HomeMy WebLinkAboutBoard of Commissioners - Minutes - 05/16/2006MINUTES OF THE
OTTER TAIL COUNTY BOARD OF COMMISSIONERS
Government Services Center, Commissioners' Room
500 Fir Avenue W., Fergus Falls, MN
Tuesday, May 16, 2006
9:30 a.m.
Call to Order
The Otter Tail County Board of Commissioners convened Tuesday, May 16, 2006, at
9:30 a.m., at the Otter Tail County Government Services Center with Commissioners
Roger Froemming, Chair; Dennis Mosher, Vice-Chair; Bob Block, Syd Nelson, and
Malcolm Lee present.
Approval of Agenda
Motion by Lee, second by Nelson, and unanimously carried to approve the County Board
agenda of May 16, 2006, with the following addition:
1 :30 p.m. -Jim Puchtel -Sewell Lake High Water Discussion
Approval of Minutes
Motion by Mosher, second by Block, and unanimously carried to approve the County Board
minutes of May 9, 2006, as mailed.
Approval to Pay Bills
Motion by Block, second by Froemming, and unanimously carried to approve payment of the
County Board bills per Attachment A of these minutes.
GIS Department Promotion
Motion by Lee, second by Mosher, and unanimously carried to approve a new job description
for a GIS Lead Developer (Job #2807) and a promotion from GIS Technician (Job #2804) to
GIS Lead Developer effective June 1, 2006.
Personnel Board of Appeals
Motion by Mosher, second by Block, and unanimously carried to reappoint Charles Davis,
effective January 1, 2005, and Virginia Portmann, effective January 1, 2006, to the Personnel
Board of Appeals for three-year terms.
Institutional Correctional Work Crew
Sheriff, Brian Schlueter, reported that the ICWC Program depends on the sale of houses
through the Otter Tail Wadena Community Action Council. Those sales have reduced in this
area; therefore, the State of Minnesota is downsizing the program from about 12 participants
to 8, which will result in reduced funding for Otter Tail County.
Sheriff Department Staffing
Motion by Nelson, second by Block, and unanimously carried to replace a Detention Officer
position due to a termination and to authorize the Sheriff to develop an Eligibility List for
Detention Officers.
Motion by Lee, second by Mosher, and unanimously carried to hire a part time Dispatcher
and to authorize the Sheriff to develop an Eligibility List for Dispatchers.
OTC Board of Commissioners' Minutes
May 16, 2006
Page 2
Motion by Nelson, second by Lee, and unanimously carried to replace a seasonal Boat and
Water Position.
Motion by Lee, second by Mosher, and unanimously carried to approve a position change
from Clerk/Typist (Job #2318) to Records Technician with a salary grade change from
Grade 8 to Grade 9.
Property Tax Issue
Tammy Anderson, Director of Children's Corner stated that Children's Corner is a non-profit
503(c) program. She stated that 12 infants are served at their infant site and 92 at their main
site with other children scheduled for back up daycare. Ms. Anderson stated that last fall, the
organization learned that their tax exempt status was being taken away and they would need
to pay approximately $10,000 per year. She staled that they do not have the money, the
program is critical for the children in the community, and Children's Corner is the only one of
its kind in Fergus Falls and in the entire County. It is already difficult to find child care and
she noted that the center would likely have to close if the property taxes were required.
Lengthy discussion took place regarding the laws, the State's opinion letter, additional
information that could be provided, valuation and classifications, and the process to defer the
property taxes. Assessor, Bob Moe, responded that Children's Corner needs to show proof
of what charities the organization is providing or what education is being provided. He
mentioned scheduled classes and a curriculum that would be similar to a school. Mr. Moe
stated that County subsidies are not a charity. County Attorney, David Hauser, stated that
the decision of who qualifies for non-profit tax exempt status is the Assessor's decision.
Motion by Nelson, second by Lee, and unanimously carried, that the Board of
Commissioners' opinion is that this appears to be an exempt property and request the
Assessor find Children's Corner a tax exempt property because of the organization's 503(c)
status and required licensing which is the same as other schools. The County Attorney
advised Ms. Anderson to apply for property tax abatement before July 1, 2006, and provided
her with the County's abatement policy.
Deferred Compensation Program
Nationwide Retirement Solutions Deferred Compensation Program Director, Tom Jones,
briefed the County Board on the Section 457 Retirement Program that is offered to County
employees. He stated that Nationwide, formerly known as PEBSCO, is the largest deferred
compensation provider in the country that focuses on governmental plans and he provided
several interesting trends with Otter Tail County's program. He reported on the Loan Access
program which can be set-up utilizing Automatic Withdrawal from employee's checking
accounts to pay back the loans rather than payroll deduction. Otter Tail County does not
currently have this option and Mr. Jones encouraged inclusion of that amendment to the
County's plan.
Resolution to Participate and Designate Property for Tax Free Zone Designation
Otter Tail County Resolution No. 2006 -42
Commissioner Nelson offered the following and moved its adoption:
WHEREAS, the Perham Economic Development Authority has a desire to promote economic
development within the city boundaries, and
OTC Board of Commissioners' Minutes
May 16, 2006
Page 3
WHEREAS, the State of Minnesota through the Minnesota Department of Employment and
Economic Development has created the Job Opportunity Building Zones to promote
economic development in rural Minnesota, and
WHEREAS, the Perham Economic Development Authority has been authorized a total of
389.56 acres of JOBZ designation, and
WHEREAS, the State of Minnesota allows JOBZ designation to be transferred to
undesignated parcels for qualified JOBZ projects, and
WHEREAS, the Perham EDA will seek authorization from the City of Perham, Perham-Dent
School District, Otter Tail County and Perham Hospital District to transfer JOBZ designation
to a 5.71 acre parcel in Happel Addition,
NOW, THEREFORE, BE IT RESOLVED, the Otter Tail County Board of Commissioners,
upon careful consideration and review, hereby approves transferring 5.71 acres of JOBZ
designation from JOBZ parcel #77000110000000, to the parcels listed below,
Owner/Developer Location Parcel Current Size
number zoning Acre
1 Simple K, LLC, selling That part of the Northwest Quarter, Tract A in Highway 5.71 ac
to the developer, Section 23, Township 136 North, Range Happel Commercial Hammers 39 West, Otter Tail County, Minnesota Addition Construction, Inc. described as follows: (Developer
Beginning at the northeast corner of Lot is
5, Block 3, HAPPEL ADDITION to the obtaining
City of Perham, Minnesota according to Property the plat on file in the office of the ID# from County Recorder, Otter Tail county, Otter Tail Minnesota; (for the purposes of this
description the east line of said Lot 5, County),
Block 3 has an assumed bearing of see
NORTH) thence easterly 212.63 feet attached along a non-tangential curve concave to map the north having a central angle of 34
degrees 48 minutes 29 seconds, a
radius of 350.00 feet, a chord bearing of
North 85 degrees 27 minutes 32
seconds East and a chord distance of
209.37 feet; thence South 26 degrees
55 minutes 12 seconds East, not
tangent to last described curve, a
distance of 269 37 feet, thence South
60 degrees 16 minutes 05 seconds
East 348.95 feet; thence South 00
degrees 34 minutes 34 seconds East
320.66 feet to the north line of STATE
HIGHWAY RIGHT OF WAY PLAT NO.
56-6; thence North 72 degrees 26
minutes 30 seconds West 87.91 feet
along the north line of said STATE
HIGHWAY RIGHT OF WAY PLAT NO.
OTC Board of Commissioners' Minutes
May 16, 2006
Page 4
56-6; thence northwesterly 399.66 feet
along the north line of said STATE
HIGHWAY RIGHT OF WAY PLAT NO.
56-6 and along a non-tangential curve
concave to the northeast having a
central angle of 17 degrees 11 minutes
10 seconds, a radius of 1332.39 feet, a
chord bearing of North 62 degrees 19
minutes 59 seconds West and a chord
distance of 398.16 feet, thence North
48 degrees 16 minutes 19 seconds
West, not tangent to last described
curve, a distance of 268.61 feet to the
southeast corner of said Lot 5, Block 3,
HAPPEL ADDITION; thence on a
bearing of North 327.12 feet along the
east line of said Lot 5, Block 3,
HAPPEL ADDITION to the point of
beginning.
Containing 5.71 acres.
Subject to easements, restrictions or
reservations of record, if any,
TOGETHER WITH:
An easement for ingress and egress
over and across that part of the
Northwest Quarter, Section 23,
Township 136 North, Range 39 West,
Otter Tail County, Minnesota described
as follows:
Beginning at the northeast corner of Lot
5, Block 3, HAPPEL ADDITION to the
City of Perham, Minnesota according to
the plat on file in the office of the
County Recorder, Otter Tail county,
Minnesota; (for the purposes of this
description the east line of said Lot 5,
Block 3 has an assumed bearing of
NORTH) thence westerly 78.35 feet
along the north line of said Lot 5 and
along a non-tangential curve concave to
the north having a central angle of 12
degrees 49 minutes 34 seconds, a
radius of 350.00 feet, a chord bearing of
North 70 degrees 43 minutes 27
seconds West and a chord distance of
78.19 feet; thence North 64 degrees 18
minutes 40 seconds West. tangent to
last described curve and along the
north line of said Lot 5, a distance of
30.42 feet; thence North 25 degrees 41
minutes 20 seconds East 66.00 feet;
thence South 64 degrees 18 minutes 40
seconds East 30.42 feet; thence
easterlv 230.36 feet alona a non-
tangential curve concave to the north
having a central angle of 46 degrees 28
minutes 26 seconds, a radius of 284.00
feet, a chord bearing of South 87
degrees 32 minutes 53 seconds East
and a chord distance of 224.10 feet;
thence South 26 degrees 55 minutes 12
seconds East, not tangent to last
described curve, a distance of 66.31
feet; thence westerly 212.63 feet along
a non-tangential curve concave to the
north having a central angle of 34
degrees 48 minutes 29 seconds, a
radius of 350.00 feet, a chord bearing of
South 85 degrees 27 minutes 32
seconds West and a chord distance of
209 37 feet to the ooint of beainnina.
OTC Board of Commissioners' Minutes
May 16, 2006
Page 5
Commissioner Lee seconded the motion, and upon being put to vote, the above resolution
was adopted as follows;
Yes: 5
No: 0
Absent: 0
Adopted this 16th day of May, 2006.
Dated: 05-2.-3-0~ OTTER TAIL COUNTY BOARD OF COMMISSIONERS
ing, Board of Commissioners Chair
Liquor License Applications
Motion by Mosher, second by Block, and unanimously carried to approve the following
applications for license, subject to review by the County Attorney's office, the County Sheriffs
office, and submission of the required insurance documents.
Fair Hills Resort
Detroit Lakes, MN 56502
Heisler's Gravel and Rental
Vergas, MN
Lakeside Market
Battle Lake, MN
Rolling Hills Golf Course
Pelican Rapids, MN
On-Sale 3.2 Malt Liquor
On-Sale Wine
On-Sale 3.2 Malt Liquor
Off-Sale 3.2 Malt Liquor
On/Off-Sale 3.2 Malt Liquor
OTC Board of Commissioners' Minutes
May 16, 2006
Page 6
Exempt Permit Application
Motion by Lee, second by Nelson, and unanimously carried to approve, with no waiting
period, the LG220 Application for Exempt Permit, as submitted by Pelican Rapids Area
Chamber of Commerce for an event scheduled to be held on Saturday, October 7, 2006, at
The Club.
Recess & Reconvene
At 10:54 a.m., Chairman Froemming declared the Otter Tail County Board of Commissioners
meeting recessed for a short break. The meeting was reconvened at 11 :01 a.m.
Planning Commission Recommendations
Preliminary Plat & Conditional Use Permit-"South Shore"/Bluebi/1 Shores. LLC:
Motion by Froemming, second by Mosher, and unanimously carried to approve a Preliminary
Plat known as "South Shore" consisting of 11 lots for single family residential use and a
Conditional Use Permit to construct a road to service the plat, with conditions as
recommended by the Planning Commission. The property is described as GL 2 ex trs (16.19
Ac) & pt of GL 3 ... (3.98 AC) Section 7 of Otter Tail Township; Long Lake (56-210).
Conditional Use Permit-Woodland Beach Resort Assoc .• LLC:
Motion by Mosher, second by Froemming, and unanimously carried to approve a Conditional
Use Permit to install new footings and foundation under an existing cabin and install new roof
as presented. The property is described as Pt GL 3, Section 2 of Everts Township; Otter Tail
Lake (56-242).
Amendment of Conditional Use Permit-Woodland Beach Resort Assoc .• LLC:
Motion by Mosher, second by Block, and unanimously carried to allow a rotation of the roof
lines to run east and· _west to match the previously approved request and approve this
amendment to CUP #6151. The property is described as Pt GL 3, Section 2 of Everts
Township; Otter Tail Lake (56-242).
Preliminary Plat and Conditional Use Permit -"Johnson Lake Estates First Addition"/Pinnacle
Land Development, Inc:
Land & Resource Director, Bill Kalar, stated that this request was recommended for denial by
the Planning Commission for various reasons as documented. Glen Freeland, President of
Pinnacle Land Development, LLC, stated that, contrary to the Planning Commission's
problems with the storm water drainage plan, he felt it was a very well done plan that follows
all Shoreland Ordinance regulations and stated that there is adequate building area on Lot 4.
He requested approval of the plan as presented. Motion by Mosher, second by Lee, to deny,
as recommended by the Planning Commission, the Preliminary Plat known as "Johnson Lake
Estates First Addition" and the Conditional Use Permit to service the plat for the reasons as
stated in the May 10, 2006, Planning Commission minutes. Chris Mccann of Interstate
Engineering, stated that the MPCA rules must be followed in the erosion control plan and the
plan was acceptable to them. Mr. Kalar expressed concern with the erosion control plan and
the buildability of Lot 4 and the likelihood of a buyer of the property actually building in the
area(s) indicated. Chairman Froemming called for a vote on the motion for denial. Motion
carried unanimously. The property is described as Lot 2 ex tr, Lot 3 & pt S½ NE¼ lying
NWL Y of Twp Rd ex N 6 rds of W 20 rds & ex tr, Section 9 of St. Olaf Township; Johnson
Lake (56-393).
Conditional Use Permit -Otter Tail Beach Club. Inc:
OTC Board of Commissioners' Minutes
May 16, 2006
Page 7
Motion by Froemming. second by Block. and unanimously carried to approve a Conditional
Use Permit to replace a roof as presented. The property is described as Pt GLS 3 & 5 (2.50
AC) Section 12 of Amor Township; Otter Tail Lake (56-242).
Conditional Use Permit -Edna Township:
Motion by Nelson, second by Lee. and unanimously carried to approve a Conditional Use
Permit to install a new culvert subject to clarification of the October 7, 2005, letter from the
DNR that this is an installation of an additional culvert not a replacement culvert. The
property is located at Engstrom Beach Road (41680 Engstrom Beach Road) Section 30 of
Edna Township; Archie Lake (56-1629) & Big McDonald Lake (56-386).
Conditional Use Permit -Allen & Marion Antonsen:
Motion by Nelson, second by Lee, and unanimously carried to approve a Conditional Use
Permit to construct a road as presented. The property is described as SW¼ ex 2 rds,
Section 9 of Hobart Township; Rose Lake (56-360).
Conditional Use Permit -Otter Tail Ag. Enterprises, LLC:
Motion by Mosher, second by Lee, and unanimously carried to approve a Conditional Use
Permit for construction of storm water drainage improvements and cooling water discharge
for the proposed ethanol facility as presented. The property is located in Sections 17 through
20 of Fergus Falls Township; Pelican River (56-PR) and Unnamed Lake (56-859).
Highway Contracts and Bonds
Motion by Lee, second by Block, and unanimously carried to authorize the Chairman's
signature to execute a contract between Otter Tail County and Morris Sealcoat & Trucking,
Inc. for the 2006 Countywide Seal Coat Project (S.A.P. 56-604-13, Etc.), contingent upon the
approval of the County Attorney.
Motion by Nelson, second by Lee, and unanimously carried to authorize the Chairman's
signature to execute a contract between Otter Tail County and AAA Striping Service Co. of
Rogers, MN, for 2006 Countywide Traffic Marking, CP 06:TM & Etc., contingent upon the
approval of the County Attorney.
Motion by Lee, second by Mosher, and unanimously carried to authorize the Chairman's
signature to execute a Contract between Otter Tail County and UAP Distribution, Inc. of
Kasota, MN, for the 2006 Seasonal Supply of Herbicides. The purchase of Herbicides is from
the State Bid, Contract #427847.
Recess & Reconvene
At 11 :51 a.m., Chairman Froemming declared the meeting of the Otter Tail County Board of
Commissioners recessed for lunch break. The meeting was reconvened at 1 :08 p.m.
Public Hearing Established
Motion by Mosher, second by Block and unanimously carried to establish a Public Hearing at
1 :00 p.m. on Tuesday, June 13, 2006, to consider enactment of an Otter Tail County
Business Subsidy Policy.
OTC Board of Commissioners' Minutes
May 16, 2006
Page 8
North & South Turtle Lake High Water Discussion
Property Owner, Bryan Severson, stated that North Turtle Lake property owners would not
accept additional restriction of the flow of water through the culvert that flows to South Turtle
Lake. County Attorney, David Hauser, spoke in regards to the Storm Sewer Systems statute,
which addresses control and disposal of rain water. The claim, in this situation, is that the
high water is the result of many years of excess rain which is storm water. Disposal is an
appropriate use of a storm water system. Mr. Hauser stated that DNR Hydrologist, Terry
Lejcher, would need to document this fact for the County to proceed with disposal of excess
rain water. The statute has requirements such as an engineered plan, special assessments,
comprehensive plan, cost estimates, and the design needs to be based upon the relative
benefits of the actual properties. Mr. Hauser stated that, unless there is a petition signed by
all landowners subject to assessment, to proceed would require a 4/5ths vote of the County
Board. Highway Engineer, Rick West, will review the current plan. Bricker Johnson of the
South Turtle Lake LID, stated that the LID has applied for two grants, one for pumping costs
and one for the permanent project. Motion by Mosher, second by Froemming, and
unanimously carried to proceed with a feasibility study of a Storm Sewer System pursuant to
M.S. 444.075 to drain storm water from the North and South Turtle Lake area.
Membership Fee for the Center for Rural Policy and Development
Motion by Block, second by Nelson, and unanimously carried to approve payment, in the
amount of $250.00, payable to the Center for Rural Policy and Development for the annual
membership investment.
Adjournment
At 2:10 p.m., Chairman Froemming declared the meeting of the Otter Tail County Board of
Commissioners adjourned until Tuesday, May 23, 2006.
Dated : _ _:o=:..s:...._-~2 .. 3:::....__,2=="'=-=-oc::l.,.=--OTTER TAIL COUNTY BOARD OF COMMISSIONERS
A
g, Board of Commissioners Chair
Attest: _ __L,J.~r.&f----L~~,bL_-
Larry Kro
CB/kd
5/16/2006 12:0):4.4
OTC Board of Commissioners' Minutes
May 16, 2006
Attachment A, Page I
OTTER TAIL COUNTY AUDITOR IFD66 PANELSON RECEIPTS ANO DISBURSEMENTS SYSTEM COtmTY 56
WARR.ANTS FOR PUBLICATION PAGE
WARRANTS APPROVED ON 5/16/2006 FOR PAYMENT S/16/2006
VENDOR NAME
A-1 LOCK AND KEY A-1 TROPHY AMERICAN SOLUTIONS FOR BUSINES APCO INTERNATIONAL INC
ARK & SPARK ARVIG COMMUNICATION SYSTEMS
AUTO SAFETY SERVICE ERIC BABOLIAN
BEN HOLZER UNLIMITED BLUESTONE TECHNOLOGIES INC
HEATHER BRANDBORG CITIZENS ADVOCATE COMPANION ANIMAL HOSPITAL COOPERS TECHNOLOGY GROUP CORPORATE TECHNOLOGIES CRONATRON WELDING SYSTEMS INC CULLIGAN WATER COND DAhOTA FLUID POWER INC DAN'S TOWING & REPAIR DENZEL'$ REGION WASTE INC
DEX MEDIA EAST
DYNAFAB CORPORATION FARN1lM'9 GENUINE PARTS INC FERGUS FALLS MEDICAL GROUP FERGUS FALLS NEWSPAPERS INC FERGUS FALLS POLICE DEPT FERGUS POWER PUMP INC FERGUS TIRE CENTER FERRELLGAS FORCE AMERICA FOTH&. VAN DYKE
Q & K SeRVICES
GE CAPITAL GOPHER STATE ONE CALL GR GRAPHICS INC ST LOUIS OPAINGER INC H & R CONSTRUCTION CO HALL GMC INC DIANE HANSON HEDAHLS HEADQUARTERS HlTESMAN & ASSOCIATES PA HOBART SALES & SERVICE SHELOON HOLM
HOMESTEAD BUILDING SUPPLIES THE INDEPENDENT
INNOVATIVE OFFICE SOLUTIONS LL INSIGHT PUBLIC SECTOR INTERSTATE INC
AMOUNT
27.75 39 .94, 1,232.31 51B.00
33.97 200.00
77.95 12. 93 25.77
-l.BB 61
106.15 60.7B
115. 54 590.69
20.00 265.72 26.64 126.20
11. 00 1,653.42 19.40 5,742.75 150.06 900.00 1,664.4.4
565.65 4,495.00 192.21 57.95 10 .53 9,986.23 2,076.21
233.65 27. 55 200 16 626.52 1,835.60 713.62 114 .45 64. 45 495.00
1,328.10
275.26 35.61
25.00 182. 72
J CRAFT DIV OF CRYSTEEL MFG IN
1,268.81
172.3) 570.84
OTC Board of Commissioners· Minutes
May 16, 2006
Attachment A, Page 2
5/16/2006
12:03:~4
OTTER TAIL COUNTY AUDITOR PANELSON RECEIPTS ANO DISBURSEMENTS SYSTEM
WARR.ANTS FOR PUBLICATIOM
IFD66
COUNTY 56
PAGE 2
WARRANTS APPROVED ON 5/16/2006 FOR PAYMENT 5/16/2006
VENDOR NAME
KEEPRS INC CY'S UNIFORMS KELLY SERVICES INC KERN & TAEERY INC L & L SERVICE LA CROSSE FORAGE & TURF SEED C LAKE REGION HEALTHCARE CORP LAKELAND MENTAL HEALTH CENTER LAKES AREA PEST CONTROL LLC LAP.RY OTT INC TRUCK SERVICE
LOCATORS & SUPPLIES INC
MAAO
MADDEN'S ON GULL LAKE
METRO SALES INC MFSP..C FALL CONFERENCE
MIDWESTERN MAT RENTAL & SUPPLY MN CO ATTOP..NEYS ASSOCIATION
MN MOTOR COMPANY
MN SHERIFFS ASSOC
MOORE MEDICAL CORP NELSON FORD LINCOLN MERCURY IN JAMES NELSON SUSAN NELSON
NEW YORK MILLS HERALD NORTH UNION TEXACO
NORTHERN STATES SUPPLY INC
NORTHSTAR TECHNOLOGY GROUP INC
NORTHWEST RESPIRATORY SERVICES
OFFIC~MAX CONTRACT INC
OLSON OIL CO INC
ONE CALL LOCATORS LTD
OTTER TAIL TELCOM
OTTERTAIL TRUCKING INC
OUTDOOR RENOVATIONS LANDSCAPE
PAMIDA PHARMACY PARK REGION CO OP
PELICAN RAPIDS BASEBALL ASSOC! ~ELICAN RAPlDS PRESS PENROSE OIL COMPANY PEPSI.AMERICAS
PERHAM CO OP CREA.MERY
PERHAM ENTERPRISE BULLETIN CITY PERHAM
PHELPS FAMILY FORD PIONEER JANITORIAL
PMR 2000 PREMIUM WATERS INC PROSWEEP INC THE RENTAL STORE P.EVIEW ENTERPRISES INC
AMOUNT
?75.95 2,288.98 607.05
124.15 2,680.07
321. 20 1,969.50 79.88
1,365.00
3,401.74
90.00
1,747.75
275.20
240.00
69. 60
.!6. 63
2 93. 14 125.00 104. .17 41. 05 791.73
58.63 34.00
82.25
185.27 2,418.75
60.00
49.67
266.53 91.06
693.55
11,893.20
332.25 5,362.47 1,287.23
350.00 45.50 513.76 139.05 667.27
103.23 46,528.58
54.5.&2
90.53
73 .10 27.84
625.00 150.00 116.38
5/16/2006 12:02:44
OTTER TAIL COUNTY AUDITOR PIU'tELSON RECEIPTS AND DISBURSEMENTS SYSTEM
WARRANTS FOR PUBLICATION
OTC Board of Commissioners' Minutes
May 16, 2006
Attachment A, Page 3
IF066 COUNTY SD PAGE 3
WARRANTS APPROVED ON 5/16/2006 FOR PAYMENT 5/16/2006
VENDOR NA.ME
ROAD EQUIPMENT PARTS CENTER MARK RONNING ROYAL TIRE INC
SCOTT HOFLAND CONSTRUCTION INC SERVICE FOOD SUPERVALU STEINS INC
STEVE'S SANITATION INC STREICHER$
SUPER SEPTIC INC OF PELICAN RA THERMAL TECHNOLOGIES INC
KELLY THOMAS
MARCIA THOMPSON TIRES PLUS TNT REPAIR INC
TOOL CRIB OF THE NORTH US POSTMASTER UNIVERSITY OF MN
VOSS LIGHTING
WALLWORK TRUCK CENTER WALTERS PHOTOGRAPHY
WASTE MANAGEMENT
WELDING SUPPLIES & FIRE EQUIPM WELLER OIL CO WEST OTTER TAIL CO FAIR ASSOC!
WEST PAYMENT CENTER WOESSNER CONSTRUCTION INC ZIEGLER INC
FINAL TOTAL ...... .
AMOlilIT
40.61
5.11
1,894.93 4,:no.oo
33. 42
1,471.83 580.58
1,431.68 77 .19
1,572.81
70.80
248.14 13.97
236.55
132.63 78.00
16,123.96
345.63
155.85 22.54
6~.885.75
5.27 61.20
75.00
894.60 10.91
5,107.40
$230,738.54 ***•