l-l I j ~ ·• • -. . . . .. ·• .t • f---,--+Hl--+--l-+-t-+HI--H-fi--+-l--t-Hil---t+-H---l--1--r--H·H ·• i~ ·• I• • • ·~ p H-"--I-Fl-#+-11-+l+-,l-l--l-+-+---+-l-lll--+-~111-...-+-l+#----+!••11-----+-H--lf-Ht---t----1---++i H-+H+-~H-~I-II h . . ·! ·• ·! I 1, I .. , •"' ·~ i a ·• i-.+1+-++H--+l-H l·-+--l-+--I--H-H--H-H-++-H-H--H-ll'i-----l--H---l+fi-+--+---!+H-1-++-!,l-+l-llll-i-ll----J4~ i ! • -~ Ji 11 • J I .:I ·• ·• I,= ·I• ·I . - .. I I . .. •. .. ., . I . , I ·• ·• , ~~ I I -~ I ·• ·1• ·• I I ·• ,1 . ~ .. -. • ~ . -~ . I fl .. •I I I .1· ·• • ' . ~I ·• • ' . f I . ' . . !,! ~ ·• . ' . . i w . . ~ i I I i .I ~ i • • ' HOUSTON . . . engineering, inc. houstoneng.com 11 on O a X General Terms and Conditions 1. STANDARD OF CARE ATTACHMENT B &HOUSTON engineering, inc. Houston shall perform its Services in a manner consistent with that degree of care and skill ordinarily exercised by members of the same profession currently practicing under similar circumstances in the region where the Project is located. 2. PAYMENT TERMS Invoices will be submitted periodically (customarily on a monthly basis) and are due and payable upon receipt. Client agrees to pay a service charge on all accounts 30 days or more past due at a rate equal to one percent (1%) each month but in no event shall such service charge exceed the maximum amount allowed by law. Acceptance of any payment from Client without accrued service charges shall not be deemed to be a waiver of such service charges by Houston. In the event Client is past due with respect to any invoice Houston may, after giving seven (7) days written notice to Client, suspend all services without liability until Client has paid in full all amounts owing Houston on account of services rendered and expenses incurred, including service charges on past due invoices. Payment of invoices is not subject to discount or offset by Client. 3. CHANGES OR DELAYS If the Project requires conceptual or process development services, such services often are not fully definable in the initial planning. If, as the Project progresses, facts develop that in Houston's judgment dictate a change in the Services to be performed, Houston shall inform Client of such changes and the parties shall negotiate, in good faith , with respect to any change in scope and adjustment to the time of performance and compensation and modify the Agreement accordingly. Houston may also proceed with additional services specifically requested in writing by the Client, including electronic communications, without a written modification to the Agreement. Client shall compensate Houston for the additional services in an amount equal to the cumulative hours worked multiplied by the billing rates specified in the Agreement, or based on Houston's standard billing rates if billing rates are not specified in the Agreement; plus reimbursement of expenses incurred in connection with providing the additional services. In the event the parties are unable to reach an agreement, either party may terminate this Agreement without liability by giving fourteen (14) days written notice to the other party. In the event of termination, the final invoice will include all Services and expenses associated with the Project up to the effective date of termination and will also include equitable adjustment to reimburse Houston for any termination settlement costs incurred relating to commitments that had become firm before termination plus a 10 percent markup on those settlement costs. 4. PAYMENT Where the method of payment under the Agreement is based upon cost reimbursement (e.g., hourly rate, time and materials, direct personnel expense, per diem, etc.), the following shall apply: (a) the minimum time segment for charging work is one-quarter hour; (b) labor (hours worked) and expenses will be charged at rates commensurate with the attached fee schedule or, if none is attached, with Houston's current fee schedule (at the time of the work); (c) when applicable, rental charges will be applied to cover the cost of pilot-scale facilities or equipment, apparatus, instrumentation, or other technical machinery. When such charges are applicable, Client will be advised at the start of an assignment, task, or phase; and (d) invoices based upon cost reimbursement will be submitted showing labor (hours worked) and total expense. If requested by Client, Houston shall provide supporting documentation at Client's cost, including labor and copying costs. 5. TERMINATION Either party may terminate this Agreement, in whole or in part, by giving thirty (30) days written notice to the other party if the other party fails to fulfill its obligations under this Agreement through no fault of the terminating party. In such event, and subject to the limitations set forth in this Agreement, the non-defaulting party may pursue its rights and remedies as contemplated by this Agreement and as allowed by law. 6. BETTERMENT If any item or component of the Services or an amended Task Order is required due to omission from the original documents or Task Order provided to Houston, Houston's liability shall be limited to the reasonable costs of correction of the omission, less the cost to Client if the omitted item or component had been initially included in the original documents or Services documents. All costs of errors, omissions or other changes that result in betterment shall be borne by Client and shall not be a basis of a claim against Houston. In no event will Houston be responsible for that portion of any cost or expense that provides betterment or upgrades or enhances the value of the Services. 7. LIMITATION OF LIABILITY In no event shall Houston be liable for punitive, special, incidental, indirect, consequential, or lost profit damages of any kind or nature, regardless of the form of action to which such damages are sought. Houston's maximum cumulative liability with respect to all claims and liabilities under this Agreement, whether or not insured, shall not exceed the greater of $50,000 or the total compensation received by Houston under this Agreement, whether such claim is based on negligence, breach of contract, or any other theory. The disclaimers and limitations of liability set forth in this Agreement shall apply regardless of any other contrary provision set forth and regardless of the form of action, whether in contract, tort or otherwise. Each provision of this Agreement which provides for a limitation of liability, disclaimer of warranty or condition or exclusion of damages is severable and independent of any other provision and is to be enforced as such. Client hereby releases Houston from any and all liability over and above the limitations set forth in this paragraph. 8. INSURANCE Houston shall obtain and maintain during the term of this Agreement, at its own expense, workers' compensation insurance and commercial general liability insurance in amounts determined by Houston and will, upon request, furnish insurance certificates to Client. The existence of any such insurance shall not increase Houston's liability as limited by paragraph 6 above. 9. HAZARDOUS SUBSTANCES Client shall furnish or cause to be furnished to Houston all documents and information known by Client that relate to the identity, location, quantity, nature, or characteristics of any asbestos, pollutant, or hazardous substance, however defined ("Hazardous Substances") at, on or under the Project site. Houston is not, and has no responsibility as a handler, generator, operator, treater, storer, transporter, or disposer of Hazardous Substances found or identified at the Project. Client agrees to bring no claim for fault, negligence, breach of contract, indemnity, or other action against Houston, its principals, employees, agents, and consultants, if such claim in any way would relate to Hazardous Substances in connection with the Project. If Hazardous Substances are identified or located at the Project site, Houston may suspend all Services without liability until remediation of the Hazardous Substances is complete. Houston reserves the right to adjust the attached Fee Schedule or any rate schedule of General Terms and Conditions -Form Version 9/30/24 Houston's subconsultants for specialized fees or services related to remediation of Hazardous Substances as agreed in writing between Houston and Client. Client further agrees, to the fullest extent permitted by law, to defend, indemnify, and hold harmless Houston, its principals, employees, agents, and consultants and subconsultants from and against all fees, costs, claims, damages, losses, and expenses, direct or indirect, or consequential damages, including but not limited to fees and charges for third-party remediation specialists, experts, attorneys, and court and arbitration costs, arising out of or resulting from the performance of Houston's Services hereunder, or claims brought against Houston by third parties arising from Houston's Services or the services of others and/or work in any way associated with Hazardous Substance activities. This indemnification shall survive termination of this Agreement. 10. INDEMNIFICATION Client shall indemnify, defend, and hold harmless Houston, together with its officers, directors, shareholder, agents, consultants and employees from and against any and all claims, costs, losses and damages, including attorneys' fees and other costs of litigation or dispute resolution arising directly or indirectly from Client's breach of this Agreement or Client's fault, negligent acts or omissions or intentional misconduct in connection with this Agreement or the Project. Subject to the limitations set forth in this Agreement, Houston shall indemnify and hold harmless Client, together with its officers, directors, and employees from and against any and all, costs, losses and damages, including reasonable attorneys' fees and other costs of litigation or dispute resolution to the extent caused by Houston's fault, negligent acts or omissions in connection with this Agreement or the Project. The indemnification obligations set forth in this paragraph shall survive termination of this Agreement. 11. WARRANTY Except as specifically set forth in this Agreement, Houston has not made and does not make any warranties or representations whatsoever, express or implied, as to Services performed or products provided including, without limitation, any warranty or representation as to: (a) the merchantability or fitness or suitability of the Services or products for a particular use or purpose whether or not disclosed to Houston; and (b) delivery of the Services and products free of the rightful claim of any person by way of infringement (including, but not limited to, patent or copyright infringement) or the like. Houston does not warrant and will not be liable for any design, material or construction criteria furnished or specified by Client and incorporated into the Services provided hereunder. 12. CONTRACTOR MEANS AND METHODS Houston has no control over, supervision of, or responsibility for construction of the Project or at the Project site. Client is solely responsible for retaining a qualified contractor or contractors licensed in the jurisdiction of the project (separately or collectively, the "Contractor") to implement the construction of the Project ("Work"). Contractor shall coordinate, control, supervise, and direct all portions of the Work and shall be solely responsible for, and have control over, construction means, methods, techniques, sequences, procedures, safety, and security. Houston shall not be responsible for and shall bear no liability for Contractor's failure to perform the Work in accordance with the requirements of the Project and any documents or contracts related to the Project. To the fullest extent permitted by law, Contractor shall indemnify and hold harmless Client, Houston, and Houston's subconsultants, officers, directors, shareholder, agents, consultants, and employees from and against claims, damages, losses, and expenses, including but not limited to attorneys' fees and costs, arising out of or resulting from performance of the Work. Contractor shall provide insurance and name Client, Houston, and Houston's subconsultants as additional insureds on Contractor's commercial general liability insurance policies on a primary and non-contributory basis. The amount of coverage available to the additional insureds shall be the amount of coverage required in the Client-Contractor agreement. 13. PROJECT SITE Client shall furnish such reports, data, studies, plans, specifications, documents, and other information regarding surface and subsurface site conditions required by Houston for proper performance of its Services. Houston shall be entitled to rely upon Client provided documents and information in performing the Services required under this Agreement. Houston assumes no responsibility or liability for the accuracy or completeness of any such documents or information. Houston will not direct, supervise, or control the Work, means or methods of Contractor or its/their subcontractors in connection with the Project. Houston's Services will not include a review or evaluation of the Contractor's or subcontractor's safety measures. The presence of Houston, its employees, agents, or subcontractors on a site shall not imply that Houston controls the operations of others, nor shall ii be construed to be an acceptance by Houston of any responsibility for jobsite safety. 14. CONFIDENTIALITY Houston shall maintain as confidential and not disclose to others without Client's prior consent all information obtained from Client that was not otherwise previously known to Houston or in the public domain and is expressly designated by Client in writing to be "CONFIDENTIAL." The provisions of this paragraph shall not apply to information in whatever form that (a) is published or comes into the public domain through no fault of Houston, (b) is furnished by or obtained from a third party who is under no obligation to keep the information confidential, or (c) is required to be disclosed by law on order of a court, administrative agency, or other authority with proper jurisdiction. Client agrees that Houston may use and publish Client's name and a general description of Houston's services with respect to the Project in describing Houston's experience and qualifications to other clients or potential clients. 15. RE-USE OF DOCUMENTS All documents, including drawings and specifications, prepared or furnished by Houston (and Houston's affiliates, agents, subsidiaries, independent professional associates, consultants, and subcontractors) pursuant to this Agreement are instruments of service in respect of the Project, and Houston shall retain ownership thereof, whether or not the Project is completed. Client may make and retain copies for information and reference in connection with the Project; however, such documents are not intended or represented to be suitable for re-use by Client or others on extensions of the Project or on any other project. Any re-use without written verification or adaptation by Houston for the specific purpose intended will be at Client's sole risk and without liability to Houston or Houston's affiliates, agents, subsidiaries, independent professional associates, consultants, and subcontractors with respect to any and all costs, expenses, fees, losses, claims, demands, liabilities, suits, actions, and damages whatsoever arising out of or resulting therefrom. Any such verification or adaptation will entitle Houston to further compensation at rates to be agreed upon by Client and Houston. Client shall indemnify, defend, and hold harmless Houston, together with its officers, directors, shareholder, agents, consultants and employees from and against any and all claims, costs, losses, and damages, including attorneys' fees and other costs of litigation or dispute resolution arising directly or indirectly from Client's re-use of all information, documents, drawings, specifications prepared as part of the Project. 16. REMEDIES Subject to the limitations set forth in this Agreement, in the event any party is in default of this Agreement, the non-defaulting party shall be entitled to pursue all rights and remedies available to it under this Agreement or as allowed by law. General Terms and Conditions -Form Version 9/30/24 2 17. PROPRIETARY DATA The technical and pricing information in connection with the Services provided by Houston is confidential and proprietary and is not to be disclosed or otherwise made available to third parties by Client without the express written consent of Houston. 18. GOVERNING LAW The validity, construction and performance of this Agreement and all disputes between the parties arising out of or related to this Agreement shall be governed by the laws, without regard to the law as to choice or conflict of law, of the State of Minnesota. Client consents to jurisdiction as to all issues concerning or relating to this Agreement or the Project with the federal or state district courts designated for Otter Tail County, Minnesota. 19. DATA PRACTICES ACT REQUESTS Houston considers certain information developed during the execution of services as "not public" and "protected" from public disclosure under the various local, state, and federal data practices laws. Client shall reimburse Houston for any and all costs and expenses, including attorneys' fees associated with any requests for release of information under any such laws. 20. FORCE MAJEURE Houston shall not be liable for any loss, damage or delay resulting out of its failure to perform hereunder due to, without limitation, causes beyond its reasonable control including, without limitation, acts of God, acts of nature or the Client, acts of civil or military authority, terrorists threats or attacks, fires, strikes, floods, epidemics, pandemics, quarantine restrictions, war, riots, delays in transportation, transportation embargos, extraordinary weather conditions or other natural catastrophe or any other cause beyond the reasonable control of Houston, if such could have not been overcome by the exercise of reasonable efforts by Houston (each, an "Event of Force Majeure). Any delay due to an Event of a Force Majeure shall not be deemed to be a breach of or failure to perform this Agreement or any part hereof; provided, however, Houston shall provide reasonable notice to the Client of any Event of Force Majeure which notice shall provide the particulars of the cause of the event of Force Majeure in writing. In the event of any such delay, Houston's performance date(s) will be extended for that length of time as may be reasonably necessary to compensate for the delay. 21. WAIVER OF JURY In the interest of expediting any disputes that might arise between Houston and Client, Client hereby waives its rights to a trial by jury of any dispute or claim concerning this Agreement, the Services, the Project and any other documents or agreements contemplated by or executed in connection with this Agreement. 22. BUSINESS ENTITY Client acknowledges that Houston is a business corporation and agrees that any claim made by Client arising out of any act or omission of any shareholder, director, officer, or employee of Houston in the execution or performance of this Agreement shall be made solely against Houston and not against any individual or group of individuals in any capacity. 23. NOTICES Any and all notices, demands or other communications required or desired to be given under this Agreement shall be in writing and shall be validly given or made if personally served; sent by commercial carrier service; deposited in the United States Mail, certified or registered, postage prepaid, return receipt requested; or sent by electronic mail with read receipt requested. If such notice or demand is served personally, notice shall be deemed constructively made at the time of such personal service. If such notice, demand or other communication is given by mail, electronic mail, or commercial carrier service, such notice shall be conclusively deemed given three (3) days after deposit thereof in the United States Mail or with a commercial carrier service or by transmission by electronic mail. Notices, demands, or other communications required or desired hereunder shall be addressed to the individuals indicated in this Agreement at the U.S. mail or electronic addresses indicated in this Agreement. Any party may change its address or authorized recipient for purposes of this paragraph by written notice given in the manner provided above. 24. MISCELLANEOUS This Agreement shall take precedence over any inconsistent or contradictory provisions contained in any proposal, contract, purchase order, requisition, notice-to-proceed, or like document regarding the Services. If any provision of this Agreement is determined to be invalid or unenforceable in whole or part by a court of competent jurisdiction, the remaining provisions hereof shall remain in full force and effect and be binding upon the parties hereto. The parties agree to reform this Agreement to replace any such invalid or unenforceable provision with a valid and enforceable provision that as closely as possible expresses the intention of the stricken provision. This Agreement, including but not limited to the indemnification provisions, shall survive the completion of the Services under this Agreement and the termination of this Agreement. This Agreement gives no rights or benefits to anyone other than Houston and Client and has no third-party beneficiaries except as may be specifically set forth in this Agreement. This Agreement constitutes the entire agreement between the parties and shall not in any way be modified, varied, or amended unless in writing signed by the parties. Prior negotiations, writings, quotes, and understandings relating to the subject matter of this Agreement are merged herein and are superseded and canceled by this Agreement. Headings used in this Agreement are for the convenience of reference only and shall not affect the construction of this Agreement. This Agreement and the rights and duties hereunder may not be assigned by Client, in whole or in part, without Houston's prior written approval. No failure or delay on the part of Houston in exercising the right, power or remedy under this Agreement shall operate as a waiver thereof; nor shall any single or partial exercise of any rights, power or remedy preclude any other or further exercise thereof or the exercise of any other right, power or remedy hereunder. The remedies provided in this Agreement are cumulative and not exclusive of any remedies provided by law. -END OF DOCUMENT - THIS SPACE INTENTIALL Y LEFT BLANK General Terms and Conditions -Form Version 9/30/24 3 2027 FEE SCHEDULE 6 1 HOUSTON engineering, inc. LABOR RATES The following is a schedule of hourly rates and charges for services offered by Houston Engineering, Inc. These rates are subject to a modest increase on January 1st of each year (typically no more than 5%). -"'ml .... ,:_.:, . .. ~ Engineering Assistant 1 $111 Engineering Assistant 2 $131 Engineer 1 $150 Engineer 2 $161 Engineer 3 $173 Engineer4 $183 Engineer 5 $195 Engineer6 $207 Engineer 7 $219 Engineer 8 $230 Engineer 9 $242 Engineer 10 $253 Engineer 11 $264 Engineer 12 $277 Engineer 13 $287 Engineering Specialist 1 $150 Engineering Specialist 2 $161 Engineering Specialist 3 $173 Engineering Specialist 4 $183 Engineering Specialist 5 $195 Engineering Specialist 6 $207 Engineering Specialist 7 $219 Engineering Specialist 8 $230 Engineering Specialist 9 $242 Engineering Specialist 10 $253 Engineering Specialist 11 $264 Engineering Specialist 12 $277 Enoineerino Specialist 13 $287 Senior Consultant 1 $234 Senior Consultant 2 $290 Senior Consultant 3 $304 Senior Consultant 4 $316 Senior Consultant 5 $327 Project Assistant 1 $93 Project Assistant 2 $108 Project Assistant 3 $114 Project Assistant 4 $119 Project Assistant 5 $128 Proiect Assistant 6 $134 -1...-.z.:_1~2~~ Land SuNeyor 1 Land SuNeyor 2 Land SuNeyor 3 Land SuNeyor 4 Land SuNeyor 5 Land SuNevor 6 SuNey Technician Assistant SuNey Technician 1 SuNey Technician 2 SuNey Technician 3 SuNey Technician 4 SuNey Crew Chief 1 SuNey Crew Chief 2 SuNey Crew Chief 3 SuNey Crew Chief 4 GPS SuNey Crew Chief 1 GPS SuNey Crew Chief 2 GPS SuNey Crew Chief 3 GPS SuNev Crew Chief 4 Technician Assistant Technician I Technician 2 Technician 3 Technician 4 Technician 5 Technician 6 Technician 7 Technician 8 Technician 9 Technician 10 Technician 11 CAD Technician 1 CAD Technician 2 CAD Technician 3 CAD Technician 4 CAD Technician 5 CAD Technician 6 z $167 $190 $211 $225 $253 $277 $100 $105 $112 $120 $128 $130 $150 $170 $190 $150 $170 $190 $210 $114 $131 $140 $149 $158 $167 $175 $184 $194 $203 $213 $221 $116 $121 $131 $140 $149 $158 Scientist Assistant Scientist 1 Scientist 2 Scientist 3 Scientist 4 Scientist 5 Scientist 6 Scientist 7 Hydrogeologist 1 Hydrogeologist 2 Hydrogeologist 3 Hydrogeologist 4 H dro eolo ist 5 GIS Assistant GIS Analyst 1 GIS Analyst 2 GIS Analyst 3 GIS Analyst 4 GIS Analyst 5 GIS Analyst 6 Project Manager 1 -Technology Project Manager 2 -Technology Pro ect Mana er 3-Technolo Software Engineer 1 Software Engineer 2 Software Engineer 3 Software Engineer 4 Software Engineer 5 Software Engineer 6 Software Engineer 7 Software En ineer 8 Landscape ArchitecVPlanner 1 Landscape ArchitecVPlanner 2 Landscape ArchitecVPlanner 3 Landscape ArchitecVPlanner 4 Landscape ArchitecVPlanner 5 Landscape ArchitecVPlanner 6 Landscape ArchitecVPlanner 7 Landsca e ArchitecVPlanner 8 SURVEY CREWS & REIMBURSABLE EXPENSES -tl!l'.JI l'f°.,_t('1.!l01.l'I @1'm -ti!W ~~! L•ll'I ~ -- Meals Actual Cost GPS Receiver $20/hour Hotel Actual Cost Hydrone RCV $50/hour Mileage -Vehicles: 2-Wheel Drive IRS Standard Mileage 4-Wheel Drive Rate IRS Standard Mileage SuNeying Materials: Lath, Hubs, Actual Cost Pipe, etc. Special Equipment and Other Actual Cost Rate + $.20/Mile Materials Required A TV /Snowmobile/Boat $15/hour Subconsultants Actual Cost + 10% ATV w/Tracks $30/hour Small UAS (Drone) $25/hour Laroe UAS (Drone) $50/hour Deliveries/Postage/Printing Actual Cost Special Software/Technology $50/hour Standard Page 1 of 1 $114 $154 $167 $183 $198 $210 $245 $277 $167 $184 $210 $260 $277 $81 $123 $137 $149 $164 $175 $187 $190 $211 $245 $144 $162 $174 $186 $201 $213 $226 $245 $202 $145 $155 $166 $178 $195 $212 $233 $259 PROJECT LOCATION GEORGE LAKE OTTERTAIL COUNTY -MINNESOTA JESSIE LAKE N ! T SCALE: 1" = 31000' CITY OF URBANK SAP 056-638-XXX CSAH 38 RECONSTRUCTION EXHIBIT A PROJECT LOCATION MAP OTTERTAIL COUNTY -MINNESOTA Engineer's Estimate Hough, Inc. of Detroit Lakes Detroit Lakes, MN Comstock Construction, Inc. Wahpeton, ND Urban Companies, LLC St. Paul, MN Gladen Construction, Inc. LaPorte, MN BID SUMMARY AND RECOMMENDATION FOR AWARD Otter Tail County Parks & Trails Department Phelps Mill Park -Phase Two Bid Opening -October 27, 1 :00 P.M. Long Lake Room, 505 South Court Street Base Bid Alternate 1 Alternate 2 $834,971.00 $388,792.50 $76,175.00 $640,044.90 $389,855.25 $63,362.50 $693,400.00 $650,000.00 $90,000.00 $1,043,133.66 $700,515.00 $115,623.05 $974,874.43 $867,906.25 $96,635.50 PARKS &TRAILS 505 South Court Street, Suite 1 Fergus Falls, MN 56537 Total Bid $1,299,938.50 $1,093,262.65 $1,433,400.00 $1,859,271.71 $1,939,416.18 I recommend the award of this project to Hough, Inc. of Detroit Lakes, Detroit Lakes, MN, as the low bidder in the bid amount of$ 1,093,262.65. 218-998-8470 @ Respectfully Submitted, Otter Tail County Parks & Trails Department Kevin Fellbaum, Parks & Trails Director November 3, 2026 OTTER TAIL COUNTY IS AN EQUAL OPPORTUNITY EMPLOYER @ ottertailcounty.gov LIVE YOUR best life HERE. Phelps Mill Park -Phase Two County Project STATE OF MINNESOTA COUNTY OF OTTER TAIL CONTRACT for PHELPS MILL PARK-PHASE TWO This agreement, made this 3th day of November , 20 26, between the County of Otter Tail in the State of Minnesota, party of the first part, hereinafter called the County, and Hough, Inc. of Detroit Lakes of 18262 Old Pit Rd, Detroit Lakes, MN , party of the second part, hereinafter called the Contractor. Witnesseth, that the Contractor, for and in consideration of the payment or payments herein specified and by the County to be made, hereby covenants and agrees to furnish all materials, ( except such as is specified to be furnished by the County), all necessary tools and equipment and to do and perform all the work and labor in the construction of the Phelps Mill Park -Phase Two located as shown on approved plans at the Phelps Mill Park in Otter Tail County for the price and compensation set forth and specified in the proposal signed by the Contractor and hereto attached and hereby made a part of this agreement, said work to be done and performed in accordance with the Plans, Specifications, and Special Provisions therefore on file in the office of the County Auditor of said County, which Plans, Specifications, and Special Provisions are hereby made a part of this agreement. The Contractor further covenants and agree that he will commence work on or before _____ _ ------~ 20 __ and will have same completed in every respect to the satisfaction and approval of the County, June 15, 2028. IN WITNESS WHEREOF, The said County has caused these presents to be executed and the Con- tractor ha hereunto subscribed ___________ name . --- Dated at Fergus Falls, MN , this ___ day of _________ , 2026 . COUNTY OF OTTER TAIL by __________________ _ County Board Chair County Board Clerk HOUGH, INC. OF DETROIT LAKES Contractor Approved as to form and execution this ____ day of __________ ,. 2026. County Attorney Contract No. State Project No. Federal No. Class of Work STATE OF MINNESOTA COUNTY OF OTTER TAIL 26-13 Trail Grading, Aggregate Base, Fishing Shore Stations, Riprap & Sidewalk Letting Date: October 27. 2026 PAYMENT AND PERFORMANCE BOND FOR PHELPS MILL PARK BOARDWALK & PRAIRIE RESTORATION PART A: PAYMENT KNOW ALL PERSONS BY THESE PRESENTS, That We, -~H=ou=ghoa=-, =In=c~. o=f~D~e~tr~o=it~L=a=k=es~_ of 18262 Old Pit Rd .. Detroit Lakes. MN 56502, contractor As principle, and ___________ _ as Surety, are held and firmly bound unto the County of Otter Tail in the amount of $1.093 262.65 One million. ninety-three thousand two hundred sixty-two and 65/100 DOLLARS, for payment of all claims, costs and charges hereinafter set forth. For the payment of this well and truly to be made we jointly and severally bind ourselves, our representatives and successors firmly by these presents. The condition of this obligation is such that whereas the principle has entered into a contract with the County of Otter Tail for the construction of Phelps Mill Park -Phase Two located at Phelps Mill Park in Otter Tail County which is on file in the office of the Otter Tail County Transportation Department, the regularity and validity of which is hereby affirmed: KNOW, THEREFORE, if the principle shall pay as they may become due all just claims for work done, and for furnishing labor, work, skills, tools, machinery, materials, insurance premiums, equipment, and supplies, for the purpose of completion of the contract in accordance with its terms, and all taxes incurred under Minnesota Statutes, Section 290 .92 and Chapter 297 A, and shall pay all costs of enforcement of the terms of the bond, if action is brought thereon, including attorney's fees, if any case in which such action is successfully maintained, and shall comply with the laws of the state appertaining to such contract, then this obligation shall be void, but otherwise it shall remain in full force and effect pursuant to Minnesota Statutes, Chapter 574. PART B; PERFORMANCE KNOW ALL PERSONS BY THESE PRESENTS, That the aforesaid principle and surety are held and firmly bound unto the County of Otter Tail in the additional amount of ~$=1.=0~9=3.=2~6=2-=6~5 _____ _ One million, ninety-three thousand two hundred sixty-two and 65/100 DOLLARS, for the faithful performance of the contract as hereinafter set forth. For the payment of this well and truly to be made we jointly and severally bind ourselves, our representatives and successors finnly by these presents. The condition of this obligation is such that whereas the principle has entered into the contract more particularly described in Part A hereof, the regularity and validity of which is hereby affirmed; NOW, THEREFORE, if the principle shall faithfully perform the contract and shall save the County of Otter Tail harmless from all costs and charges that may accrue on account of the performance of the work specified and shall pay all costs of enforcement of the terms of the bond, if action is brought thereon, including attorney's fees, in any case in which such action is successfully maintained, and shall comply with the laws of the state appertaining to such contract, then this obligation shall be void, but otherwise it shall remain in full force and effect pursuant to Minnesota Statutes, Chapter 574. THE AGGREGATE LIABILITY UNDER PART A AND PART B HEREOF IS $1,093 262.65 DOLLARS -~-'---------------------------------- SIGNATURES Date ________ ~ 20 (Contractor Name) (Contractor Corporate Seal) By _________________ _ (Officer) (Officer) (Surety Corporate Seal) (Name of Surety) By _________________ _ (Attorney in Fact) CORPORATE ACKNOWLEDGMENT FOR CONTRACTOR ST ATE OF MINNESOTA County of ____________ ss. On this ____________ day of ____________ , 20 __ , before me appeared __________________ and ____________________ _ to me personally known, who being by me duly sworn, did say that they are respectively __________________ and ____________________ _ of the ____________________________ _, a corporation; that the seal affixed to the foregoing instrument is the corporate seal of the corporation, and that said instrument was executed in behalf of the corporation by authority of its board of directors; and they acknowledged said instrument to be the free act and deed of the corporation. (Notary Signature and Seal) INDIVIDUAL AND CO-PARTNERSIDP ACKNOWLEDGMENT STATE OF MINNESOTA County of ________________ ss. On this ___________ day of _____________ , 20 __ before me personally appeared _______________ to me known to be the person(s) described in and who executed the foregoing bond, and acknowledged that (he/she/they) executed the same as (his/her/their) free act and deed. (Notary Signature and Seal) ACKNOWLEDGEMENT OF SURETY STATE OF MINNESOTA COUNTY OF OTTER TAIL On this _________ day of _________ ~20 __ , before me a Notary Public within and for said County and State, appeared _________________ known to me to be the Attorney(s)-in-Fact of ____________________ that he/she is (are) the Attorney(s)-in -Fact of the ____________________ the corporation described in and that executed the within and foregoing instrument and known to me to be the person who executed the said instrument in behalf of said corporation and he/she duly acknowledged to me that such corporation executed the same. NOTICE TO PERSONAL SURETIES NOTICE TO CORPORATE SURETIES Full Name of Surety Company Home Office Address (street) City, State and Zip Code Name of Attorney in Fact Name of Local Agent Address of Local Agent (street) City, State and Zip Code NOTARY SIGNATURE AND SEAL Bond will not be accepted unless accompanied by a sworn financial statement of each of the sureties. This bond will not be accepted unless executed or countersigned by a Minnesota agent or attorney-in fact whose name and address must be noted below. If this bond is executed outside of the State of Minnesota it must be countersigned on page three by a Minnesota Resident Agent of the Surety Company. Name of Agent affixing countersignature _________________________ _ Address LEGEND '"''"'"' 80AROW"1.IC CONSTIILICTIOHUMITS CERTIFICATION "" ''" ~ C===:J ~ UJIJDJ I hearby ce-rtlfy that this plan. specification, or report was prepared by me or under my direct supervision ilnd that I am il duly Licensed Professlonal Engineer under the laws of the staleo[M;nE / C::'---Sfgnature: ( ~-~1 RANDY G. E LSTA0 C7 Date; 10-02-2026 ... license Number: 48967 i ► ..... ------------...---.-...----------;..;::;.;:;.....;...,."" ____ ..;.;i=-------.,;,;;;~.:..::=.----------------------,-.J.--------,----< :i CJ. PHELPS Mill COUNTY PARK PHASE TWO -BASE BID OVERVIEW MAP SHEET 8 1---1------------+----+---I (;11 HOUSTON lO-D2•2026 OTTERTAILCOUNTY-MINNESOTA i engtneP.ring, inc. c•;~by ':~HOWN UNDERWOOD, MN i' No. Rl'Ylslon Date By PROJECT NO. 5197-0037 C4.0 i i i Alf. I ''" LEGEND ::AC~.:itr c:=] ;::!!'~~.:'' ~· l PH.I.SETWC!•8A$!8IO c:=] 5DFTSUIIFAC[iAAll ADOITIONALGAADING ~ CONCRfffSl0£WAU" C=:==J t'O"-C~TTEPAV(MtNT E====:l ~~(L)( U1II[[[[/J ::!~~~OAREA - CON5Tltl.lC'T10NLMTS Pllll'OS{D(L(CTIOCAl. -UGE--CONDUIT l CERTIFICATION I, ~ ~ I hearby certify that this plan, specification, or ~ report was prepared by me or under my direct i ~C, supervision and that I am a duly Licensed q,O Professional Engineer under the laws of the l ,;,-v state,rMin,•. / ~ .,:,.~~ Signature:~ t9= l «"~ RANDYG.E l5TAO ~ ~ 0 -~ l t~:i::::::::::::::::::::::::::::Jc::::J::J1 _____ ...;;.;;_,;,__.::.:.._ ... ~!f-.... ..:..:;..z;..:...;. .... t:.:....1.r'::~~-r::~'-;=iT" __________ .!, ___ ...;:._ ________ T".J..:u:''"::":.::N:um::b::"'::'.: .. :•::6:.7 _ _,, ___ ~ ~ r PHELPS MILL COUNTY PARK PHASE TWO· BID ALTERNATE ONE OVERALL PLAN I t--+---------------1---+----1 OTTER TAIL COUNTY. MINNESOTA f No. RNision Datit ev UNDERWOOD, MN PROJECT NO. 5197-0037 SHEET C3.0 I ~ i " .. ! ! l j Al+.l. \ ."71 I __ \~ {/ . PAVIUSSTWatUII.FIIIOf!I ~ '(!? \ \ ', \ ; -- i ---- J ~ LEGEND KUIDSURFAC,TIWt. SOFTSUMfAC.ftl'tAlt AOOITIOfW.GAAOING EXIS'TINGIIOAIICWAlllli Vle'NING Pl.,f.lrQRM (l(ISTIN(j PHAUONE HAIIO SURfAC[TIIAIL CONSTRUCTION LIMITS c=J c=J rzzzlZZZl c=J i:==i PHo\SETW0-~810 c=J j_ ~ a:J;~ lhearbycertifythatthlspl,m,speclncatlon,or f report was prepared by me or under my direct ~ supervision and that I am a duly Licensed g Professional Engineer under the laws of tht . i rtoteofMin~'-/q---- J Signature: --1~'4--,l-----'6=-=>~cr--L--f RANDY G. EN LSTAO .,.,,- ~' Date: 10-02-2026 ~ ►""1';;.....1., __ .._..__.:-.,..;;;;;.,iM:;....:...._._"T" __ "T""-;f---;..;:;;......;. ___ .;;;;, __ ...;.:..,__"T _______ &...lll....,~-.::;:;~,:_--,----...:.""""~-----------------,-J.-llc .. en_,_•_N_um_h_,_"_•89-•7--...----< l-+------------+---1----l 61 HOUSTON "'~;~"' ':02-2026 r: No. Revision Date ev engineering, inc. en~~ bv ~eSHOWN PHELPS MILL COUNTY PARK PHASE TWO BID ALTERNATE TWO OTTER TAIL COUNTY UNDERWOOD, MN OVERALL PLAN SHEET PROJECT NO. 5197-0037 C3.0 Board of Commissioners’ Meeting Minutes October 27, 2026 Page 1 of 3 OTTER TAIL COUNTY – MINNESOTA DRAINAGE AUTHORITY MINUTES Government Services Center, Commissioners’ Room & Via Livestream 515 West Fir Avenue, Fergus Falls, MN October 27, 2026 | 10:25 a.m. CALL TO ORDER The Otter Tail County Drainage Authority convened at 10:25 a.m. Tuesday, October 27, 2026, at the Government Services Center in Fergus Falls, MN. Commissioners Robert Lahman, Chair; Dan Bucholz, Vice Chair; Kurt Mortenson, Wayne Johnson, and Sean Sullivan were present. APPROVAL OF AGENDA & CONSENT AGENDA Chair Lahman called for joint approval of the Drainage Authority Agenda and Consent Agenda. Motion by Johnson, second by Mortenson and unanimously carried to approve the Drainage Authority Agenda and the Consent Agenda of October 27, 2026 as follows: 1. October 13, 2026, Drainage Authority Meeting Minutes 2. Warrants/Bills for October 27, 2026 (Exhibit A) BEAVER DAMS Motion by Johnson, second by Bucholz and unanimously carried to approve the following County Ditch repairs as recommended by Drainage Inspector Tyler Armstrong: Ditch 04 – Resser Road – Beaver trapping and dam removal Ditch 05 – Parcel Nos. 34000280184002 and 34000210137000 – Beaver trapping and dam removal. Armstrong will be inspecting for additional beaver dams further upstream at a later date. Ditch 25 – Outlet to Big McDonald – Beaver trapping and dam removal Ditch 38 – 37796 550th Ave, east side of the road – Beaver trapping and dam removal DITCH 16 – BEAVER DAM Drainage Inspector Tyler Armstrong was notified by the Minnesota Department of Transportation (MnDOT) of a beaver dam in County Ditch 16 along State Highway 210. MnDOT will remove the dam and cover the cost. DITCH 41 – BEAVER DAM Drainage Inspector Tyler Armstrong provided an update on County Ditch 41 north of US Highway 10. There is a snowmobile trail bridge with a beaver dam restricting water flow. The beaver activity has been an ongoing issue at this location. A beaver fence was put in place 3 feet from the bridge with the intent to redirect beaver activity for better accessibility for trapping. ADJOURNMENT At 10:35 a.m., Chair Lahman declared the Otter Tail County Drainage Authority meeting adjourned. The next Drainage Authority meeting will immediately follow the next regular Board meeting on Tuesday, November 3, 2026, at the Government Services Center in Fergus Falls and via livestream. OTTERTAIL COUNTY -MINNESOTA > > > > Board of Commissioners’ Meeting Minutes October 27, 2026 Page 2 of 3 OTTER TAIL COUNTY BOARD OF COMMISSIONERS Dated: November 3, 2026 By: _________________________________________ Attest: _______________________________ Robert Lahman, Board of Commissioners Chair Nicole Hansen, Clerk OTTERTAIL COUNTY · MINNESOTA Board of Commissioners’ Meeting Minutes October 27, 2026 (Exhibit A) Page 3 of 3 Vendor Name BAKBR EXCAVATING FRIEDSAM/KEITH NORTHLAND AREA SERVICES OTTBR TAIL CO TREASURER TRLJENORTH STBEL INC Final Total: Amount 400.00 650.00 5,880.00 13,699.55 774.50 2.1,404.05 OTTER TAIL COUNTY DRAINAGE INSPECTOR’S REPORT 26CD2801 (MN Statute 103E.065) Page 1 of 2 DITCH SYSTEM: County Ditch No. 28 CONTACT OR PERSON REQUESTING THE REPAIR: Lyle Hovde 218-371-0009 DATE OF CONTACT: 10/27/2026 LOCATION: Outlet to Indian lake. PROBLEM: Beaver Dam FINDINGS AND ACTION: SIGNATURE: Tyler Armstrong- County Drainage Inspector DATE PRESENTED TO COUNTY BOARD: 11/3/2026 DATE OF BOARD ACTION: CONTRACTOR NAME AND ADDRESS: Mike Nelson Trapper est. $750.00 Will probably have to hand remove dam due to access. OTTER TAIL COUNTY DRAINAGE INSPECTOR’S REPORT 26CD2801 (MN Statute 103E.065) Page 2 of 2 COST: CONTRACT OR PER HOUR Trapping est. $750.00 (Mike Nelson) COMPLETION DATE: 10/28/2026 Spoke with Lyle, Lyle stated the water is up on Indian, he believes it is caused by the dam. 10/28/2026 Attempted contact with landowner on west side Michael Sonju 701-200-0560. Left message to call back. 10/28/2026 Attempted contact with landowner on east side Daryl Lund 218-495-2238. Left message to call back. OTTER TAIL COUNTY DRAINAGE INSPECTOR’S REPORT 26CD2901 (MN Statute 103E.065) Page 1 of 1 DITCH SYSTEM: County Ditch No. 29 CONTACT OR PERSON REQUESTING THE REPAIR: Bryan Haugrud 218-457-5140 DATE OF CONTACT: 10/20/2026 LOCATION: North of Haugrud Property PROBLEM: High water, possible beaver dam. FINDINGS AND ACTION: SIGNATURE: Tyler Armstrong- County Drainage Inspector DATE PRESENTED TO COUNTY BOARD: 11/3/2026 DATE OF BOARD ACTION: CONTRACTOR NAME AND ADDRESS: COST: CONTRACT OR PER HOUR COMPLETION DATE: OTTER TAIL COUNTY DRAINAGE INSPECTOR’S REPORT 26CD5502 (MN Statute 103E.065) Page 1 of 2 DITCH SYSTEM: County Ditch No. 55 CONTACT OR PERSON REQUESTING THE REPAIR: Doug Kugler 218-731-8695 DATE OF CONTACT: 10/27/2026 LOCATION: Long lake outlet PROBLEM: Beaver Dam at water control structure. FINDINGS AND ACTION: SIGNATURE: Tyler Armstrong- County Drainage Inspector DATE PRESENTED TO COUNTY BOARD: 11/3/2026 DATE OF BOARD ACTION: CONTRACTOR NAME AND ADDRESS: Doug Kugler est. $750.00 COST: CONTRACT OR PER HOUR OTTER TAIL COUNTY DRAINAGE INSPECTOR’S REPORT 26CD5502 (MN Statute 103E.065) Page 2 of 2 COMPLETION DATE: