HomeMy WebLinkAboutBoard of Commissioners – Supporting Documents Compiled – 01/27/2026Board of Commissioners & Drainage Authority Supporting Documents
OTTER TAIL COUNTY – MINNESOTA
BOARD OF COMMISSIONERS’ MEETING
& DRAINAGE AUTHORITY MEETING
SUPPORTING DOCUMENTS
January 27, 2026 | 8:30 a.m.
BOARD OF COMMISSIONERS’ SUPPORTING DOCUMENTS
2.1 BOC Minutes for January 13, 2026
2.2 Warrants/Bills for January 27, 2026
2.3 Amazon Warrants/Bills for January 27, 2026
2.4 Human Services Warrants/Bills for January 27, 2026
2.5 Warrants/Bills, as Approved for Payment, by the County Auditor-Treasurer
2.6 Human Services Contracts
4.0 Pay Equity Report
5.0 Award Recommendation and Approval of Contracts & Bonds - SAP 056-635-042
5.0 Professional Services Contract Amendment with Stonebrooke Engineering
6.0 Glacial Edge Trail - Maplewood Segment Resolution
7.0 New York Mills Lease Agreement
8.0 Resolution to Delegate Authority for Paying Certain Claims
9.0 Tabled Abatement of Penalty & Interest Request
10.0 Donation for Hazard Mitigation Project Assistance Grant Program
11.0 Government Services Technical Unit Collective Bargaining Agreement
DRAINAGE AUTHORITY SUPPORTING DOCUMENTS
2.1 Drainage Authority Minutes for January 13, 2026
2.2 Warrants/Bills for January 27, 2026
OTTERTAIL
COUNTY-MINNESOTA
>
>
>
>
>
>
>
> > > >
>
>
>
>
>
>
Board of Commissioners’ Meeting Minutes January 13, 2026
Page 1 of 15
OTTER TAIL COUNTY – MINNESOTA
BOARD OF COMMISSIONERS’ MINUTES
Government Services Center, Commissioners’ Room & Via Livestream
515 West Fir Avenue, Fergus Falls, MN
January 13, 2026 | 8:30 a.m.
CALL TO ORDER
The Otter Tail County Board of Commissioners convened at 8:30 a.m. Tuesday, January 13, 2026, at the
Government Services Center in Fergus Falls, MN. Commissioners Robert Lahman, Chair; Dan Bucholz, Vice
Chair; Wayne Johnson, Kurt Mortenson and Sean Sullivan were present.
APPROVAL OF AGENDA
Chair Lahman called for approval of the Board Agenda. Motion by Johnson, second by Sullivan and
unanimously carried to approve the Board of Commissioners’ Agenda of January 13, 2026, with the following
additions:
West Central Initiative Follow-up
01/26 | 3:00 p.m. | Elected Leaders Round Table at the FM Bank in Fergus Falls
APPROVAL OF CONSENT AGENDA
Motion by Mortenson, second by Bucholz and unanimously carried to approve the consent agenda items as
amended with a clerical correction to the January 6, 2026 minutes:
1. January 6, 2026, Board of Commissioners’ Meeting Minutes
2. Warrants/Bills for January 13, 2026 (Exhibit A)
3. Amazon Warrants/Bills for January 13, 2026 (Exhibit A)
4. Human Services Warrants/Bills for January 13, 2026 (Exhibit A)
5. Final Payment for 2025 Traffic Marking to Sir-Lines-A-Lot of Edina, MN
6. Final Payment for SP 056-070-035 to Gladen Construction, Inc. of Laporte, MN
7. Approval of the issuance of a Departmental Otter Tail County Purchasing Card, with a 30-Day
Limit of $2,500 to the Otter Tail County Recorder’s Department, as requested by Lynn Larson,
County Recorder.
8. Approval of the issuance of a County Purchasing card for Chad Nelson, with a 30-Day Limit of
$800.00, as requested by Jodi Teich, County Highway Engineer.
9. Approval of the Renewal of a Tobacco License for the Dalton Corner Store Licensed by Elizabeth
A Dorn, for the period of January 13, 2026, through December 31, 2026.
10. Approval of the Renewal application for an On-Sale Six Month Seasonal Liquor and Sunday
Liquor License for Hillside Beach Holdings Inc dba Elks Point Bar & Grill for the period of May
1, 2026, through October 31, 2026.
OTTERTAIL
COUNTY -MINNESOTA
■
Board of Commissioners’ Meeting Minutes January 13, 2026
Page 2 of 11
PRAIRIE LAKES COMMUNITY HEALTH BOARD (PLCHB) AGREEMENTS
Motion by Johnson, second by Bucholz and unanimously carried to authorize appropriate County Officials’
signatures to approve the agreement, including clerical updates, between Otter Tail County and Wilkin County
for Prairie Lakes Community Health Board data practices and records management.
Motion by Mortenson, second by Sullivan and unanimously carried to authorize appropriate County Officials’
signatures to approve the agreement, including clerical updates, between Otter Tail County and Wilkin County
pertaining to the delegation of program, administration, data and resource sharing between Prairie Lakes
Community Health Board and the Boards of Otter Tail and Wilkin Counties.
EMPLOYEE COMMENDATION
The County Assessor commended Otter Tail County Appraiser Todd Finkelson for his outstanding actions
while working in the field on October 24, 2025. Finkelson’s actions resulted in a saved life. The Board
recognized and applauded Finkelson.
RECESS & RECONVENE
At 8:49 a.m., Chair Lahman declared the meeting of the Otter Tail County Board of Commissioners recessed
for a short break. The Board of Commissioners meeting was reconvened at 8:53 a.m.
FRAUD SUPPORT & COLLECTIONS SPECIALIST
Motion by Johnson, second by Mortenson and unanimously carried to reclassify a Support Specialist position
in the Attorney’s Office from a B22 on the classification and compensation structure to a B23 Fraud Support
and Collections Specialist due to the specialized scope of duties that the incumbent is performing.
ADMINISTRATIVE SPECIALIST - FPLM
Motion by Sullivan, second by Bucholz and unanimously carried to approve the addition of a 1.0 full-time
equivalent (FTE) Administrative Specialist to the County structure to support the Finance, Property & License
Management Service Team.
INTERGOVERNMENTAL AGREEMENT
Otter Tail County Probation Director Michael Schommer informed the Board that the Todd Wadena
Community Corrections has a desire to contract for services with Otter Tail County due to a Community
Corrections Director vacancy. Motion by Johnson, second by Mortenson and unanimously carried to authorize
appropriate County Officials’ signatures to execute an Intergovernmental Agreement between Otter Tail
County and Todd Wadena Community Corrections to fulfill statutory functions of a Community Corrections
Director for Todd Wadena Community Corrections effective January 13, 2026 through December 31, 2026.
RECESS & RECONVENE
At 9:03 a.m., Chair Lahman declared the meeting of the Otter Tail County Board of Commissioners recessed
for a short break. The Board of Commissioners meeting was reconvened at 9:09 a.m.
DONATIONS TO OTTER TAIL COUNTY SHERIFF’S OFFICE
OTTER TAIL COUNTY RESOLUTION NO. 2026-12
WHEREAS, community members, service organizations, businesses, and Church groups, offer to donate
items/funds to Otter Tail County Sheriff’s Office to assist in meeting the needs of people served by Sheriff’s
Office; and
OTTERTAIL
COUNTY · MINNESOTA
Board of Commissioners’ Meeting Minutes January 13, 2026
Page 3 of 11
WHEREAS, Minnesota Statute 465.03 requires a county to accept gifts by resolution; and
WHEREAS, the donations received throughout the year from community members, service organizations,
businesses, and Church groups will be for the sole purpose of providing services from Otter Tail County
Sheriff’s Office to meet needs that are otherwise not covered; and
WHEREAS, acceptance of the items/funds in accordance with the donor’s terms is in the best interest of the
County of Otter Tail.
NOW, THEREFORE, BE IT RESOLVED that the Otter Tail County Board of Commissioners does accept the
above-described items/funds as donated throughout the year from community members, service
organizations, businesses, and Church groups and extends its grateful appreciation.
The motion for the adoption of the foregoing resolution was introduced by Commissioner Johnson, duly
seconded by Commissioner Sullivan and, after discussion thereof and upon vote being taken thereon, passed
unanimously.
Adopted at Fergus Falls, MN this 13th day of January 2026.
OTTER TAIL COUNTY BOARD OF COMMISSIONERS Dated: January 27, 2026
By: _________________________________________ Attest: _______________________________
Robert Lahman, Board of Commissioners Chair Nicole Hansen, Clerk
DONATION
Motion by Sullivan, second by Bucholz and unanimously carried for the Sheriff’s Office to accept a donation
in the amount of $500.00 from Otter Trail Riders Snowmobile Club.
EMERALD WATERS DEVELOPMENT & CONSULTING CONTRACT
Motion by Sullivan, second by Mortenson and unanimously carried to approve appropriate County Officials’
signatures to execute an agreement between Otter Tail County and Independent Contractor, Tina Edwards,
with Emerald Waters Development & Consulting for Independent Contractor services to support
documentation development, staff training, workflow clarification, and process improvement within property
tax operations.
EDUCATION IDENTITY AND ACCESS MANAGEMENT BOARD RESOLUTION
FOR THE MINNESOTA DEPARTMENT OF EDUCATION
OTTER TAIL COUNTY RESOLUTION NO. 2026-13
WHEREAS, the Minnesota Department of Education (MDE), Professional Educator Licensing Standards
Board (PELSB), and Office of Higher Education (OHE) require annual designation of an Identified Official with
Authority (IOwA) for the County that uses the Education Identity and Access Management (EDIAM) system;
and
WHEREAS, the IOwA is responsible for authorizing, reviewing, and recertifying user access for their local
educational agency in accordance with the State of Minnesota Enterprise Identity and Access Management
OTTERTAIL
COUNTY · MINNESOTA
Board of Commissioners’ Meeting Minutes January 13, 2026
Page 4 of 11
Standard, which states that all user access rights to Minnesota state systems must be reviewed and recertified
at least annually; and
WHEREAS, the IOwA will authorize user access to the State of Minnesota Education secure systems in
accordance with the user’s assigned job duties, and will revoke that user’s access when it is no longer needed
to perform their job duties; and
WHEREAS, Elizabeth Mickelson, Deputy Administrator for the Finance, Property & License Center Service
Team is designated as the Identified Official with Authority on behalf of Otter Tail County to authorize user
access to State of Minnesota Education secure websites; and
WHEREAS, Otter Tail County’s 6-Digit Organization Number is 0056-91.
NOW THEREFORE BE IT RESOLVED THAT, the Otter Tail County Board of Commissioners designates
Elizabeth Mickelson, Deputy County Administrator, as the Identified Official with Authority for Otter Tail County
to access and designate user access to the Education Identity and Access Management system with the
Minnesota Department of Education.
The motion for the adoption of the foregoing resolution was introduced by Commissioner Mortenson, duly
seconded by Commissioner Bucholz and, after discussion thereof and upon vote being taken thereon, passed
unanimously.
Adopted at Fergus Falls, MN this 13th day of January 2026.
OTTER TAIL COUNTY BOARD OF COMMISSIONERS Dated: January 27, 2026
By: _________________________________________ Attest: ______________________________
Robert Lahman, Board of Commissioners Chair Nicole Hansen, Clerk
RECESS & RECONVENE
At 9:16 a.m., Chair Lahman declared the meeting of the Otter Tail County Board of Commissioners recessed
for a short break. The Board of Commissioners meeting was reconvened at 9:21 a.m.
FINAL PAYMENT TO NORTH CENTRAL, INC.
Motion by Bucholz, second by Sullivan and unanimously carried to approve final payment, in the amount of
$138,487.68, to North Central, Inc. for the construction of a partial final cover on the Henning Construction
and Demolition Landfill as presented by Solid Waste Director Chris McConn.
FAMILY RESOURCE CENTERS ARCHITECTURAL SERVICES
Motion by Sullivan, second by Mortenson and unanimously carried to authorize appropriate County Officials
to proceed with the preparation and execution of service agreements with Widseth, within the terms of the
grants through the MN Department of Education, for architectural services related to the build out of Family
Resource Centers in New York Mills and Pelican Rapids.
OTTERTAIL
COUNTY · MINNESOTA
Board of Commissioners’ Meeting Minutes January 13, 2026
Page 5 of 11
COMMUNITY DEVELOPMENT AGENCY ANNUAL SERVICE AGREEMENT
Motion by Mortenson, second by Bucholz and unanimously carried to authorize appropriate County Officials’
signatures to execute the agreement between Otter Tail County and the Community Development Agency
(CDA) of Otter Tail County for the advancement of economic, commercial, housing, and/or industrial
development and redevelopment within Otter Tail County.
2026 PUBLIC HEARINGS REGARDING SINGLE-FAMILY TAX REBATE APPLICATIONS
Motion by Johnson, second by Sullivan and unanimously carried to approve the proposed list of 2026 Public
Hearing Dates regarding Single-Family Tax Rebate Applications as presented. Notices of the public hearings
will be published as each hearing date approaches on an as-needed basis when applications for new homes
in a partner community have been submitted.
NORTHERN COUNTIES COALITION
Motion by Johnson, second by Mortenson and unanimously carried to authorize appropriate County Officials’
signatures on an Agreement Establishing Participation in Northern Counties Land Use Coordinating Board,
also known as Northern Counties Coalition, which includes a $2,000.00 membership appropriation, for a
partnership focused on supporting land use and natural resources.
OTTER TAIL LAKES COUNTRY ASSOCIATION AGREEMENT
Deputy Administrator Nick Leonard provided the Board with history and background on Otter Tail Lakes
Country Association and provided a list of current Board of Directors and marketing efforts. Motion by Bucholz,
second by Mortenson and unanimously carried to authorize appropriate County Officials’ signatures to execute
an agreement between Otter Tail County and Otter Tail Lakes Country Association (OTLCA) for marketing
and promotion of Otter Tail County as a premiere destination to vacation/visit, live and work.
WEST CENTRAL INITIATIVE
Commissioner Mortenson provided background and information on West Central Initiative with a focus on their
financial resources and programing specific to Otter Tail County. Mortenson recognized the positive economic
impacts as well as youth leadership support that West Central Initiative has provided and continues to provide
throughout the county.
RECESS & RECONVENE
At 9:58 a.m., Chair Lahman declared the meeting of the Otter Tail County Board of Commissioners recessed
for a short break. The Board of Commissioners meeting was reconvened at 10:02 a.m.
FPL ORDINANCES PUBLIC HEARING
Land and Resource Management Director Chris LeClair noted that with the establishment of the new Prairie
Lakes Community Health Board (PLCHB), the five (5) ordinances related to the Food, Pool and Lodging (FPL)
Program need to reflect the name of the new Community Health Board. LeClair highlighted language changes
and updates to the Food Protection Ordinance, Lodging Ordinance, Public Swimming Pool and Spa
Ordinance, Youth Camp Ordinance and Manufactured Home Park and Recreational Camping Area
Ordinance.
At 10:08 a.m., Chair Lahman opened the Public Hearing regarding the five (5) Food, Pool and Lodging
Ordinances. Chair Lahman asked for comments from the public. One comment was made and pertained to
vacation home rental licensing fees. The Public Hearing was closed at 10:10 a.m., at which time, Land and
Resource Management Director Chris LeClair presented the following resolution for approval:
OTTERTAIL
COUNTY · MINNESOTA
Board of Commissioners’ Meeting Minutes January 13, 2026
Page 6 of 11
ENVIRONMENTAL HEALTH
OTTER TAIL COUNTY RESOLUTION NO. 2026-14
WHEREAS, the Prairie Lakes Community Health Board (CHB) has entered into a Delegation Agreement with
the Minnesota Department of Health to provide licensing, regulation and inspection services for food,
beverage, and lodging establishments, public pools and related facilities, youth camps, manufactured home
parks and recreational camping areas; and
WHEREAS, Otter Tail County has five ordinances related to the Food, Pool and Lodging (FPL) program: Food
Protection Ordinance; Lodging Ordinance; Public Swimming Pool Ordinance; Manufactured Home
Park/Recreational Camping Area Ordinance; Youth Camp Ordinance; and
WHEREAS, the Minnesota Department of Health is requiring the five ordinances to be revised to reflect the
name of the new CHB; and
WHEREAS, the Minnesota Department of Health has reviewed each of the five ordinances and approved for
passage by the County Board.
NOW THEREFORE BE IT RESOLVED THAT, Otter Tail County by this resolution adopts the proposed
revisions of the Food Protection Ordinance; the Lodging Ordinance; the Public Swimming Pool Ordinance; the
Manufactured Home Park/Recreational Camping Area Ordinance; and the Youth Camp Ordinance.
The motion for the adoption of the foregoing resolution was introduced by Commissioner Johnson, duly
seconded by Commissioner Mortenson and, after discussion thereof and upon vote being taken thereon,
passed on a roll call vote as follows:
BOARD OF COMMISSIONERS YEA NAY ABSENT ABSTAIN
Dan Bucholz x
Wayne Johnson x
Kurt Mortenson x
Bob Lahman x
Sean Sullivan x
Adopted at Fergus Falls, MN this 13th day of January 2026.
OTTER TAIL COUNTY BOARD OF COMMISSIONERS Dated: January 27, 2026
By: _________________________________________ Attest: ______________________________
Robert Lahman, Board of Commissioners Chair Nicole Hansen, Clerk
2026 SSTS GRANT/LOAN GUIDANCE
Motion by Sullivan, second by Bucholz and motion carried with Johnson abstaining to approve the Subsurface
Sewage Treatment System (SSTS) Grant and Loan Guidelines, as presented by Land & Resource
Management Director Chris LeClair, which include:
SSTS Local Cost Share Fix Up Fund Program through the Minnesota Pollution Control Agency,
SSTS Local Cost Share Fix Up Fund Program through Otter Tail River, Leaf-Wing-Redeye River, Boise
de Sioux River, Pomme de Terre River, and Long Prairie River One Watershed One Plan, and
SSTS Clean Water Program (CWP) Loan Program.
>
>
>
Board of Commissioners’ Meeting Minutes January 13, 2026
Page 7 of 11
FINAL PLAT – EAST BATTLE SOUTH SHORES
Motion by Mortenson, second by Johnson and unanimously carried to approve the Final Plat known as “East
Battle South Shore”, consisting of 5 Riparian Single Family Residential Riparian Lots and 6 Single Family
Residential Non-Riparian lots, 2 Blocks, located South and East of 21978 450th Ave., Battle Lake, MN, Section
2, Nidaros Township, East Battle Lake (56-138) RD.
LONG LAKE LID BOARD MEMBER APPOINTMENTS
Motion by Johnson, second by Mortenson and unanimously carried to appoint the following seasonal property
owners to the Board of Directors for the Long Lake Improvement District:
Allan Cleveland (one-year term)
Steven Aesoph (two-year term)
Craig Hertsgaard (three-year term)
Motion by Bucholz, second by Johnson and unanimously carried to appoint the following homesteaded
property owners to the Board of Directors for the Long Lake Improvement District:
Chris Impola (one-year term)
Dawn Godel (two-year term)
Shawn Scheer (three-year term)
Cameron Rittenour (one-year term)
RECESS & RECONVENE
At 10:24 a.m., Chair Lahman declared the meeting of the Otter Tail County Board of Commissioners recessed
for a short break. The Board of Commissioners meeting was reconvened at 10:30 a.m.
TABLED CONDITIONAL USE PERMIT
Land and Resource Management Director Chris LeClair held discussion regarding the conditional use permit
application for Arch D Designs LLC which was previously tabled from the December 16, 2025 Board of
Commissioners meeting. The conditional use permit application request was for manufacturing and small craft
retail cannabis at the same location as the cultivation. It was noted that information received from property
owner Scott Dahms was to withdraw the retail component from the proposed conditional use permit
application. LeClair clarified that cultivation does not require a land use permit, but manufacturing does require
a conditional use permit for industrial use. Discussion continued with a motion by Johnson, second by
Mortenson to accept the applicant’s withdrawal of his request for small craft retail and approve the Conditional
Use Permit Application for Arch D Designs LLC for manufacturing cannabis, at the same location as the
cultivation, with the following conditions: 1) absolutely no retail at this location, 2) no outside storage, 3) no
signage, 4) all manufacturing is within the structure, 5) any traffic, dust and noise be mitigated by the applicant,
6) minimize light pollution with downward or dark sky lighting, and 7) follow all regulations that are put forth by
the Office of Cannabis Management, with the proposal located at 33963 300th Ave., Dent, MN 56528, Section
5, Maine Township, Mud Lake (56-484) NE, and, after discussion thereof, and upon vote being taken thereon,
the motion passed on a roll call vote as follows:
BOARD OF COMMISSIONERS YEA NAY ABSENT ABSTAIN
Dan Bucholz x
Wayne Johnson x
Kurt Mortenson x
Bob Lahman x
Sean Sullivan x
>
>
>
>
> >
>
Board of Commissioners’ Meeting Minutes January 13, 2026
Page 8 of 11
CANNABIS REGISTRATION APPLICATION
Land & Resource Management Director Chris LeClair presented a Cannabis Registration Application from
Zachary Paige for a retail cannabis business in Dunn Township. LeClair noted that all required buffer distances
detailed in the County’s Ordinance to Regulate Cannabis and Lower-Potency Hemp Businesses are met.
Motion by Johnson, second by Sullivan and unanimously carried to approve the Cannabis Registration
Application for “North Circle Seeds” from Zachary Paige for a retail cannabis business at 26249 485th St.,
Vergas, MN (Dunn Township) as the location meets requirements for operation.
ADJOURNMENT
At 10:57 a.m., Chair Lahman declared the Otter Tail County Board of Commissioners meeting adjourned. The
next regular Board meeting is scheduled at 8:30 a.m. on Tuesday, January 27, 2026, at the Government
Services Center in Fergus Falls and via livestream.
OTTER TAIL COUNTY BOARD OF COMMISSIONERS Dated: January 27, 2026
By: _________________________________________ Attest: _______________________________
Robert Lahman, Board of Commissioners Chair Nicole Hansen, Clerk
OTTERTAIL
COUNTY · MINNESOTA
Board of Commissioners’ Meeting Minutes January 13, 2026 (Exhibit A)
Page 9 of 11
Vendor Name
A-OX WELDING SUPPLY CO INC
ACORNS-OAK CONSUL TING INC
ALBANY RECYCLING CENTER
AMERICAN SOLUTIONS FOR BUSINESS
ASSOCIATION OF MN COUNTIES
AVERY, ATTORNEY AT lAW/JILL
AXON ENTERPRISE INC
BCA TRAINING
BERG'S WELDING & REPAI R LLC
BRANON ER/COLE
BRANDON COMMUNICATIONS INC
BRAUN VENDINIG INC
BREDENB ERG/ALEXIS
BUREAU OF CRIMINAL APPREhlENSION
CAROLINA SOFlWARE INC
CUEAN SWEEP COMMERCIAL SERVICES
CMI INC
CULLIGAN OF WADENA
DACOTAhl PAPER CO
DAKOTA WHOLESALE TIRE INC
EVCO PETROLEUM PRODUCTS INC
FERGUS FALLS DAILY JOURNAL
GALLS ULC
GANOE/KA TIE
GAPPA OIL COMPANY INC
GOODPOINTE TECl1NOLOGY INC
GREATER MN PARTNERSl11P
110USTON ENGINEERING INC
INNOVATIVE OFFICE SOLUTIONS LLC
INTERSTATE ENGINEERING INC
JAKE'S JOHNS LLC
JOHNSON CONTROLS FIRE PROTECTIO"
JORGENSON/MICH ELLE
lAKES COMMUNITY COOPERATIVE
lANGUAGE LINE SERVICES INC
lARRY OTT INC
LEADSONLIN E LLC
LEIGHTON MEDIA -FERGUS FALLS
LEROY MOTORSPORTS ULC
LOCATORS & SUPPLI ES INC
M-R SIGN CO INC
MACPZA
Amount
122.50
1,500.00
2,663.80
94.20
3,469.00
525.08
650.00
75.00
15,568.03
718.11
2,881.50
58.00
26.25
2,970.00
2,500.00
1,395.00
2,489.00
67.75
234 03
2,812.00
389.60
490.65
970.93
1,600.00
115.00
2,545.00
2,500.00
26,904.05
120.87
14,232.90
340.00
23,552.00
138.00
476.69
78.30
4,550.00
3,230.00
1,696.00
612.97
205.99
2,071.36
180.00
Board of Commissioners’ Meeting Minutes January 13, 2026 (Exhibit A)
Page 10 of 11
Vendor Name
MARCO TECHNOLOGIES LLC
MARTINSON CONSTRUCTION
MATTHEW BENDE.R & COMPANY INC
MCM EDUCATIONAL FOUNDATION
MCCONN/CHRISTOPHER
MEYER/GEORGE
MINNESOTA MOTOR COMPANY
MN ASSOCIATION OF TOWNSHIPS
MN CONTINUING LEGAL EDUCATION
MN POLLUTION CONTROL AGENCY
MNCCC LOCKBOX
NAPA CENTRAL
NEWBORGJKEVIN
NUSS TRUCK & EQUIPMENT
OK TIRE
OLSON OIL CO INC
OTTER TAIL CO TREASURER
OUTDOOR RENOVATIONS LANDSCAPE &
PACE ANALYTICAL SERVICES INC
PARKERS PRAIRIE/CITY OF
PEOPLEFACTS LLC
PLUNKETTS VARMENT GUARD
POPE DOUGU\S SOLID WASTE MANAGE!
POWERPLAN OIB
PRIMADATA LLC
PRO AG FARMERS COOPERATIVE
RDO EQUIPMENT CO
SCHNEIDER GEOSPATIAL LLC
SHERWIN-WILLIAMS COMPANY INC/THE
SIMENGAARDIPAUL
STEINS INC
Sl7EVE'S SANITATION INC
SUPBR SEPTIC INC
SYS17EMS TECHNOLOGY
l7EICHIJODI
THOMSON REUTERS -WEST
TK ELEVATOR CORP
UNLIMITED AUTOGLASS INC
USIC LOCATING SERVICES LLC
VESTIS
VESTIS
WCM DRUG & VIOLENT CRIME TASK FOR
WEBER, ATTORNEY AT LAW/DAWN
WIDSETH SMITH NOL TING & ASSOCIATE!
WSB & ASSOCIATES INC
Final Total:
Amount
2,308.82
80.00
430.31
1,000.00
122.94
170.80
227.22
15.00
89.00
15.00
71,750.00
31.35
299.60
15,771.95
1,508.36
1,527.73
30.65
5,232.50
48,553.60
130.00
16.45
162.24
588.50
2,705.65
23,000.00
722.91
149.77
22,272 00
158.81
28.28
948.16
10,731.49
99.00
600.00
177.10
529.92
2,131.50
490.08
69.96
80.05
499.88
5,000.00
40.00
205.00
12,144.00
360,665.14
Board of Commissioners’ Meeting Minutes January 13, 2026 (Exhibit A)
Page 11 of 11
Vendor Name
AMAZON CAPITAL SERVICES INC
Final Total:
Vendor Name
ANDERSON/MEGAN
ASSOCIATION OF MN COUNTIES
OONVENE
FURE/ALLISON
JENSENfMELISSA
MN DEPT OF HUMAN SERVICES
NEXT CHAPTER TECHNOLOGY l~C
OLSON/ALIXANDRA
OTTER TAIL CO AUDITOR
OTTER TAIL CO RECORDER
PREMIER BIOTECH INC
W ENZEUERICA
Final Total:
Amount
2,125.83
2,125.83
Amount
75.86
3,1B5.00
999.00
14.95
9.75
168.10
190,928.00
24.94
340.00
138.00
1,190.00
11.82
197,085.42
COMMISSIONER'S VOUCHERS ENTRIES1/22/2026
Achristoph
N
N
D
4
N
Otter Tail County Auditor
Audit List for Board Page 1
Print List in Order By:
Save Report Options?:
Type of Audit List:
on Audit List?:
Paid on Behalf Of Name
Explode Dist. Formulas?:
D - Detailed Audit List
S - Condensed Audit List
1 - Fund (Page Break by Fund)
2 - Department (Totals by Dept)
3 - Vendor Number
4 - Vendor Name
9:54:59AM
r.:1 INTtGRATCO
11:;:.1 FINANCIAL SYSTEMS
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
General Revenue Fund
Copyright 2010-2025 Integrated Financial Systems
01-112-108-0000-6572 302.40 SERVICED LOCK CYLINDERS 5495 Repair And Maintenance/Supplies N
50-000-000-0000-6300 AP 120.00 REPAIR DOOR LOCK 5440 Building And Grounds Maintenance N
23-705-000-0000-6140 AP 90.00 CDA - PER DIEM 12/15/25 Per Diem Y
10-304-000-0000-6487 29.97 MILWAUKEE METAL BAND SAW BLADE 15621872 Tools & Minor Equipment N
01-201-000-0000-6396 AP 509.00 TOW CFS 25042414 339799 Special Investigation Y
01-201-000-0000-6491 225.00 ACCT AA822 FIRE EXTINGUISHERS 011393223 General Supplies N
01-112-108-0000-6572 AP 378.60 ACCT C012801 BOILER CHEMICALS AR107269 Repair And Maintenance/Supplies N
01-031-000-0000-6241 125.00 ACCT 8963 2026 MCHRMA DUES 8963-26 Membership Dues N
01-201-000-0000-6396 367.50 TOW 2025 DODGE RAM P-27238 Special Investigation N
01-250-000-0000-6342 9,842.25 ACCT 125630 TASERS INUS410155 Service Agreements N
5 A-1 LOCK & KEY
422.405
6297 ACKERSON/JEFF
90.006297
15007 ACME TOOLS
29.9715007
8803 ALLEN'S AUTO BODY & TOWING
509.008803
765 AMERICAN WELDING & GAS INC
225.00765
18160 APEX WATER & PROCESS INC
378.6018160
30171 ASSOCIATION OF MN COUNTIES
125.0030171
17112 AVT FERGUS FALLS
367.5017112
7086 AXON ENTERPRISE INC
9,842.257086
Page 2Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
2 Transactions
1 Transactions
1 Transactions
1 Transactions
1 Transactions
1 Transactions
1 Transactions
1 Transactions
1 Transactions
A-1 LOCK & KEY
ACKERSON/JEFF
ACME TOOLS
ALLEN'S AUTO BODY & TOWING
AMERICAN WELDING & GAS INC
APEX WATER & PROCESS INC
ASSOCIATION OF MN COUNTIES
AVT FERGUS FALLS
AXON ENTERPRISE INC
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
Solid Waste Fund
Copyright 2010-2025 Integrated Financial Systems
50-000-000-0120-6278 AP 1,001.50 HENNING TSF PROFESSIONAL SVCS 23561055.01-8 Engineering & Hydrological Testing N
50-000-000-0120-6278 AP 3,360.00 HENNING TSF PROFESSIONAL SVCS 23561055.02-3 Engineering & Hydrological Testing N
50-000-000-0130-6278 AP 1,391.00 NEOT PROFESSIONAL SERVICES 23561056.01-7 Engineering & Hydrological Testing N
01-112-101-0000-6572 AP 544.00 ACCT OTTC01 CONTROL VALVES J007368 Repair And Maintenance/Supplies N
01-112-101-0000-6572 5,268.17 ACCT OTTC01 REPAIRS J007421 Repair And Maintenance/Supplies N
01-112-101-0000-6572 AP 2,010.21 ACCT OTTC01 SVC WYE STRAINER W20333 Repair And Maintenance/Supplies N
01-112-108-0000-6572 AP 822.70 ACCT OTGSC01 REPAIR RPZ W20339 Repair And Maintenance/Supplies N
50-399-000-0000-6300 AP 855.00 ACCT OTCTYSW SVC EQUIPMENT W20313 Building And Grounds Maintenance N
50-000-000-0000-6978 DTG 90.00 ACCT 1801 AG PLASTICS DEC 2025 003-00487417 Ag Plastic Expenses N
50-000-000-0000-6978 DTG 129.00 ACCT 1801 AG PLASTICS DEC 2025 003-00487858 Ag Plastic Expenses N
01-149-000-0000-6354 AP 750.00 HAUL PLOW TRUCK 25-11911 Insurance Claims N
01-201-000-0000-6396 700.00 TOW CFS 26000616 26-12291 Special Investigation N
10-304-000-0000-6306 750.00 WINCHING 25-11956 Repair/Maint. Equip N
50-000-000-0000-6674 AP 9,832.75 PROFESSIONAL SERVICES IN1002672 2022A Bond Eligible Expenses N
01-061-000-0000-6330 AP 33.60 MILEAGE - DEC 2025 DEC2025 Mileage N
01-149-000-0000-6354 AP 3,922.78 ACCT 100330 #97 REPAIRS 082110 Insurance Claims Y
10-304-000-0000-6306 1,426.14 ACCT #100330 - REPAIR 082264 Repair/Maint. Equip N
10-304-000-0000-6572 2,953.94 TIRES 082273 Repair And Maintenance Supplies N
5765 BARR ENGINEERING CO
5,752.505765
5058 BDT MECHANICAL LLC
9,500.085058
11153 BECKER CO ENVIRONMENTAL SERVICES
219.0011153
31803 BEYER BODY SHOP INC
2,200.0031803
386 BRAUN INTERTEC CORPORATION
9,832.75386
5234 BRUTLAG/STEVE
33.605234
3423 BUY-MOR PARTS & SERVICE LLC
Page 3Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
3 Transactions
5 Transactions
2 Transactions
3 Transactions
1 Transactions
1 Transactions
BARR ENGINEERING CO
BDT MECHANICAL LLC
BECKER CO ENVIRONMENTAL SERVICES
BEYER BODY SHOP INC
BRAUN INTERTEC CORPORATION
BRUTLAG/STEVE
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
Road And Bridge Fund
Copyright 2010-2025 Integrated Financial Systems
10-304-000-0000-6572 126.27 TIRE 082299 Repair And Maintenance Supplies N
50-399-000-0000-6304 AP 12.28 ACCT 100331 PARTS 082076 Repair And Maint-Vehicles Y
50-399-000-0000-6304 AP 397.90 ACCT 100331 #1810 ALIGNMENT 082147 Repair And Maint-Vehicles Y
50-399-000-0000-6304 AP 5.65 ACCT 100331 ANIT-FREEZE 082192 Repair And Maint-Vehicles Y
01-250-000-0000-6452 AP 86.95 ACCT OTTER TUBE SOCKS 0429187-IN Prisioners Clothing Cost N
10-304-000-0000-6565 AP 2,837.34 ACCT #338815 - DIESEL FUEL B7R-ID4926 Fuels - Diesel N
10-301-000-0000-6240 AP 8.00 HELP WANTED 37606 Publishing & Advertising N
10-301-000-0000-6240 AP 8.00 HELP WANTED 37637 Publishing & Advertising N
01-091-000-0000-6281 52.90 56-CR-25-1395 SERVICE FEE 25001757 Court Case Expenses N
01-201-000-0000-6304 701.80 UNIT 2208 REMOVE EQUIPMENT 11339 Repair And Maintenance N
10-304-000-0000-6306 3,035.09 UPFIT LIGHT BAR, CENTER CONSOL 11350 Repair/Maint. Equip N
01-031-000-0000-6406 54.98 ACCT 2189988076 SUPPLIES 472399 Office Supplies N
01-043-000-0000-6677 AP 918.00 ACCT 2189988030 CHAIR 472359 Office Furniture And Equipment N
10-302-000-0000-6350 132.65 REPLACED PHOTOCELL 5535 Maintenance Contractor N
8,844.963423
14840 CHARM-TEX INC
86.9514840
17234 CHS INC
2,837.3417234
5580 CITIZEN'S ADVOCATE
16.005580
32022 CLAY CO SHERIFF
52.9032022
9087 CODE 4 SERVICES INC
3,736.899087
32603 COOPER'S OFFICE SUPPLY INC
972.9832603
16919 COSSETTE ELECTRIC LLC
132.6516919
Page 4Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
7 Transactions
1 Transactions
1 Transactions
2 Transactions
1 Transactions
2 Transactions
2 Transactions
1 Transactions
BUY-MOR PARTS & SERVICE LLC
CHARM-TEX INC
CHS INC
CITIZEN'S ADVOCATE
CLAY CO SHERIFF
CODE 4 SERVICES INC
COOPER'S OFFICE SUPPLY INC
COSSETTE ELECTRIC LLC
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
Solid Waste Fund
Copyright 2010-2025 Integrated Financial Systems
50-000-000-0150-6290 AP 15.50 ACCT 267-10336022-3 12/31/25 Contracted Services.N
50-000-000-0170-6290 AP 29.50 ACCT 327-00028118-5 12/31/25 Contracted Services.N
01-061-000-0000-6202 1,186.19 WEB SITE SUPPORT FEES 303952 County Website N
01-112-101-0000-6485 AP 659.27 ACCT 227160 SUPPLIES 63413 Custodian Supplies N
01-112-101-0000-6485 467.10 ACCT 227160 SUPPLIES 74767 Custodian Supplies N
50-000-000-0170-6485 AP 601.23 ACCT 227162 SUPPLIES 66817 Custodian Supplies N
50-399-000-0000-6485 AP 91.26 ACCT 227162 SUPPLIES CREDIT 5537 Custodian Supplies N
50-399-000-0000-6453 AP 108.38 ACCT 227162 SUPPLIES 66953 Ppe & Safety Equip.&Supplies N
01-149-000-0000-6210 98.00 POSTAGE SUPPLIES 12092 Postage & Postage Meter N
01-201-000-0000-6491 649.00 ACCT 397194 GLOVES INV1344518 General Supplies N
01-250-000-0000-6491 185.00 CLEANING TAPE 26-072 Jail Supplies N
10-304-000-0000-6565 503.19 ACCT #2638 - D.E.F. FLUID BULK 254834 Fuels - Diesel N
3710 CULLIGAN OF DETROIT LAKES
15.503710
5407 CULLIGAN OF ELBOW LAKE
29.505407
9018 D & T VENTURES LLC
1,186.199018
36 DACOTAH PAPER CO
1,744.7236
14949 DAKOTA BUSINESS SOLUTIONS INC
98.0014949
13214 DASH MEDICAL GLOVES INC
649.0013214
15128 DATAWORKS PLUS LLC
185.0015128
9672 DEANS DISTRIBUTING
503.199672
14946 DEM-CON MATERIALS RECOVERY LLC
Page 5Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
1 Transactions
1 Transactions
1 Transactions
-
5 Transactions
1 Transactions
1 Transactions
1 Transactions
1 Transactions
CULLIGAN OF DETROIT LAKES
CULLIGAN OF ELBOW LAKE
D & T VENTURES LLC
DACOTAH PAPER CO
DAKOTA BUSINESS SOLUTIONS INC
DASH MEDICAL GLOVES INC
DATAWORKS PLUS LLC
DEANS DISTRIBUTING
Otter Tail County Auditor
ELLINGSON PLUMBING HEATING AC ELECTRIC
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
Solid Waste Fund
Copyright 2010-2025 Integrated Financial Systems
50-399-000-0000-6290 AP 3,507.74 ACCT 223 TIPPING FEES DEC 2025 8909 Contracted Services.N
01-149-000-0000-6369 35.00 DITCH VIEWER - FEES 1/8/26 Miscellaneous Charges Y
01-149-000-0000-6369 280.00 DITCH VIEWER - PER DIEM 1/8/26 Miscellaneous Charges Y
01-002-000-0000-6333 35.00 SNACKS FOR BOARD MTG 1/6/26 1/6/26 Meeting/Event Costs N
01-002-000-0000-6333 AP 35.00 SNACKS FOR BOARD MTG 12/16/25 12/16/25 Meeting/Event Costs N
23-705-000-0000-6333 102.50 MEALS FOR BOARD MTG 1/7/26 1/7/26 Meeting/Event Costs N
01-250-000-0000-6390 DTG 24,743.47 INMATE BOARDING DEC 2025 DEC2025 Board Of Prisioners N
10-304-000-0000-6300 AP 1,986.00 ACCT #C40349 - INSTALL SENSOR 248330001 Building And Grounds Maintenance N
10-304-000-0000-6572 AP 32.27 ACCT #MNFER0153 - PARTS MNFER155566 Repair And Maintenance Supplies N
01-002-000-0000-6240 AP 596.99 BOC MINUTES 12/16/25 A571853B-0085 Publishing & Advertising N
01-031-000-0000-6436 AP 142.00 ACCT 529337 CORRECTIONS OFFICR 818501 New hire start up cost N
01-031-000-0000-6436 AP 103.00 ACCT 529337 ELIGIBILITY WORKER 819289 New hire start up cost N
50-000-000-0130-6863 DTG 4,200.00 LEACHATE DISPOSAL DEC 2025 970 Leachate Disposal N
3,507.7414946
15245 DENBROOK/GARY
315.0015245
11391 DOUBLE A CATERING
172.5011391
12429 DOUGLAS CO JAIL
24,743.4712429
13330
1,986.0013330
2997 FASTENAL COMPANY
32.272997
35011 FERGUS FALLS DAILY JOURNAL
841.9935011
32679 FERGUS FALLS/CITY OF
4,200.0032679
2153 FERGUS POWER PUMP INC
Page 6Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
1 Transactions
2 Transactions
3 Transactions
1 Transactions
1 Transactions
1 Transactions
3 Transactions
1 Transactions
ELLINGSON PLUMBING HEATING AC ELECTRIC
DEM-CON MATERIALS RECOVERY LLC
DENBROOK/GARY
DOUBLE A CATERING
DOUGLAS CO JAIL
FASTENAL COMPANY
FERGUS FALLS DAILY JOURNAL
FERGUS FALLS/CITY OF
Otter Tail County Auditor
FOTH INFRASTRUCTURE & ENVIRONMENT LLC
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
Solid Waste Fund
Copyright 2010-2025 Integrated Financial Systems
50-000-000-0120-6291 1,700.00 HAULING CHARGES 56852 Contract Transportation N
50-000-000-0170-6291 6,335.00 HAULING CHARGES 56852 Contract Transportation N
50-000-000-0120-6291 850.00 HAULING CHARGES 56876 Contract Transportation N
50-000-000-0170-6291 5,215.00 HAULING CHARGES 56876 Contract Transportation N
50-399-000-0000-6291 4,980.00 HAULING CHARGES 56852 Contract Transportation N
50-399-000-0000-6291 3,735.00 HAULING CHARGES 56876 Contract Transportation N
01-044-000-0000-6304 AP 714.60 ACCT 0002465 INSTALL TIRES 411740 Repair And Maintenance N
01-122-000-0000-6304 AP 872.08 ACCT 0002459 INSTALL TIRES 411830 Repair And Maintenance N
02-103-000-0000-6369 AP 13,410.10 ACCT 2711103 AVID LIFE Q4 2025 0710269-IN Miscellaneous Charges N
01-112-101-0000-6349 1,260.00 PARKING LOT RENTAL 132 Miscellaneous Rentals N
10-304-000-0000-6572 AP 426.20 ACCT #504250 - PARTS IN001-2124140 Repair And Maintenance Supplies N
01-121-000-0000-6239 AP 98.00 ACCT MP45604 VETS VAN DRIVER MP456041225 MDVA Grant N
50-000-000-0000-6674 AP 21,151.55 HENNING TSF PROFESSIONAL SVCS 100285 2022A Bond Eligible Expenses N
01-201-000-0000-6426 AP 135.21 ACCT 1002151493 PLACARD 033511295 Uniform Allowance N
01-201-000-0000-6426 AP 80.79 ACCT 1002151493 CUFFS 033523037 Uniform Allowance N
01-201-000-0000-6426 AP 56.49 ACCT 1002151493 BELT 033571614 Uniform Allowance N
22,815.002153
35018 FERGUS TIRE CENTER INC
1,586.6835018
13636 FIDLAR TECHNOLOGIES INC
13,410.1013636
383 FIRST LUTHERAN CHURCH
1,260.00383
2497 FORCE AMERICA DISTRIBUTING LLC
426.202497
14517 FORUM COMMUNICATIONS COMPANY
98.0014517
387
21,151.55387
392 GALLS LLC
Page 7Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
6 Transactions
2 Transactions
1 Transactions
1 Transactions
1 Transactions
1 Transactions
1 TransactionsFOTH INFRASTRUCTURE & ENVIRONMENT LLC
FERGUS POWER PUMP INC
FERGUS TIRE CENTER INC
FIDLAR TECHNOLOGIES INC
FIRST LUTHERAN CHURCH
FORCE AMERICA DISTRIBUTING LLC
FORUM COMMUNICATIONS COMPANY
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
General Revenue Fund
Copyright 2010-2025 Integrated Financial Systems
01-201-000-0000-6426 85.50 ACCT 1002151493 PANTS 033668325 Uniform Allowance N
01-201-000-0000-6426 138.99 ACCT 1002151493 PLACAR 033670551 Uniform Allowance N
01-201-000-0000-6426 161.10 ACCT 1002151493 FLASHLIGHT 033670560 Uniform Allowance N
01-201-000-0000-6426 194.35 ACCT 1002151493 UA BASE 033678230 Uniform Allowance N
01-201-000-0000-6426 64.59 ACCT 1002151493 BELT 033681277 Uniform Allowance N
01-250-000-0000-6426 AP 167.76 ACCT 5287917 BELT/SOCKS 033493780 Uniform Allowance N
01-250-000-0000-6426 AP 87.00 ACCT5287917 SHIRT 033496621 Uniform Allowance N
01-250-000-0000-6426 AP 214.09 ACCT 5287917 PANTS 033496638 Uniform Allowance N
01-250-000-0000-6426 AP 591.79 ACCT 5287917 PANTS 033555605 Uniform Allowance N
01-250-000-0000-6426 AP 98.16 ACCT 5287917 PULLOVER 033563189 Uniform Allowance N
01-250-000-0000-6426 AP 45.15 ACCT 5287917 BODY CAM CASE 033563198 Uniform Allowance N
01-250-000-0000-6426 AP 103.65 ACCT 5287917 SHIRT 033576517 Uniform Allowance N
01-112-000-0000-6275 AP 4.05 ACCT MN01166 DEC 2025 51213144 Fiber Locating Service N
10-303-000-0000-6331 27.59 MEAL REIMBURSEMENT 1/13/2026 Travel Expenses N
10-303-000-0000-6331 14.50 MEAL REIMBURSEMENT 1/14/2026 Travel Expenses N
10-303-000-0000-6331 15.33 MEAL REIMBURSEMENT 1/15/2026 Travel Expenses N
01-201-000-0000-6426 246.91 UNIFORM ITEMS 1/6/26 Uniform Allowance N
01-480-000-0000-6331 34.01 MEALS - CPO CLASS 1/14/26 Travel Expenses N
50-399-000-0000-6304 1,383.21 SERVICE AIR BAGS 8976 Repair And Maint-Vehicles N
50-399-000-0000-6304 509.60 SERVICE FREIGHTLINER 8994 Repair And Maint-Vehicles N
2,224.62392
5089 GOPHER STATE ONE CALL
4.055089
16122 GREWE/TUCKER
57.4216122
17661 GUCK/JACOB
246.9117661
18163 HALVORSON/ALEX
34.0118163
16060 HANSEN SERVICE LLC
1,892.8116060
Page 8Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
15 Transactions
1 Transactions
3 Transactions
1 Transactions
1 Transactions
2 Transactions
GALLS LLC
GOPHER STATE ONE CALL
GREWE/TUCKER
GUCK/JACOB
HALVORSON/ALEX
HANSEN SERVICE LLC
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
Road And Bridge Fund
Copyright 2010-2025 Integrated Financial Systems
10-304-000-0000-6300 280.00 PUMP HOLDING TANKS 1/12/2026 Building And Grounds Maintenance N
10-304-000-0000-6306 74.39 OIL CHANGE 64273 Repair/Maint. Equip N
09-507-575-0000-6278 740.00 R005197-0038 GLACIAL EDGE 80065 Engineer & Hydrological Testing GLACIAL N
01-112-104-0000-6572 AP 427.50 SERVICE PHASE LOSS FAULTS 13891 Repair And Maintenance/Supplies N
01-201-000-0000-6406 10.33 ACCT 9988526 SUPPLIES IN5017478 Office Supplies N
10-303-000-0000-6278 AP 2,900.00 PROFESSIONAL ENGINEERING SERVI F1712036 Engineering Consultant N
10-303-000-0000-6278 AP 3,780.00 PROFESSIONAL ENGINEERING SERVI F1812058 Engineering Consultant N
50-000-000-0000-6426 AP 160.00 HATS 98050 Clothing Allowance N
50-000-000-0110-6426 AP 160.00 HATS 98050 Clothing Allowance N
50-000-000-0120-6426 AP 160.00 HATS 98050 Clothing Allowance N
50-000-000-0130-6426 AP 160.00 HATS 98050 Clothing Allowance N
50-000-000-0170-6426 AP 160.00 HATS 98050 Clothing Allowance N
50-399-000-0000-6426 AP 160.00 HATS 98050 Clothing Allowance N
23-705-000-0000-6140 90.00 CDA - PER DIEM 1/7/26 Per Diem Y
23-705-000-0000-6330 27.55 CDA - MILEAGE 1/7/26 Mileage Y
9453 HAWES SEPTIC TANK PUMPING LLC
280.009453
10642 HOMETOWN REPAIR INC
74.3910642
5835 HOUSTON ENGINEERING INC
740.005835
17798 IDEAL SERVICE INC
427.5017798
38100 INNOVATIVE OFFICE SOLUTIONS LLC
10.3338100
10049 INTERSTATE ENGINEERING INC
6,680.0010049
39324 JK SPORTS INC
960.0039324
6299 JOHNSON/DENA
Page 9Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
1 Transactions
1 Transactions
1 Transactions
1 Transactions
1 Transactions
2 Transactions
6 Transactions
HAWES SEPTIC TANK PUMPING LLC
HOMETOWN REPAIR INC
HOUSTON ENGINEERING INC
IDEAL SERVICE INC
INNOVATIVE OFFICE SOLUTIONS LLC
INTERSTATE ENGINEERING INC
JK SPORTS INC
Otter Tail County Auditor
Community Development Authority COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
Copyright 2010-2025 Integrated Financial Systems
23-705-000-0000-6140 AP 90.00 CDA - PER DIEM 12/15/25 Per Diem Y
10-304-000-0000-6572 AP 247.40 ACCT #174818 - PARTS 104009950 Repair And Maintenance Supplies N
10-304-000-0000-6572 AP 87.50 ACCT #174818 - PARTS 104013035 Repair And Maintenance Supplies N
10-304-000-0000-6572 AP 268.50 ACCT #174818 - PARTS 104013381 Repair And Maintenance Supplies N
10-304-000-0000-6572 AP 422.50 ACCT #174818 - PARTS 104014652 Repair And Maintenance Supplies N
23-705-000-0000-6241 525.00 LRBA MEMBERSHIP DUES 2026 12506 Membership Dues N
01-031-000-0000-6436 AP 243.50 ACCT 30025613 EXAM & LAB WORK 327084313 New hire start up cost N
09-507-510-0000-6251 AP 332.97 ACCT 700285 LP GAS COMMERCIAL 66735 Gas And Oil - Utility N
50-000-000-0130-6565 AP 820.89 ACCT 009080 LP & WINTERMASTER 595 & 80 Fuels N
50-000-000-0110-6565 AP 413.53 ACCT 009080 #1 FIELDMASTER 75362 Fuels N
01-149-000-0000-6435 AP 168.00 ACCT 36093 DRUG TESTS DEC 2025 102389 Screening Tests N
01-201-000-0000-6433 AP 630.00 CHECK UP SERVICES DEC 2025 1943 Special Medical 6
13-012-000-0000-6276 AP 1,050.00 SELF HELP SERVICES DEC 2025 1451 Professional Services Y
207.556299
1002 KIMBALL MIDWEST
1,025.901002
6950 LAKE REGION BUILDERS ASSOCIATION
525.006950
79 LAKE REGION HEALTHCARE
243.5079
10350 LAKES COMMUNITY COOPERATIVE
1,567.3910350
41450 LAKES COUNTRY SERVICE COOPERATIVE
168.0041450
17932 LE-AST SERVICES COUNSELING
630.0017932
8049 LEGAL SERVICES OF NW MINNESOTA
1,050.008049
1022 LITTLE FALLS MACHINE INC
Page 10Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
3 Transactions
4 Transactions
1 Transactions
1 Transactions
3 Transactions
1 Transactions
1 Transactions
1 Transactions
JOHNSON/DENA
KIMBALL MIDWEST
LAKE REGION BUILDERS ASSOCIATION
LAKE REGION HEALTHCARE
LAKES COMMUNITY COOPERATIVE
LAKES COUNTRY SERVICE COOPERATIVE
LE-AST SERVICES COUNSELING
LEGAL SERVICES OF NW MINNESOTA
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
Road And Bridge Fund
Copyright 2010-2025 Integrated Financial Systems
10-304-000-0000-6572 6,084.63 ACCT #OTTER - PARTS 375423 Repair And Maintenance Supplies N
50-000-000-0170-6426 19.99 ACCT 23-52F1 GLOVES 0324951-IN Clothing Allowance N
50-000-000-0110-6426 1,122.01 ACCT 23-52F1 UNIFORMS 0325035-IN Clothing Allowance N
50-000-000-0120-6426 1,122.01 ACCT 23-52F1 UNIFORMS 0325035-IN Clothing Allowance N
50-000-000-0150-6426 1,122.01 ACCT 23-52F1 UNIFORMS 0325035-IN Clothing Allowance N
50-000-000-0170-6426 1,122.01 ACCT 23-52F1 UNIFORMS 0325035-IN Clothing Allowance N
50-399-000-0000-6426 1,122.01 ACCT 23-52F1 UNIFORMS 0325035-IN Clothing Allowance N
01-201-000-0000-6426 AP 64.00 EMBROIDERED SHIRTS 2639 Uniform Allowance N
01-201-000-0000-6426 AP 80.00 EMBROIDERED SHIRTS 3159 Uniform Allowance N
10-302-000-0000-6515 1,960.00 3/8" STEEL ECONO DRIVE RIVET 230357 Signs And Posts N
01-061-000-0000-6342 536.00 ACCT OT00 CN222421-01 INV14744129 Service Agreements N
10-302-000-0000-6505 AP 1,962.79 TONS WINTER SAND - BATTL ELAKE 11/10/2025 Aggregates N
10-302-000-0000-6505 AP 5,187.61 TONS WINTER SAND - FERGUS FALL 11/12/2025 Aggregates N
10-302-000-0000-6505 AP 853.48 TONS WINTER SAND - FERGUS FALL 11/13/2025 Aggregates N
10-302-000-0000-6505 AP 1,461.63 TONS WINTER SAND - FERGUS FALL 11/17/2025 Aggregates N
10-302-000-0000-6505 AP 2,719.89 TONS WINTER SAND - FERGUS FALL 11/18/2025 Aggregates N
10-302-000-0000-6505 AP 1,503.28 TONS WINTER SAND - FERGUS FALL 11/19/2025 Aggregates N
10-302-000-0000-6505 AP 10,987.78 TONS WINTER SAND - FERGUS FALL 11/21/2025 Aggregates N
10-302-000-0000-6505 AP 2,076.41 TONS WINTER SAND - BATTLE LAKE 11/6/2025 Aggregates N
10-302-000-0000-6505 AP 1,358.64 TONS WINTER SAND - BATTLE LAKE 11/7/2025 Aggregates N
6,084.631022
41638 LOCATORS & SUPPLIES INC
5,630.0441638
6934 LONG WEEKEND SPORTSWEAR
144.006934
511 M-R SIGN CO INC
1,960.00511
2721 MARCO TECHNOLOGIES LLC
536.002721
1026 MARK SAND & GRAVEL CO
28,111.511026
Page 11Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
1 Transactions
6 Transactions
2 Transactions
1 Transactions
1 Transactions
9 Transactions
LITTLE FALLS MACHINE INC
LOCATORS & SUPPLIES INC
LONG WEEKEND SPORTSWEAR
M-R SIGN CO INC
MARCO TECHNOLOGIES LLC
MARK SAND & GRAVEL CO
Otter Tail County Auditor
Community Development Authority COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
Copyright 2010-2025 Integrated Financial Systems
23-705-000-0000-6140 90.00 CDA - PER DIEM 1/7/26 Per Diem Y
23-705-000-0000-6330 29.00 CDA - MILEAGE 1/7/26 Mileage Y
23-705-000-0000-6140 AP 90.00 CDA - PER DIEM 12/18/25 Per Diem Y
01-149-000-0000-6354 62.00 ACCT 1140 ADD CEQ 16056 Insurance Claims N
01-149-000-0000-6354 2,500.00 ACCT 1140 DEDUCTIBLE D1956299160 Insurance Claims N
01-149-000-0000-6354 2,500.00 ACCT 1140 DEDUCTIBLE D24926581 Insurance Claims N
50-000-000-0120-6276 DTG 1,000.00 ACCT 1140 DEDUCTIBLE D70002484 Professional Services N
01-201-000-0000-6241 2,191.99 2026 ICLD DUES 4305 Membership Dues N
01-201-000-0000-6241 5,985.56 2026 MSA DUES 4305 Membership Dues N
01-201-000-0000-6241 6,643.99 2026 LEXIPOL DUES 4305 Membership Dues N
01-031-000-0000-6369 AP 30.00 ACCT 1143-12 SHREDDING SERVICE 468066 Miscellaneous Charges N
01-042-000-0000-6342 AP 48.00 ACCT 1143-14 SHREDDING SERVICE 468067 Service Agreements N
01-201-000-0000-6342 AP 78.00 ACCT 1159 SHREDDING SERVICE 468071 Service Agreements N
01-112-000-0000-6342 580.00 ACCT 7786 ELEVATOR OPS ALR0185270X Service Agreements N
10-304-000-0000-6369 DTG 25.00 HAZARDOUS CHEMICAL FEE 5616500542025 Miscellaneous Charges N
10-304-000-0000-6369 DTG 25.00 HAZARDOUS CHEMICAL FEE 5619400092025 Miscellaneous Charges N
10-304-000-0000-6369 DTG 25.00 HAZARDOUS CHEMICAL FEE 5625100052025 Miscellaneous Charges N
50-000-000-0130-6242 240.00 LANDFILL OPERATOR REGISTRATION 2/26/26 Registration Fees N
6300 MARTIN/VALERIE
209.006300
546 MCIT
6,062.00546
563 MINNESOTA SHERIFFS' ASSOCIATION
14,821.54563
7661 MINNKOTA ENVIRO SERVICES INC
156.007661
928 MN DEPT OF LABOR & INDUSTRY
580.00928
1051 MN DEPT OF PUBLIC SAFETY
75.001051
1576 MN POLLUTION CONTROL AGENCY
Page 12Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
3 Transactions
4 Transactions
3 Transactions
3 Transactions
1 Transactions
3 Transactions
MARTIN/VALERIE
MCIT
MINNESOTA SHERIFFS' ASSOCIATION
MINNKOTA ENVIRO SERVICES INC
MN DEPT OF LABOR & INDUSTRY
MN DEPT OF PUBLIC SAFETY
Otter Tail County Auditor
MN STATE COMMUNITY & TECHNICAL COLLEGE
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
Solid Waste Fund
Copyright 2010-2025 Integrated Financial Systems
01-284-804-0000-6829 AP 5,000.00 CDL TRNG REGISTRATION 359744/9178 Drive for 5 Grant Expenses N
10-301-000-0000-6241 5,736.00 2026 MEMBERSHIP DUES P26-2038 Membership Dues N
01-042-000-0000-6457 95.50 MN DRIVER MANUALS 5629 Manuals N
14-507-000-0000-6687 9,599.20 MOWER FOR PHELPS MILL 1/27/26 Equipment-Current Year N
10-303-000-0000-6278 AP 4,112.50 PROFESSIONAL ENGINEERING SERVI SIN006973 Engineering Consultant N
10-304-000-0000-6572 AP 279.92 ACCT #15732 - PARTS 926966 Repair And Maintenance Supplies N
10-304-000-0000-6572 AP 209.56 ACCT #15732 - PARTS 928036 Repair And Maintenance Supplies N
10-304-000-0000-6572 AP 45.38 ACCT #15732 - PARTS 928037 Repair And Maintenance Supplies N
10-304-000-0000-6572 AP 55.61 ACCT #15732 - PARTS 928059 Repair And Maintenance Supplies N
10-304-000-0000-6572 AP 15.46 ACCT #15732 - PARTS 928099 Repair And Maintenance Supplies N
10-304-000-0000-6572 AP 27.43 ACCT #15732 - PARTS 928120 Repair And Maintenance Supplies N
10-304-000-0000-6572 31.35 ACCT #15732 - PARTS 928319 Repair And Maintenance Supplies N
10-302-000-0000-6331 8.63 MEAL REIMBURSEMENT 1/6/2026 Travel Expenses N
240.001576
14107
5,000.0014107
1047 MN TRANSPORTATION ALLIANCE
5,736.001047
13121 MNDRIVERSMANUALS.COM
95.5013121
14537 MOENCH BODY SHOP
9,599.2014537
6012 MOORE ENGINEERING INC
4,112.506012
2036 NAPA CENTRAL
14.112036
17930 NELSON/CHAD
8.6317930
13242 NEW YORK MILLS DISPATCH
Page 13Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
1 Transactions
1 Transactions
1 Transactions
1 Transactions
1 Transactions
1 Transactions
-
-
7 Transactions
1 Transactions
MN STATE COMMUNITY & TECHNICAL COLLEGE
MN POLLUTION CONTROL AGENCY
MN TRANSPORTATION ALLIANCE
MNDRIVERSMANUALS.COM
MOENCH BODY SHOP
MOORE ENGINEERING INC
NAPA CENTRAL
NELSON/CHAD
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
Road And Bridge Fund
Copyright 2010-2025 Integrated Financial Systems
10-301-000-0000-6240 AP 8.00 HELP WANTED 37493 Publishing & Advertising N
10-301-000-0000-6240 AP 8.00 HELP WANTED 37550 Publishing & Advertising N
10-303-000-0000-6683 900.00 LEGAL & VESTING REPORTS 113166 Right Of Way, Ect.N
01-002-000-0000-6241 2,000.00 2026 NCC DUES 1/27/26 Membership Dues N
01-201-000-0000-6304 43.00 ACCT 0057522 #2205 MOUNT TIRES 27023749 Repair And Maintenance N
01-201-000-0000-6304 1,284.05 ACCT 0057522 #2302 BRAKE JOB 27023813 Repair And Maintenance N
01-201-000-0000-6304 46.42 ACCT 0057522 #2310 TIRE ROT 27023850 Repair And Maintenance N
01-201-000-0000-6304 104.35 ACCT 0057522 #2103 OIL CHANGE 27023860 Repair And Maintenance N
01-201-000-0000-6304 34.48 ACCT 0057522 #2204 TIRE REPAIR 27023939 Repair And Maintenance N
01-121-000-0000-6241 75.00 2026 NWMNCVSO DUES 1/27/26 Membership Dues N
01-061-000-0000-6201 DTG 2,162.44 ACCT 100A05602 WAN DEC 2025 DV25120388 Communication Fees -N
01-125-000-0000-6369 DTG 21.00 ACCT 100A05602 VOICE DEC 2025 W25120526 Miscellaneous Charges N
01-201-000-0000-6276 DTG 15.75 ACCT 100A05602 VOICE DEC 2025 W25120526 Professional Services N
11-406-000-0000-6276 DTG 51.45 ACCT 100A05602 VOICE DEC 2025 W25120526 Professional Services N
11-407-200-0047-6276 DTG 205.80 ACCT 100A05602 VOICE DEC 2025 W25120526 Professional Services N
11-407-600-0090-6276 DTG 43.05 ACCT 100A05602 VOICE DEC 2025 W25120526 Professional Services N
11-420-601-0000-6276 DTG 655.20 ACCT 100A05602 VOICE DEC 2025 W25120526 Professional Services N
01-201-000-0000-6304 72.71 ACCT 12824 UNIT 2303 OIL CHNGE 26-7593 Repair And Maintenance N
16.0013242
3032 NF FIELD ABSTRACT CO LLC
900.003032
18157 NORTHERN COUNTIES COALITION
2,000.0018157
6407 NORTHWEST TIRE INC
1,512.306407
15568 NWMNCVSO
75.0015568
4106 OFFICE OF MNIT SERVICES
3,154.694106
13291 OK TIRE STORE
Page 14Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
2 Transactions
1 Transactions
1 Transactions
5 Transactions
1 Transactions
7 Transactions
NEW YORK MILLS DISPATCH
NF FIELD ABSTRACT CO LLC
NORTHERN COUNTIES COALITION
NORTHWEST TIRE INC
NWMNCVSO
OFFICE OF MNIT SERVICES
Otter Tail County Auditor
OUTDOOR RENOVATIONS LANDSCAPE & NURSERY
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
General Revenue Fund
Copyright 2010-2025 Integrated Financial Systems
01-205-000-0000-6273 1,000.00 TRANSPORT - M GEISINGER OLS2601003 Coroner Expense N
23-705-000-7001-6828 DTO 56.00 REVISED PLAT FEE 4192137 Site Development (TIF)N
23-706-807-0000-6832 DTO 46.00 GROW PERHAM ABSTRACT FEE 4192786 Loan Assistance Program N
50-399-000-0000-6290 AP 40.00 PLOWING BY FUSH LAKE BINS 136504 Contracted Services.N
50-399-000-0000-6290 AP 40.00 PLOWING BY FUSH LAKE BINS 136567 Contracted Services.N
01-112-000-0000-6319 AP 8,775.00 SNOW REMOVAL DEC 2025 CM13089 Snow Removal N
10-305-000-0000-6369 25.00 MN DITCH VIEWERS ASSOCIATION M 1/8/2026 Miscellaneous Charges N
10-305-000-0000-6369 10.00 MN DITCH VIEWERS ASSOCITATION 1/8/2026 Miscellaneous Charges N
01-201-000-0000-6491 255.17 ACCT 630256 PROPANE 1/15/26 10993 General Supplies N
01-044-000-0000-6240 AP 176.00 HOMESTEAD NOTICE 2511053 Publishing & Advertising N
01-041-000-0000-6240 AP 11,982.21 2024 FINANCIAL STMT 2ND PRINT 12/31/25 Publishing & Advertising N
01-121-000-0000-6239 AP 34.43 VETS VAN DRIVER AD 12/31/25 MDVA Grant N
72.7113291
44015 OLSON FUNERAL HOME
1,000.0044015
44086 OTTER TAIL CO RECORDER
102.0044086
1080 OTTERTAIL AGGREGATE INC
80.001080
6351
8,775.006351
15919 PALMERSHEIM/COLBY
35.0015919
45022 PARK REGION CO OP
255.1745022
70 PARKERS PRAIRIE INDEPENDENT LLC/THE
176.0070
156 PAW PUBLICATIONS LLC
Page 15Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
1 Transactions
1 Transactions
2 Transactions
2 Transactions
1 Transactions
2 Transactions
1 Transactions
1 Transactions
OUTDOOR RENOVATIONS LANDSCAPE & NURSERY
OK TIRE STORE
OLSON FUNERAL HOME
OTTER TAIL CO RECORDER
OTTERTAIL AGGREGATE INC
PALMERSHEIM/COLBY
PARK REGION CO OP
PARKERS PRAIRIE INDEPENDENT LLC/THE
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
General Revenue Fund
Copyright 2010-2025 Integrated Financial Systems
10-304-000-0000-6306 1,450.06 REPAIR 46329 Repair/Maint. Equip N
10-304-000-0000-6500 568.44 SUPPLIES 1/9/2026 Supplies N
10-303-000-0000-6330 206.63 MILEAGE REIMBURSEMENT 1/12/2026 Mileage N
10-303-000-0000-6331 210.00 LODGING REIMBURSEMENT 1/12/2026 Travel Expenses N
10-303-000-0000-6331 29.71 MEAL REIMBURSEMENT 1/12/2026 Travel Expenses N
10-303-000-0000-6330 219.68 MILEAGE REIMBURSEMENT 1/13/2026 Mileage N
10-303-000-0000-6331 56.00 MEAL REIMBURSEMENT 1/13/2026 Travel Expenses N
10-304-000-0000-6300 33.28 ACCT #9512212 - GENERAL PEST C 10325743 Building And Grounds Maintenance N
10-304-000-0000-6300 58.24 ACCT #9512215 - GENERAL PEST C 10325818 Building And Grounds Maintenance N
10-304-000-0000-6300 58.24 ACCT #9512219 - GENERAL PEST C 10325916 Building And Grounds Maintenance N
50-000-000-0170-6290 124.80 ACCT 9595020 PEST CONTROL 10327604 Contracted Services.N
50-399-000-0000-6290 135.20 ACCT 9595020 PEST CONTROL 10327457 Contracted Services.N
50-000-000-0120-6565 196.04 ACCT 988529 FUEL OIL 1/7/26 43238 Fuels N
10-304-000-0000-6251 992.36 ACCT #106446 - PROPANE 88118723 Gas And Oil - Utility N
01-284-804-0000-6829 AP 38.00 BUS RIDES DEC 2025 INV6054 Drive for 5 Grant Expenses N
50-399-000-0000-6290 AP 69.62 JANITORIAL SERVICES DEC 2025 INV5905 Contracted Services.N
12,016.64156
45464 PEBBLE LAKE AUTO
1,450.0645464
1093 PERHAM STEEL & WELDING
568.441093
14554 PIEPER/JORDAN
722.0214554
16472 PLUNKETT'S VARMENT GUARD
409.7616472
45475 PRO AG FARMERS CO OP
196.0445475
6547 PRO AG FARMERS COOPERATIVE
992.366547
25082 PRODUCTIVE ALTERNATIVES INC
Page 16Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
2 Transactions
1 Transactions
1 Transactions
5 Transactions
5 Transactions
1 Transactions
1 Transactions
PAW PUBLICATIONS LLC
PEBBLE LAKE AUTO
PERHAM STEEL & WELDING
PIEPER/JORDAN
PLUNKETT'S VARMENT GUARD
PRO AG FARMERS CO OP
PRO AG FARMERS COOPERATIVE
Otter Tail County Auditor
PROFESSIONAL DEVELOPMENT ACADEMY LLC
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
Solid Waste Fund
Copyright 2010-2025 Integrated Financial Systems
01-149-000-0000-6400 10,000.00 LEADERSHIP TRAINING TUITION 148553 Leadership Training Expense Y
01-705-000-0000-6276 3,916.66 REPRESENTATION FEES JAN 2026 2026-001 Professional Services N
71-171-000-0000-6369 AP 11,440.72 ACCT 01-2300-1061639 DEC 2025 1889113 Miscellaneous Charges N
10-304-000-0000-6487 33.48 SUPPLIES 317213 Tools & Minor Equipment N
02-280-000-0000-6369 17,408.47 RAVE ALERT SERVICE AGREEMENT INV-71872 Miscellaneous Charges N
01-112-108-0000-6572 AP 296.40 ACCT 0313001 INSTALL EQUIPMENT W4883549 Repair And Maintenance/Supplies N
10-304-000-0000-6572 AP 43.89 ACCT #99227 - PARTS 843214FX1 Repair And Maintenance Supplies N
10-304-000-0000-6572 AP 522.60 ACCT #99227 - PARTS 843423F Repair And Maintenance Supplies N
10-304-000-0000-6572 AP 126.93 ACCT #99227 - PARTS CM842806F Repair And Maintenance Supplies N
01-112-109-0000-6342 90.00 ACCT 18458 PEST CONTROL 111375 Service Agreements N
107.6225082
5745
10,000.005745
15407 PSICK CAPITOL SOLUTIONS INC
3,916.6615407
17833 PUBLIC GROUP LLC/THE
11,440.7217833
16848 QUICK'S NAPA AUTO PARTS
33.4816848
15989 RAVE WIRELESS INC
17,408.4715989
9166 RDO EQUIPMENT CO
296.409166
8622 RDO TRUCK CENTERS LLC
439.568622
16192 RED DOT PEST CONTROL
90.0016192
14593 REEDSBURG HARDWARE COMPANY
Page 17Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
2 Transactions
1 Transactions
1 Transactions
1 Transactions
1 Transactions
1 Transactions
1 Transactions
-
3 Transactions
1 Transactions
PROFESSIONAL DEVELOPMENT ACADEMY LLC
PRODUCTIVE ALTERNATIVES INC
PSICK CAPITOL SOLUTIONS INC
PUBLIC GROUP LLC/THE
QUICK'S NAPA AUTO PARTS
RAVE WIRELESS INC
RDO EQUIPMENT CO
RDO TRUCK CENTERS LLC
RED DOT PEST CONTROL
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
Road And Bridge Fund
Copyright 2010-2025 Integrated Financial Systems
10-304-000-0000-6572 AP 4,640.66 PARTS 1017 Repair And Maintenance Supplies N
23-705-000-0000-6140 90.00 CDA - PER DIEM 1/7/26 Per Diem Y
23-705-000-0000-6140 AP 90.00 CDA - PER DIEM 12/5/25 Per Diem Y
23-705-000-0000-6140 90.00 CDA - PER DIEM 1/7/26 Per Diem Y
23-705-000-0000-6330 58.00 CDA - MILEAGE 1/7/26 Mileage Y
23-705-000-0000-6140 AP 90.00 CDA - PER DIEM 12/18/25 Per Diem Y
23-705-000-0000-6140 AP 90.00 CDA - PER DIEM 12/5/25 Per Diem Y
01-149-000-0000-6354 AP 16,854.75 REPAIRS TO POLICE CHARGER 33252 Insurance Claims N
23-705-000-0000-6140 90.00 CDA - PER DIEM 1/7/26 Per Diem Y
23-705-000-0000-6330 58.00 CDA - MILEAGE 1/7/26 Mileage Y
23-705-000-0000-6140 AP 90.00 CDA - PER DIEM 12/15/25 Per Diem Y
23-705-000-0000-6330 AP 56.00 CDA - MILEAGE 12/15/25 Mileage Y
23-706-000-0000-6333 AP 423.75 K3210 WORKFORCE EVENT FOOD 12/10/25 Meeting/Event Costs N
23-706-000-0000-6333 AP 5.69 K3210 WORKFORCE EVNT BEVERAGES 12/11/25 Meeting/Event Costs N
01-061-000-0000-6686 AP 2,004.00 ACCT 1079757 HP CARE PACKS B20652381 Computer Software N
4,640.6614593
6307 RODER/BETSY
180.006307
17200 SAMUELSON/HEIDI
238.0017200
15942 SCHEMPP JR/BOBBY
90.0015942
10885 SCHMITZ BODY PAINT & REPAIR INC
16,854.7510885
11188 SCHORNACK/DAVID
294.0011188
19005 SERVICE FOOD SUPER VALU
429.4419005
10001 SHI INTERNATIONAL CORP
Page 18Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
1 Transactions
2 Transactions
3 Transactions
1 Transactions
1 Transactions
4 Transactions
2 Transactions
REEDSBURG HARDWARE COMPANY
RODER/BETSY
SAMUELSON/HEIDI
SCHEMPP JR/BOBBY
SCHMITZ BODY PAINT & REPAIR INC
SCHORNACK/DAVID
SERVICE FOOD SUPER VALU
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
General Revenue Fund
Copyright 2010-2025 Integrated Financial Systems
10-304-000-0000-6487 29.72 SNAP RING PLIERS ARV/66796326 Tools & Minor Equipment N
10-302-000-0000-6369 20,207.29 AB POWER FLEX 400 VFD PUMP & S 1251 Miscellaneous Charges N
10-303-000-0000-6278 AP 349.83 PROFESSIONAL ENGINEERING SERVI 17540.00-10 Engineering Consultant N
10-303-000-0000-6278 AP 33,789.95 PROFESSIONAL ENGINEERING SERVI 18159.00-8 Engineering Consultant N
10-303-000-0000-6331 16.25 MEAL REIMBURSEMENT 1/13/2026 Travel Expenses N
10-303-000-0000-6331 14.53 MEAL REIMBURSEMENT 1/14/2026 Travel Expenses N
10-303-000-0000-6331 11.16 MEAL REIMBURSEMENT 1/15/2026 Travel Expenses N
10-301-000-0000-6406 AP 287.35 ACCT #DEPT 1673054 - SUPPLIES 7008148245 Office Supplies N
10-304-000-0000-6675 AP 17,606.46 TAG #003056 - REPAIR FLOOR SCR 959450 Machinery And Automotive Equipment N
10-304-000-0000-6572 101.67 ACCT #00252204 - DAWN POT & PA 968799 Repair And Maintenance Supplies N
10-303-000-0000-6278 AP 49,595.91 PROFESSIONAL ENGINEERING SERVI R-001054.00-31 Engineering Consultant N
10-303-000-0000-6278 AP 1,823.06 PROFESSIONAL ENGINEERING SERVI R-002020.00-6 Engineering Consultant N
10-303-000-0000-6278 AP 2,179.00 PROFESSIONAL ENGINEERING SERVI R-002052.00-9 Engineering Consultant N
2,004.0010001
16296 SNAP-ON INDUSTRIAL
29.7216296
15436 SOPP CONTROL SERVICES INC
20,207.2915436
6321 SRF CONSULTING GROUP INC
34,139.786321
17347 STACH/TRENT
41.9417347
10646 STAPLES BUSINESS CREDIT
287.3510646
48183 STEINS INC
17,708.1348183
15004 STONEBROOKE ENGINEERING INC
53,597.9715004
168 STREICHERS
Page 19Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
1 Transactions
1 Transactions
1 Transactions
2 Transactions
3 Transactions
1 Transactions
2 Transactions
3 Transactions
SHI INTERNATIONAL CORP
SNAP-ON INDUSTRIAL
SOPP CONTROL SERVICES INC
SRF CONSULTING GROUP INC
STACH/TRENT
STAPLES BUSINESS CREDIT
STEINS INC
STONEBROOKE ENGINEERING INC
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
General Revenue Fund
Copyright 2010-2025 Integrated Financial Systems
01-201-000-0000-6426 446.98 ACCT 974 BOOTS/BODY CAM/BELT I1802955 Uniform Allowance N
01-250-000-0000-6269 AP 5,210.88 C1252000 MEALS 12/20-26/2025 INV2000261882 Professional Services-Kitchen N
01-250-000-0000-6269 AP 4,675.44 C1252000 MEALS 12/27/25-1/2/26 INV2000262398 Professional Services-Kitchen N
01-201-000-0000-6385 6,805.30 ACCT 0565372 AMMO 0012753-IN Entry Team Srt N
01-201-000-0000-6481 6,000.00 ACCT 0565372 AMMO 0012753-IN Radar, Weapons Etc.N
01-201-000-0000-6490 14,000.00 ACCT 0565372 AMMO 0012753-IN Ammo, Shooting Supplies N
50-000-000-0150-6290 99.00 TOILET RENTAL 12837 Contracted Services.N
10-304-000-0000-6572 39.09 SUPPLIES 15662 Repair And Maintenance Supplies N
01-044-000-0000-6369 24.50 ACCT 972003628 PLAQUE INV2026330 Miscellaneous Charges N
01-124-000-0000-6406 AP 26.55 ACCT 972003628 PLAQUE 508493 Office Supplies N
01-480-000-0000-6243 AP 9,700.00 FILEMAKER PRO SUBSCRIPTION 401 Subscriptions N
10-304-000-0000-6572 AP 111.93 ACCT #29242 - PARTS 79512-00 Repair And Maintenance Supplies N
01-112-108-0000-6572 1,450.00 ACCT OTTCTY REPAIR ROOF LEAK 43335 Repair And Maintenance/Supplies N
446.98168
6642 SUMMIT FOOD SERVICE LLC
9,886.326642
15186 SUNSET LAW ENFORCEMENT LLC
26,805.3015186
2043 SUPER SEPTIC INC
99.002043
16694 SUPERIOR PLOW BLADES INC
39.0916694
8718 TAG UP
51.058718
13350 TECH TRONIX INC
9,700.0013350
13290 TERMINAL SUPPLY CO
111.9313290
12992 THELEN HEATING & ROOFING INC
Page 20Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
1 Transactions
2 Transactions
3 Transactions
1 Transactions
1 Transactions
2 Transactions
1 Transactions
1 Transactions
STREICHERS
SUMMIT FOOD SERVICE LLC
SUNSET LAW ENFORCEMENT LLC
SUPER SEPTIC INC
SUPERIOR PLOW BLADES INC
TAG UP
TECH TRONIX INC
TERMINAL SUPPLY CO
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
General Revenue Fund
Copyright 2010-2025 Integrated Financial Systems
01-091-000-0000-6455 AP 1,677.95 ACCT 1000520140 DEC 2025 853014418 Reference Books & Literature N
01-091-000-0000-6455 328.02 ACCT 1000520140 LIBRARY PLAN 853089049 Reference Books & Literature N
13-012-000-0000-6455 1,056.59 ACCT 1000551281 LIBRARY PLAN 853089992 Reference Books & Literature N
01-149-000-0000-6369 35.00 DITCH VIEWER - FEES 1/8/26 Miscellaneous Charges Y
01-149-000-0000-6369 39.15 DITCH VIEWER - MILEAGE 1/8/26 Miscellaneous Charges Y
01-149-000-0000-6369 280.00 DITCH VIEWER - PER DIEM 1/8/26 Miscellaneous Charges Y
01-112-104-0000-6342 377.75 ACCT 50366 BRONZE SERVICE 3009134955 Service Agreements N
10-304-000-0000-6500 67.30 SUPPLIES 043892 Supplies N
10-304-000-0000-6572 196.00 TIRES 043949 Repair And Maintenance Supplies N
01-201-000-0000-6426 AP 299.35 UNIFORM REIMBURSEMENT 12/18/25 Uniform Allowance N
01-112-108-0000-6342 2,965.00 ACCT 110304 SERVICE AGREEMENT 315848940 Service Agreements N
10-303-000-0000-6278 AP 3,682.00 PROFESSIONAL ENGINEERING SERVI 24-128-21 Engineering Consultant N
01-201-000-0000-6408 50.00 2026 MEMBERSHIP RENEWAL 28968 Canine Supplies N
1,450.0012992
183 THOMSON REUTERS - WEST
3,062.56183
11623 TIGGES/DENNIS
354.1511623
77 TK ELEVATOR CORP
377.7577
1999 TNT REPAIR INC
263.301999
17196 TOLLEFSON/DEREK
299.3517196
3023 TRANE U.S. INC
2,965.003023
7010 TRANSPORTATION COLLABORATIVE &
3,682.007010
8242 US POLICE CANINE ASSOCIATION INC
Page 21Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
1 Transactions
3 Transactions
3 Transactions
1 Transactions
2 Transactions
1 Transactions
1 Transactions
1 Transactions
THELEN HEATING & ROOFING INC
THOMSON REUTERS - WEST
TIGGES/DENNIS
TK ELEVATOR CORP
TNT REPAIR INC
TOLLEFSON/DEREK
TRANE U.S. INC
TRANSPORTATION COLLABORATIVE &
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
General Revenue Fund
Copyright 2010-2025 Integrated Financial Systems
01-201-000-0000-6304 1,396.49 UNIT 2501 TIRES/OIL CHANGE 32215 Repair And Maintenance Y
10-304-000-0000-6500 AP 4.74 ACCT #3422324 - SUPPLIES B78760 Supplies N
50-000-000-0000-6290 50.34 ACCT 160002035 SERVICE 2520713908 Contracted Services N
50-000-000-0120-6290 67.68 ACCT 160002806 SUPPLIES 2530493838 Contracted Services.N
50-390-000-0000-6290 50.33 ACCT 160002035 SERVICE 2520713908 Contracted Services.N
50-399-000-0000-6290 100.68 ACCT 160002035 SERVICE 2520713908 Contracted Services.N
01-043-000-0000-6342 AP 593.41 Q4 2025 CREDIT CLERK FEES JS-6033 Service Agreements/Technical Support N
10-303-000-0000-6683 447.20 P-SAP 056-676-010, NEG. NO. 1 NEG. NO. 1 Right Of Way, Ect.Y
10-303-000-0000-6683 149.50 T-SAP 056-676-010, NEG. NO. 1 NEG. NO. 1 Right Of Way, Ect.Y
01-061-000-0000-6330 47.85 MILEAGE JAN 2026 1/27/26 Mileage N
01-061-000-0000-6330 AP 116.90 MILEAGE DEC 2025 1/27/26 Mileage N
50-000-000-0000-6093 DTG 177.10 ACCT110 RECYCLING JUL 2025 002-00091129 Single Sort Recycling Grant Expenses N
50-000-000-0000-6093 DTG 324.30 ACCT110 RECYCLING JUL 2025 002-00091567 Single Sort Recycling Grant Expenses N
50-000-000-0000-6093 DTG 264.50 ACCT 110 RECYCLING DEC 2025 002-00094975 Single Sort Recycling Grant Expenses N
50-000-000-0000-6093 DTG 151.80 ACCT 110 RECYCLING DEC 2025 002-00094976 Single Sort Recycling Grant Expenses N
50-000-000-0000-6093 DTG 220.80 ACCT 110 RECYCLING DEC 2025 002-00095050 Single Sort Recycling Grant Expenses N
50.008242
10022 VERGAS AUTO REPAIR LLC
1,396.4910022
2068 VERGAS HARDWARE
4.742068
13620 VESTIS
269.0313620
6599 VISUAL GOV SOLUTIONS LLC
593.416599
18166 VOLKMANN/TIMOTHY P & SUSAN M
596.7018166
17180 WACH/RON
164.7517180
11441 WADENA CO SOLID WASTE
Page 22Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
1 Transactions
1 Transactions
1 Transactions
4 Transactions
1 Transactions
2 Transactions
2 Transactions
US POLICE CANINE ASSOCIATION INC
VERGAS AUTO REPAIR LLC
VERGAS HARDWARE
VESTIS
VISUAL GOV SOLUTIONS LLC
VOLKMANN/TIMOTHY P & SUSAN M
WACH/RON
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:54:59AM1/22/2026
Achristoph
Solid Waste Fund
Copyright 2010-2025 Integrated Financial Systems
50-000-000-0000-6093 DTG 156.40 ACCT 110 RECYCLING DEC 2025 002-00095052 Single Sort Recycling Grant Expenses N
01-250-000-0000-6449 57,349.08 ACCT 0226 MEDICAL SVCS FEB 26 INV0135837 Medical Agreements 6
01-149-000-0000-6369 35.00 DITCH VIEWER - FEES 1/8/26 Miscellaneous Charges Y
01-149-000-0000-6369 280.00 DITCH VIEWER - PER DIEM 1/8/26 Miscellaneous Charges Y
01-091-000-0000-6281 50.00 C2500300 SERVICE FEE 1/5/26 Court Case Expenses N
50-000-000-0110-6853 AP 321.38 ACCT 3-85099-73002 12/16-31/25 0005882-0010-5 MSW BY PASSED EXPENSE LANDFILL N
50-000-000-0120-6853 AP 3,924.08 ACCT 3-85099-73002 12/16-31/25 0005882-0010-5 MSW BY PASSED EXPENSE LANDFILL N
50-000-000-0130-6853 AP 1,057.85 ACCT 3-85099-73002 12/16-31/25 0005882-0010-5 MSW BY PASSED EXPENSE LANDFILL N
50-000-000-0150-6853 AP 89.84 ACCT 3-85099-73002 12/16-31/25 0005882-0010-5 MSW BY PASSED EXPENSE LANDFILL N
50-000-000-0170-6853 AP 12,769.62 ACCT 3-85099-73002 12/16-31/25 0005882-0010-5 MSW By Passed Expense Landfill N
50-000-000-0000-6978 AP 787.77 ACCT 25-18701-13009 12/1-31/25 0482162-1766-0 Ag Plastic Expenses N
01-705-000-0000-6826 AP 251.00 MALL CONCEPT PLANS R-023674-000-25 Grant Expenses 2001 W Lincoln Grant N
50-399-000-0000-6306 936.66 ACCT 6842300 REPAIR HYDRAULICS SI000745700 Repair/Maint. Equip N
50-399-000-0000-6306 692.18 ACCT 6842300 MAINTENACE SI000748187 Repair/Maint. Equip N
50-399-000-0000-6306 790.80 ACCT 6842300 MAINTENANCE SI000748198 Repair/Maint. Equip N
1,294.9011441
17417 WELLPATH LLC
57,349.0817417
13863 WIEBE/JEFFREY JON
315.0013863
52374 WILKIN CO SHERIFF
50.0052374
2278 WM CORPORATE SERVICES INC
18,950.542278
13074 WSB & ASSOCIATES INC
251.0013074
2086 ZIEGLER INC
2,419.642086
637,675.15
Page 23Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
6 Transactions
1 Transactions
2 Transactions
1 Transactions
6 Transactions
1 Transactions
3 Transactions
Final Total ............162 Vendors 323 Transactions
WADENA CO SOLID WASTE
WELLPATH LLC
WIEBE/JEFFREY JON
WILKIN CO SHERIFF
WM CORPORATE SERVICES INC
WSB & ASSOCIATES INC
ZIEGLER INC
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES 9:54:59AM1/22/2026
Achristoph
Solid Waste Fund
Copyright 2010-2025 Integrated Financial Systems
Page 24Audit List for Board
Otter Tail County Auditor
Community Development Authority
Amount
265,952.92 General Revenue Fund 1
30,818.57 General Fund Dedicated Accounts 2
1,072.97 Parks and Trails 9
209,132.43 Road And Bridge Fund 10
955.50 Health and Wellness Fund 11
2,106.59 Law Library Fund 13
9,599.20 Capital Improvement Fund 14
2,467.49 23
104,128.76 Solid Waste Fund 50
11,440.72 Forfeited Tax Sale Fund 71
637,675.15
NameFundRecap by Fund
All Funds Total Approved by,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1/22/2026
Achristoph
Y
N
D
4
N
Otter Tail County Auditor
Audit List for Board Page 1
Print List in Order By:
Save Report Options?:
Type of Audit List:
on Audit List?:
Paid on Behalf Of Name
Explode Dist. Formulas?:
D - Detailed Audit List
S - Condensed Audit List
1 - Fund (Page Break by Fund)
2 - Department (Totals by Dept)
3 - Vendor Number
4 - Vendor Name
9:55:59AM MANUAL WARRANTS/VOIDS/CORRECTIONS
r.:1 INTtGRATCO
11:;:.1 FINANCIAL SYSTEMS
1MGC-PYGR-NRFW
Account/Formula
9:55:59AM1/22/2026
Achristoph
General Revenue Fund
Copyright 2010-2025 Integrated Financial Systems
01-031-000-0000-6406 40.49 A2RJVV5AA0WI1P NAME TAGS 1C4W-Y1DV-3ND3 Office Supplies 1 N
01-061-000-0000-6406 258.96 A2RJVV5AA0WI1P SUPPLIES 19D7-WVHD-1HG6 Office Supplies 6 N
01-061-000-0000-6406 47.70 A2RJVV5AA0WI1P SCANNER 1CW6-MYJF-YC7W Office Supplies 2 N
01-061-000-0000-6406 79.68 A2RJVV5AA0WI1P HUB 4 PORTS Office Supplies 3 N
01-061-000-0000-6406 320.52 A2RJVV5AA0WI1P SUPPLIES 1NY4-4KDG-RN1L Office Supplies 5 N
01-061-000-0000-6406 57.88 A2RJVV5AA0WI1P SUPPLIES 1P6Q-KMKL-NRWF Office Supplies 4 N
01-063-000-0000-6406 37.41 A2RJVV5AA0WI1P SEALS/BINDERS 1WGX-HVQ3-4DKT Office Supplies 7 N
01-101-000-0000-6406 14.99 A2RJVV5AA0WI1P PLANNER 1L97-LDCW-3NLC Office Supplies 9 N
01-101-000-0000-6406 122.54 A2RJVV5AA0WI1P TONER 1YGV-HDQW-7JXF Office Supplies 8 N
01-112-101-0000-6572 269.97 A2RJVV5AA0WI1P DAMPER ACUATORS 1CNW-VF7W-4FV6 Repair And Maintenance/Supplies 10 N
01-112-101-0000-6572 280.03 A2RJVV5AA0WI1P SENSORS 1T6D-H7XM-3RYH Repair And Maintenance/Supplies 11 N
01-112-000-0000-6572 563.58 A2RJVV5AA0WI1P MAINT SUPPLIES 1WCG-GGQH-6DC9 Repair And Maintenance/Supplies 12 N
01-125-000-0000-6369 45.25 A2RJVV5AA0WI1P OFFICE SUPPLIES 136F-9MY7-99C6 Miscellaneous Charges 13 N
01-125-000-0000-6369 50.70 A2RJVV5AA0WI1P STAMP 17RC-1CV1-3YMV Miscellaneous Charges 14 N
01-127-000-0000-6406 10.84 A2RJVV5AA0WI1P PACKING TAPE 1Q11-14M7-6GM1 Office Supplies 15 N
01-201-000-0000-6426 159.74 A2RJVV5AA0WI1P FLASHLIGHTS 16QF-9TLP-69LK Uniform Allowance 23 N
01-201-000-0000-6426 112.54 A2RJVV5AA0WI1P UNIFORMS 1776-CMMV-PVK1 Uniform Allowance 22 N
01-201-000-0000-6426 115.96 A2RJVV5AA0WI1P UNIFORMS 1F63-4TTQ-W641 Uniform Allowance 21 N
01-201-000-0000-6406 139.34 A2RJVV5AA0WI1P SUPPLIES 1FWX-R9YH-4VW3 Office Supplies 19 N
01-201-000-0000-6406 114.00 A2RJVV5AA0WI1P HEADSETS 1HVJ-7J6V-G63M Office Supplies 18 N
01-201-000-0000-6426 25.59 A2RJVV5AA0WI1P RIFLE MAGAZINE 1RVQ-PLFT-Y673 Uniform Allowance 16 N
01-201-000-0000-6406 26.10 A2RJVV5AA0WI1P ENVELOPES 1T6D-H7XM-CK6Y Office Supplies 17 N
01-201-000-0000-6406 54.08 A2RJVV5AA0WI1P PHONE CASES 1YW4-GPGP-4MJP Office Supplies 20 N
01-250-000-0000-6426 AP 107.30 A2RJVV5AA0WI1P EARPIECE 1DRP-NH4K-1W1C Uniform Allowance 26 N
01-250-000-0000-6406 127.07 A2RJVV5AA0WI1P SUPPLIES 1HNN-1T1K-96G4 Office Supplies 24 N
02-103-000-0000-6369 119.98 A2RJVV5AA0WI1P CHARGER 136F-9MY7-3TRV Miscellaneous Charges 27 N
02-260-000-0000-6369 AP 169.60 A2RJVV5AA0WI1P BOOKS 1D4L-R37H-6VP9 Miscellaneous Charges 25 N
09-507-510-0000-6304 9.23 A2RJVV5AA0WI1P CONNECTOR 1C14-RGTR-QX9M Repair And Maintenance 28 N
10-301-000-0000-6406 69.99 A2RJVV5AA0WI1P HEADSET 1P9V-VPL4-XPJ3 Office Supplies 30 N
10-302-000-0000-6500 578.77 A2RJVV5AA0WI1P SUPPLIES 1RQ3-CMM4-R73M Supplies 32 N
10-304-000-0000-6572 47.32 A2RJVV5AA0WI1P TORCH LIGHTER 19MX-9JQC-CKRL Repair And Maintenance Supplies 31 N
10-304-000-0000-6487 351.94 A2RJVV5AA0WI1P TOOLS 1C3W-YD1P-M73H Tools & Minor Equipment 33 N
10-304-000-0000-6500 56.60 A2RJVV5AA0WI1P SUPPLIES 1MML-7TYX-WPGJ Supplies 34 N
10-304-000-0000-6352 37.52 A2RJVV5AA0WI1P STYLUS FOR IPAD 1WXK-FL6F-91KK Computer Equipment & Access 29 N
11-406-000-0000-6406 13.00 A2RJVV5AA0WI1P BATTERIES 16PN-R9DJ-6GFT Office Supplies 35 N
11-407-100-0017-6488 536.94 A2RJVV5AA0WI1P BCBS DENTAL 113M-RY6K-FXRY Innovations Grant Blue Cross prog supply 50 N
11-407-100-0017-6488 467.89 A2RJVV5AA0WI1P BCBS DENTAL 1MML-7TYX-VMGN Innovations Grant Blue Cross prog supply 49 N
14386 AMAZON CAPITAL SERVICES INC
Page 2Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
Otter Tail County Auditor
MANUAL WARRANTS/VOIDS/CORRECTIONS
Account/Formula
9:55:59AM1/22/2026
Achristoph
Health and Wellness Fund
Copyright 2010-2025 Integrated Financial Systems
11-420-601-0000-6677 8.79 A2RJVV5AA0WI1P WIRELESS MOUSE 176L-PWQQ-PPMG Office Furniture And Equipment - Im 44 N
11-420-601-0000-6406 5.24 A2RJVV5AA0WI1P TAPE 19NK-WJV9-61HR Office Supplies 36 N
11-420-601-0000-6406 AP 13.44 A2RJVV5AA0WI1P TISSUE 1CX9-HJTR-NYYT Office Supplies 40 N
11-420-601-0000-6406 6.58 A2RJVV5AA0WI1P BATTERIES 1FCQ-R419-6FCL Office Supplies 46 N
11-420-601-0000-6406 AP 3.95 A2RJVV5AA0WI1P CORRECTION TAPE 1NJV-9CDX-1CL4 Office Supplies 38 N
11-420-601-0000-6406 26.91 A2RJVV5AA0WI1P SUPPLIES 1RG7-4Y73-Q439 Office Supplies 42 N
11-430-700-0000-6406 AP 50.99 A2RJVV5AA0WI1P BASSINET 16NG-MCNL-MFD7 Office Supplies 48 N
11-430-700-0000-6677 11.19 A2RJVV5AA0WI1P WIRELESS MOUSE 176L-PWQQ-PPMG Office Furniture And Equipment - Ss 45 N
11-430-700-0000-6406 6.67 A2RJVV5AA0WI1P TAPE 19NK-WJV9-61HR Office Supplies 37 N
11-430-700-0000-6406 AP 17.10 A2RJVV5AA0WI1P TISSUE 1CX9-HJTR-NYYT Office Supplies 41 N
11-430-700-0000-6406 8.37 A2RJVV5AA0WI1P BATTERIES 1FCQ-R419-6FCL Office Supplies 47 N
11-430-700-0000-6406 AP 5.02 A2RJVV5AA0WI1P CORRECTION TAPE 1NJV-9CDX-1CL4 Office Supplies 39 N
11-430-700-0000-6406 34.25 A2RJVV5AA0WI1P SUPPLIES 1RG7-4Y73-Q439 Office Supplies 43 N
50-000-000-0000-6406 197.89 A2RJVV5AA0WI1P TONER 1JYH-XFM4-3N9L Office Supplies 51 N
50-399-000-0000-6453 185.47 A2RJVV5AA0WI1P PPE SUPPLIES 1H6Q-4VXY-9JNN Ppe & Safety Equip.&Supplies 52 N
50-399-000-0000-6300 12.99 A2RJVV5AA0WI1P DOOR SIGN 1XKC-73GG-JRLW Building And Grounds Maintenance 54 N
50-399-000-0000-6300 187.00 A2RJVV5AA0WI1P AIR FILTERS 1YXX-YCLP-PD7C Building And Grounds Maintenance 53 N
51-000-000-0000-6491 327.90 A2RJVV5AA0WI1P SEAT/LEVER 131F-XMLN-L3FM Operating Supplies 55 N
51-000-000-0000-6491 394.95 A2RJVV5AA0WI1P OFFICE CHAIR 1R66-4KV3-VQ13 Operating Supplies 56 N
7,043.7614386
7,043.76
Page 3Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
-
56 Transactions
Final Total ............1 Vendors 56 Transactions
AMAZON CAPITAL SERVICES INC
Otter Tail County Auditor
MANUAL WARRANTS/VOIDS/CORRECTIONS
Prairie Lakes Municipal Sw Authority
9:55:59AM1/22/2026
Achristoph
Copyright 2010-2025 Integrated Financial Systems
Page 4Audit List for Board
Otter Tail County Auditor
MANUAL WARRANTS/VOIDS/CORRECTIONS
Prairie Lakes Municipal Sw Authority
Amount
3,182.26 General Revenue Fund 1
289.58 General Fund Dedicated Accounts 2
9.23 Parks and Trails 9
1,142.14 Road And Bridge Fund 10
1,114.35 Health and Wellness Fund 11
583.35 Solid Waste Fund 50
722.85 51
7,043.76
NameFundRecap by Fund
All Funds Total Approved by,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
COMMISSIONER'S VOUCHERS ENTRIES1/22/2026
Apanderson
Y
N
D
4
N
Otter Tail County Auditor
Audit List for Board Page 1
Print List in Order By:
Save Report Options?:
Type of Audit List:
on Audit List?:
Paid on Behalf Of Name
Explode Dist. Formulas?:
D - Detailed Audit List
S - Condensed Audit List
1 - Fund (Page Break by Fund)
2 - Department (Totals by Dept)
3 - Vendor Number
4 - Vendor Name
11:41:27AM
r.:1 INTtGRATCO
11:;:.1 FINANCIAL SYSTEMS
INDEPENDENT CONTRACT SERVICES OF FF LLC
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
11:41:27AM1/22/2026
Apanderson
Health and Wellness Fund
Copyright 2010-2025 Integrated Financial Systems
11-430-700-0000-6560 24.58 Gas for County Car 01/16/2026 Gasoline 31 N
01/16/2026 01/16/2026
11-410-000-0000-6826 44,420.00 FY2 - Year 2 Award Opioid Grant Community Opioid Grants 55 N
01/16/2026 01/16/2026
11-420-601-0000-6265 114.84 2026 - QTR 1 3414 Data Processing Costs - Im Adm 19 N
01/01/2026 03/31/2026
11-430-700-0000-6265 146.16 2026 - QTR 1 3414 Data Processing Costs - Ss Adm 20 N
01/01/2026 03/31/2026
11-420-640-0000-6298 AP 428.00 Child Suport Blood Test Charge 137546122025 Genetic Testing 8 6
12/01/2025 12/31/2025
11-420-640-0000-6298 AP 58.00 Child Suport Blood Test Charge 138046122025 Genetic Testing 7 6
12/01/2025 12/31/2025
11-420-601-0000-6265 528.00 Data Processing Costs -3595 Data Processing Costs - Im Adm 29 N
01/01/2026 12/31/2026
11-430-700-0000-6265 672.00 Data Processing Costs -3595 Data Processing Costs - Ss Adm 30 N
01/01/2026 12/31/2026
11-409-000-0010-6261 618.83 Collaborative 2026-0101 Lcts Coordination 6 Y
01/01/2026 01/31/2026
11-430-700-0000-6276 AP 190.00 Interpreter Services 260114-2 Professional Services 24 Y
18164 ANDERSON/ANNA
24.5818164
6937 COMMUNITY & LIFE SERVICES
44,420.006937
15378 COUNTIES PROVIDING TECHNOLOGY
261.0015378
11695 DNA DIAGNOSTICS CENTER INC
486.0011695
17140 HEALTHEC LLC
1,200.0017140
8471
618.838471
15019 JOHNSON PULSCHER/BARBARA
Page 2Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
1 Transactions
1 Transactions
2 Transactions
2 Transactions
2 Transactions
1 TransactionsINDEPENDENT CONTRACT SERVICES OF FF LLC
ANDERSON/ANNA
COMMUNITY & LIFE SERVICES
COUNTIES PROVIDING TECHNOLOGY
DNA DIAGNOSTICS CENTER INC
HEALTHEC LLC
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
11:41:27AM1/22/2026
Apanderson
Health and Wellness Fund
Copyright 2010-2025 Integrated Financial Systems
11/21/2025 11/21/2025
11-430-700-0000-6276 190.00 Interpreter service 260114.1 Professional Services 28 Y
01/14/2026 01/14/2026
11-430-710-1440-6051 8 24,049.63 Local Homeless Aide CY QTR 1 Child Service - Housing 10 N
01/01/2026 03/31/2026
11-430-720-2110-6270 29,727.50 CCAP QTR 1 2026 CY QTR 1 CCAP Childcare Adm Contract BSF/CCAP 11 N
01/01/2026 03/31/2026
11-420-601-0000-6342 AP 113.85 Cust #1143 - GSC 468064 Service Agreements 16 N
12/01/2025 12/31/2025
11-420-640-0000-6406 AP 35.00 Cust #1143 - CS 468064 Office Supplies 15 N
12/01/2025 12/31/2025
11-430-700-0000-6342 AP 144.91 Cust #1143 - GSC 468064 Service Agreements 17 N
12/01/2025 12/31/2025
11-430-720-2112-6061 DTG 3,076.00 12-25 CCAP A300MC56277I County Match BSF/CCAP 12 N
12/01/2025 12/31/2025
11-420-605-0000-6040 DTG 3,242.88 09-25 Maxis Recoveries A300MX56271I State Share Of Maxis Refunds To State 9 N
09/01/2025 09/30/2025
11-420-640-0000-6260 DTF 6,141.00 IV-D Billing for Nov-Dec 2025 Nov - Dec 2025 Legal Services Iv-D 18 N
11/01/2025 12/31/2025
11-420-640-0000-6297 45.00 Case#20260041/Party 001 01/13/2026 Iv-D Sheriff's Costs 21 N
380.0015019
12560 MAHUBE-OTWA CAP INC
53,777.1312560
7661 MINNKOTA ENVIRO SERVICES INC
293.767661
12077 MN DEPT OF CHILDREN YOUTH & FAMILIES
3,076.0012077
43022 MN DEPT OF HUMAN SERVICES
3,242.8843022
12963 OTTER TAIL CO ATTORNEY'S OFFICE
6,141.0012963
44010 OTTER TAIL CO SHERIFF
Page 3Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
2 Transactions
2 Transactions
3 Transactions
1 Transactions
1 Transactions
1 Transactions
JOHNSON PULSCHER/BARBARA
MAHUBE-OTWA CAP INC
MINNKOTA ENVIRO SERVICES INC
MN DEPT OF CHILDREN YOUTH & FAMILIES
MN DEPT OF HUMAN SERVICES
OTTER TAIL CO ATTORNEY'S OFFICE
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
11:41:27AM1/22/2026
Apanderson
Health and Wellness Fund
Copyright 2010-2025 Integrated Financial Systems
01/13/2026 01/13/2026
11-420-640-0000-6297 40.00 Case#20260041/Party 002 01/14/2026 Iv-D Sheriff's Costs 22 N
01/14/2026 01/14/2026
11-420-601-0000-6272 DTF 6,800.64 FPI Expenses - Jeff December 2025 Fraud Prevention Officer Expense (FPI) 13 N
12/01/2025 12/31/2025
11-420-601-0000-6272 DTF 1,032.00 FPI Expenses - Karen December 2025 Fraud Prevention Officer Expense (FPI) 14 N
12/01/2025 12/31/2025
11-430-700-0000-6331 15.74 Meal 01/14/2026 Travel Expense - Ss Adm 23 N
01/14/2026 01/14/2026
11-420-601-0000-6260 1,248.75 Ma Trans Prog Adm Services DECEMBER 2025 Ma Trans Prog Adm/Volunteer Driver 38 N
12/01/2025 12/31/2025
11-420-650-0000-6041 200.00 Ma Trans Nonload DECEMBER 2025 Ma Trans Nonload 37 N
12/01/2025 12/31/2025
11-420-650-0000-6050 100.00 MA Transp Charges Fed Rate DECEMBER 2025 Ma Trans Charges Fed Rate 36 N
12/01/2025 12/31/2025
11-420-601-0000-6260 1,248.75 Ma Trans Prog Adm Services NOVEMBER 2025 Ma Trans Prog Adm/Volunteer Driver 35 N
11/01/2025 11/30/2025
11-420-650-0000-6041 200.00 Ma Trans Nonload NOVEMBER 2025 Ma Trans Nonload 34 N
11/01/2025 11/30/2025
11-420-650-0000-6050 100.00 MA Transp Charges Fed Rate NOVEMBER 2025 Ma Trans Charges Fed Rate 33 N
11/01/2025 11/30/2025
11-430-710-1621-6097 10.13 Client Meal 01/12/2026 In Home Service - Brief 32 N
01/12/2026 01/12/2026
85.0044010
44003 OTTER TAIL CO TREASURER
7,832.6444003
17724 PETERSON/TIM
15.7417724
25082 PRODUCTIVE ALTERNATIVES INC
3,097.5025082
17766 RUPP/MARY
10.1317766
31623 SCHOOL DIST 542 - BATTLE LAKE
Page 4Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
2 Transactions
2 Transactions
1 Transactions
6 Transactions
1 Transactions
OTTER TAIL CO SHERIFF
OTTER TAIL CO TREASURER
PETERSON/TIM
PRODUCTIVE ALTERNATIVES INC
RUPP/MARY
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
11:41:27AM1/22/2026
Apanderson
Health and Wellness Fund
Copyright 2010-2025 Integrated Financial Systems
11-409-330-1100-6091 AP 2,710.15 Collaborative - SBMH BL SBMH #1 Mental Health Project 51 N
07/01/2025 12/31/2025
11-409-330-1300-6091 AP 1,425.13 School Engagement BL SBMH #1 Truancy Project 52 N
07/01/2025 12/31/2025
11-409-330-1100-6091 AP 15,599.74 Collaborative - SBMH FF SBMH #1 Mental Health Project 39 N
07/01/2025 12/31/2025
11-409-330-1300-6091 AP 8,203.10 School Engagement FF SBMH #1 Truancy Project 40 N
07/01/2025 12/31/2025
11-409-330-1100-6091 AP 2,356.65 Collaborative - SBMH HEN SBMH #1 Mental Health Project 41 N
07/01/2025 12/31/2025
11-409-330-1300-6091 AP 1,239.24 School Engagement HEN SBMH #1 Truancy Project 42 N
07/01/2025 12/31/2025
11-409-330-1100-6091 AP 3,371.32 Collaborative - SBMH Park P SBMH#1 Mental Health Project 45 N
07/01/2025 12/31/2025
11-409-330-1300-6091 AP 1,772.81 School Engagement Park P SBMH#1 Truancy Project 46 N
07/01/2025 12/31/2025
11-409-330-1100-6091 AP 10,703.14 Collaborative - SBMH Per SBMH #1 Mental Health Project 47 N
07/01/2025 12/31/2025
11-409-330-1300-6091 AP 5,628.23 School Engagement Per SBMH #1 Truancy Project 48 N
07/01/2025 12/31/2025
11-409-330-1100-6091 AP 3,489.16 Collaborative - SBMH NWD SBMH #1 Mental Health Project 49 N
07/01/2025 12/31/2025
11-409-330-1300-6091 AP 1,834.77 School Engagement NWD SBMH #1 Truancy Project 50 N
4,135.2831623
898 SCHOOL DIST 544 - FERGUS FALLS
23,802.84898
5434 SCHOOL DIST 545 - HENNING
3,595.895434
45387 SCHOOL DIST 547 - PARKERS PRAIRIE
5,144.1345387
902 SCHOOL DIST 549 - PERHAM
16,331.37902
50072 SCHOOL DIST 550 - UNDERWOOD
Page 5Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
2 Transactions
2 Transactions
2 Transactions
2 Transactions
2 Transactions
SCHOOL DIST 542 - BATTLE LAKE
SCHOOL DIST 544 - FERGUS FALLS
SCHOOL DIST 545 - HENNING
SCHOOL DIST 547 - PARKERS PRAIRIE
SCHOOL DIST 549 - PERHAM
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
11:41:27AM1/22/2026
Apanderson
Health and Wellness Fund
Copyright 2010-2025 Integrated Financial Systems
07/01/2025 12/31/2025
11-409-330-1100-6091 AP 5,295.92 Collaborative - SBMH NYM SBMH #1 Mental Health Project 43 N
07/01/2025 12/31/2025
11-409-330-1300-6091 AP 2,784.85 School Engagement NYM SBMH #1 Truancy Project 44 N
07/01/2025 12/31/2025
11-430-700-0000-6331 6.16 Meal 01/14/2026 Travel Expense - Ss Adm 25 N
01/14/2026 01/14/2026
11-430-700-0000-6331 4.94 Meal 01/14/2026 Travel Expense - Ss Adm 26 N
01/14/2026 01/14/2026
11-430-700-0000-6331 12.41 Meal 01/14/2026 Travel Expense - Ss Adm 27 N
01/14/2026 01/14/2026
11-430-700-0000-6331 20.58 Meal 01/12/2026 Travel Expense - Ss Adm 53 N
01/12/2026 01/12/2026
11-430-700-0000-6331 20.40 Meal 01/12/2026 Travel Expense - Ss Adm 54 N
01/12/2026 01/12/2026
11-430-700-0000-6331 AP 16.60 Meal 10/28-11/18/25 Travel Expense - Ss Adm 1 N
10/28/2025 11/18/2025
11-430-700-0000-6331 AP 18.18 Meal 10/28-11/18/25 Travel Expense - Ss Adm 2 N
10/28/2025 11/18/2025
11-430-700-0000-6331 AP 12.88 Meal 10/28-11/18/25 Travel Expense - Ss Adm 3 N
10/28/2025 11/18/2025
11-430-700-0000-6331 AP 17.26 Meal 10/28-11/18/25 Travel Expense - Ss Adm 4 N
10/28/2025 11/18/2025
11-430-710-1621-6097 AP 17.26 Client Meal 10/28-11/18/25 In Home Service - Brief 5 N
10/28/2025 11/18/2025
5,323.9350072
43329 SCHOOL DIST 553 - NEW YORK MILLS
8,080.7743329
12702 SJOLIE/DARIN
23.5112702
17881 SWITTERS/KELSEY
40.9817881
13803 ULSCHMID/LIZA
Page 6Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
2 Transactions
2 Transactions
3 Transactions
2 Transactions
SCHOOL DIST 550 - UNDERWOOD
SCHOOL DIST 553 - NEW YORK MILLS
SJOLIE/DARIN
SWITTERS/KELSEY
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
11:41:27AM1/22/2026
Apanderson
Health and Wellness Fund
Copyright 2010-2025 Integrated Financial Systems
82.1813803
191,523.07
Page 7Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
5 Transactions
Final Total ............27 Vendors 55 Transactions
ULSCHMID/LIZA
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES11:41:27AM1/22/2026
Apanderson
Health and Wellness Fund
Copyright 2010-2025 Integrated Financial Systems
Page 8Audit List for Board
Otter Tail County Auditor
Amount
191,523.07 Health and Wellness Fund 11
191,523.07
NameFundRecap by Fund
All Funds Total Approved by,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
HENNING TSF PROJECT NOV 2025
RE ASSURANCE - REGISTERED LAND
CO RECORDER & REGISTRAR FEES
RE ASSURANCE - TAX FORFEITED
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
csteinbach
01/09/2026
10:07:31AM01/09/2026
Copyright 2010-2025 Integrated Financial Systems
BLCK
Auditor Warrants
109.48 10-304-000-0000-6200ARVIGACCT #2100975 GARAGE #3 - TELE 30480
2,202.27 10-304-000-0000-6251BATTLE LAKE/CITY OF ACCT #0564 GARAGE 8 - NATURAL 1703
95.35 10-304-000-0000-6252ACCT #0564 GARAGE 8 - WATER & 1703
312,147.34 50-000-000-0000-6674BCI CONSTRUCTION INC 6 17914
64.99 50-000-000-0110-6200CENTURY LINK ACCT 333328523 12/29/25 46027
225.00 84-000-000-9517-2100COMMISSIONER OF MMB MARR LIC / NO PREMARITAL ED DEC2025 191
393.00 84-000-000-9517-2100CHILDREN'S SURCHARGE DEC2025 191
22.00 84-000-000-9517-2100MARR LIC / MN ENABL DEC2025 191
110.00 84-000-000-9517-2100MARR LIC / VICTIMS OF CRIME DEC2025 191
495.00 84-000-000-9517-2100MARRIAGE LICENSE FEE DEC2025 191
1,310.00 84-000-000-9517-2100BIRTH RECORD SURCHARGE DEC2025 191
33.00 84-000-000-9517-2100MARR LIC / SUPRVD VISIT DEC2025 191
13.50 84-000-000-9517-2100 DEC2025 191
45.00 84-000-000-9517-2100MARR LIC / U OF M COUPLES DEC2025 191
1,624.00 84-000-000-9517-2100BIRTH / DEATH SURCHARGE DEC2025 191
14,007.00 84-000-000-9517-2100 DEC2025 191
20.00 84-000-000-9517-2100MARR LIC / PREMARITAL ED DEC2025 191
7,293.60 71-171-000-0000-6369COMMISSIONER OF MMB DEC2025A 191
29,836.58 12-000-000-0000-2374DELTA DENTAL OF MN ACCT 907578 JAN 2026 CNS0002028422 3020
340.11 01-149-000-0000-6369DEWEY/DAVID & HEATHER DITCH 30 REIMBURSEMENT 1/9/26 18156
123.92 01-149-000-0000-6750DITCH 30 INTEREST 1/9/26 18156
109.48 198775
2,297.62 198776
312,147.34 198777
64.99 198778
18,297.50 198779
7,293.60 198780
29,836.58 198781
Page 1ApprovedWARRANT REGISTERWarrant Form
Auditor's Warrants
From Date To Date
PO #Invoice #Account Number
On-Behalf-of-NameOBO#
Description
AmountVendor NameVendor #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Otter Tail County Auditor
Pay Date
Tx
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
csteinbach
01/09/2026
10:07:31AM01/09/2026
Copyright 2010-2025 Integrated Financial Systems
BLCK
Auditor Warrants
340.12 01-149-000-0000-6369DEWEY/MARK DITCH 30 REIMBURSEMENT 1/9/26 18155
123.91 01-149-000-0000-6750DITCH 30 INTEREST 1/9/26 18155
30,000.00 01-505-000-0000-6950EAST OTTER TAIL FAIR ASSOC 2026 APPROPRIATIONS 1/9/26 343
334.86 01-112-101-0000-6252FERGUS FALLS/CITY OF ACCT 9080 UTILITIES DEC2025 57
475.17 01-112-101-0000-6253ACCT 9080 UTILITIES DEC2025 57
134.42 01-112-104-0000-6252ACCT 9258 UTILITIES DEC2025 57
232.93 01-112-104-0000-6253ACCT 9258 UTILITIES DEC2025 57
778.24 01-112-108-0000-6252ACCT 19132 UTILITIES DEC2025 57
706.00 01-112-108-0000-6253ACCT 19132 UTILITIES DEC2025 57
172.20 50-000-000-0170-6252ACCT 27870 UTILITIES DEC2025 57
147.17 50-399-000-0000-6252ACCT 17239 UTILITIES DEC2025 57
157.33 50-399-000-0000-6252ACCT 17238 UTILITIES DEC2025 57
1,604.62 01-061-000-0000-6200FIRST DIGITAL COMMUNICATIONS LLC ACCT 625222 LD JAN 2026 00916666-1 16734
905.00 01-149-000-0000-6855GIRARD TOWNSHIP 2025 GOPHER REIMBURSEMENT 1/9/26 837
8,578.57 01-112-101-0000-6251GREAT PLAINS NATURAL GAS CO ACCT 94290020000 12/31/25 7001
666.87 01-112-101-0000-6251ACCT 05290020006 12/31/25 7001
77.90 23-705-000-7001-6829ACCT 06642865478 12/11/25 7001
1,312.89 50-399-000-0000-6251ACCT 26760020003 12/23/25 7001
2,876.54 50-399-000-0000-6251ACCT 16760020004 12/23/25 7001
8.68 50-000-000-0120-6200MCI A VERIZON COMPANY ACCT 218-583-2129 NOV 2025 409149101 90
464.03 198782
464.03 198783
30,000.00 198784
3,138.32 198785
1,604.62 198786
905.00 198787
13,512.77 198788
8.68 198789
Page 2ApprovedWARRANT REGISTERWarrant Form
Auditor's Warrants
From Date To Date
PO #Invoice #Account Number
On-Behalf-of-NameOBO#
Description
AmountVendor NameVendor #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Otter Tail County Auditor
Pay Date
Tx
75% OF SALES 2ND HALF DEC 2025
LICENSE RENEWALS - TABS FOR 95
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
csteinbach
01/09/2026
10:07:31AM01/09/2026
Copyright 2010-2025 Integrated Financial Systems
BLCK
Auditor Warrants
1,441.50 84-000-000-9517-2100MN DEPT OF HEALTH WELL CERTIFICATES DEC 2025 DEC2025 2852
160.00 01-201-000-0000-6369MN DEPT OF PUBLIC SAFETY - BCA VENDOR FINGERPRINTS 1/9/26 9739
182,339.91 71-171-000-0000-6369MN MANAGEMENT & BUDGET DEC2025A 9859
620,596.82 12-000-000-0000-2378MN PEIP STMT 430530 JAN 2026 1582244 5387
1,800.00 01-703-000-0000-6804MN RED RIVER VALLEY DEV ASSOC 2026 APPROPRIATIONS 1/9/26 560
2,018.75 10-304-000-0000-6369OTTER TAIL CO AUDITOR 25309
42.50 50-000-000-0000-6379OTTER TAIL CO AUDITOR VEHICLE REGISTRATIONS 1/9/26 42075
21.25 50-000-000-0000-6978VEHICLE REGISTRATION 1/9/26 42075
42.50 50-000-000-0120-6379VEHICLE REGISTRATIONS 1/9/26 42075
42.50 50-000-000-0170-6379VEHICLE REGISTRATIONS 1/9/26 42075
21.25 50-390-000-0000-6379VEHICLE REGISTRATION 1/9/26 42075
318.75 50-399-000-0000-6379VEHICLE REGISTRATIONS 1/9/26 42075
63.75 01-031-000-0000-6560OTTER TAIL CO AUDITOR VEHICLE REGISTRATIONS 1/9/26 42075
212.50 01-044-000-0000-6304OTTER TAIL CO AUDITOR VEHICLE REGISTRATIONS 1/9/26 42075
21.25 01-121-000-0000-6560OTTER TAIL CO AUDITOR VEHICLE REGISTRATION 1/9/26 42075
66.00 01-122-000-0000-6304OTTER TAIL CO AUDITOR ATV REGISTRATION 1/9/26 42075
1,441.50 198790
160.00 198791
182,339.91 198792
620,596.82 198793
1,800.00 198794
2,018.75 198795
488.75 198796
63.75 198797
212.50 198798
21.25 198799
66.00 198800
Page 3ApprovedWARRANT REGISTERWarrant Form
Auditor's Warrants
From Date To Date
PO #Invoice #Account Number
On-Behalf-of-NameOBO#
Description
AmountVendor NameVendor #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Otter Tail County Auditor
Pay Date
Tx
NOVEMBER RECEIPTS - SALES TAX
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
csteinbach
01/09/2026
10:07:31AM01/09/2026
Copyright 2010-2025 Integrated Financial Systems
BLCK
Auditor Warrants
233.75 01-122-000-0000-6304OTTER TAIL CO AUDITOR VEHICLE REGISTRATIONS 1/9/26 42075
225.50 01-201-000-0000-6397OTTER TAIL CO AUDITOR VEHICLE REGISTRATIONS 1/9/26 42075
106.25 09-507-000-0000-6369OTTER TAIL CO AUDITOR VEHICLE REGISTRATIONS 1/9/26 42075
21.25 23-705-000-0000-6369OTTER TAIL CO AUDITOR VEHICLE REGISTRATION 1/9/26 42075
46.00 71-171-000-0000-6369OTTER TAIL CO RECORDER RECORDING FEE - 24000180147001 1/9/26 44086
1.65 71-171-000-0000-6369DEED TAX - 24000180147001 1/9/26 44086
1.65 71-171-000-0000-6369OTTER TAIL CO RECORDER DEED TAX - 71002990553001 1/9/26 44086
46.00 71-171-000-0000-6369OTTER TAIL CO RECORDER RECORDING FEE - 71002990553001 1/9/26 44086
0.22 10-301-000-0000-6805OTTER TAIL CO TREASURER 98
569.00 51-000-000-0000-6810SALES & USE TAX DEC 2025 DEC2025 98
187.00 71-171-000-0000-6369OTTER TAIL CO TREASURER 65000990017000 2026 EST TAXES 1/9/26 127
127.44 71-171-000-0000-636965000990018000 2026 EST TAXES 1/9/26 127
151.63 71-171-000-0000-636924000180157001 2026 EST TAXES 1/9/26 127
129,152.41 82-000-000-0000-2100OTTER TAIL CO TREASURER MORTGAGE REGISTRATION TAX DEC2025 1682
174,717.68 84-000-000-0000-5014DEED TAX DEC2025 1682
1,623.29 50-399-000-0000-6250OTTER TAIL POWER COMPANY ACCT 1036243 1/23/26 15009
233.75 198801
225.50 198802
106.25 198803
21.25 198804
47.65 198805
1.65 198806
46.00 198807
569.22 198808
466.07 198809
303,870.09 198810
1,623.29 198811
Page 4ApprovedWARRANT REGISTERWarrant Form
Auditor's Warrants
From Date To Date
PO #Invoice #Account Number
On-Behalf-of-NameOBO#
Description
AmountVendor NameVendor #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Otter Tail County Auditor
Pay Date
Tx
ACCT #1127984 WATER PUMP ELECT
ACCT #20060792 ALCOTT DEC ST L
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
csteinbach
01/09/2026
10:07:31AM01/09/2026
Copyright 2010-2025 Integrated Financial Systems
BLCK
Auditor Warrants
9.52 10-302-000-0000-6250OTTER TAIL POWER COMPANY ACCT #20090904 STREET LIGHT - 44271
55.88 10-302-000-0000-6250 44271
12.65 10-302-000-0000-6250ACCT #1149997 STREET LIGHT - E 44271
14.27 10-302-000-0000-6250ACCT #20090791 STREET LIGHT - 44271
13.06 10-302-000-0000-6250ACCT #1145295 STREET LIGHT - E 44271
12.18 10-302-000-0000-6250ACCT #1136877 STREET LIGHT - E 44271
231.86 10-302-000-0000-6250ACCT #20060792 STREET LIGHT - 44271
55.11 10-302-000-0000-6250ACCT #200603793 STREET LIGHT - 44271
42.75 10-302-000-0000-6250ACCT #1153214 STREET LIGHT - E 44271
711.76 10-304-000-0000-6250ACCT #20134128 GARAGE 10 - ELE 44271
354.62 10-304-000-0000-6250ACCT #20076106 GARAGE 8 - ELEC 44271
30.24 10-305-000-0000-6369 44271
1,019.91 01-061-000-0000-6200OTTER TAIL TELCOM ACCT 736-6821 1/1/26 7250
96.39 01-112-110-0000-6200ACCT 998-2567 1/1/26 7250
402.16 02-214-000-0000-6200ACCT 998-0522 1/1/26 7250
96.60 10-304-000-0000-6200ACCT #999-0408 GARAGE #8 - TEL 7250
136.07 50-000-000-0110-6200ACCT 864-8666 1/1/26 7250
96.60 50-000-000-0170-6200ACCT 998-2708 1/1/26 7250
101.49 50-399-000-0000-6200ACCT 998-2708 1/1/26 7250
41.84 50-399-000-0000-6200ACCT 998-4021 1/1/26 7250
22,571.33 02-122-000-0000-6369OTTER TRAIL RIDERS BENCHMARK #1 1/9/26 2593
29.75 01-112-109-0000-6252OTTERTAIL/CITY OF ACCT 40 UTILITIES DEC2025 15737
181.25 09-507-510-0000-6200PARK REGION TELEPHONE ACCT 826-6159 12481 1/1/26 45109
23.74 02-815-000-0000-6369SERVICE FOOD SUPER VALU K1170 HEALTHY SNACKS 1/5/26 19005
1,543.90 198812
1,991.06 198813
22,571.33 198814
29.75 198815
181.25 198816
Page 5ApprovedWARRANT REGISTERWarrant Form
Auditor's Warrants
From Date To Date
PO #Invoice #Account Number
On-Behalf-of-NameOBO#
Description
AmountVendor NameVendor #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Otter Tail County Auditor
Pay Date
Tx
N
N
csteinbach
01/09/2026
10:07:31AM01/09/2026
Copyright 2010-2025 Integrated Financial Systems
BLCK
Auditor Warrants
30,000.00 01-704-000-0000-6815WEST CENTRAL INITIATIVE 2026 APPROPRIATIONS 1/9/26 52010
30,000.00 01-505-000-0000-6950WEST OTTER TAIL CO FAIR ASSOCIATION 2026 APPROPRIATIONS 1/9/26 48082
23.74 198817
30,000.00 198818
30,000.00 198819
1,622,905.54BLCK 99
Page 6ApprovedWARRANT REGISTERWarrant Form
Auditor's Warrants
From Date To Date
PO #Invoice #Account Number
On-Behalf-of-NameOBO#
Description
AmountVendor NameVendor #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Warrant Form Total...Transactions
Otter Tail County Auditor
Pay Date
Tx
N
N
N
N
N
N
N
N
csteinbach
01/09/2026
10:07:31AM01/09/2026
Copyright 2010-2025 Integrated Financial Systems
BLCK-ACH
Auditor Warrants
37.41 10-302-000-0000-6250HENNING/CITY OF ACCT #01-00002311-00-4 STREET 32661
37.62 10-302-000-0000-6250ACCT #01-00002321-00-7 STREET 32661
194.73 10-304-000-0000-6250ACCT #01-00005635-00-2 GARAGE 32661
1,612.80 10-304-000-0000-6251ACCT #01-00005635-00-2 GARAGE 32661
540.00 10-304-000-0000-6252ACCT #01-00005635-00-2 GARAGE 32661
272.00 01-149-000-0000-6855HOBART TOWNSHIP 2025 GOPHER REIMBURSEMENT 1/9/26 841
43.25 10-304-000-0000-6252PELICAN RAPIDS/CITY OF ACCT #02-00000872-00-1 GARAGE 864
65.00 71-171-000-0000-6369UNDERWOOD/CITY OF ACCT 01-00010662-00-6 UTILITIE DEC2025 879
2,422.56 307507
272.00 307508
43.25 307509
65.00 307510
2,802.81BLCK-ACH 8
1,625,708.35 107
Page 7ApprovedWARRANT REGISTERWarrant Form
Auditor's Warrants
From Date To Date
PO #Invoice #Account Number
On-Behalf-of-NameOBO#
Description
AmountVendor NameVendor #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Warrant Form Total...Transactions
Total...Transactions
Otter Tail County Auditor
Pay Date
Tx
Final
csteinbach
01/09/2026
10:07:31AM01/09/2026
Copyright 2010-2025 Integrated Financial Systems
BLCK-ACH
Auditor Warrants
Page 8ApprovedWARRANT REGISTERWarrant Form
Auditor's Warrants
Otter Tail County Auditor
Pay Date
1,622,905.54 198819 01/09/2026BLCK 45 198775
2,802.81 307510 01/09/2026BLCK-ACH 2,802.81 0 4 307507
1,625,708.35
WARRANT RUN WARRANT STARTING DATE OF DATE OF
FORM WARRANT NO.PAYMENT APPROVAL
PPD CTX
COUNT AMOUNT COUNT AMOUNTWARRANT NO.
ENDING
INFORMATION
TOTAL
4
INITGRATCD
Fl A CIAL SYSTEM
csteinbach
01/09/2026
10:07:31AM01/09/2026
Copyright 2010-2025 Integrated Financial Systems
BLCK-ACH
Auditor Warrants
Page 9ApprovedWARRANT REGISTERWarrant Form
Auditor's Warrants
Otter Tail County Auditor
Pay Date
1
2
9
10
12
23
50
51
71
82
84
General Fund Dedicated Accounts
Community Development Authority
Prairie Lakes Municipal Sw Authority
109,545.54 General Revenue Fund 109,273.54272.00
22,997.23 22,997.23
287.50 Parks and Trails 287.50
8,532.38 Road And Bridge Fund 6,066.572,465.81
650,433.40 Insurance Reserve Fund 650,433.40
99.15 99.15
319,375.18 Solid Waste Fund 319,375.18
569.00 569.00
190,259.88 Forfeited Tax Sale Fund 190,194.8865.00
129,152.41 Mortgage Registration Fund 129,152.41
194,456.68 State Tax Fund 194,456.68
1,625,708.35 2,802.81 1,622,905.54
RECAP BY FUND
FUND AMOUNT NAME ACH AMOUNT NON-ACH AMOUNT
-
-
-
-
-
-
-
-
TOTAL TOTAL ACH TOTAL NON-ACH
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
csteinbach
01/16/2026
11:35:56AM01/16/2026
Copyright 2010-2025 Integrated Financial Systems
BLCK
Auditor Warrants
101.38 10-304-000-0000-6200ARVIGACCT #1115296 - GARAGE #4 TELE 30480
35.26 10-304-000-0000-6200ACCT #3045128 - GARAGE #10 TEL 30480
103.95 10-304-000-0000-6200ACCT #2576925 - GARAGE #6 TELE 30480
128.06 10-304-000-0000-6200ACCT #11210 - GARAGE #20 TELEP 30480
480.40 50-000-000-0130-6200ACCT 41344 1/6/26 30480
243.59 50-000-000-0150-6200ACCT 2575721 1/6/26 30480
436.00 01-149-000-0000-6855EAGLE LAKE TOWNSHIP 2025 GOPHER REIMBURSEMENT 1/16/26 822
40.34 71-171-000-0000-6369FERGUS FALLS/CITY OF ACCT 9114 UTILITIES 524 S MILL DEC2025 57
40.34 71-171-000-0000-6369ACCT 2312 UTILITIES 1209 VINE DEC2025 57
8,259.67 10-303-000-0000-6651GLADEN CONSTRUCTION INC SP 056-070-035 EST #4F 17485
1,184.56 01-112-104-0000-6251GREAT PLAINS NATURAL GAS CO ACCT 78462020005 1/6/26 7001
94.00 01-149-000-0000-6855HOMESTEAD TOWNSHIP 2025 GOPHER REIMBURSEMENT 1/16/26 842
380.63 09-507-510-0000-6250LAKE REGION ELECTRIC COOP GROUP 20649 ELECTRIC DEC2025 41558
188.45 50-000-000-0110-6250GROUP 45060 ELECTRIC DEC2025 41558
973.38 50-000-000-0120-6250GROUP 45060 ELECTRIC DEC2025 41558
454.53 50-000-000-0130-6250GROUP 45060 ELECTRIC DEC2025 41558
271.63 50-000-000-0150-6250GROUP 45060 ELECTRIC DEC2025 41558
1,211.68 50-000-000-0170-6250GROUP 45060 ELECTRIC DEC2025 41558
665.72 12-000-000-0000-2379METLIFEPOLICY 5780392 VOLUNTARY STD JAN2026 18159
1,035.59 12-000-000-0000-2379POLICY 5780392 VISION JAN2026 18159
7,900.00 12-000-000-0000-2379POLICY 5780392 MN PFML JAN2026 18159
1,092.64 198926
436.00 198927
80.68 198928
8,259.67 198929
1,184.56 198930
94.00 198931
3,480.30 198932
Page 1ApprovedWARRANT REGISTERWarrant Form
Auditor's Warrants
From Date To Date
PO #Invoice #Account Number
On-Behalf-of-NameOBO#
Description
AmountVendor NameVendor #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Otter Tail County Auditor
Pay Date
Tx
JT - LOEWS ARLINGTON HOTEL - L
JT - DOUBLE TREE BLOOMINGTON -
HWY - CRAGUNS - J. TEICH LODGI
CF - U OF M CONTLEARNING - REG
CP - DEPT OF AGRICULTURE - T.A
CP - DEPT OF AGRICULTURE - S.R
CP - DEPT OF AGRICULTURE - D.L
CP - DEPT OF AGRICULTURE - D.L
CP - SP BULLETPOINT MOUNT - PH
HWY - U OF M CONTLEARNING - RE
HWY - CRAGUNS - C. TSCHIDA LOD
TH - MSP COMMERCIAL DECALS - D
ACCT #20124759 - WATER PUMP EL
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
csteinbach
01/16/2026
11:35:56AM01/16/2026
Copyright 2010-2025 Integrated Financial Systems
BLCK
Auditor Warrants
64.00 01-201-000-0000-6369MN DEPT OF PUBLIC SAFETY - BCA VENDOR FINGERPRINTS 1/16/26 9739
138,487.68 50-000-000-0000-6674NORTH CENTRAL INC FINAL PAY PROJ 25O007 1/16/26 10132
293.98 10-301-000-0000-6331OTTER TAIL CO TREASURER 16678
462.93 10-301-000-0000-6331 16678
845.16 10-301-000-0000-6331 16678
210.00 10-302-000-0000-6242 16678
15.32 10-302-000-0000-6249 16678
15.32 10-302-000-0000-6249 16678
15.32 10-302-000-0000-6249 16678
15.32 10-302-000-0000-6249 16678
155.70 10-302-000-0000-6352 16678
130.00 10-303-000-0000-6242 16678
590.72 10-303-000-0000-6331 16678
114.41 10-304-000-0000-6572 16678
7,199.99 01-112-101-0000-6250OTTER TAIL POWER COMPANY ACCT 1001187 1/5/26 15009
13.89 10-302-000-0000-6250OTTER TAIL POWER COMPANY ACCT #1136769 - STREET LIGHT E 44271
15.53 10-302-000-0000-6250ACCT #1136771 - STREET LIGHT E 44271
10.36 10-302-000-0000-6250ACCT #1149974 - STREET LIGHT E 44271
24.41 10-302-000-0000-6250 44271
91.17 10-304-000-0000-6250ACCT #1002112 - GARAGE #3 ELEC 44271
161.62 02-260-000-0000-6369OTTER TAIL TELCOM ACCT 999-3303 1/1/26 7250
9,601.31 198933
64.00 198934
138,487.68 198935
2,864.18 198936
7,199.99 198937
155.36 198938
161.62 198939
Page 2ApprovedWARRANT REGISTERWarrant Form
Auditor's Warrants
From Date To Date
PO #Invoice #Account Number
On-Behalf-of-NameOBO#
Description
AmountVendor NameVendor #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Otter Tail County Auditor
Pay Date
Tx
WETLAND CREDIT PROCESSING FEES
N
N
N
N
N
N
N
N
N
csteinbach
01/16/2026
11:35:56AM01/16/2026
Copyright 2010-2025 Integrated Financial Systems
BLCK
Auditor Warrants
41.82 02-815-000-0000-6369SERVICE FOOD SUPER VALU K1170 HEALTHY SNACKS 1/12/26 19005
7,814.73 10-302-000-0000-6350SIR LINES-A-LOT LLC JOB 4305 EST #4F - CH MAINT 6864
9,125.66 10-302-000-0000-6350JOB 4305 EST #4F - MUN MAINT 6864
993.82 10-302-000-0000-6350JOB 4305 EST #4F - A/R 6864
23,571.66 10-302-000-0000-6350JOB 4305 EST #4F - REG MAINT 6864
96,811.00 09-507-575-0000-6683SPAETH/DEAN & JOANN WETLAND BANKING CREDITS 1/16/26 17267
5,975.27 12-000-000-0000-2375SUN LIFE FINANCIAL POLICY 246473 LTD JAN2026 5607
12,036.98 12-000-000-0000-2375POLICY 246473 BASIC/VOLUNTARY JAN2026 5607
2,552.83 09-507-575-0000-6683WETLAND BANK ADMINISTRATOR 1/16/26 12056
41.82 198940
41,505.87 198941
96,811.00 198942
18,012.25 198943
2,552.83 198944
332,085.76BLCK 51
Page 3ApprovedWARRANT REGISTERWarrant Form
Auditor's Warrants
From Date To Date
PO #Invoice #Account Number
On-Behalf-of-NameOBO#
Description
AmountVendor NameVendor #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Warrant Form Total...Transactions
Otter Tail County Auditor
Pay Date
Tx
N
N
N
N
N
csteinbach
01/16/2026
11:35:56AM01/16/2026
Copyright 2010-2025 Integrated Financial Systems
BLCK-ACH
Auditor Warrants
541.00 01-149-000-0000-6855DEER CREEK TOWNSHIP 2025 GOPHER REIMBURSEMENT 1/16/26 817
100.00 01-149-000-0000-6855EDNA TOWNSHIP 2025 GOPHER REIMBURSEMENT 1/16/26 824
766.00 01-149-000-0000-6855HENNING TOWNSHIP 2025 GOPHER REIMBURSEMENT 1/16/26 839
820.16 01-112-109-0000-6251PERHAM/CITY OF ACCT 7-4002500-100 GAS DEC2025 867
224.00 01-149-000-0000-6855PINE LAKE TOWNSHIP 2025 GOPHER REIMBURSEMENT 1/16/26 868
541.00 307512
100.00 307513
766.00 307514
820.16 307515
224.00 307516
2,451.16BLCK-ACH 5
334,536.92 56
Page 4ApprovedWARRANT REGISTERWarrant Form
Auditor's Warrants
From Date To Date
PO #Invoice #Account Number
On-Behalf-of-NameOBO#
Description
AmountVendor NameVendor #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Total...Warrant #
Warrant Form Total...Transactions
Total...Transactions
Otter Tail County Auditor
Pay Date
Tx
Final
csteinbach
01/16/2026
11:35:56AM01/16/2026
Copyright 2010-2025 Integrated Financial Systems
BLCK-ACH
Auditor Warrants
Page 5ApprovedWARRANT REGISTERWarrant Form
Auditor's Warrants
Otter Tail County Auditor
Pay Date
332,085.76 198944 01/16/2026BLCK 19 198926
2,451.16 307516 01/16/2026BLCK-ACH 2,451.16 0 5 307512
334,536.92
WARRANT RUN WARRANT STARTING DATE OF DATE OF
FORM WARRANT NO.PAYMENT APPROVAL
PPD CTX
COUNT AMOUNT COUNT AMOUNTWARRANT NO.
ENDING
INFORMATION
TOTAL
5
INITGRATCD
Fl A CIAL SYSTEM
csteinbach
01/16/2026
11:35:56AM01/16/2026
Copyright 2010-2025 Integrated Financial Systems
BLCK-ACH
Auditor Warrants
Page 6ApprovedWARRANT REGISTERWarrant Form
Auditor's Warrants
Otter Tail County Auditor
Pay Date
1
2
9
10
12
50
71
General Fund Dedicated Accounts
11,429.71 General Revenue Fund 8,978.552,451.16
203.44 203.44
99,744.46 Parks and Trails 99,744.46
53,153.73 Road And Bridge Fund 53,153.73
27,613.56 Insurance Reserve Fund 27,613.56
142,311.34 Solid Waste Fund 142,311.34
80.68 Forfeited Tax Sale Fund 80.68
334,536.92 2,451.16 332,085.76
RECAP BY FUND
FUND AMOUNT NAME ACH AMOUNT NON-ACH AMOUNT
-
-
-
-
-
-
TOTAL TOTAL ACH TOTAL NON-ACH
Otter Tail County Contract Outline
Presented to Human Service Board
January 27, 2026
CONTRACT RENEWALS
Agency Program Effective
Date
Targeted Population Amount
of
Contract
Amount of
Previous Contract
Funding Source
The Village Family
Service Center
Children’s Therapeutic
Support Services,
School Based Mental
Health Services
01-01-26
through
12-31-26
Children
Otter Tail County Human
Services agrees to pay the
Center $10,842 annually
No Change
County of Financial
Responsibility
Fergus Falls
Salvation Army
Pathway of Hope
01-01-26
through
12-31-26
Provide services to
families experiencing,
financial instability,
parenting skills and
similar areas of need.
Up to $25,000.00
No Change
Otter Tail County
m, MANAGEMENT
AND BUDGET
Pay Equity Implementation Report
Part A: Jurisdiction Identification
Jurisdiction: Otter Tail County
Government Services Center
520 West Fir Avenue
Fergus Falls, MN 56537
Contact: Stephanie Retzlaff
Contact: Nicole Hansen
Part B: Official Verification
Phone: (218) 998-8064
Phone: (218) 998-8066
Jurisdiction Type: County
E-Mail: sretzlaff@ottertailcoun
ty.gov
E-Mail: nhansen@co.ottertail.
mn.us
1. The job evaluation system used measured
skill, effort responsibility and working
conditions and the same system was used for
all classes of employees.
3. An official notice has been posted at:
The system was used: Consultant
Description:
Gallagher
Decision Band Method
(same system as previous report)
2. Health Insurance benefits for male and
female classes of comparable value have
been evaluated and :
There is no difference and female classes are
not at a disadvantage.
Part C: Total .=--P=ayL..:.r=o=-=-11---~
I $47676584.23
is the annual payroll for the calendar year just
ended December 31.
Government Services Center
(prominent location)
informing employees that the Pay Equity
Implementation Report has been filed and is
available to employees upon request. A copy
of the notice has been sent to each exclusive
representative, if any, and also to the public
library.
The report was approved by:
Otter Tail County Board of Commissioners
(governing body)
Robert Lahman
(chief elected official)
Chair
(title)
[X] Checking this box indicates the following:
-signature of chief elected official
-approval by governing body
-all information is complete and accurate,
and
-all employees over which the jurisdiction has
final budgetary authority are included
Date Submitted:1/22/2026
m, MANAGEMENT
AND BUDGET
Compliance Report
Jurisdiction: Otter Tail County
Government Services Center
520 West Fir Avenue
Fergus Falls, MN 56537
Contact: Stephanie Retzlaff Phone: (218) 998-8064
Report Year: 2026
Case: 1 -2025 Data (Submitted)
E-Mail: sretzlaff@ottertailcoun
ty.gov
The statistical analysis, salary range and exceptional service pay test results are shown below. Part I is general information
from your pay equity report data. Parts 11, Ill and IV give you the test results.
For more detail on each test, refer to the Guide to Pay Equity Compliance and Computer Reports.
I. GENERAL JOB CIASS INFORMATION
Male Classes Female Classes Balanced Classes All Job Classes
# Job Classes 29
# Employees 134
Avg. Max Monthly Pay per employee 7156.08
II. STATISTICAL ANALYSIS TEST
A. Underpayment Ratio= 111.7497 •
a.# At or above Predicted Pay
b. # Below Predicted Pay
c. TOTAL
d. % Below Predicted Pay (b divided by c = d)
35
261
7670.38
Male Classes
4
25
29
86.21
21
110
Female Classes
8
27
35
77.14
*(Result is% of male classes below predicted pay divided by% of female classes below predicted pay.)
B. T-test Results I Degrees of Freedom (DF) = 393
a. Avg. diff. in pay from predicted pay for male jobs= -7
b. Avg. diff. in pay from predicted pay for female jobs= 1
Ill. SALARY RANGE TEST= 100.00 (Result is A divided by B)
A. Avg.# of years to max salary for male jobs= 11.00
8. Avg. # of years to max salary for female jobs = 11.00
IV. EXCEPTIONAL SERVICE PAY TEST = 0.00 (Result is B divided by A)
A. % of male classes receiving ESP = 0.00 *
B. % of female classes receiving ESP= 0.00
*(If 20% or less, test result will be 0.00)
Value ofT = -1.5261
85
505
7611.34
m 11
=--;;; -;;;
(f)
MANAGEMEN T
AND BUDGE T
20000
15000
1 ODDO
5000
Predicted Pay Report for: Otter Tall County
Case: 2025 Data
•.. -·······
•---·•·/
.............
_,..,, .......
•
........
0-+------.,-------,--------,------.,-------,--------,-----,--------,-------,
D 11 DO 2200 3300 4400 5500 6600 7700 8800 990[
Points
♦ fvlale Jobs Fem ale Jobs e Balanced Jobs --Predicted Pay ----Line Continuation (Min) ----Line Continuation (Max)
Page 1 of 4 1/22/2026 11:~
OTTERTAIL
COUNTY -MINNESOTA
TO:
FROM:
DATE:
ME MORANDU M
Board of Commissioners
Jodi Teich, County Engineer
January 20, 2026
HIGHWAY
505 South Court Street, Suite 1
Fergus Falls, MN 56537
SUBJECT: SAP 056-635-042; CSAH 35 Reconstruction between CSAH 18 and CSAH 1
Recommended Action:
• Award contract to Gladen Construction, Inc. of Laporte, MN and approve contracts and bonds.
Background Information:
This project involves full reconstruction of CSAH 35 between CSAH 18 and approximately 125 feet north of
CSAH 1. The final roadway section will have 12 foot lanes and four foot paved shoulders. Bids were opened
on January 15, after delaying the bid from December 18 because of plan errors that were discovered. Six of
the seven bids received were under estimate with the lowest bid being 22.18 percent under. The competitive
bids may be due to the timing of the bid, and potentially also because the estimate was prepared by the
consultant using metro area costs. The construction will primarily take place this summer, with clearing of
trees happening before March 31. The project will be funded with state aid construction funding.
218-998-8470 @ LIVE YOUR best life HERE. @ ottertailcounty.gov
OTTERTAIL
COUNTY -MINNESOTA
BID SUMMARY AND
RECOMMENDATION FOR AWARD
Otter Tail County Highway Department
S.A.P. 056-635-042
Bid Opening -January 15, 1 :00 P.M.
505 South Court Street Building, Fergus Falls
Engineer's Estimate $ 6,360,483.50
Gladen Construction, Inc.
Laporte, MN
Anderson Brothers Construction Co.
of Brainerd, LLC
Brainerd, MN
Mark Sand & Gravel Co.
Fergus Falls, MN
R.J. Zavoral and Sons. Inc.
East Grand Forks, MN
Kern & Tabery, Inc.
Wadena, MN
Central Specialties, Inc.
Alexandria, MN
Border States Paving, Inc.
Fargo, ND
Bid Amount
$ 4,949,544.51
$5,028,029.61
$ 5, 143,312.82
$ 5,808,574.70
$ 5,882,445.56
$5,995,618.67
$6,580,728.97
HIGHWAY
505 South Court Street, Suite 1
Fergus Falls, MN 56537
I recommend the award of this project to Gladen Construction, Inc., Laporte, MN, as the low
bidder in the bid amount of $4,949,544.51.
218-998-8470 @
Respectfully Submitted,
Otter Tail County Highway Department
Jo • eich, County Engineer
January 27, 2026
OTTER TAIL COUNTY IS AN EQUAL OPPORTUNITY EMPLOYER
LIVE YOUR best life HERE.
@ ottertailcounty.gov
----...------7
kl l ~ ·~ ru _, i
f!
~
_JI
. I .
CSAH35
County State Aid Highways
Job No. S.A.P. 056-635-042
STATE OF MINNESOTA
COUNTY OF OTTER TAIL
CONTRACT
HIGHWAY CONSTRUCTION
This agreement, made this 27th day of January , 20--1§_, between the County of
Otter Tail in the State of Minnesota, party of the first part, hereinafter called the County, and
Gladen Construction. Inc. of 40739 US 71 , Laporte, MN , party of the second part,
hereinafter called the Contractor. Witnesseth, that the Contractor, for and in consideration of the payment
or payments herein specified and by the County to be made, hereby covenants and agrees to furnish all
materials, (except such as is specified to be furnished by the County), all necessary tools and equipment and
to do and perform all the work and labor in the construction on CSAH 35 , Job No. S.A.P. 056-635-042
located as shown on approved plans on CSAH 35 from CSAH 18 to CSAH 1 as indicated in the Plans,
approved September 4, 2025 for the price and compensation set forth and specified in the proposal signed
by the Contractor and hereto attached and hereby made a part of this agreement, said work to be done and
performed in accordance with the Plans, Specifications, and Special Provisions therefore on file in the office
of the County Auditor of said County, which Plans, Specifications, and Special Provisions are hereby made
a part of this agreement.
The Contractor further covenants and agree that he will commence work on or before -----~
_______ 20_ and will have same completed in every respect to the satisfaction and approval of
the County, September 18, 2026
IN WITNESS WHEREOF, The said County has caused these presents to be executed and the Con-
tractor ha hereunto subscribed ___________ name ------
Dated at Fergus Falls, MN , this ___ day of _______ _:, 20_.1§__.
COUNTY OF OTTER TAIL
by _________________ _
County Board Chair
County Board Clerk
GLADEN CONSTRUCTION. INC.
Contractor
Approved as to form and execution this ____ day of _________ _, 2026 .
County Attorney
Letting Date: January 15, 2026
Contract No.
State Project No.
Federal No.
Class of Work
26-01
S.A.P. 056-635-042
Grading & Bituminous Surfacing
COUNTY OF OTTER TAIL
(STATE OF MINNESOTA)
TRANSPORTATION DEPARTMENT
PAYMENT AND PERFORMANCE BOND
FOR HIGHWAY CONSTRUCTION AND MAINTENANCE PROJECTS
PART A: PAYMENT
KNOW ALL PERSONS BY THESE PRESENTS, That We, ---~G=la=d~e=n~C~o=n=stru~c=ti=on=·~In=c~._of
40739 US 71. Laporte, MN 56461 , contractor As principle, and _________ ~ as Surety, are held
and firmly bound unto the County of Otter Tail in the amount of ___ ~$~4=,9~4=9=.5~4~4=.5~1 _____ _
~F~o~u~r=m=il=h=·o=n~,n=m=·=e~h=u=n=dr~e~d~£=ort~·~y-~n=in=e~t=h=o~u=san=d~,=fi~v~e=h=un=d=r=e=d=fo=rty~-=fo=u=r~a=n=d~5~1~/l=0~0~ ____ DOLLARS,
for payment of all claims, costs and charges hereinafter set forth.
For the payment of this well and truly to be made we jointly and severally bind ourselves, our
representatives and successors firmly by these presents.
The condition of this obligation is such that whereas the principle has entered into a contract with the County of
Otter Tail for the construction of Project No. SAP 056-635-042 . On Highway __lL located from CSAH 18 to
CSAH 1 which is on file in the office of the Otter Tail County Highway Department, the regularity and validity of
which is hereby affirmed:
NOW, THEREFORE, if the principle shall pay as they may become due all just claims for work done, and for
furnishing labor, work, skills, tools, machinery, materials, insurance premiums, equipment, and supplies, for the
purpose of completion of the contract in accordance with its terms, and all taxes incurred under Minnesota Statutes,
Section 290.92 and Chapter 297 A, and shall pay all costs of enforcement of the terms of the bond, if action is
brought thereon, including attorney's fees, if any case in which such action is successfully maintained, and shall
comply with the laws of the state appertaining to such contract, then this obligation shall be void, but otherwise it
shall remain in full force and effect pursuant to Minnesota Statutes, Chapter 574.
PART B; PERFORMANCE
KNOW ALL PERSONS BY THESE PRESENTS, That the aforesaid principle and surety are held and firmly bound
unto the County of Otter Tail in the additional amount of ---~$~4~,9_4=9~.5~4~4~.5~1~------------
--~F~o~u~r=m=il=h=·o=n~, n=in=e~h=u=ndr=ed~D=ort~Y ... -~mn=· =e~th=o=u=sa=n=d~, =fi~v~e =h=un=dr=ed~fo=rty'-'--'--=fo=ur~an=d~5~1~/l=0~0 _____ .DOLLARS,
for the faithful performance of the contract as hereinafter set forth.
For the payment of this well and truly to be made we jointly and severally bind ourselves, our
representatives and successors firmly by these presents.
The condition of this obligation is such that whereas the principle has entered into the contract more
particularly described in Part A hereof, the regularity and validity of which is hereby affirmed;
NOW, THEREFORE, if the principle shall faithfully perform the contract and shall save the County of
Otter Tail harmless from all costs and charges that may accrue on account of the performance of the work specified
and shall pay all costs of enforcement of the terms of the bond, if action is brought thereon, including attorney's
fees, in any case in which such action is successfully maintained, and shall comply with the laws of the state
appertaining to such contract, then this obligation shall be void, but otherwise it shall remain in full force and effect
pursuant to Minnesota Statutes, Chapter 574.
THE AGGREGATE LIABILITY UNDER PART A AND PART B HEREOF IS
_$~4=,9_4~9,~54~4=.5~1 _________________________ DOLLARS
SIGNATURES
Date ________ ~ 20
(Contractor Name)
(Contractor Corporate Seal) By _________________ _
(Officer)
(Officer)
(Surety Corporate Seal)
(Name of Surety)
By _________________ _
(Attorney in Fact)
CORPORATE ACKNOWLEDGMENT FOR CONTRACTOR
STATE OF MINNESOTA
County of ___________ ss.
On this ___________ day of ____________ , 20 __ , before me appeared
and ---------------------------------------
to me personally known, who being by me duly sworn, did say that they are respectively
and ---------------------------------------
of the ____________________________ , a corporation; that the seal
affixed to the foregoing instrument is the corporate seal of the corporation, and that said instrument was executed in
behalf of the corporation by authority of its board of directors; and they acknowledged said instrument to be the free
act and deed of the corporation.
(Notary Signature and Seal)
INDIVIDUAL AND CO-PARTNERSHIP ACKNOWLEDGMENT
STATE OF MINNESOTA
County of ________________ ss.
On this ___________ day of _____________ , 20 __ before me personally
appeared ______________ to me known to be the person(s) described in and who executed
the foregoing bond, and acknowledged that (he/she/they) executed the same as (his/her/their) free act and deed.
(Notary Signature and Seal)
ACKNOWLEDGEMENT OF SURETY
STATE OF MINNESOTA
COUNTY OF OTTER TAIL
On this _________ day of. __________ ,20 __ , before me a Notary Public within
and for said County and State, appeared ________________ ....:known to me to be the
Attorney(s)-in-Fact of ____________________ that he/she is (are) the
Attorney(s)-in -Fact of the ____________________ the corporation described in
and that executed the within and foregoing instrument and known to me to be the person who executed the said
instrument in behalf of said corporation and he/she duly acknowledged to me that such corporation executed the
same.
NOTICE TO PERSONAL SURETIES
NOTICE TO CORPORATE SURETIES
Full Name of Surety Company
Home Office Address (street)
City, State and Zip Code
Name of Attorney in Fact
Name of Local Agent
Address of Local Agent (street)
City, State and Zip Code
NOTARY SIGNATURE AND SEAL
Bond will not be accepted unless accompanied by a
sworn financial statement of each of the sureties.
This bond will not be accepted unless executed or
countersigned by a Minnesota agent or attorney-in
fact whose name and address must be noted below.
If this bond is executed outside of the State of Minnesota it must be countersigned on page three by a Minnesota
Resident Agent of the Surety Company.
Name of Agent affixing countersignature _________________________ _
Address
OTTERTAIL
COUNTY -MINNESOTA
TO:
FROM:
DATE:
MEMORANDUM
Board of Commissioners
Jodi Teich, County Engineer
January 20, 2026
SUBJECT: SAP 056-601-076; Fir Avenue (CSAH 1) and Friberg Avenue Roundabout
Professional Services Contract Amendment Request
HIGHWAY
505 South Court Street, Suite 1
Fergus Falls, MN 56537
Stonebrooke Engineering partnered with Moore Engineering and Braun lntertec to provide design and
construction administration services for the above referenced project. The original contract for this work was
approved by the county board in December 2022. In June 2025 they requested a contract amendment
request for additional fees related to the design and construction administration of the project. The
consultant was advised that the county wanted one contract amendment and that would need to wait until
construction was done so that all costs could be reviewed and included as appropriate. The amendment
request was reviewed with the board at committee on 1/13/2026, and the following recommendations were
reached:
1. Project Management: Deny this request because project management costs were included with all
extra tasks.
2. CSAH 1 Trail Extension: As it was noted that this work would be beyond the original scope of work
at the time it was requested, approve this additional cost of $16,550.
3. Opperman Lake Bank Stabilization: This work was noted as outside of the original scope at the time
it was requested. Approve the additional cost of $1,900.
4. Additional Right of Way and Easement Work: Approve $2800 because of the added right of way
parcel.
5. Additional Utility Coordination: Deny this request, as it fell under the original proposal scope of work.
6. Additional Storm Sewer Design and Analysis: Approve $4,700 of this request because of additional
design work required.
7. Timber Place Trail/Sidewalk Extension Design and Plan Revisions: This work was noted as beyond
the original scope at the time it was requested. Approve the additional cost of $15,125.
8. Stonebrooke Costs for rate increase from 2023/2024 to 2024/2025: Approve the additional fee of
$4,600.
218-998-8470 @ LIVE YOUR best life HERE. @ ottertailcounty.gov
9. Stonebrooke Additional Construction Assistance: Deny this request.
10. Moore Engineering Additional Survey: Approve $3,535 of additional payment.
11. Moore Engineering Construction Services: Approve the $72,261 of additional fees requested.
12. Braun lntertec Construction Testing Services: This is being removed from the amendment request
as time charged is based on actual services delivered for the county. This did result in a savings of
$35,675.75 from original proposal, which will help to offset the added fees.
The overall recommendation of the Department is to approve an additional $121 ,471 in engineering fees
to Stonebrooke/Moore. With the savings from the Braun lntertec contract the overall added cost for
engineering to the project is $85,795.25.
~ Stonebrooke
a 12279 Nicollet Avenue Burnsville, MN 55337
o 952-402-9202 f 952,403.6803
w stonebrookeenglneering.com
Bob Ehlert
Engineering Supervisor
Otter Tail County Highway Department
SOS South Court Street
Fergus Falls, MN 56537
RE: Fir Avenue (CSAH 1) and Friberg Avenue Intersection Improvements Project
Professional Services Contract Amendment Request #1
Dear Ms. Foster:
December S, 2025
We respectfully request a contract amendment to cover the engineering services required for the design
of the Fir Avenue (CSAH 1) and Friberg Avenue Roundabout project, which have exceeded the level of
effort estimated in our proposal for the project.
1. Project Management: The time needed to provide oversight of the project and ensure a quality
design for the County will be minimized to the greatest extent possible. However, the additional
tasks listed below require oversight and coordination with Stonebrooke staff, County staff, and
subconsultants.
Requested amount: $8,350
2. CSAH 1 Trail Extension: During our project Kick-Off Meeting, the County requested the design of
a trail extension along Fir Avenue from the proposed roundabout, east approximately 1,100 feet,
to CR 111. This additional work included:
• Additional topographic survey by Moore Engineering (included in Item 9).
• Layout and design ofthe trail.
• Drainage design required for impacts to yard drains.
• Additional boundary survey (included in Item 4).
• Redesign of the trail to accommodate citizen concerns regarding the offset of the trail near
the roundabout. This decision was made after the original layout and preliminary design
were completed, requiring a revision to the trail design as well as the associated roundabout
design to be modified.
• Additional plan sheets (7) that were required for the trail addition were not included in our
original proposal.
This work was not included in our original contract, and we respectfully request a contract
amendment to cover the engineering services required for the design of this trail extension.
Requested amount: $16,550
S:\PROJECTS\ TRANS\County\Otter_ Toil\ T-01054\Admin\Controcts\Amendment 111\Fir-Friberg RAB Amendment 111 Request REVISED 12.05.25.docx 1
3. Opperman Lake Bank Stabilization: During the project's design, the County expressed concern
that the wood timber edging at the lake edge was a tripping hazard. The County requested that
we remove the edging from the project plans. This additional work included a short site visit
before the public information meeting, the removal of the edging, and design work for the
associated grading, creating special provisions, and an engineer's estimate. This work was not
included in our original contract, and we are requesting an amendment to cover the cost of the
engineering work.
Requested amount: $1,900
4. Additional Right-of-Way and Easement Work: Additional work was needed for the right-of-way
and easement survey work that exceeded our anticipated work. This work included:
• Additional right-of-way boundary survey and parcel calculations for the addition of the trail
extension.
• The number of existing recorded easements on the adjacent parcels increased the
complexity of parcel calculations and resulted in additional time needed to prepare the base
property maps.
• We provided additional support to the County's R/W staff during the acquisition process,
including answering questions, providing additional exhibits, and revising easement
drawings to accommodate negotiations.
• Our original proposal included the preparation of easements for six (6) parcels. Because of
the addition of the trail extension and some additional impacts to adjacent parcels, we
prepared easement documents for seven (7) parcels.
This work was not anticipated in our original contract, and we respectfully request a contract
amendment to cover the survey and engineering services required for the preparation of the
right-of-way and easement documents.
Requested amount: $7,225
5. Additional Utility Coordination: Following the conclusion of Utility Coordination Meeting #1,
Lumen Communications indicated that they had a fiber duct installed in the area of the
intersection. Lumen requested that clearances be reviewed versus the proposed storm sewer.
As a result, Lumen performed potholing of its facilities to determine depth, and the County
surveyed the locations and elevations. This information was provided to us to calculate the
clearances/conflicts for the project. Additionally, we held an additional meeting with Lumen to
discuss the results. This work was not anticipated in our original scope of work, and we are
requesting an amendment to the contract to include this additional work.
Requested amount: $3,775
6. Additional Storm Sewer Analysis and Design: The work required for the storm sewer design
exceeded our anticipated level of effort. As we proceeded through our design of the storm sewer
system for the roundabout, we found difficulty in determining the flows and pipe sizes of the
existing storm sewer system. The additional work included:
• Additional work to reconcile existing storm sewer record drawings versus field
measurements.
• Additional survey time needed to verify measured items in the field versus conflicting record
drawings (included in Item 9).
• Work determining elevations of the storm sewer west of the south leg of the roundabout
because the manhole was buried and could not be surveyed. There was conflicting
information in the record drawings provided.
5:\PROJECTS\ TRANS\County\Otter_ Toil\ T-01054\Admin\Contracts\Amendment #1\Fir-Friberg RAB Amendment #1 Request REVISED 12.05.25.docx 2
• Unanticipated work on the Opperman Lake overflow storm sewer due to insufficient
hydraulic records.
• Additional design on the E-W storm sewer just north of the YMCA Parking lot. There were
insufficient records of this storm sewer, and we needed to determine if it was sufficient for
connection to the stormwater pond outlet.
• Additional design time to determine the existing flows from the west due to insufficient
stormwater records along Fir Avenue. The drainage area was significantly larger than
anticipated, and the records conflicted with the measured information.
Requested amount: $9,425
7. Timber Place Trail Extension Design and Plan Revisions: During the right-of-way acquisition
process, the HRA requested the sidewalk be extended from the roundabout to Timber Place on
the south side of the west leg of the roundabout. Since the plans were 95% complete, this task
took longer than expected, requiring multiple revisions and necessitating the redesign of
previously designed items. This work included:
• Preparation of a sketch and preliminary cost estimate to obtain an agreement with the HRA.
• Design of the sidewalk extension, including an ADA design at Timber Place.
• Revisions to the previously completed corridor models, earthwork computations, ADA
accommodations, signing and striping, and lighting design.
• Revisions to the already completed 95% plans and the engineer's estimate.
• Preparation of additional easements and right-of-way drawings to accommodate the
proposed sidewalk extension.
Requested amount: $15,125
8. Stonebrooke Costs for Rate Increase from 2023/2024 to 2024/2025: Our original proposal
assumed the plans would be completed in 2023 and construction would occur in 2024. Because
of delays in the project due to staff turnover and the application and award of the LRIP grant, we
incurred additional expenses due to labor occurring at a higher hourly rate. This was not
anticipated in our original fee estimate.
Requested amount: $4,600
9. Stonebrooke Additional Construction Assistance: During the course of construction there was
additional time spent by our staff to coordinate with utility companies, project staff, as well as
additional design checks and redesign to accommodate requested field adjustments. While we
had time included in our original contract for construction assistance, our time spent exceeded
our original estimate.
Requested amount: $2,400
10. Moore Engineering Additional Survey: The addition of the CSAH 1 trail extension required an
additional topographic survey. Also, during the design process, conflicting information was found
between the survey and the record drawings. An additional survey was needed to resolve this
issue.
Requested amount: $3,800
S:\PROJECTS\ TRANS\County\Otter_ Tail\ T-01054\Admin\Contracts\Amendment #1\Fir-Friberg RAB Amendment #1 Request REVISED 12.05.25.docx 3
11. Moore Engineering Construction Services: The scope and conditions ofthe construction portion
of our contract have changed since our original agreement. These changes include:
• The delay in construction from 2024 to 2025 affected Moore's hourly rates for staff due to
higher labor rates. ($22,273).
• The addition of the CSAH 1 Trail will require additional survey, observation, and
documentation time. Also, ($10,536).
• Staking requests by contractor exceeded anticipated trips to project and time spent. ($3,482)
• The estimate for construction time has increased from 12 weeks to 18 weeks. ($35,970)
Requested amount: $72,261
12. Braun lntertec Construction Testing Services: Braun lntertec had originally provided a scope of
work and a fee estimate to provide construction testing services for the project in 2024, and was
included in our original contract. Since the project has been delayed a year, Braun's rates have
increased from 2024 to 2025. However, the County has determined it has available staff to cover
the majority of the testing services for the project, with some assistance being required from
Braun lntertec when County staff are not available for this project.
The new scope assumes Braun will provide all concrete plant inspections for the project.
Additionally, Braun has assumed, for contracting purposes, 10% of the necessary concrete field,
aggregate gradations, and field compaction testing for the project. We have included a revised
scope of work and estimate from Braun. With the exception of the concrete plant inspections, all
other services would be on-call and as needed. Overall, this would result in a net decrease in the
contract for construction testing services.
Requested amount: -$26,500
Amendment Request Total = $118,911.00
Thank you for considering this amendment request. If you have any questions or need additional
information, please contact me at your earliest convenience.
Sincerely,
David L. Betts, PE
Senior Project Manager
S:\PROJECTS\ TRANS\County\Otter_ Tail\ T-01054\Admin\Contracts\Amendment #1\Fir-Friberg RAB Amendment #1_ Request REVISED 12.05.25.docx 4
~ Stonebrooke
a 12279 Nicollet Avenue Burnsville, MN 55337
o 952-402·9202 f 952.403.6803
w stonebrookeengineering.com
Matthew Yavarow, PE
Assistant County Engineer
Otter Tail County Highway Department
505 South Court Street
Fergus Falls, MN 56537
RE: Professional Services Contract
Fir Avenue (CSAH 1) and Friberg Avenue Intersection Improvements Project
Dear Mr. Yavarow:
November 29, 2022
Thank you for the opportunity to submit this scope of work and engineering fee proposal for the Fir
Avenue (CSAH 1) and Friberg Avenue Intersection Improvement Project. We understand the project will
consist of construction of a roundabout and necessary approach work generally consistent with the
layouts provided in the Fir Avenue Intersection Feasibility Study.
We understand that the County may utilize State Aid Funds for the project and the plans and special
provisions will be prepared to State Aid standards. If the County does utilize State Aid Funds, a State Aid
submittal will occur at the conclusion of design work. There are no federal aid funds tied to this project.
Our proposed hourly, not-to-exceed fee is $489,508.23, based on our understanding of the work
required and as outlined in our proposal. See the enclosed cost proposal for a summary and detailed
breakdown of tasks and associated costs, for both Stonebrooke Engineering and our subconsultants.
Approach
This section summarizes our proposed approach to the tasks required to complete the final design for
this project. We understand Otter Tail County wishes to have completed plans by late 2023, with the
intent to construct this project in 2024. We will work with you to establish a mutually acceptable
detailed schedule after project authorization.
Task 1 Project Management
Our project manager is fully prepared to manage internal staff and project delivery to deliver the tasks
within scope, on time, within budget, meeting Otter Tail County's and industry standards of care, and in
coordination with the County. They will work in partnership with the County, City, and other key project
stakeholders to ensure the most responsible, efficient, and cost-effective solutions for this project are
achieved.
• Regular phone calls will be held with the County representative to provide updates of the work
and discuss any ongoing project challenges or issues.
• We have also included time for 2 formal meetings, one in Fergus Falls and one virtual. The timing
of these can be coordinated with County and City representatives, but we believe the most
appropriate time would be project kickoff and after preliminary plans are submitted, to discuss
the plan set and County/City feedback/comments.
• We will prepare and maintain a mutually agreed upon detailed schedule for all tasks and subtasks.
\\SEISRV\SBEServer\PROPOSALS\COUNTY\Otter Tail\PT698\Firand Friberg Intersection Improvements Proposal• 2022-11-29 Update.docx 1
• Monthly invoices will be submitted with labors hours broken down by task and progress status
reports with each invoice.
• We will coordinate with project subconsultants Braun lntertec (geotechnical
investigation/materials testing), Moore Engineering (construction services) and Henning
Professional Services (Property Acquisition) throughout the duration of the project to ensure
timely deliverables that meet the County's needs.
Task 2 Public and Agency Involvement
In the initial public outreach completed during the study phase, there were public comments made
indicating that a number of farm implements use Fir Avenue as an east/west route through town.
Additionally, there are multiple commercial sites located in close proximity to Fir Avenue, notably on the
west end of the project corridor. These items indicate a strong likelihood of larger vehicles traveling along
Fir Avenue that will need to navigate this roundabout. Additionally, these vehicles will need to navigate
the future roundabouts that may occur at the Fir Avenue intersections with Tower Road and Union
Avenue.
We recommend that public involvement on this project connect with business owners, landowners, and
County/City staff that would have knowledge as to the larger vehicles using this corridor, so that we can
determine a design vehicle for the roundabout, as well as the largest vehicle the roundabout is likely to
need to accommodate (farm implements, house movers, OSOW trucks, etc.). Doing this will help ensure
the roundabout can be efficiently and safely navigated for these vehicles through design decisions such
as curb selection, paved boulevards, and sign and lighting placement, while still providing the best possible
geometric configuration for regular vehicle traffic.
We propose the following outreach activities:
Connect with adjacent landowners and business owners through coordination with County/City
staff to determine design vehicles and accommodating vehicles. If a site meeting is required to
obtain specific vehicle dimensioning, we will most likely work with project partner Moore
Engineering to efficiently obtain these details.
Host 2 public open houses, one prior to the start of detailed design to collect information, and a
second near the conclusion of design to present the design to the public and discuss construction
impacts. We will create the necessary graphics/plots to supplement the open house.
Produce a mailer for each open house that the County can print and distribute.
We will also coordinate regularly with City staff on project issues or concerns, including
understanding necessary utility improvements (we assume water main and sanitary sewer will be
replaced within the project limits).
At this time, we are not including time for a virtual open house/presentation. This could be added to
accompany either open house to provide outreach to those unable to attend in-person. We can provide
an additional fee for this task at the County request.
Task 3 Utility Coordination
Stonebrooke will:
• Obtain utility maps through the Gopher State One Call process for the final design.
• Utilize these maps to compare with the field locates obtained during the topographic survey and
identify the locations where utility adjustments are needed.
• Host one in-person and one virtual utility coordination meeting.
• Identify conflicts with existing utilities and proposed improvements and show these in the plan set.
\ \SEISRV\SBEServer\PROPOSALS\COUNTY\Otter Tail\PT698\Fir and Friberg Intersection Improvements Proposal -2022-11-29 Update.docx 2
• Coordinate with impacted utility owners on relocation plans, and ultimately review the final utility
relocation plans prior to County permit approval.
Task 4 Topographic Survey & Right of Way
Project partner Moore Engineering will perform a Topographic and Utility Survey, including:
• Full topographic and utility survey of all features to about 200' beyond the project limits as
indicated in the study layout.
• Gopher State One Call utility field markings.
• We will locate right-of-way monuments and property corners as available.
Moore Engineering's Fergus Falls office is located on the project, making for an efficient opportunity to
pick up added topo survey during the project should there be additional needs.
The Stonebrooke Engineering survey team will establish the existing R/W for use in determining
necessary permanent and temporary property acquisitions. Our team will propose the necessary
acquisitions to County staff, including final parcel sketches and legal descriptions for up to 6 parcels. We
will plan to stake the final easements as well to assist in the R/W acquisition process. We understand
the County will lead the R/W acquisition process, including appraisals, estimating costs, and all
coordination with impacted property owners.
Task 5. Traffic Analysis
We will evaluate the information collected for the 2020 traffic study to formulate year of opening traffic
projections, along with future traffic projections. This information will be used to create an ICE report in
accordance with State Aid Standards. If 13-hour count data was not obtained with the 2018 counts, we
would need to obtain those counts to complete the ICE report. This time has been included in our
proposal to be conservative, but we will not collect this information unless needed.
A warrant analysis will be completed to use for the ICE evaluation. We will use what ever information
we can from the previously completed studies to help supplement and expedite the completion of the
ICE report. We will also coordinate with County staff prior to performing any counts or report work to
ensure we are in concurrence on existing information available and deliverables.
Task 6. Preliminary Engineering
The preliminary design for the project will be performed in accordance with State Aid design standards.
We will establish the existing alignment and profile for the intersection approaches. We will prepare the
proposed horizontal geometrics for the project. We will perform intersection and driveway checks to be
sure the project will not negatively impact the adjacent entrances and roadways. Most specifically, we
will perform detailed design checks for the roundabout, which will include creating, as needed, project
specific turning movement templates for both the design vehicles and accommodated vehicles, based on
feedback from the public involvement process.
Prior to proceeding with detailed vertical design and construction limit preparation, we will review the
design checks and horizontal geometrics with Otter Tail County to ensure that the County is in
concurrence with and understanding of our approach and design decisions. At the conclusion of
\ \SE/SRV\SBEServer\PROPOSALS\COUNTY\Otter Tail\PT698\Fir and Friberg Intersection Improvements Proposal -2022-11-29 Update.docx 3
preliminary design, we expect to have construction limits suitable for determining proposed right of way
and construction easement acquisition.
Subconsultant Braun lntertec will perform soil borings and pavement design tasks during the preliminary
design stage to help determine project construction costs, and investigate to determine the condition of
existing soils in the project area for both road construction and stormwater treatment locations.
Task 7. Drainage Design
Our team will complete a stormwater design in compliance with County, City and MnDOT State Aid
standards. Additionally, we assume that stormwater treatment will be required on this project to comply
with the Fergus Falls MS4 permit requirements.
We will work with County and City staff to determine the preferred BMPs and locations to meet these
requirements.
We assume that we will be able to discharge stormwater into existing stormwater systems as the water
leaves the project area to the downstream end of the system. We have not included time in our proposal
for downstream stormwater system improvements that may become necessary or requested beyond the
area of the current project site.
Task 8. Final Construction Plans/Document
Utilizing the preliminary design, the Stonebrooke team will prepare preliminary and final construction
plans and documents for review. All documents will be completed in accordance with current Otter Tail
County, Fergus Falls, and State Aid standards. In addition, our team will utilize our extensive PROWAG
expertise to ensure pedestrian accommodations are designed in accordance with the latest standards
and guidance.
Based on our understanding, this project will require a full closure of the intersection to better facilitate
the proposed construction. Our scope includes the preparation of a detour plan. Our scope assumes the
proposed detour routes will not require detailed traffic analysis or construction improvements.
Roundabout intersection lighting will be included, meeting the most current design guidance. At this
time, we are assuming full replacement or relocation of the existing water main and sanitary sewer lines
through the intersection. We realize that this has not been fully determined and will coordinate this work
with the City prior to beginning any design efforts.
All bid items will be tabulated, and a statement of estimated quantities (SEQ) will be prepared with each
submittal. The final SEQ will include cost participation/cost splits for each bid item in accordance with
the requirements of the funding sources for the project.
We will prepare specialty Division S, SL & ST special provisions, along with a full project proposal
document. We will provide copies of the draft and final special provisions to accompany the plan
submittals. Stonebrooke will complete the plan submittal to State Aid at the completion of the project, in
preparation for bidding. We will provide one final grade surface to the County for its use during
construction.
Task 9. Project Submittal and Bidding Assistance
Stonebrooke will create a final grade surface to provide to the Contractor for its use during construction.
Should the Contractor have special surface requests, or the creation of additional surfaces for use, this
could either be completed by Stonebrooke at an additional fee or by the Contractor.
Our team will also answer questions during bidding and prepare addenda as necessary.
\\SEISRV\SBEServer\PROPOSALS\COUNTY\Otter Tail\PT698\Fir and Friberg Intersection Improvements Proposal-2022-11-29 Update.docx 4
Task 10. Permits
We assume the following Permits will be required:
• NPDES Permit -We will start the permit through MPCA and provide a reference number to the
Contractor to finalize and secure the permit.
• Department of Health Water Main Permit-We will prepare this permit and provide it to the
City for application and payment of fees.
• Wetland Permitting -We understand that wetland impacts are not expected and therefore not
included in our scope of services. We also assume there will be no permitting required through
the SWCD.
Task 11. Construction Administration and Inspection
Stonebrooke Engineering is teaming with subconsultant and local engineering firm, Moore Engineering,
to deliver construction services for this project. Moore Engineering will lead the construction
administration, construction inspection, and construction staking tasks. Key tasks associated with these
services include:
Construction Contract Administration
• Coordinate and hold a preconstruction meeting.
• Provide for full tracking of material utilization, and partial payment and final payment
pre pa ration.
• Facilitate progress meetings, prepare agendas and prepare regular meeting minutes.
• Perform all work necessary to ensure the construction contractor is following Federal and State
Prevailing Wage requirements (if necessary based on final funding sources)
• Identify changed field conditions or inconsistencies. Evaluate these situations based on the
contract documents. When appropriate, obtain cost proposals from the Contractor and provide
recommendations to the county to adjust the construction work.
• Perform Final Inspection, prepare punch list, recommend final payment
• Perform project close out duties and prepare State Aid Close out Paperwork
Construction Engineering including Construction Survey
• Perform detailed construction staking for all removals, grading, curb and gutter, drainage, and
ADA work
• Provide full time onsite Resident Project Representative -we are currently assuming a 12 week
construction schedule at 50 hours per week. If the assumed construction schedule changes we
would notify the County and work to amend this assumption.
• Complete and submit weekly progress reports
• Conduct weekly progress meetings with the county and construction contractor with at least two
(2) on site meetings per month.
• Coordinate and oversee materials testing on site.
• Maintain all records as required through the State Aid processes for submittal to State Aid. (if
necessary based on final funding sources)
Construction Materials Testing
• Subconsultant Braun lntertec will perform construction materials testing on the project. Please
see the attached scope of services for additional information.
\ \SEISRV\SBE5erver\PROPOSALS\COUN1Y\Otter Tail\PT698\Fir and Friberg Intersection Improvements Proposal• 2022-11-29 Update.docx 5
We appreciate your consideration of this proposal, and we welcome the opportunity to discuss the details
with you. Please contact us with any questions or concerns you may have regarding our proposal.
Sincerely,
Rick West, PE
Stonebrooke Engineering
\ \SEISRV\SBEServer\PROPOSALS\COUNTY\Otter Tail\PT698\Fir and Friberg Intersection Improvements Proposal -2022-11-29 Update.docx 6
BRAUN
INTERTEC
Braun lntertec Corporation
11001 Hampshire Avenue S
Minneapolis, MN 55438
The Science You Build On.
November 11, 2022
David Betts, PE
Stonebrooke Engineering, Inc
12279 Nicollet Avenue South
Burnsville, MN 55337
Re: Proposal for Construction Materials Testing Services
Otter Tail County Fir-Friberg Roundabout Project
Intersection of Fir Avenue and Friberg Avenue
Fergus Falls, Minnesota
Dear Mr. Betts:
Proposal QTB168805
Phone: 952.995.2000
Fax: 952.995.2020
Web: braunintertec.com
Braun lntertec Corporation is pleased to submit this proposal to provide construction materials testing
services for the Otter Tail County Fir-Friberg Roundabout Project in Fergus Falls, Minnesota.
Since our inception in 1957, we have grown into one of the largest employee owned engineering firms in
the nation. With more than 1,000 employee owners, retaining our firm gives you access to a diverse
range of services and professionals you can consult with if the unforeseen occurs. The size of our
company also allows us to respond quickly when schedule constraints occur.
Our Understanding of Project
We assume this project will include sub-grade preparation, placement of granular subgrade and
aggregate base, new concrete curb and gutter, sidewalk, and medians along with a new bituminous
pavement. Construction will also include improvements to local utilities and the construction of a new
roundabout.
Available Project Information
This proposal was prepared using the following documents and information.
AA/EOE
• Preliminary Concept Arial Perspective prepared by SRF Consulting Group, Inc., dated
January 2, 2020.
• Email correspondence with David Betts from Stonebrooke Engineering, Inc. regarding project
scope.
• We were not provided with any plans, specifications, or other quality control documents for
this project.
Stonebrcioke Engineering, Inc
ProposalQTB168805
November 11, 2022
Page 2
• To our knowledge, no geotechnical report was prepared for this project.
• Once final plans and specifications are completed, we request an opportunity to review the
final construction documents and revise our scope of services and/or our cost estimate
based on the final plans and specifications if needed.
Scope of Services
Services are performed under the direction of a licensed professional engineer. Observation and testing
services will be performed on an as-needed basis as requested and scheduled by you or your on-site
project representative. After reviewing available our scope of services for the project will be limited to
the tasks defined below.
Soil Related Services
• Perform nuclear gauge density tests on subgrade, granular subgrade, embankment, and
utility backfill materials.
• Perform Dynamic Cone Penetrometer (DCP) tests on aggregate base materials.
• Perform gradation tests on granular subgrade and aggregate base materials.
• Perform laboratory standard Proctor tests on backfill and fill materials.
• As a geotechnical evaluation was not provided for this project, our evaluation of the soils will
be limited to observations of the near-surface soils immediately below the foundations and
slabs, which does not constitute a geotechnical evaluation. There is a risk that conditions
may exist which could affect the serviceability ofthe structure, which may not be noted due
to the limited scope of this evaluation. The owner will assume this risk unless a geotechnical
evaluation is performed. We would be pleased to provide a geotechnical evaluation to
confirm the assumed bearing pressures and conditions, if requested.
Concrete Field Testing Related Services
• Sample and test the plastic concrete for slump, air content, temperature prior to placement.
We assume that we will be able to appropriately dispose of excess concrete (and associated
wash water) on site at no additional cost to us.
• Prepare 4-inch by 8-inch cylinders for compressive strength testing. A set of three cylinders
will be tested at 28 days for each set cast. If field cure cylinders are requested, each
additional cylinder will be charged at the unit price listed in our cost estimate.
• Laboratory compressive strength testing of cylinders.
BRAUN
INTERTEC
Bituminous Related Services
Stonebrooke Engineering, Inc
Proposal QTB168805
November 11, 2022
Page3
■ Collect verification samples per MnDOT's 2360 specification to run quality assurance tests
on. Perform quality assurance tests on the verification samples which include the following
tests: Rice specific gravity, asphalt content, extracted aggregate gradation, gyratory density,
coarse aggregate angularity, and fine aggregate angularity. Compare agency test results with
contractor's test results for compliance with MnDOT 2360 specification.
■ Randomly determine bituminous core locations by using MnDOT's random core worksheet
and mark pavement core locations.
■ Observe the contractor coring and core testing in accordance with MnDOT 2360
specification, which include watching quality control personnel weigh the cores at their
laboratory.
■ Collect companion cores and test for thickness and density of pavement cores. Compare
agency test results with contractor's test results for compliance with MnDOT 2360
specification. Review incentive and disincentive sheets completed by contractor.
Consulting, Project Communication and Reporting Services
■ Project management, including scheduling of our field personnel.
■ Review observation and test reports and communicating with you and the parties you may
designate such as the project contractor(s), and other project team members, as needed.
■ Transmit test results to the project team on a weekly basis.
Basis of Scope of Work
The costs associated with the proposed scope of services were estimated using the following
assumptions. If the construction schedule is modified or the contractor completes the various phases of
the project at different frequencies or durations than shown in this proposal, we may need to adjust the
overall cost accordingly. The scope of work and number of trips required to perform these services are as
shown in the attached table. Notable assumptions in developing our estimate include:
■ We assume it will take nine trips to complete the nuclear density gauge testing on this
project.
■ We assume compaction testing on aggregate base will be performed using the Dynamic Cone
Penetration (DCP) method; a minimum of three tests will be conducted each trip with four
trips assumed.
■ We assume twenty-four sets of concrete tests will be required to complete the project.
■ We assume the rebar observations before concrete placements will be completed by the
project representative's construction oversight manager.
BRAUN
INTERTEC
Stonebrooke Engineering, Inc
Proposal QTB168805
November 11, 2022
Page4
• We assume bituminous paving will be completed in four days for this project.
• We assume your full-time on-site construction observer will observe the test rolling for this
project.
• We assume the project engineer of record will review and approve the contractor's quality
control submittals and test results.
• You, or others you may designate, will provide us with current and approved plans and
specifications for the project. Modification to these plans must also be sent to us so we can
review their incorporation into the work.
• We will require a minimum of 24 hours' notice for scheduling inspections for a specific time.
Shorter than 24 hours' notice may impact our ability to perform the requested services, and
the associated impacts will be the responsibility of others.
Once finalized plans, specifications, and/or project documents have been completed, this proposal
should be revised and resubmitted.
Cost and Invoicing
We will furnish the services described herein for an estimated fee of $37,437. Our estimated costs are
based on industry averages for construction production. Depending on the contractor's performance,
our costs may be significantly reduced or slightly higher than estimated. A tabulation showing our
estimated hourly and/or unit rates associated with our proposed scope of services is also attached. The
actual cost of our services will be based on the actual units or hours expended to meet the requirements
of the project documents.
This cost estimate was developed with the understanding that the scope of services defined herein will
be required and requested during our normal work hours of 6:00 a.m. to 6:00 p.m., Monday through
Saturday. Services that we are asked to provide to meet the project requirements or the contractor's
construction schedule outside our normal business hours will be invoiced using an overtime rate factor.
The factor for services provided outside our normal work hours will be 1.25 times the listed hourly rate
for the service provided. The factor for services provided on Sunday or legal holidays will be 1.5 times the
listed hourly rate for the service provided. We have not included premiums for overtime in our cost
estimate; however, we recommend that allowances and contingencies be made for overtime charges
based on conversations with the contractor. You will be billed only for services provided on a time and
materials basis.
Because our services are directly controlled by the schedule and performance of others, the actual cost
may vary from our estimate. It is difficult to project all of the services and the quantity of services that
may be required for any project. If services are required that are not discussed above, we will provide
them at the rates shown in the attached table or, if not shown, at our current Schedule of Charges. We
will invoice you on a monthly basis.
BRAUN
INTERTEC
General Remarks
Stonebrooke Engineering, Inc
ProposalQTB168805
November 11, 2022
Pages
We will be happy to meet with you to discuss our proposed scope of services further and clarify the
various scope components.
We appreciate the opportunity to present this proposal to you. If anything in this proposal is not
consistent with your requirements, please let us know immediately. Braun lntertec will not release any
written reports until we have received a signed agreement. Also, ordering services from Braun lntertec
constitutes acceptance of the terms of this proposal.
BRAUN
INTERTEC
Stonebrooke Engineering, Inc
Proposal QTB168805
November 11, 2022
Page 6
We include the Braun lntertec General Conditions, which provide additional terms and are a part of our.
agreement.
To have questions answered or schedule a time to meet and discuss our approach to this project further,
please contact John Rutherford at 651.487.7052 (jrutherford@braunintertec.com).
Sincerely,
BRAUN INTERTEC ('.:ORPORATION
£~~:.:
Project Manager
/l~
Jeffrey A. Gebhard, PE
Vice President, Principal Engineer
Attachments:
Project Proposal
General Conditions -CMT (1/1/18)
The proposal is accepted. We will reimburse you in accordance with this agreement, and you are
authorized to proceed:
Authorizer's Firm
Authorizer's Signature
Authorizer's Name (please print or type)
Authorizer's Title
Date
BRAUN
INTERTEC
BRAUN
INTERTEC
The Science Yoa Build On.
Project Proposal
QTB168805
Otter Tail County Fir-Friberg Roundabout Project
Client:
Stonebrooke Engineering, Inc
David Betts
i~; Address:
Intersection of Fir Avenue and Friberg Avenue
Fergus Falls, MN 56537
r~ ------·--1 Service Description:
1
Construction Materials Testing
I 12279 Nicollet Ave S.
Burnsville, MN 55337
(952) 402-9202
\ Description
[_ _______ _
! QuantityjUnits I Unit Price) Extensioni
Phase 1 MnDOT,Materials Testing
, ,.. i.o.cu~ty 1.1 1so1i-1e~tin9 -__ , ____ ____ -~-$8,281.001
7 2~-.. __ ;com[:;;~:~~;g;e~~;lear ------·-----· ·" -~-Qo/ ~f •--~-31 .szt:r 1:::~~--$2,772~oi
Subgrade Prep I Utilities 6.00 Trips 3.50 21.00 JSelectGranular/Embankment 3.00 Trips 3.50 10.50l•
,... ---.-· ·--····-""·""·""--·~-• ,,., --··~--··· ,-·· ___ _...-, µ 30~ ---~_·. Nuctear molsture-densitymeter charge, per hour ·_ l--31 .50T~a-Bh. ··--26.~{.~--~. ~.-
! 1318 , Moisture Density Relationship (Standard), per sample i 4.00. Each 194.00 i $776.00 i
!m_~ _jcomp:;;~:~:::~:g;e~a~;·s ·----• Qty unui; .. ~ 1
~:~:, ~ Exte!!;~~IL---$
1
,408~
Aggregate Base --4.00 Trips 4.00 16.00/
r1162·---: s1;;:..;:n-;iy~-~th200 wash;·j;;.--~;~ple ___ -·-------·-1 ··--4.00IE-;~--r --··1~i£00 r ~ " $568~00·:
S og lsample pick-up ·--r-~00 Hour --· as.oaf $352.00:
L-----~-• --•------·· ---+-----if------;-----~
~:2_q~~----1Asphalt Content ~f Aggregate Base,~:!'"~~=----·--, ----~00 Each __ 156~~ L_"'·~-~ _ $_1,:~?~J
j 1228 ----~psoil Testing w~ nutrients, per sample ______ J _ _ 1.00 Eac~-_ . ~90.001·-"'· ~390.0~
!ia61 1CMTTrip Charge I 13.00 Each so.oar-$1,040.001
[Ati'2
_ • ~~;;:;T~==::~ _ _ _ __ • _____ -_---:=;-_~:::~~~ I ~--=r:;•,:~
1 !:York Activity Detail Qt¥ Units Hrs/Unit Extension J
Curb & Gutter 8.00 Trips 3.50 28.00•i
!Ftatwork 12.00 Trips 3.50 42.00
~c. Placements 4.00 Trips 3.50 _ 14.00 ·
! 1364 l Compressive strength of concrete cylinders (ASTM C 39),per ) 72.00 Each 34.00
L_ ____ _Jspe~..!" --------~------------~ _ . _ ... Work Activity Detail Qty Units Hrs/Unit Extension
Curb & Gutter • 8.00 Sets ·-• 3.00 24.oo j
Flatwork 12.00 Sets 3.00 36.001'
___,
$2,448.oo;
Misc. Placements 4.00 Sets 3.00 ____ 12_.001 •
E _-_}concrete Cylinder P~ck up __ • __ _ --i-40.0~l~our -88.00 -• $3,520.007
Work Activity Detail Qty Units Hrs/Unit Extension
Cylinder Pickup • • • •• 16.00 Trips • 2.50 .-40.00\
~i:~: ~~3 __ !~~:~;~:::sting -.. -= ! ~~=--~_!~?0
L ___ !t~~;~~
209 I Verification Sample pick-up ____ I 14.00 Hour • 88.00 ' ·----·$1,232.-0-0 !
7Wc,rk Activity Detail ·--QtyUnits Hrs/Unit Extension
I Verification Sample Pick-up ___ 4.00 Trips 3.50 14.00'
[
2689 __ -I MnDOT Asphalt Verification, per sample 4.00 Each 710.00
221 j Bituminous Coring 110.00
Work Activity _D_e~ta_il____ QtyUnits
Mark & Observe Contractor Coring & Testing--4.00 Trips
Hrs/Unit Extension
--4-.-50--18.00
Thickness and Density of Bituminous Core 16.oo [Eacii 56.oo
11/11/2022 08:17 AM
$2,840.00 i
$1 ,980.00j
$896.00
Page 1 of 2
BRAUN
INTERTEC
The Science You Build On.
11/11/2022 08:17 AM
Project Proposal
QTB168805
Otter Tail County Fir-Friberg Roundabout Project
Proposal Total:! $37,431.001
Page 2 of 2
General Conditions
Construction Material Testing and Special Inspections
Section 1: Agreement
1.1 Our agreement with you consists of these
General Conditions and the accompanying written
proposal or authorization ("Agreement"). This
Agreement is the entire agreement between you
and us. It supersedes prior agreements. It may be
modified only in a writing signed by us, making
specific reference to ttie provision modified.
1.2 The words "you," "we," "us," and "our11
include officers, employees, and subcontractors.
1.3 In the event you use a purchase order or
other documentation to authorize our scope of
work ("Services"), any conflicting or additional
terms are not part of this Agreement. Directing us
to start work prior to execution of this Agreement
constitutes your acceptance. If, however, mutually
acceptable terms cannot be established, we have
the right to terminate this Agreement without
liability to you or others, and you will compensate
us for fees earned and expenses incurred up to the
time of termination.
Section 2: Our Responsibilities
2.1 We will provide Services specifically
described in this Agreement. You agree that we
are not responsible for services that are not
expressly included in this Agreement. Unless
otherwise agreed in writing, our findings, opinions,
and recommendations will be provided to you in
writing. You agree not to rely on oral findings,
opinions, or recommendations without our
written approval.
2.2 In performing our professional services, we
will use that degree of care and skill ordinarily
exercised under similar circumstances by
reputable members of our profession practicing in
the same locality. If you direct us to deviate from
our recommended procedures, you agree to hold
us harmless from claims, damages, and expenses
arising out of your direction. If during the one year
period following completion of Services it Is
determined that the above standards have not
been met and you have promptly notified us in
writing of such failure, we will perform, at our
cost, such corrective services as may be necessary,
within the original scope in this Agreement, to
remedy such deficiency. Remedies set forth in this
section constitute your sole and exclusive recourse
with respect to the performance or quality of
Services.
2.3 We will reference our field observations and
sampling to available reference points, but we will
not survey, set, or check the accuracy of those
points unless we accept that duty in writing.
Locations of field observations or sampling
described in our report or shown on our sketches
are based on information provided by others or
estimates made by our personnel. You agree that
such dimensions, depths, or elevations are
approximations unless specifically stated
otherwise in the report. You accept the inherent
risk that samples or observations may not be
representative of things not sampled or seen and
GC-CMT
further that site conditions may vary over distance
or change over time.
2.4 Our duties do not include supervising or
directing your representatives or contractors or
commenting on, overseeing, or providing the
means and methods of their services unless
expressly set forth in this Agreement. We will not
be responsible for the failure of your contractors,
and the providing of Services will not relieve
others of their responsibilities to you or to others.
2.5 We will provide a health and safety program
for our employees, but we will not be responsible
for contractor, owner, project, or site health or
safety.
2.6 You will provide, at no cost to us,
appropriate site safety measures as to work areas
to be observed or inspected by us. Our employees
are authorized by you to refuse to work under
conditions that may be unsafe.
2.7 Unless a fixed fee is indicated, our price is an
estimate of our project costs and expenses based
on information available to us and our experience
and knowledge. Such estimates are an exercise of
our professional judgment and are not guaranteed
or warranted. Actual costs may vary. You should
allow a contingency in addition to estimated costs.
Section 3: Your Responsibilities
3.1 You will provide us with prior environmental,
geotechnical and other reports, specifications,
plans, and information to which you have access
about the site. You agree to provide us with all
plans, changes in plans, and new information as to
site conditions until we have completed Services.
3.2 You will provide access to the site. In the
performance of Services some site damage is
normal even when due care is exercised. We will
use reasonable care to minimize damage to the
site. We have not included the cost of restoration
of damage in the estimated charges.
3.3 If we notify you that radiographic or gamma
ray equipment or other nuclear testing or
measuring device will be used, you will be
responsible for the cooperation of your employees
and your contractors in observing all radiation
safety standards.
3.4 You will notify us of any knowledge or
suspicion of the presence of hazardous or
dangerous materials present on any work site. If
we observe or suspect the presence of
contaminants not anticipated in this Agreement,
we may terminate Services without liability to you
or to others, and you will compensate us for fees
earned and expenses incurred up to the time of
termination.
3.5 The time our field personnel spend on the
job site depends upon the scheduling of the work
we are observing or testing. You agree that any
changes in scheduling may result in additional
BRAUN
INTERTEC
costs and agree to pay for those services at the
rates listed in our cost estimate.
3.6 You agree to include us as an indemnified
party in your contracts, if any, for work by others
on the project, protecting us to the same degree
as you are protected. You agree to list us as an
Additional Insured under your liability insurance
policies and to require subrogation be waived
against us and that we will be added as an
Additional Insured on all policies of insurance,
including any policies required of your contractors
or subcontractors, covering any construction or
development activities to be performed on the
project site.
Section 4: Reports and Records
4.1 Unless you request otherwise, we will
provide our report(s) in an electronic format.
4.2 Our reports, notes, calculations, and other
documents and our computer software and data
are instruments of our service to you, and they
remain our property. We hereby grant you a
license to use the reports and related information
we provide only for the related project and for the
purposes disclosed to us. You may not transfer our
reports to others or use them for a purpose for
which they were not prepared without our written
approval. You agree to indemnify, defend, and
hold us harmless from claims, damages, losses,
and expenses, including attorney fees, arising aut
of such a transfer or use.
4.3 If you do not pay for Services in full as
agreed, we may retain work not yet delivered to
you and you agree to return to us all of our work
that is in your possession or under your control.
4.4 Electronic data, reports, photographs,
samples, and other materials provided by you or
others may be discarded or returned to you, at our
discretion, unless within 15 days of the report date
you give us written direction to store or transfer
the materials at your expense.
Section 5: Compensation
5.1 You will pay for Services as stated in this
Agreement. If such payment references our
Schedule of Charges, the invoicing will be based
upon the most current schedule. An estimated
amount is not a firm figure. You agree to pay all
sales taxes and other taxes based on your
payment of our compensation. Our performance is
subject to credit approval and payment of any
specified retainer.
5.2 You will notify us of billing disputes within 15
days. You will pay undisputed portions of invoices
upon receipt. You agree to pay interest on unpaid
balances beginning 30 days after invoice dates at
the rate of 1.5% per month, or at the maximum
rate allowed by law.
5.3 If you direct us to invoice a third party, we
may do so, but you agree to be responsible for our
compensation unless the third party is
Page 1 of 2
creditworthy (in our sole opinion) and provides
written acceptance of all terms of this Agreement.
5.4 Your obligation to pay for Services under this
Agreement is not contingent on your ability to
obtain financing, governmental or regulatory
agency approval, permits, final adjudication of any
lawsuit, your successful completion of any project,
receipt of payment from a third party, or any
other event. No retainage will be withheld.
5.5 If you do not pay us in accordance with this
Agreement, you agree to reimburse all costs and
expenses for collection of the moneys-invoiced,
including but not limited to attorney fees and staff
time.
5.6 You agree to compensate us in accordance
with our Schedule of Charges if we are asked or
required to respond to legal process arising out of
a proceeding related to the project and as to
which we are not a party.
5.7 If we are delayed by factors beyond our
control, or if project conditions or the scope or
amount of work changes, or if changed labor
conditions result in increased costs, decreased
efficiency, or delays, or if the standards or
methods change, we will give you timely notice,
the schedule will be extended for each day of
delay, and we will be compensated for costs and
expenses incurred in accordance with our
Schedule of Charges.
5.8 If you fail to pay us in accordance with this
Agreement, we may consider the default a total
breach of this Agreement and, at our option,
terminate our duties without liability to you or to
others, and you will compensate us for fees
earned and expenses incurred up to the time of
termination.
5.9 In consideration of our providing insurance
to cover claims made by you, you hereby waive
any right to offset fees otherwise due us.
Section 6: Disputes, Damage, and Risk Allocation
6.1 Each of us will exercise good faith efforts to
resolve disputes without litigation. Such efforts
will include, but not be limited to, a meeting(s)
attended by each party's representative(s)
empowered to resolve the dispute. Before either
of us commences an action against the other,
disputes (except collections) will be submitted to
mediation.
6.2 Notwithstanding anything to the contrary in
this Agreement, neither party hereto shall be
responsible or held liable to the other for
punitive, indirect, incidental, or consequential
damages, or liability for loss of use, loss of
GC-CMT
business opportunity, loss of profit or revenue,
loss of product or output, or business
Interruption.
6.3 You and we agree that any action in relation
to an alleged breach of our standard of care or this
Agreement shall be commenced within one year
of the date of the breach or of the date of
substantial completion of Services, whichever is
earlier, without regard to the date the breach is
discovered. Any action not brought within that
one year time period shall be barred, without
regard to any other limitations period set forth by
law or statute. We will not be liable unless you
have notified us within 30 days of the date of such
breach and unless you have given us an
opportunity to investigate and to recommend
ways of mitigating damages. You agree not to
make a claim against us unless you have provided
us at least 30 days prior to the institution of any
legal proceeding against us with a written
certificate executed by an appropriately licensed
professional specifying and certifying each and
every act or omission that you contend constitutes
a violation of the standard of care governing our
professional services. Should you fail to meet the
conditions above, you agree to fully release us
from any liability for such allegation.
6.4 For you to obtain the benefit of a fee which
Includes a reasonable allowance for risks, you
agree that our aggregate liability for all claims
will not exceed the fee paid for Services or
$50,000, whichever is greater. If you are
unwilling to accept this a/location of risk, we will
increase our aggregate liability to $100,000
provided that, within 10 days of the date of this
Agreement, you provide payment in an amount
that will increase our fees by 10%, but not less
than $500, to compensate us for the greater risk
undertaken. This increased fee is not the purchase
of insurance.
6.5 You agree to indemnify us from all llobility
to others in excess of the risk a/location stated
herein and to Insure this obligation. In addition,
oil indemnities and limitations of liabillty set
forth in this Agreement apply however the same
may arise, whether in contract, tort, statute,
equity or other theory of law, including, but not
limited to, the breach of any legal duty or the
fault, negligence, or strict I/ability of either party.
6.6 This Agreement shall be governed,
construed, and enforced in accordance with the
laws of the state in which our servicing office is
located, without regard to its conflict of laws rules.
The laws of the state of our servicing office will
govern all disputes, and all claims shall be heard in
the state or federal courts for that state. Each of
us waives trial by jury.
Revised 1/1/2018
6.7 No officer or employee acting within the
scope of employment shall have individual liability
for his or her acts or omissions, and you agree not
to make a claim against individual officers or
employees.
Section 7: General Indemnification
7.1 We will indemnify and hold you harmless
from and against demands, damages, and
expenses of others to the comparative extent they
are caused by our negligent acts or omissions or
those negligent acts or omissions of persons for
whom we are legally responsible. You will
indemnify and hald us harmless from and against
demands, damages, and expenses of others to the
comparative extent they are caused by your
negligent acts or omissions or those negligent acts
or omissions of persons for whom you are legally
responsible.
7.2 To the extent it may be necessary to
indemnify either of us under Section 7 .1, you and
we expressly waive, in favor of the other only, any
immunity or exemption from liability that exists
under any worker compensation law.
Section 8: Miscellaneous Provisions
8.1 We will provide a certificate of insurance to
you upon request. Any claim as an Additional
Insured shall be limited to losses caused by our
negligence.
8.2 You and we, for ourselves and our insurers,
waive all claims and rights of subrogation for
losses arising out of causes of loss covered by our
respective insurance policies.
8.3 Neither of us will assign or transfer any
interest, any claim, any cause of action, or any
right against the other. Neither of us will assign or
otherwise transfer or encumber any proceeds or
expected proceeds or compensation from the
project or project claims to any third person,
whether directly or as collateral or otherwise.
8.4 This Agreement may be terminated early
only in writing. You will compensate us for fees
earned for performance completed and expenses
incurred up to the time of termination.
8.5 If any provision of this Agreement is held
invalid or unenforceable, then such provision will
be modified to reflect the parties' intention. All
remaining provisions of this Agreement shall
remain in full force and effect.
8.6 No waiver of any right or privilege of either
party will occur upon such party's failure to insist
on performance of any term, condition, or
instruction, or failure to exercise any right or
privilege or its waiver of any breach.
Page 2 of 2
BRAUN
INTERTEC
The Science You Build On.
November 11, 2022
David L. Betts, PE
Stonebrooke Engineering, Inc.
12279 Nicollet Avenue
Burnsville, MN 55337
Re: Proposal for a Geotechnical Evaluation
Braun lntertec Corporation
1826 Buerkle Road
Saint Paul, MN 55110
Proposal QTB168642
Otter Tail County Fir-Friberg Roundabout Project
Otter Tail County, Minnesota
Dear Mr. Betts:
Phone: 651.487.3245
Fax: 651.487.1812
Web: braunintertec.com
Braun lntertec Corporation respectfully submits this proposal to complete a geotechnical evaluation for
the Otter Tail County Roundabout project located in Fergus Falls at the intersection of Fir Avenue and
Friberg Avenue in Otter Tail County, Minnesota.
Project Information
Per the information provided, we understand the proposed project will include the construction of a
roundabout at the intersection Fir Avenue (CSAH l} and Friberg Avenue. We understand pavements will
be constructed with bituminous and that a pond may be constructed as part of the project.
It has been requested that we perform a geotechnical evaluation including soil borings and provide
recommendations for design and construction of the project.
Purpose
The purpose of our geotechnical evaluation will be to characterize subsurface geologic conditions at
selected boring locations, evaluate their impact on the project, and provide geotechnical
recommendations for the design and construction of the roundabout.
Scope of Services
We propose the following tasks to help achieve the stated purpose. If we encounter unfavorable or
unforeseen conditions during the completion of our tasks that lead us to recommend an expanded scope
of services, we will contact you to discuss the conditions before resuming our services.
Site Access
Based on the map provided and our review in Google Earth, it appears that the site is accessible to a truck
drill rig. We assume there will be no cause for delays in accessing the boring locations. We are not including
tree clearing, debris or obstruction removal, grading of navigable paths, or snow plowing.
AA/EOE
Stonebrooke Engineering, Inc.
Proposal QTB168642
November 11, 2022
Page 2
Depending on access requirements, ground conditions or potential utility conflicts, our field crew may
alter the boring locations from those proposed to facilitate accessibility.
Our drilling activities may also impact the vegetation and may rut the surface to access boring locations.
Restoration of vegetation and turf is not part of our scope of services.
Staking
We will stake prospective boring locations using GPS (Global Positioning System) technology at selected
boring locations. Elevations will be obtained at the time of staking. For purposes of linking the GPS data
to an appropriate reference, we request that you provide CAD files indicating location/elevation
references appropriate for this project, or give us contact information for the consultant that might have
such information.
Utility Clearance
Prior to drilling, we will contact Gopher State One Call and arrange for notification of the appropriate
utility vendors to mark and clear the boring locations of public underground utilities. You, or your
authorized representative, are responsible to notify us before we begin our work of the presence and
location of any underground objects or private utilities that are not the responsibility of public agencies.
Penetration Test Borings
We propose to drill a total of six standard penetration test borings for the project, extending them to a
depth of 10 feet each. We will perform standard penetration tests at 2 1/2-foot vertical intervals to the
termination depth.
If the borings encounter groundwater during or immediately after drilling of each boring, we will record
the observed depth on the boring logs.
If the intended boring depths do not extend through unsuitable material, we will extend the borings at
least 5 feet into suitable material at greater depths. The additional information will help evaluate such
issues as excavation depth and consolidation settlement, among others. If we identify a need for deeper
(or additional) borings based on our findings, we will contact you prior to increasing our total estimated
drilled footage and submit a Change Order summarizing the anticipated additional effort and the
associated cost, for your review and authorization.
MDH Notification and Sealing Record
Since our planned borings will be less than 15 feet in depth, the Minnesota Statutes will not require that we
complete any notifications or sealing records. If we extend any of the borings to a depth of 15 feet or
greater, the Statutes requires that we seal the boreholes and complete a Sealing Record. If 25 feet or
greater, the Statutes also require us to complete a Sealing Notification Form. If the Record or Form are
required, we will contact you to discuss the additional fees and sealing requirements.
Borehole Abandonment
We will backfill our boring locations immediately after completing the drilling at each location. We
currently do not anticipate having to seal any of the borings.
BRAUN
INTERTEC
Stonebrooke Engineering, Inc.
ProposalQTB168642
November 11, 2022
Page3
Upon backfilling boring locations, we will fill holes in pavements with a temporary patch. Over time,
subsidence of borehole (core) backfill may occur, requiring releveling of surface grades or replacing
bituminous or concrete patches. We are not assuming responsibility for re-leveling or re-patching after
we complete our fieldwork.
Traffic Control
Based on Annual Average Daily Traffic (AADT) counts for the project area which vary between about
6,400 and 9,200 vehicles per day, traffic control will be required. The cost for traffic control has been
included in our cost estimate.
Sample Review and Laboratory Testing
We will return recovered samples to our laboratory, where a geotechnical engineer will visually classify
and log them. To help classify the materials encountered and estimate the engineering properties
necessary to our analyses, we anticipate performing 8moisture content tests, 4 mechanical analyses
(through a #200 sieve only), 2 organic content tests and 1 full sieve analysis test. We will adjust the actual
number and type of tests based on the results of our borings.
Engineering Analyses
We will use data obtained from the boring and laboratory tests to evaluate the subsurface profile and
groundwater conditions, and to perform engineering analyses related to pavement design and
performance.
Report
We will prepare a report including:
•
•
•
•
•
•
•
•
A CAD sketch showing the boring locations .
Logs of the Borings describing the materials encountered and presenting the results of our
groundwater measurements and laboratory tests.
A summary of the subsurface profile and groundwater conditions .
Discussion identifying the subsurface conditions that will impact design and construction .
Discussion regarding the reuse of on-site materials during construction .
Recommendations for preparing pavement subgrades, and the selection, placemerit and
compaction of fill.
Recommendations for the design and construction of the project including bituminous
pavement designs and estimated R-value.
Estimated infiltration rates for the planned pond .
We will submit an electronic copy of our report to you.
BRAUN
INTERTEC
Stonebrooke Engineering, Inc.
Proposal QTB168642
November 11, 2022
Page4
Schedule
We anticipate performing our work according to the following schedule.
■ Drill rig mobilization -within about 2 to 3 weeks of project authorization
■ Field exploration -about 1 and 1/2 days on site to complete the work
■ Classification and laboratory testing -within 1 to 2 weeks after completion of field
exploration
■ Preliminary results -within about 1 week after completion of field exploration
■ Final report submittal -within three weeks of completing field work and laboratory testing.
If we cannot complete our proposed scope of services according to this schedule due to circumstances
beyond our control, we may need to revise this proposal prior to completing the remaining tasks.
Fees
We will furnish the services described in this proposal for an estimated fee of $9,551. We are attaching a
tabulation showing hourly and/or unit rates associated with our proposed scope of services.
Our work may extend over several invoicing periods. As such, we will submit partial progress invoices for
work we perform during each invoicing period.
General Remarks
We will be happy to meet with you to discuss our proposed scope of services further and clarify the
various scope components.
We appreciate the opportunity to present this proposal to you . Please sign and return a copy to us in its
entirety.
We based the proposed fee on the scope of services described and the assumptions that you will
authorize our services within 30 days and that others will not delay us beyond our proposed schedule.
BRAUN
INTERTEC
Stonebrooke Engineering, Inc.
Proposal QTB168642
November 11, 2022
Pages
We include the Braun lntertec General Conditions, which provide additional terms and are a part of our
agreement.
To have questions answered or schedule a time to meet and discuss our approach to this project further,
please contact Amy Grothaus at 651.261.7122 or agrothaus@braunintertec.com.
Sincerely,
BRAUN INTERTEC CORPORATION
rfll1t~~
Amy J. Grothaus, PE
Account Manager, Senior Engineer
Charles M. Cadenhead Jr, PE
Vice President, Principal Engineer
Attachments:
Tabular Cost Estimate
General Conditions (1/1/18)
The proposal is accepted, and you are authorized to proceed.
Authorizer's Firm
Authorizer's Signature
Authorizer's Name (please print or type)
Authorizer's Title
Date
BRAUN
INTERTEC
BRAUN
INTERTEC
The Science You Build On.
Client: .... Stonebrooke Engineering, Inc
David Betts
12279 Nicollet Ave S.
Burnsville, MN 55337
(952) 402-9202
! Description
Project Proposal
QTB168642
Otter Tail County Fir-Friberg Roundabout Project
-lwork0 Sit;··Aidress~---• •• 1 F;;; •• llesc,;pt,~n, -
' Fir-Friberg lnte;-se--c-ti--o-n _________ Geotechnical Eva-,u-a-iton---
Fergus Falls, MN
-----__ J _______ _ 11 ! I
Quantity !Units Unit Pricej Extension:
[
Proposal Total:j $9,551.00 I
11/11/2022 09:43 AM Page 1 of 1
General Conditions
Section 1: Agreement
1.1 Our agreement with you consists of these
General Conditions and the accompanying written
proposal or authorization ("Agreement"). This
Agreement is the entire agreement between you
and us. It supersedes prior agreements. It may be
modified only in a writing signed by us, making
specific reference to the provision modified.
1.2 The words "you," "we," "us," and "our"
include officers, employees, and subcontractors.
1.3 In the event you use a purchase order or
other documentation to authorize our scope of
work ("Services"), any conflicting or additional
terms are not part of this Agreement. Directing us
to start work prior to execution of this Agreement
constitutes your acceptance. If, however, mutually
acceptable terms cannot be established, we have
the right to terminate this Agreement without
liability to you or others, and you will compensate
us for fees earned and expenses incurred up to the
time of termination.
Section 2: Our Responsibilities
2.1 We will provide Services specifically
described in this Agreement. You agree that we
are not responsible for services that are not
expressly included in this Agreement. Unless
otherwise agreed in writing, our findings, opinions,
and recommendations will be provided to you in
writing. You agree not to rely on oral findings,
opinions, or recommendations without our
written approval.
2.2 In performing our professional services, we
will use that degree of care and skill ordinarily
exercised under similar circumstances by
reputable members of our profession practicing in
the same locality. If you direct us to deviate from
our recommended procedures, you agree to hold
us harmless from claims, damages, and expenses
arising out of your direction. If during the one year
period following completion of Services it is
determined that the above standards have not
been met and you have promptly notified us in
writing of such failure, we will perform, 'at our
cost, such corrective services as may be necessary,
within the original scope in this Agreement, to
remedy such deficiency. Remedies set forth in this
section constitute your sole and exclusive recourse
with respect to the performance or quality of
Services.
2.3 We will reference our field observations and
sampling to available reference points, but we will
not survey, set, or check the accuracy of those
points unless we accept that duty in writing.
Locations of field observations or sampling
described in our report or shown on our sketches
are based on information provided by others or
estimates made by our personnel. You agree that
such dimensions, depths, or elevations are
approximations unless specifically stated
otherwise in the report. You accept the inherent
risk that samples or observations may not be
representative of things not sampled or seen and
further that site conditions may vary over distance
or change over ti me.
GC
2.4 Our duties do not include supervising or
directing your representatives or contractors or
commenting on, overseeing, or providing the
means and methods of their services unless
expressly set forth in this Agreement. We will not
be responsible for the failure of your contractors,
and the providing of Services will not relieve
others of their responsibilities to you or to others.
2.5 We will provide a health and safety program
for our employees, but we will not be responsible
for contractor, owner, project, or site health or
safety.
2.6 You will provide, at no cost to us,
appropriate site safety measures as to work areas
to be observed or inspected by us. Our employees
are authorized by you to refuse to work under
conditions that may be unsafe.
2.7 Unless a fixed fee is indicated, our price is an
estimate of our project costs and expenses based
on information available to us and our experience
and knowledge. Such estimates are an exercise of
our professional judgment and are not guaranteed
or warranted. Actual costs may vary. You should
allow a contingency in addition to estimated costs.
Section 3: Your Responsibilities
3.1 You will provide us with prior environmental,
geotechnical and other reports, specifications,
plans, and information to which you have access
about the site. You agree to provide us with all
plans, changes in plans, and new information as to
site conditions until we have completed Services.
3.2 You will provide access to the site. In the
performance of Services some site damage is
normal even when due care is exercised. We will
use reasonable care to minimize damage to the
site. We have not included the cost of restoration
of damage in the estimated charges.
3.3 You agree to provide us, in a timely manner,
with information that you have regarding buried
objects at the site. We will not be responsible for
locating buried objects at the site. You agree to
hold us harmless, defend, and indemnify us from
claims, damages, losses, penalties and expenses
(including attorney fees) involving buried objects
that were nat properly marked or identified or of
which you had knowledge but did not timely call to
our attention or correctly show on the plans you or
others furnished to us.
3.4 You will notify us of any knowledge or
suspicion of the presence of hazardous or
dangerous materials present on any work site or in
a sample provided to us. You agree to provide us
with information in your possession or control
relating to such materials or samples. If we
observe or suspect the presence of contaminants
not anticipated in this Agreement, we may
terminate Services without liability to you or to
others, and you will compensate us for fees
earned and expenses incurred up to the time of
termination.
BRAUN
INTERTEC
3.5 Neither this Agreement nor the providing of
Services will operate to make us an owner,
operator, generator, transporter, treater, storer,
or a disposal facility within the meaning of the
Resource Conservation Recovery Act, as amended,
or within the meaning of any other law governing
the handling, treatment, storage, or disposal of
hazardous substances. You agree to hold us
harmless, defend, and indemnify us from any
damages, claims, damages, penalties or losses
resulting from the storage, removal, hauling or
disposal of such substances.
3.6 Monitoring wells are your property, and you
are responsible for their permitting, maintenance,
and abandonment unless expressly set forth
otherwise in this Agreement.
3.7 You agree to make all disclosures required by
law. In the event you do not own the project site,
you acknowledge that it is your duty to inform the
owner of the discovery or release of contaminants
at the site. You agree to hold us harmless, defend,
and indemnify us from claims, damages, penalties,
or losses and expenses, including attorney fees,
related to failures to make disclosures, disclosures
made by us that are required by law, and from
claims related to the informing or failure to inform
the site owner of the discovery of contaminants.
Section 4: Reports and Records
4.1 Unless you request otherwise, we will
provide our report in an electronic format.
4.2 Our reports, notes, calculations, and other
documents and our computer software and data
are instruments of our service to you, and they
remain our property. We hereby grant you a
license to use the reports and related information
we provide only for the related project and for the
purposes disclosed to us. You may not transfer our
reports to others or use them for a purpose for
which they were not prepared without our written
approval. You agree to indemnify, defend, and
hold us harmless from claims, damages, losses,
and expenses, including attorney fees, arising out
of such a transfer or use.
4.3 If you do not pay for Services in full as
agreed, we may retain work not yet delivered to
you and you agree to return to us all of our work
that is in your possession or under your control.
4.4 Samples and field data remaining after tests
are conducted and field and laboratory equipment
that cannot be adequately cleansed of
contaminants are and continue to be your
property. They may be discarded or returned to
you, at our discretion, unless within 15 days of the
report date you give us written direction to store
or transfer the materials at your expense.
4.5 Electronic data, reports, photographs,
samples, and other materials provided by you or
others may be discarded or returned to you, at our
discretion, unless within 15 days of the report date
you give us written direction to store or transfer
the materials at your expense.
Page 1 of 2
Section 5: Compensation
5.1 You will pay for Services as stated in this
Agreement. If such payment references our
Schedule of Charges, the invoicing will be based
upon the most current schedule. An estimated
amount is not a firm figure. You agree to pay all
sales taxes and other taxes based on your
payment of our compensation. Our performance is
subject to credit approval and payment of any
specified retainer.
5.2 You will notify us of billing disputes within 15
days. You will pay undisputed portions of invoices
upon receipt. You agree to pay interest on unpaid
balances beginning 30 days after invoice dates at
the rate of 1.5% per month, or at the maximum
rate allowed by law.
5.3 If you direct us to invoice a third party, we
may do so, but you agree to be responsible for our
compensation unless the third party is
creditworthy (in our sole opinion) and provides
written acceptance of all terms of this Agreement.
5.4 Your obligation to pay for Services under this
Agreement is not contingent on your ability to
obtain financing, governmental or regulatory
agency approval, permits, final adjudication of any
lawsuit, your successful completion of any project,
receipt of payment from a third party, or any
other event. No retain age will be withheld.
5.5 If you do not pay us in accordance with this
Agreement, you agree to reimburse all costs and
expenses for collection of the moneys invoiced,
including but not limited to attorney fees and staff
time.
5.6 You agree to compensate us in accordance
with our Schedule of Charges if we are asked or
required to respond to legal process arising out of
a proceeding related to the project and as to
which we are not a party.
5.7 If we are delayed by factors beyond our
control, or if project conditions or the scope or
amount of work changes, or if changed labor
conditions result in increased costs, decreased
efficiency, or delays, or if the standards or
methods change, we will give you timely notice,
the schedule will be extended for each day of
delay, and we will be compensated for costs and
expenses incurred in accordance with our
Schedule of Charges.
5.8 If you fail to pay us in accordance with this
Agreement, we may consider the default a total
breach of this Agreement and, at our option,
terminate our duties without liability to you or to
others, and you will compensate us for fees
earned and expenses incurred up to the time of
termination.
5.9 In consideration of our providing insurance
to cover claims made by you, you hereby waive
any right to offset fees otherwise due us.
Section 6: Disputes, Damage, and Risk Allocation
6.1 Each of us will exercise good faith efforts to
resolve disputes without litigation. Such efforts
will include, but not be limited to, a meeting(s)
GC
attended by each party's representative(s)
empowered to resolve the dispute. Before either
of us commences an action against the other,
disputes (except collections) will be submitted to
mediation.
6.2 Notwithstanding anything to the contrary in
this Agreement, neither party hereto shall be
responsible or held liable to the other for
punitive, indirect, incidental, or consequential
damages, or I/ability for loss of use, Joss of
business opportunity, loss of profit or revenue,
loss of product or output, or business
interruption.
6.3 You and we agree that any action in relation
to an alleged breach of our standard of care or this
Agreement shall be commenced within one year
of the date of the breach or of the date of
substantial completion of Services, whichever is
earlier, without regard to the date the breach is
discovered. Any action not brought within that
one year time period shall be barred, without
regard to any other limitations period set forth by
law or statute. We will not be liable unless you
have notified us within 30 days of the date of such
breach and unless you have given us an
opportunity to investigate and to recommend
ways of mitigating damages. You agree not to
make a claim against us unless you have provided
us at least 30 days prior to the institution of any
legal proceeding against us with a written
certificate executed by an appropriately licensed
professional specifying and certifying each and
every act or omission that you contend constitutes
a violation of the standard of care governing our
professional services. Should you fail to meet the
conditions above, you agree to fully release us
from any liability for such allegation.
6.4 For you to obtain the benefit of a fee which
Includes a reasonable allowance for risks, you
agree that our aggregate I/ability for all claims
will not exceed the fee paid for Services or
$50,000, whichever is greater. If you are
unwilling to accept this allocation of risk, we will
increase our aggregate Jiab/1/ty to $100,000
provided that, within 10 days of the date of this
Agreement, you provide payment in an amount
that will increase our fees by 10%, but not less
than $500, to compensate us for the greater risk
undertaken. This increased fee is not the purchase
of insurance.
6.5 Yau agree to indemnify us from all liability
to others In excess of the risk allocation stated
herein and to insure this obllgation. In addition,
all indemnities and limitations of liability set
forth in this Agreement apply however the same
may arise, whether in contract, tort, statute,
equity or other theory of low, including, but not
limited ta, the breach of any legal duty or the
fault, negligence, or strict liability of either party.
6.6 This Agreement shall be governed,
construed, and enforced in accordance with the
laws of the state in which our servicing office is
located, without regard to its conflict of laws rules.
The laws of the state of our servicing office will
govern ail disputes, and ail claims shall be heard in
the state or federal courts for that state. Each of
us waives trial by jury.
Revised 1/1/2018
6.7 No officer or employee acting within the
scope of employment shall have individual liability
for his or her acts or omissions, and you agree not
to make a claim against individual officers or
employees.
Section 7: General Indemnification
7 .1 We will indemnify and hold you harmless
from and against demands, damages, and
expenses of others to the comparative extent they
are caused by our negligent acts or omissions or
those negligent acts or omissions of persons far
wham we are legally responsible. You will
indemnify and hold us harmless from and against
demands, damages, and expenses of others to the
comparative extent they are caused by your
negligent acts or omissions or those negligent acts
or omissions of persons for whom you are legally
responsible.
7.2 To the extent it may be necessary to
indemnify either of us under Section 7.1, you and
we expressly waive, in favor of the other only, any
immunity or exemption from liability that exists
under any worker compensation law.
7.3 You agree to indemnify us against losses and
costs arising out of claims of patent or copyright
infringement as to any process or system that is
specified or selected by you or by others on your
behalf.
Section 8: Miscellaneous Provisions
8.1 We will provide a certificate of insurance to
you upon request. Any claim as an Additional
Insured shall be limited to losses caused by our
negligence.
8.2 You and we, for ourselves and our insurers,
waive ail claims and rights of subrogation for
losses arising out of causes of loss covered by our
respective insurance policies.
8.3 Neither of us will assign or tra_nsfer any
interest, any claim, any cause of action, or any
right against the other. Neither of us will assign or
otherwise transfer or encumber any proceeds or
expected proceeds or compensation from the
project or project claims to any third person,
whether directly or as collateral or otherwise.
8.4 This Agreement may be terminated early
• only in writing. You will compensate us for fees
earned for performance completed and expenses
incurred up to the time of termination.
8.5 If any provision of this Agreement is held
invalid or unenforceable, then such provision will
be modified to reflect the parties' intention. Ail
remaining provisions of this Agreement shall
remain in full force and effect.
8.6 No waiver of any right or privilege of either
party will occur upon such party's failure to insist
on performance of any term, condition, or
instruction, or failure to exercise any right or
privilege or its waiver of any breach.
Page 2 of 2
~ Stonebrooke
CLIENT: Otter Tail County
PROJECT: Fir Avenue (CSAH 1) & Friberg Avenue Intersection Improvement Project Project CONSULTANT: Stonebrooke Engineering, Inc.
Manager
Task No. Work Task Description
TASK 1.0 PROJECT MANAGEMENT 123
TASK 2.0 PUBLIC INVOLVEMENT & AGENCY COORDINATION 32
TASK 3.0 UTILITY COORDINATION 1
TASK4.0 TOPOGRAPHIC SURVEY & RIGHT OF WAY 0
TASK 5.0 TRAFFIC ANALYSIS 0
TASK 6.0 PRELIMINARY ENGINEERING 12
TASK 7.0 DRAINAGE DESIGN 6
TASK 8.0 FINAL CONSTRUCTION PLANS/DOCUMENTS 45
TASK 9.0 PROJECT SUBMITTAL AND BIDDING ASSISTANCE 6
TASK 10.0 PERMITS 0
TASK 11.0 CONSTRUCTION ADMINISTRATION AND INSPECTION (STONEBROOKE 8 SUPPLEMENTAL ASSISTANCE)
TOTAL HOURS 233
AVERAGE HOURLY RATE $222.56
TOTAL STONEBROOKE LABOR COST $51,856.48
EXPENSES (printing, plan set, mileage, etc.)
PROJECT FEE (Stonebrooke Engineering)
SUBCONSULTANT-Braun lntertec (geotechnical investigation)
SUBCONSULTANT • Braun lntertec (materials testing)
COST PROPOSAL
Fir Avenue (CSAH 1) & Friberg Avenue Intersection Improvement Project
Otter Tail County
Sr. Trans. Traffic Senior Project Project Design Sr CADD Tech Engineer Engineer Engineer Engineer Engineer
0 0 39 0 0 0
0 0 64 0 5 0
0 0 18 37 0 0
0 0 4 6 0 0
33 0 0 66 0 0
0 0 107 170 0 0
0 0 8 8 18 0
0 93 158 374 204 137
0 0 14 24 4 0
0 0 0 4 0 0
0 0 16 14 0 0
33 93 428 703 231 137
$160.00 $167.99 $120.91 $105.93 $133.75 $90.95
$5,280.00 $15,623.07 $51,749.48 $74,468.79 $30,896.25 $12,460.15
SUBCONSULTANT -Moore Engineering (construction administration, construction inspection, construction staking)
TOTAL PROJECT FEE including all Subconsultants
Drainage Drainage Graphic One-Person Project Design RLS Total Hours Total Cost
J:',..winoor ~nafna M Specialist Survey Crew
0 0 0 0 0 162 $32,090.37
0 0 28 0 0 129 $18,584.83
0 0 0 9 0 65 $7,637.66
0 0 0 66 40 116 $16,794.16
0 0 0 0 0 99 $12,271.38
0 0 0 0 0 289 $33,616.19
70 135 0 0 0 245 $25,341.88
12 28 0 0 0 1051 $127,922.78
0 0 0 0 0 48 $6,105.42
2 6 0 0 0 12 $1,177.00
0 0 0 0 0 38 $5,198.06
84 169 28 75 40 2254
$113.42 $87.74 $109.14 $146.59 $150.00
$9,527.28 $14,828.06 $3,055.92 $10,994.25 $6,000.00 $286,739.73
$2,058.00
$288,797.73
$9,551.00
$37,437.00
$153,722.50
$489,508.23
B DETAILED HOUR ESTIMATE
Stonebrooke ESTIMATED PERSON-HOURS AND FEES
Fir Avenue (CSAH 1) & Friberg Avenue Intersection Improvement Project
Otter Tail County
CLIENT: Otter Tail County
PROJECT: Fir Avenue (CSAH 1) & Friberg Avenue Intersection Improvement Project Senior Drainage Drainage
CONSULTANT: Stonebrooke Engineering, Inc. Project Sr. Trans. Traffic Project Design SrCADD Design Graphic One-Person Project Project Design RLS Totals Manager Engineer Engineer Engineer Engineer Tech Engineer Specialist Survey Crew
Task No. Work Task Description Engineer Engineer Engineer
TASK 1.0 PROJECT MANAGEMENT
1.01 General Project Mana ement (Assume Project Duration Janua 95 25 120
1.02 Project Schedule/lnvoicin Assume Pro·ect Duration January 2023 to Februa 16 16
1.03 Formal Team Meetin s one in Fer us Falls, one virtual 12 14 26
SUBTOTAL HOURS -TASK 1.0 123 0 0 39 0 0 0 0 0 0 0 0 0 162
TASK2.0 PUBLIC INVOLVEMENT & AGENCY COORDINATION
2.01 Project Kickoff and Informational Gathering Open House (in-person) 14 14 28
2.02 Project Open House to Present Final Design, Impacts (in-person) 14 14 28
2.03 Additional Graphics Needs Throughout Proiect for Open Houses 2 2 5 16 25
2.04 Postcard/Newsletter for Open House notification (assume the County will print and mail) 2 2 12 16
2.05 Coordinate with City of Fergus Falls on Public Utility Improvement Needs 10 10
2.06 Coordinate with surrounding business owners and property owners to determine appropriate design 22 22 and accomodatinR. vehicles.
SUBTOTAL HOURS -TASK 2.0 32 0 0 64 0 0 5 0 0 0 28 0 0 129
TASK3.0 UTILITY COORDINATION
3.01 GSOC Request for Maps (field marks and maps) 1 1
3.02 Compare Maps to Field Locations From County -Update Utility File As Necessary 4 4
3.03 Draw Up lnplace Utility Files 8 8
3.04 Utility Coordination Meetings (2 virtual) 10 10
3.05 On going Coordination During Design Process 1 4 25 30
3.06 Review and Coordination of Relocation Plans 4 8 12
SUBTOTAL HOURS -TASK 3.0 1 0 0 18 37 0 0 0 0 0 0 9 0 65
TASK 4.0 TOPOGRAPHIC SURVEY & RIGHT OF WAY
4.01 Field Topographic Survey (all by Moore Engineering) 0
4.02 Work with Subconsultant Moore on Processing Data and Preparing for Design 8 8
4.03 Determination of lnplace R/W 20 20 40
4.04 Draw Proposed ROW and TE Based on Design Needs 2 5 7
4.05 One Trip to Fergus Falls to Stake all Easements (assume 6) 2 20 22
4.06 Parcel Sketches and Legal Descriptions (assume 6) 2 1 36 39
SUBTOTAL HOURS -TASK 4.0 0 0 0 4 6 0 0 0 0 0 0 66 40 116
TASK 5.0 TRAFFIC ANALYSIS
5.01 Traffic Data Collection on Site (only to be completed if determined necessary) 26 26
5.02 ICE Report 33 40 73
SUBTOTAL HOURS -TASK 5.0 0 33 0 0 66 0 0 0 0 0 0 0 0 99
TASK 6.0 PRELIMINARY ENGINEERING
6.01 Concept Layout 4 35 60 99
6.02 Design Checks, including Turn Movement Analysis resulting from Outreach 3 10 20 33
6.03 Profiles, Alignments, Model, Surface 2 45 so 97
6.04 Cross Sections 1 10 25 36
6.05 Finalize Construction Limits 2 7 15 24
SUBTOTAL HOURS -TASK 6.0 12 0 0 107 170 0 0 0 0 0 0 0 0 289
~ Stonebrooke
CLIENT: Otter Tail County
PROJECT: Fir Avenue (CSAH 1) & Friberg Avenue Intersection Improvement Project
CONSULTANT: Stonebrooke Engineering, Inc.
Task No. Work Task Description
TASK 7.0 DRAINAGE DESIGN
7.01 Document Pre/Post Project Discharge Rates with brief summary memo
7.02 Storm Sewer Design/Plans/Tabulations
7.03 Storm Water Treatment Design & Grading Plan (assume 1 wet pond or infiltration basin)
SUBTOTAL HOURS -TASK 7.0
TASK 8.0 FINAL CONSTRUCTION PLANS/DOCUMENTS
8.01 Title Sheet/CAD Start Up Coordination
8.02 General Layout
8.03 Statement of Estimated Quantities
8.04 Soils and Construction Notes, Standard Plates and Tab Index
8.05 Typical Sections
8.06 Quantity Tabulations
8.07 Earthwork Tabulations
8.08 Miscellaneous Details
8.09 Standard Plans
8.10 Existing Topo, Utility, and Removal Plans, Including Utility Relocations/Impacts
8.11 Removal Plans
8.12 Alignment Plan and Tabulations
8.13 Roadway Plan & Profile Sheets
8.14 Intersection/ADA Details
8.15 Paving & Driveways Plan (assume Bituminous Paving)
8.16 Drainage Plan and Profile Sheets
8.17 Drainage Tabulation
8.18 Water Main and Sanitary Sewer (Assume full replacement -spot repairs and relocations would likely
be a slightly less effort)
8.19 Turf Establishment and Erosion Control Plan
8.20 Traffic Control wit h Detour Plan
8.21 Cross Section Sheets
8.22 Pavement Marking and Signing Plans
8.23 Lighting Plan
8.24 SWPPP
8.25 Preliminary Plan Set (70-80%)
8.26 Address Preliminary Plan Set Submittal Comments
8.27 Final Plan Set Package (including cost estimate)
8.28 Address any Final Plan set Comments Prior to State Aid Submittal
8.29 Submittal to State Aid and County for Final Approvals
8.30 Address any Final Plan and Spec Comments Prior to Bidding
8.31 Quality Control Plan Reviews
8.32 Special Provisions/Project Manual
SUBTOTAL HOURS -TASK 8.0
TASK9.0 PROJECT SUBMITTAL AND BIDDING ASSISTANCE
9.01 Submittal of the Work (includes final surface for construction)
9.02 Answer questions for bidders
9.03 Addenda as needed
SUBTOTAL HOURS -TASK 9.0
DETAILED HOUR ESTIMATE
ESTIMATED PERSON-HOURS AND FEES
Fir Avenue (CSAH 1) & Friberg Avenue Intersection Improvement Project
Otter Tail County
Project
Manager
4
2
6
1
1
Sr. Trans.
Engineer
0
See Task 7 Above
See Task 7 Above
4
2
1
1
1
1
1
1
1
30
45 0
4
2
6 0
Traffic
Engineer
0
28
40
25
93
0
Senior
Project
Engineer
4
4
8
1
4
1
6
10
6
2
4
4
8
10
6
4
1
2
1
8
8
20
8
8
20
6
10
158
10
4
14
Project
Engineer
4
4
8
2
2
8
2
14
30
16
4
1
8
12
2
25
16
20
30
8
45
25
8
16
16
8
8
8
40
374
20
4
24
Design
Engineer
0
0
0
Sr CADD
Tech
12
6
18
3
4
2
2
12
4
3
12
16
4
25
24
18
15
4
8
8
8
8
8
8
8
204
4
4
Design
Engineer
0
20
12
12
12
36
30
15
137
0
Drainage
Project
Engineer
10
35
25
70
10
2
12
0
Drainage
Design
Engineer
25
70
40
135
24
4
28
0
Graphic
Specialist
0
0
0
RLS
0
0
0
One-Person
Survey Crew
0
0
0
Totals
35
129
81
245
7
6
14
5
33
60
22
10
4
36
44
6
70
86
44
0
0
83
38
44
16
89
52
6
25
33
45
25
25
37
36
50
1051
30
4
14
48
~ Stonebrooke
CLIENT: Otter Tail County
PROJECT: Fir Avenue (CSAH 1) & Friberg Avenue Intersection Improvement Project
CONSULTANT: Stonebrooke Engineering, Inc.
Task No. Work Task Description
TASKl0.0 PERMITS
10.01 NPDES, DOH (at this time assume no NPDES, DNR, other Utility Permits)
SUBTOTAL HOURS -TASK 10.0
TASKll.O CONSTRUCTION ADMINISTRATION AND INSPECTION (STONEBROOKE SUPPLEMENTAL
ASSISTANCE)
11.01 Construction Supplemental Assistance by Desien Team, During Construction Project
11.02 Preconstruction Meeting in Otter Tail County
SUBTOTAL HOURS -TASK 11.0
DETAILED HOUR ESTIMATE
ESTIMATED PERSON-HOURS AND FEES
Fir Avenue (CSAH 1} & Friberg Avenue Intersection Improvement Project
Otter Tail County
Project Sr. Trans.
Manager Engineer
0 0
8
8 0
Traffic
Engineer
0
0
Senior
Project
Engineer
0
8
8
16
Project
Engineer
4
4
14
14
Design
Engineer
0
0
SrCADD
Tech
0
0
Design
Engineer
0
0
Drainage
Project
Engineer
2
2
0
Drainage
Design
Engineer
6
6
0
Graphic
Specialist
0
0
RLS
0
0
One-Person
Survey Crew
0
0
Totals
12
12
30
8
38
~ Stonebrooke
DETAILED HOUR ESTIMATE
ESTIMATED PERSON-HOURS AND FEES -SUBCONSULTANT -MOORE ENGINEERING
Fir Avenue (CSAH 1) & Friberg Avenue Intersection Improvement Project
Otter Tail County
CLIENT: Otter Tail County
PROJECT: Fir Avenue {CSAH 1) & Friberg Avenue Intersection Improvement Project MOORE
CONSULTANT: Stonebrooke Engineering, Inc. Project MOORE Const MOORE MOORECADD
Engineer Spec t Administrative Manager TECH3
Task No. Work Task Description
MOORE HOURLY RATE $195 $150 $100 $140
CONSTRUCTION ADMINISTRATION AND INSPECTION
Desgin support -Kick off meeting, public meeting, constructability reviews 20
Preconstruction Meeting -including preperation time 6 8
RPR -assumes 12 weeks construction @ SO hrs/week 600
Weekly site meeting 48
Partial Payments 4 10
Review shop drawings 8
Review Material submittals 8
Geotech coordination 8
Answer Questions during construction 36
Review Payrolls 30
Punchlist 4 8
Substantial Comoletion/Final Pav Ano 4 4
SUBTOTAL HOURS-TASK 146 616 44 0
CONSTRUCTION STAKING
Stake Removals 1
Stake Storm Sewer 1
Blue top subgrade 1
Blue top aggregate base 1
Stake curb & gutter 1
Control for Contractor 1
Stake sidewalk 1
Stake lighting 1
Stake striping 1
Stake Water/Sanitary 1
ALL STAKING IS TO BE COMPLETED 1 TIME, RESTAKING BILLED HOURLY
SUBTOTAL HOURS-TASK 0 0 0 10
TOPOGRPAHIC SURVEY (WINTER WORK)
Topo Survey
Process Survey Data 12
SUBTOTAL HOURS-TASK 0 0 0 12
MOORE
Survey MOORE MOORE
Crew Chief2 Survey Tech3 Manager
$155 $150 $115
0 0 0
3 3
0.5 4 4
1 6 6
1 6 6
4 20 20
0.5 4 4
1 8 8
0.5 2 2
0.5 4 4
0.5 4 4
9.5 61 61
2.5 24 24
1
3.5 24 24
MOORE Senior
LS
$185
0
4
0.5
4.5
0
Totals
20
14
600
48
14
8
8
8
36
30
12
8
806
7
9.5
14
14
49
10
18
5.5
9.5
9.5
0
146
50.5
13
63.5
$3,900.00
$2,370.00
$90,000.00
$9,360.00
$1,780.00
$1,560.00
$1,560.00
$1,560.00
$7,020.00
$3,000.00
$1,980.00
$1,180.00
$125,270.00
$935.00
$1,277.50
$1,885.00
$1,885.00
$6,800.00
$1,370.00
$2,415.00
$747.50
$1,277.50
$1,277.50
$0.00
$19,870.00
$6,747.50
$1,835.00
$8,582.50
Otter Tail County Resolution for Glacial Edge Trail-Maplewood Segment
Accepting Bond Award, Predesign, Design and Construction Grant
OTTER TAIL COUNTY RESOLUTION NO. 2026 -
WHEREAS, Otter Tail County ("County") has been awarded the 2023 Funds in the amount of $939,000 from the
Minnesota Laws 2023 Ch. 72, Art. 2, Sec. 3, Subd. 8 bonding bill by the State of Minnesota to predesign. design, and
construct the Maplewood State Park segment of the Glacial Edge Regional Trail.
BE IT FURTHER RESOLVED that the County has the legal authority to apply for financial assistance, and financial
capability to fully and completely pay for the project and all other expenses that may occur to ensure adequate
construction, operation, maintenance and replacement of the proposed project for its design life.
BE IT FURTHER RESOLVED that the County hereby pledges to fully complete the project or phase using the County's
Parks and Trails Funding if it exceeds the total funding provided by the proposed $ 939,000 grant from Minnesota
Department of Natural Resources.
BE IT FURTHER RESOLVED that the County will comply with all applicable laws, environmental requirements, regulations,
terms and conditions as stated in the grant agreement.
BE IT FURTHER RESOLVED that the County has read the Conflict of Interest Policy and certifies it will report any actual,
potential, perceived, or organizational conflicts of interest upon discovery to the state related to the application or grant
award.
BE IT FURTHER RESOLVED that the County has or will acquire fee title or permanent easement over the land described in
the site plan and the contemplated use thereof are permitted by and will comply with all applicable use or other
restrictions and requirements imposed by applicable zoning ordinances or regulations, and, if required by law, have
been duly approved by the applicable municipal or governmental authorities having jurisdiction there over.
BE IT FURTHER RESOLVED, the City/County names the fiscal agent for the City/County for this project as:
Kevin Fellbaum
Parks and Trails Director
County of Otter Tail
505 South Court Street
Fergus Falls, 56537
NOW, THEREFORE BE IT RESOLVED that Parks and trails Director, Kevin Fellbaum, is hereby authorized to execute such
agreements as are necessary to implement the project on behalf of the applicant.
I CERTIFY THAT the above resolution was adopted by the County Board of Otter Tail County on the 27th day of January
2026.
SIGNED: WITNESSED:
(Signature) (Date) (Signature) (Date)
Bob Lahman, Board of Commissioners Chair Nicole Hansen, County Administrator
Wednesday, January 21st, 2026 Page 1 of 8
Lease Agreement Between
City of New York Mills and Otter Tail County
THIS LEASE AGREEMENT (Lease or Agreement) is made and entered into January 1st, 2026 (Effective
Date), by and between THE CITY OF NEW YORK MILLS, 28 Centennial 84 Drive W., New York Mills,
MN 56567 (Lessor), and THE COUNTY OF OTTER TAIL, 520 West Fir Avenue, Fergus Falls, MN 56537 (Lessee).
WHEREAS, Lessee is in need of a facility in the New York Mills area to provide a Family Resource Center and other government services;
WHEREAS, Lessor, a political subdivision of the State of Minnesota, is desirous that the County provide
such services within the City of New York Mills;
WHEREAS, Lessor is the fee title owner of facility in the City of New York Mills located at 118 N Main Ave., New York Mills, MN 56567 / 119 N. Tousley, New York Mills, MN 56567.
NOW THEREFORE, in consideration of the mutual covenants set forth herein, the parties hereby agree as follows:
1.PREMISES. Lessor hereby leases to Lessee and Lessee hereby leases from Lessor the premises located in the County of Otter Tail at 118 N Main Ave., New York Mills, MN 56567 / 119 N. Tousley, New York Mills, MN 56567 as described in Exhibit A.
2.SUBLETTING. Lessor shall have the right to transfer and assign, in whole or in part, by operation
of law or otherwise, its rights and obligations hereunder. Lessee shall not have the right to assign this
Lease or any interest herein, or to sublet the Premises or any part thereof, or any right or privilege
appurtenant thereto, without the express written consent of Lessor.
Should Lessee sublease the Premises, then the Lessee will be bound by the requirements of this
Lease, including the hold harmless and indemnification requirements of Section 13 of this
Agreement, and said requirements will be incorporated in any agreement between Lessee and any
secondary Sublessee with the express written consent of the Lessor. Any assignment under this
section does not relieve Lessee of any of its obligations under this Lease.
3.AUTHORIZED USE. The authorized use of the Premises is for the housing and delivery of services for government services. Lessee shall peaceably and quietly hold and enjoy the Premises for the Term (hereinafter defined), subject to the provisions and conditions set forth in this Lease.
4.TERM.A.Subject to and upon the terms and conditions set forth in this Lease, this Lease shall
be in force through December 31st, 2035 for the space identified in Exhibit A. This
Lease shall automatically renew for another Ten (10) Years with both parties’ consent. If the lease is renewed automatically, the Lessor and Lessee shall mutually agree upon the annual rent.
Wednesday, January 21st, 2026 Page 2 of 8
5.TERMINATIONA.Notwithstanding any other provision of this Lease, the Lease may be terminated at
any time upon the mutual written consent of the Lessor and Lessee.
6.RENT.A.In consideration of the covenants, representations and conditions of the Lease, Lessee shallpay Lessor rent annually as outlined below:
i.2026 $21,032.50
ii.2027 $22,084.13iii.2028 $23,188.33iv. 2029 $24,347.75v. 2030 $25,565.14
vi. 2031-2035 – The annual rent shall be mutually agreed upon by the Lessor and Lessee;
provided, however, that in no event shall the annual rent exceed Thirty ThousandDollars ($30,000).B.Furthermore, in consideration of the covenants, representations and conditions of the Lease,Lessee shall complete approximately $320,000 in capital improvements to the leased space
identified in Exhibit A:
i.Renovation of approximately 1,600 square feet, including energy efficient lighting,new carpeting, installation of new egress windows, painting, electrical, requiredbuilding elevator upgrades for code compliance, misc. interior demo and wall repair,installation of new interior doorways and doors, and construction of new kitchenette
(including plumbing, cabinets, sink, countertops and serving counter).
C.Real Estate Taxes: Lessor shall be responsible for the payment of all real estate taxes andspecial assessments, if any, associated with the Real Estate during the term of this lease.D.Lessor shall be responsible for any costs related to fire protection from the New YorkMills Fire Department.
E.Lessor shall be responsible for the costs associated with annual inspections by building
officials, fire marshals, etc.
7.ALTERATIONS
A.Remodeling, alternations, additions and/or changes (hereinafter referred to as “Alterations”)
to the Leased Premises may be needed from time to time to accommodate new programs or
services provided by Lessee. Lessee shall not make such Alterations to the Leased Premisesthat exceed $20,000 without advance written consent of Lessor. If agreed to by both theLessee and Lessor, payment of all costs of an Alternation shall be the responsibility of theLessee.
B.Lessor authorizes Lessee to complete the capital improvements as outlined in section 6.B.i.
8.MAINTENANCE AND REPAIRS
A.Lessor shall be responsible for all cleaning, supplies, maintenance and repairs to the property
not otherwise addressed in this agreement.
B.Lessor shall be responsible for all infrastructure and capital improvements not otherwise
addressed in this agreement.
C.Lessee is responsible for completing the cleaning and basic maintenance for the areas
identified in Exhibit A.
Wednesday, January 21st, 2026 Page 3 of 8
9. UTILITIES
A. Lessor shall be responsible for all utilities necessary for building operations, including but not limited to: electric, natural gas, water, sewer, phone (including dedicated phone lines for fire alarm, elevator, etc.).
B. Lessee will be responsible for its dedicated internet and phone services necessary for operations.
C. Lessee shall be allowed to maintain keycard access for its employees at exterior entrances and within leased areas.
D. Lessee is responsible for maintaining physical keys for all its leased office space and areas.
10. INSURANCE/LIABILITY A. Lessee shall be responsible for providing, at Lessee's own expense, general liability insurance, worker’s compensation insurance, and all insurance coverage necessary for the protection against loss or damage from fire or other casualty of Lessee's goods, furniture, and
interior content property. B. Lessor shall be responsible for providing, at Lessor’s own expense, insurance for the structure of the building, including coverage necessary for the protection against loss or damage from a fire or other casualty.
C. Lessee and Lessor shall, respectively, be named as an additional covered party related to general liability only for negligent acts of Lessee or Lessor. A certificate of insurance shall be provided to the other party, and such insurance shall provide that it may not be altered or
canceled without thirty (30) calendar days prior written notice but failure to provide notice
shall impose no obligation or liability of any kind. If insurance coverage provided under this section has a deductible, the party responsible for providing the insurance agrees to be responsible to provide funds to cover the costs of any deductible applicable to a covered loss regarding a claim.
11. FIRE OR OTHER CASUALTY. In the event that, at any time during the Term, all, or such portion of the Premises (or improvements thereon) as shall adversely affect Lessee's operations (in Lessee's discretion), shall be damaged or destroyed by fire or any other casualty, then, Lessee shall, within
90 days of the casualty, inform Lessor of its intention to terminate the Lease or request Lessor to
repair the damage caused by the casualty with applicable insurance proceeds. If Lessee elects to terminate, this Lease shall terminate as of the date of such damage or destruction, and Lessee shall have a period of sixty (60) days from the date of the notice of termination, in which to remove Lessee's property from the Premises. Lessee will also be responsible to provide funds in the amount
equal to any insurance deductible if Lessor determines to repair or reconstruct the Leased Premises
or purchase replacement personal property. This obligation of Lessee survives the termination of the Lease. If Lessee shall not elect to terminate this Lease as aforesaid, the Lessor may: (i) apply all of the insurance proceeds payable as a result of such loss or damage to the reconstruction or repair of the facilities damaged to restore the same, to the extent of such proceeds, as nearly as practicable
to the condition existing just prior to such damage or destruction, subject to such changes and
variations in construction and design as both parties agree in good faith would contribute to making the reconstructed facility more useful as a treatment facility, as the case may be; or (ii) if the loss resulting from such damage to or destruction of the Premises exceeds $1,000,000 pay to the Lessee
Wednesday, January 21st, 2026 Page 4 of 8
the unamortized value of all improvements to the Premises for which insurance proceeds were paid less any deductible, retain the balance of insurance proceeds remaining after such payment and
terminate the Lease. Such termination will be effective 90 days after notice of termination is given
to Lessee. 12. WAIVER OF CLAIMS. Lessor shall not be liable to Lessee for any inconvenience or loss that is not negligent to Lessee in connection with any of the repair, maintenance, damage, destruction,
restoration, or replacement referred to in this lease. Lessor shall not be obligated to insure any of
Lessee's goods, furniture, or otherwise be liable for any damage to or destruction of any of the foregoing.
13. INDEMNITY OF LESSOR. Except to the extent of loss, injury or damage caused by the acts or omissions of Lessor, its employees, contractors, invitees or agents, Lessee covenants to indemnify Lessor, and save it harmless, from and against any and all claims, actions, damages, injuries, accidents, liability and expense, including reasonable attorneys' fees and costs, in connection with or arising from, or occasioned wholly or in part by, any breach by Lessee of its obligations under this Lease or the rendition or failure to render services to any person in connection with the business to be conducted on the premises. This section does not require the Lessee to be responsible for or
defend against claims or damages arising solely from errors or omissions of the Lessor, its officers,
agents or employees.
14. INDEMNITY OF LESSEE. Except to the extent of loss, injury or damage caused by the acts or
omissions of Lessee, its employees, contractors, invitees or agents, Lessor covenants to indemnify
Lessee, and save it harmless, from and against any and all claims, actions, damages, injuries,
accidents, liability and expense, including reasonable attorneys' fees and costs, in connection with
or arising from, or occasioned wholly or in part by, any breach by Lessor of its obligations under this Lease or the rendition or failure to render services to any person in connection with the business to be conducted on the premises. This section does not require the Lessor to be responsible for or defend against claims or damages arising solely from errors or omissions of the Lessee, its officers, agents or employees.
15. NON-WAIVER. Neither the acceptance by Lessor of any Rent or other payment hereunder, whether or not any default hereunder by Lessee is then known to Lessor, or any custom or practice followed in connection with this Lease shall constitute a consent or waiver of any right or obligation by either party. Failure by either party to complain of any action or non-action on the part of the other or to declare the other in default, irrespective of how long such failure may continue, shall not be deemed
to be a waiver of any rights hereunder.
16. TIME. is of the essence with respect to the performance of every obligation under this Lease in which time of performance is a factor. 17. NOTICES. Each notice required or permitted to be given hereunder by one party to the other shall
be in writing with a statement therein to the effect that notice is given pursuant to this Lease, and the
same shall be given and shall be deemed to have been delivered, served and given if placed in the
United States mail, postage prepaid, by United States registered or certified mail, return receipt
requested, addressed to such party at the address provided for such party herein. Any notices to
Lessor shall be addressed and given to Lessor as follows:
Wednesday, January 21st, 2026 Page 5 of 8
Lessor: City of New York Mills Julie Roberts City Clerk PO Box H New York Mills, MN 56567 Lessee: Otter Tail County Nick Leonard Deputy Administrator 520 West Fir Avenue Fergus Falls, Minnesota 56537 The addresses stated above shall be effective for all notices to the respective parties until written
notice of a change in address is given pursuant to the provisions hereof.
18. RIGHTS UPON DEFAULT. If Lessee shall be in default under any provision of this Lease and
shall remain so for a period of ten (10) days after written notice from Lessor to Lessee then Lessor
may, by giving notice to Lessee at any time thereafter during the continuance of such default, either (a) terminate this Lease, or (b) re- enter the Premises by summary proceedings or otherwise, expel Lessee and remove all Lessee's property therefrom, relet the Premises at the best possible rent readily obtainable (making reasonable efforts therefor), and receive the rent therefrom, and Lessee
shall remain liable for the amount of all rent reserved herein, plus the costs of maintenance and
repairs to the date that Lessor secures possession of the Premises, less the avails of reletting, if any, after deducting therefrom the reasonable cost of obtaining possession of said Premises, including reasonable attorney’s fees and of any repairs necessary to prepare it for reletting. If the Premises is relet at an equal or greater amount than specified in Section 6 herein, Lessee obligation under this
Agreement cease. Any and all deficiencies so payable by Lessee shall be paid on the date herein
provided for the payment of rent. If any default by Lessee cannot reasonably be remedied within thirty (30) days after notice of default but Lessee shall commence promptly to cure the same and thereafter prosecute the curing thereof with diligence, then Lessee shall have such additional time, not to exceed 30 days, as shall be reasonably necessary to remedy such default before this Lease
can be terminated or other remedy enforced by Lessor. Lessee shall be responsible, upon
termination of the Lease, for curing any deficiencies in the inventory of equipment, furniture, and supplies for which it is responsible. If Lessor shall be in default under any provision of this Lease and shall remain so for a period of ten (10) days after written notice from Lessee to Lessor than Lessee may, by giving notice to Lessor at any time thereafter during the continuance of such default, either (a) terminate this Lease, or (b) any other remedy available at law and equity. If any default by Lessor cannot reasonably be remedied
within thirty (30) days after notice of default but Lessor shall commence promptly to cure the same and thereafter prosecute the curing thereof with diligence, then Lessor shall have such additional time, not to exceed 30 days, as shall be reasonably necessary to remedy such default before this Lease can be terminated or other remedy enforced by Lessee.
19. SURRENDER. On the last day of the Term, or upon earlier termination of this Lease, Lessee shall peaceably and quietly surrender the Premises to Lessor, broom clean, in good order, repair and condition, excepting only wear and tear resulting from normal use, casualty covered by casualty
insurance available from Lessee or any other source and the following types of losses or events not covered by casualty insurance: acts of God, terrorism, earthquakes and floods.
Wednesday, January 21st, 2026 Page 6 of 8
20. LEGAL INTERPRETATION. This Lease and the rights and obligations of the parties hereto shall
be interpreted, construed, and enforced in accordance with the laws of the State of Minnesota. The determination that any provision of this Lease is invalid, void, illegal, or unenforceable shall not affect or invalidate the other provisions hereof. All obligations of either party requiring any performance after the expiration of the Term shall survive the expiration of the Term and shall be fully enforceable in accordance with those provisions pertaining thereto. Section titles are for convenient reference only and shall not be used to interpret or limit the meaning of any provision of this Lease. Any lawsuit pertaining to or affecting this Lease shall be venued in District Court, 7th Judicial District, Otter Tail County, State of Minnesota.
21. INTEGRATION. This Agreement, along with any exhibits, appendices, schedules, and amendments hereto, encompasses the entire agreement of the parties, and supersedes and merges all previous understandings and agreements between the parties, whether oral or written. The parties hereby acknowledge and represent, by affixing their signatures hereto, that said parties have
not relied on any representation, assertion, guarantee, warranty, collateral contract, or other assurance, except those set out in this Agreement, made by or on behalf of any other party or any other person or entity whatsoever, prior to the execution of this Agreement. The parties hereby waive all rights and remedies, at law or in equity, arising or which may arise as the result of party’s reliance on such representation, assertion, guarantee, warranty, collateral contract, or other
assurance, provided that nothing herein contained shall be construed as a restriction or limitation of said party’s right to remedies associated with the gross negligence, willful misconduct, or fraud of any person or party taking place prior to, or contemporaneously with, the execution of this Agreement.
22. SEVERABILITY. In the event of any conflict between a provision of this Agreement and any statute not subject to variation by this Agreement, the provisions of the statute shall govern. If any provisions of this Agreement is held to be invalid, illegal, or unenforceable in any respect, such provisions shall be fully severable, this Agreement shall be construed and enforced as if such
invalid, illegal, or unenforceable provisions had never comprised a part of this Agreement and the
validity, legality, and enforceability of the remaining provisions shall in no way be affected or impaired. Furthermore, in lieu of such invalid, illegal, or unenforceable provision, there will be added automatically as part of this Agreement a provision as similar in terms to such invalid, illegal, or unenforceable provision as may be possible and still be valid, legal, and enforceable.
23. BLUE PENCIL DOCTRINE. In the event that any of the restrictive covenants contained in this Agreement shall be found by a court of competent jurisdiction to be unreasonable by reason of its extending for too great a period of time or over too great a geographic area or by reason of its being too extensive in any other respect then such restrictive covenant shall be deemed modified to
the minimum extent necessary to make it reasonable and enforceable under the circumstances.
24. SIGNAGE. To the extent not prohibited by applicable law, ordinance or restrictive covenant, and with Lessor's prior approval (which shall not be unreasonably withheld or denied), Lessee may install in reasonable locations on the property of Lessor signs of reasonable dimensions advertising
Lessee's operations at the Premises. Such signs shall be erected and maintained at Lessee's expense
and removed at Lessee's expense upon termination of this Lease. Such signage shall comply with all applicable laws, ordinances and restrictive covenants and Lessee will obtain, at its expense, all utility service, licenses, permits and insurance for the same.
Wednesday, January 21st, 2026 Page 7 of 8
25. SECURITY DEPOSIT. A security deposit of $0 is required of Lessee under this Lease, said deposit is due at the date of commencement of this agreement. Lessee agrees to purchase and maintain insurance and name Lessor as an additional insured and a loss payee as noted in Sections 10 and 11 of this agreement.
26. PHYSICAL INVENTORY. A complete physical inventory of the personal property (other than
consumables) located on the Premises shall be conducted prior to the date of execution of this Lease. The physical inventory shall be listed in Exhibit B. Upon termination of this Lease, a complete physical inventory will be taken. Lessee will be required to replace any items lost, discarded or damaged during the term of this Lease. The Lessor may, at its option, remove or otherwise dispose of any items of personal property not listed on Exhibit B upon termination of this Lease.
27. REPORTING REQUIREMENT. Lessee agrees to report to Lessor any event encountered in the
course of performance of this Lease which results in or may result in material injury in an amount
of $10,000 or more to person or property of third parties, or which may otherwise subject Lessee
or Lessor to material liability. Lessee shall report any such event to the Lessor as promptly as practicable after discovery. Executed to be effective for all purposes as of the Effective Date.
LESSOR: CITY OF NEW YORK MILLS
By:
________________________________________ Latham Hetland, Mayor __________________________________________ Julie Roberts, City Clerk
LESSEE: OTTER TAIL COUNTY
By:
Robert Lahman, Board Chair ____________________________________________ Nicole Hansen, County Administrator
OF-11
OF-12
OF-13
Otter Tail County City
Exhibit ADescription of Premises
A. The following spaces on the exhibit below located on the lower level of 118 N Main Ave., New York Mills, MN 56567 / 119 N. Tousley, New York Mills, MN 56567 labeled:
--
Wednesday, January 21st, 2026 Page 8 of 8
Exhibit A Continued
Description of Premises
B. All shared common spaces at 118 N Main Ave., New York Mills, MN 56567 / 119 N. Tousley, New York Mills, MN 56567 that Lessor will maintain in working order, including but not limited to: 1. Entrances/Hallways 2. Mother’s Room
3. Lunch/Break Room 4. Common space that can be reserved: Multipurpose room at entrance and Courtroom 5. Parking lot
RESOLUTION TO AUTHORIZE THE AUDITOR/TREASURER AND FINANCE DIRECTOR
TO PAY CERTAIN CLAIMS
OTTER TAIL COUNTY RESOLUTION NO. 2026 - ___
WHEREAS, Minnesota Statute Section 375.18 subd.1b allows delegation by the County Board to pay certain
claims to a county administrative official; and
WHEREAS, the County Board delegates authority for the Finance, Property and License Deputy Administrator
or the Finance Director to authorize payment for the following types of claims made against the County:
• Routine claims such as utility bills, telephone bills, gas, oil and fuel billings
• Insurance, Payroll Tax and Payroll Deduction Payments
• Septic Grants and Loans
• Appropriations (Previously Approved by the Board)
• Tax Settlements, TIF and Abatements
• Sales, Use Mortgage or Deed Taxes
• Highway Department Partial Contract Payments (Except Final Payment) on Contracts Previously
Approved by the Board
• District Court Judge Approved Bills for Court Matters
• Pass Through Monies
• Rent Payments
• Recorder Fees
• Reimbursements/Refunds (Non-Employe)
• County Vehicle License Tabs
• Postage
• Other Routine Payments as Needed to Meet Deadlines
WHEREAS, claims that are not routine in nature or it is anticipated that there may be possible questions or
issues as determined by the Finance, Property and License Deputy Administrator or Finance Director, will not
be issued, but will be presented to the County Board for action at its next regularly scheduled meeting; and
WHEREAS, this delegated authority conferred shall be and remain in full force and effect until any amendment
or revocation is issued by the Board of Commissioners; and
WHEREAS, that as part of internal accounting and administrative control procedures and for informational
purposes, a list of all such claims paid will be presented to the County Board at its next regularly scheduled
meeting.
NOW, THEREFORE BE IT RESOLVED THAT, the County Board delegates authority for the Finance,
Property and License Deputy Administrator or the Finance Director to authorize payments to claims as set
forth above.
The motion for the adoption of the foregoing resolution was introduced by Commissioner ______________,
duly seconded by Commissioner ______________ and, after discussion thereof and upon vote being taken
thereon, passed unanimously.
Adopted at Fergus Falls, MN this 27th day of January, 2026.
OTTER TAIL COUNTY BOARD OF COMMISSIONERS Dated: January 27, 2026
By: _________________________________________ Attest: ______________________________
Robert Lahman, Board of Commissioners Chair Nicole Hansen, Clerk
STATE OF MINNESOTA )
)
COUNTY OF OTTER TAIL )
I, Nicole Hansen, the County Administrator, do hereby certify that the foregoing resolution is a true and correct
copy of the resolution presented to and adopted by Otter Tail County at a duly authorized meeting therefore
held on the 27th day of January, 2026.
________________________________
Nicole Hansen, Clerk
MEMORANDUM
Date: January 22, 2026
To: Otter Tail County Commissioners
From Amber Anderson, Chief Deputy Treasurer
RE: Tax Abatement Request for Parcel #52000140082004
I. BACKGROUND
Lavonne Matson is requesting a tax abatement of $41.44 for parcel #52000140082004
located at 43067 County Highway 53 in New York Mills MN due to Family Medical
Needs. This original request was brought to a Board Meeting on January 6, 2026, and
Commissioners requested additional information.
Ms. Matson’s submission for the tax abatement is provided separately to comply with
data practices.
II. RECOMMENDATION
The standard for forgiveness of penalty is limited to hardship. Hardship is defined as a
tragedy or casualty suffered by the taxpayer, such as a death in the family, extreme or
extended illness, accident, fire or other extreme hardship that is documented to the
county that made timely payment impossible.
After reviewing the additional information provided by Ms. Matson, it is recommended
that her situation does not meet the requirements listed above for forgiveness of penalty
due to a hardship.
AUDITOR-TREASURER
Government Services Center
510West Fir Avenue
Fergus Falls, MN 56537
To: Otter Tail County Board of Commissioners
From: Patrick Waletzko, Emergency Manager
Date: 22 January 2026
Subject: West Central Initiative Donation to Hazard Mitigation Project Assistance Grant Program
In 2023, the Otter Tail County Board established the Hazard Mitigation Project Assistant Grant
Program, utilizing funds available from the American Rescue Plan / Local Assistance and Tribal
Consistency Fund to help eligible communities implement projects that will eliminate or reduce the
long-term risk to human life and property resulting from severe winter and summer storms. Outdoor
warning siren and generator projects, and pre-award assistance (for state/federal grants) were
allowable.
The first round of grants was awarded in 2024 to the cities of Pelican Rapids and New York Mills for
outdoor warning siren projects. Funds remained to solicit another round of applications in 2025.
West Central Initiative has approached Emergency Management, expressing interest in supporting
the program. Their letter expressing interest, including a contribution of $30,000.00 to the program
are attached to this memo.
The Emergency Management program seeks Otter Tail County Board of Commissioners approval
and acceptance of the $30,000.00 donation from West Central Initiative to support the Hazard
Mitigation Project Assistance Grant Program at its meeting on January 27, 2026. This donation will
ensure that more projects can be funded, leading to a measurable reduction in long-term risks to
human life across the county.
218-998-8067 @
EMERGENCY MANAGEMENT
OTTER TAIL COUNTY IS AN EQUAL OPPORTUNITY EMPLOYER
LIVE YOUR best life HERE.
520 West Fir Avenue
Fergus Falls, MN 56537
@ ottertailcounty.gov
January 14, 2026
Patrick Waletzko
Emergency Manager
Otter Tail County
Dear Patrick,
West Central Initiative (WCI) is interested in partnering with Otter Tail County to support
outdoor warning sirens for four communities within Otter Tail County.
WCI is prepared to contribute $30,000 in grant funds to fully fund outdoor warning sirens in
the identified communities as a part of our ongoing community resilience and extreme
weather preparedness work.
WCI is interested in replicating these efforts to fund emergency sirens and offer extreme
weather preparedness workshops in additional counties across west central Minnesota.
Utilizing lessons learned from this current collaborative endeavor, and drawing from your
expertise and guidance, we hope that this marks a first step in working together and
broadening our impact.
We look forward to working with Otter Tail County Emergency Management on supporting
community preparedness and resilience in the communities we serve.
Sincerely,
Cedar Walters
Director.of.Climate.and.Sustainability.Programs
1000 Western Avenue PO Box 318 Fergus Falls, MN 56538 (800) 735-2239 wcif.org
To: Board of Commissioners
From: Nicole Hansen
County Administrator/HR Director
Date: January 22, 2025
Re: Collective Bargaining Agreement Approvals for Government Services Technical Unit
As you are aware, the negotiating team for the County met with the Teamsters Local No. 320
Business Agent and Stewards to negotiate a 3-year contract with the Government Services
Technical Unit. The following summarizes the agreement:
The duration of the agreement is January 1, 2026 – December 31, 2028
The updates include minor changes to definitions to align with our current Service Team
organizational structure which was previously under divisions and updating language from
Division Directors to Service Team Leaders throughout the contract.
Cost of Living Adjustments:
• 2026: 4.5%
• 2027: 4.0%
• 2028: 3.0%
Employer contributions for benefits:
• Legacy Employer Contributions – employed prior to December 31, 2019:
2026: $1,420
2027: $1,430
2028: $1,430
• Employees – Single Plan:
2026: $900
2027: $920
2028: $975
• Employees – Plus Children Plan:
2026: $1,600
2027: $1,625
2028: $1,700
• Employees – Family Plan:
2026: $1,900
2027: $1,950
2028: $2,050
Holidays: Incorporates Juneteenth per Minnesota statute.
Vacation Schedule:
• Adjusted per biweekly pay periods.
• Added language allowing employees to use accrued vacation after their hire date but
cannot exceed the available vacation leave balance.
>
>
>
>
>
>
218-998-8060 ® OTTER TAIL COUNTY IS AN EQUAL OPPORTUNITY EMPLOYER
LIVE YOUR best life HERE.
ADMINISTRATION
Government Services Center
520 West Fir Avenue
Fergus Falls, MN 56537
@ ottertailcounty.gov
Sick Leave: Adjusted per biweekly pay periods from eight (8) hours per month to 3.70 hours
per biweekly pay period.
Sick leave provisions are updated to align with the Earned Sick and Safe Time law.
Meal Allowances
• Breakfast: $13.00 for 2026; $14.00 for 2027; and $15.00 for 2028
• Lunch: $20.00 for 2026 & 2027; $22.00 for 2028
• Supper: $23.00 for 2026 & 2027; $25.00 for 2028
Minnesota Paid Leave: Included language acknowledging the statute and that the premium
contribution will be split 50/50 between employee and employer beginning January 1, 2026.
Post Employment Health Care: Modified language to pay all accumulated comp time (to the
maximum 40 hours) to be paid out as of December 31 of each year.
If you would like a copy of the bargaining agreement in its entirety, please let me know. The existing
contract is available on the Employee Dashboard, which will be updated upon the approval of the
negotiated contract.
If you have any questions, please do not hesitate to contact me.
>
>
>
>
>
Board of Commissioners’ Meeting Minutes January 13, 2026 (Exhibit A)
Page 1 of 1
OTTER TAIL COUNTY – MINNESOTA
DRAINAGE AUTHORITY MINUTES
Government Services Center, Commissioners’ Room & Via Livestream
515 West Fir Avenue, Fergus Falls, MN
January 13, 2026 | 11:02 a.m.
CALL TO ORDER
The Otter Tail County Drainage Authority convened at 11:02 a.m. Tuesday, January 13, 2026, at the
Government Services Center in Fergus Falls, MN. Commissioners Robert Lahman, Chair; Dan Bucholz, Vice
Chair; Kurt Mortenson, Wayne Johnson, and Sean Sullivan were present.
APPROVAL OF AGENDA & CONSENT AGENDA
Chair Lahman called for joint approval of the Drainage Authority Agenda and Consent Agenda. Motion by
Mortenson, second by Bucholz and unanimously carried to approve the Drainage Authority Agenda of January
13, 2026 and the Consent Agenda of January 13, 2026 as follows:
1. January 6, 2026, Drainage Authority Meeting Minutes
DITCH 15/28 – JPA WITH THE STATE OF MINNESOTA
Drainage Inspector Colby Palmersheim and Nicholas Kludt with the Minnesota Department of Natural
Resources (DNR) provided an update on the County Ditch 15/28 repair plan. Otter Tail County entered into a
Joint Powers Agreement with the DNR for the purpose of funding the completion of initial engineering and
design work necessary to complete repairs and improvements to County Ditch 15/28, which includes the
removal of the stone arch bridge, regrading of in-slopes, stabilizing the ditch grade and the implementation of
fish passage at the outlet of Dead Lake. Kludt provided a project overview with a focus on outcome, roles and
project funding.
ADJOURNMENT
At 11:16 a.m., Chair Lahman declared the Otter Tail County Drainage Authority meeting adjourned. The next
Drainage Authority meeting will immediately follow the next regular Board meeting on Tuesday, January 27,
2026, at the Government Services Center in Fergus Falls and via livestream.
OTTER TAIL COUNTY BOARD OF COMMISSIONERS Dated: January 27, 2026
By: _________________________________________ Attest: _______________________________
Robert Lahman, Board of Commissioners Chair Nicole Hansen, Clerk
OTTERTAIL
COUNTY -MINNESOTA
COMMISSIONER'S VOUCHERS ENTRIES1/22/2026
Achristoph
Y
N
D
4
N
Otter Tail County Auditor
Audit List for Board Page 1
Print List in Order By:
Save Report Options?:
Type of Audit List:
on Audit List?:
Paid on Behalf Of Name
Explode Dist. Formulas?:
D - Detailed Audit List
S - Condensed Audit List
1 - Fund (Page Break by Fund)
2 - Department (Totals by Dept)
3 - Vendor Number
4 - Vendor Name
9:56:19AM
r.:1 INTtGRATCO
11:;:.1 FINANCIAL SYSTEMS
COMMISSIONER'S VOUCHERS ENTRIES
Account/Formula
9:56:19AM1/22/2026
Achristoph
County Ditch Fund
Copyright 2010-2025 Integrated Financial Systems
22-622-000-0632-6370 519.46 EASEMENT DAMAGE PAYMENT 50000260199000 Buffer Strip 1 N
18168 SCHULTZ/JOHN E
519.4618168
519.46
Page 2Audit List for Board
Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099
Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates
1 Transactions
Final Total ............1 Vendors 1 Transactions
SCHULTZ/JOHN E
Otter Tail County Auditor
COMMISSIONER'S VOUCHERS ENTRIES 9:56:19AM1/22/2026
Achristoph
County Ditch Fund
Copyright 2010-2025 Integrated Financial Systems
Page 3Audit List for Board
Otter Tail County Auditor
Amount
519.46 County Ditch Fund 22
519.46
NameFundRecap by Fund
All Funds Total Approved by,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .