Loading...
HomeMy WebLinkAboutBoard of Commissioners – Supporting Documents Compiled – 09/22/2020 OTTER TAIL COUNTY BOARD OF COMMISSIONERS SUPPORTING DOCUMENTS Tuesday, September 22, 2020 8:30 a.m. Government Services Center & Via Live Stream 515 West Fir Avenue, Fergus Falls, MN 2.1 Draft Otter Tail County Board Minutes for 09.01.2020 2.2 Otter Tail County Bills-Warrants for 09.08.2020 2.2 Otter Tail County Bills-Warrants for 09.22.2020 2.3 Public Health & Human Services Warrants-Bills for 9-8-2020 2.3 Public Health & Human Services Warrants-Bills for 9-22-2020 2.7 Human Services Contracts 3.0 PS4H Dental Services Grant 4.0 Sheriff Donation Resolution 5.0 Buffalo Red River Watershed 1W1P 6.0 Planning Commission 6.0 Long Prairie 1W1P Policy Committee 6.0 Redeye Resolution to Adopt and Implement OTC 7.0 Towards Zero Deaths Grant Resolution 8.0 OTC Adult Mental Health Local Advisory Council recommendations 9.0 Out of State Travel Request 11.0 Highway Items 12.0 County Ditch 70 13.0 Auditor-Treasurer Items 14.0 Solar Project 14.0 Legislative Representation Agreement Page 1 of 3 MINUTES OF THE OTTER TAIL COUNTY BOARD OF COMMISSIONERS Government Services Center, Commissioners’ Room & Via Livestream 515 West Fir Avenue, Fergus Falls, MN September 1, 2020 8:30 a.m. Call to Order The Otter Tail County Board of Commissioners convened at 8:31 a.m. Tuesday, September 1, 2020, at the Government Services Center in Fergus Falls, MN. Commissioners Lee Rogness, Chair; Betty Murphy, Vice-Chair; John Lindquist, Wayne Johnson, and Doug Huebsch were present in the room. The meeting was held via Webex and was available to the public via livestream due to the health pandemic and declared emergency in accordance with Minn. Stat. Sec. 13D.021 Subd. 1(1). Approval of Agenda Chair Rogness called for approval of the Board Agenda. Motion by Lindquist, second by Huebsch and unanimously carried to approve the Board of Commissioners’ agenda of September 1, 2020. Consent Agenda Motion by Murphy, second by Johnson and unanimously carried to approve the Consent Agenda items as follows: 1. August 25, 2020 Board of Commissioners’ Meeting Minutes as amended below 2. Warrants/Bills for September 1, 2020 (Exhibit A) County Board Minutes of August 25, 2020 - Original Motion: Deputy Position Motion by Huebsch, second by Murphy to approve one full time Deputy position in the Sheriff’s Department. The request is a result of restructure within the department due to an upcoming retirement and was approved by the Finance Committee. Amended Language: Deputy and Corrections Officer Positions Motion by Huebsch, second by Murphy to approve one full time Deputy position and one full time Corrections Officer position in the Sheriff’s Department. The request is a result of restructure within the department due to an upcoming retirement and was approved by the Finance Committee. Community Resilience Policy for the OTC CARES Act Emergency Assistance Program Motion by Huebsch, second by Johnson and unanimously carried to adopt the Community Resilience Policy for the Otter Tail County CARES Act Emergency Assistance Program. The purpose of the policy is to specify program and strategies to assist households experiencing housing instability, food insecurity, and other financial crises as a result of COVID-19. Final Plat – Pladson’s Addition Motion by Johnson, second by Lindquist and unanimously carried to approve the final Plat known as Pladson’s Addition consisting of 5 single family residential non-riparian lots, 1 block. Located at 24689 Labrador Beach Rd, section 27 & 34 of Dunn Township; Franklin Lake (56-759). Final Plat – Pelican Developments II Motion by Johnson, second by Murphy and unanimously carried to approve the final Plat known as Pelican Developments II, LLC, consisting of 8 single family residential non-riparian lots, 1 block and is located at 50577 County Highway 9, section 11, Scambler Township; Pelican (56-786). Engineering Services Agreement Motion by Johnson, second by Huebsch and unanimously carried to authorize appropriate County Officials’ signatures to execute the Engineering Services Agreement between Otter Tail County and Interstate Engineering, Inc., for the creation of a bridge design to replace the existing structure (L0923) on CSAH 75 in Bluffton Township. Board of Commissioners’ Meeting Minutes September 1, 2020 Page 2 of 3 Approval of Payment Motion by Lindquist, second by Huebsch and unanimously carried to approve payment in the amount of $4,596.80 to Sandford Health for costs incurred under the provisions of Minnesota Statute 609.35. Absentee Ballot Board Appointments Motion by Johnson, second by Murphy and unanimously carried to appoint the following individuals to the Otter Tail County Absentee Ballot Board for the processing of absentee ballots issued and received under the provisions of Minnesota Statutes 203B.04 through 203B.15 and Minnesota Statutes 203B.16 through 203B.27 for the August 11, 2020 State Primary Election and for the November 3, 2020 State General Election and to establish compensation for those services at $15.00 per hour with a reimbursement for travel at $0.575 per mile. Patricia Tell Jean Kathy Anderson Joyce Albjerg Desta Hunt Virginia Portmann Ron Burt Joleen Lentz Renae Legge RESOLUTION CALLING FOR A PUBLIC HEARING ON A FIVE-YEAR CAPITAL IMPROVEMENT PLAN AND AUTHORIZING THE ISSUANCE AND SALE OF GENERAL OBLIGATION CAPITAL IMPROVEMENT PLAN BONDS Otter Tail County Resolution No. 2020 -61 BE IT RESOLVED by the Board of County Commissioners of Otter Tail County, Minnesota (the County), as follows: 1. Approval of the Five-Year Capital Improvement Plan. The County intends to approve its Capital Improvement Plan (the “CIP”) pursuant to Minnesota Statutes, Section 373.40. The CIP supplements the capital improvement plan of the County adopted March 5, 2019. 2. Approval of the Issuance of Capital Improvement Plan Bonds. The County intends to issue its capital improvement plan bonds (the “Bonds”) to finance various facility renovation and improvement projects and various park and trail improvement projects, as described in the CIP, pursuant to Minnesota Statutes, Section 373.40. 3. Public Hearing. A public hearing is hereby scheduled to be held on the approval of the CIP and the issuance of the Bonds at 11:30 a.m. on Tuesday, October 6, 2020, at the Government Services Center in Fergus Falls, Minnesota. The County Auditor-Treasurer is hereby authorized and directed to cause notice of such public hearing in substantially the form of attached hereto to be published in the official newspaper of the County not less than fourteen (14) days nor more than twenty-eight (28) days prior to the date of the hearing. The motion for the adoption of the foregoing resolution was introduced by Commissioner Murphy, duly seconded by Commissioner Huebsch and after discussion thereof and upon vote being taken thereon, the motion passed unanimously. Adopted this 1st day of September 2020. OTTER TAIL COUNTY BOARD OF COMMISSIONERS Dated ___________________________________ By: _____________________________________________ Attest____________________________________ Leland R. Rogness, Board of Commissioners Chair Nicole Hansen, Clerk Organizational Structure Motion by Huebsch, second by Murphy and unanimously carried to approve of the ongoing concept and direction of the organizational restructuring for Otter Tail County. The restructure was discussed during a working session on August 18, 2020 and is planned to be effective January 1, 2021. Board of Commissioners’ Meeting Minutes September 1, 2020 Page 3 of 3 Recess & Reconvene At 9:30 a.m., Chair Rogness declared the meeting of the Otter Tail County Board of Commissioners recessed for a short break. The Board of Commissioners meeting was reconvened at 9:38 a.m. Public Health Fee Schedule Motion by Lindquist, second by Murphy and unanimously carried to approve the Public Health fee schedule as presented by the Public Health director effective September 1, 2020. Public Health Update Public Health Director Jody Lien reported that Minnesota has 75,864 lab confirmed cases, of which 67,656 no longer require isolation, and 1,817 lab confirmed deaths. Otter Tail County has 296 lab confirmed cases of COVID-19, of which 251 are no longer contagious, and four (4) COVID-19 related deaths. No longer contagious is a number estimate based on ten (10) days from a positive test date of the case and the individual may not be fully recovered. For more detailed information regarding Otter Tail County COVID-19 data, visit https://ottertailcountymn.us/content-page/covid-19- health-information/. Ms. Lien expressed concerns regarding the increase in cases as the cold and flu season nears and stressed the importance of masking and social distancing. Countywide Emergency Operations Center (EOC) Emergency Management Director Patrick Waletzko informed the Board that the EOC is currently working to identify facilities throughout the county to safely administer vaccines for the upcoming flu season. The EOC has also been fielding questions regarding the CARES Act program and the first reimbursement request has been submitted to Federal Emergency Management Agency (FEMA). Business Community Community Development Director Amy Baldwin briefed the Board regarding the business community and shared July unemployment data. Otter Tail County unemployment rate is at 4.8%, down from June at 6.2%. The small business support program is planned to be launched September 1, 2020 and applications will be accepted through the month of September. Internal Operations and County Planning County Administrator Nicole Hansen provided a brief update to the Board regarding internal operations and county planning. Commissioners requested that employees who request to return to the workplace be allowed to safely do so while following the executive order of the governor. Adjournment At 10:36 a.m., Chair Rogness declared the Otter Tail County Board of Commissioners meeting adjourned. The next regular Board meeting is scheduled at 8:30 a.m. on Tuesday, September 22, 2020 and will be available to the public via live stream. OTTER TAIL COUNTY BOARD OF COMMISSIONERS Dated ___________________________________ By: _____________________________________________ Attest____________________________________ Leland R. Rogness, Board of Commissioners Chair Nicole Hansen, Clerk Board of Commissioners’ Meeting Minutes September 1, 2020 (Exhibit A) Page 1 of 2 Board of Commissioners’ Meeting Minutes September 1, 2020 (Exhibit A) Page 2 of 2 COMMISSIONER'S VOUCHERS ENTRIES9/8/2020 csteinba N Y D 4 N Otter Tail County Auditor Audit List for Board Page 1 Print List in Order By: Save Report Options?: Type of Audit List: on Audit List?: Paid on Behalf Of Name Explode Dist. Formulas?: D - Detailed Audit List S - Condensed Audit List 1 - Fund (Page Break by Fund) 2 - Department (Totals by Dept) 3 - Vendor Number 4 - Vendor Name 10:51:25AM COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba Solid Waste Fund Copyright 2010-2020 Integrated Financial Systems 50-000-000-0110-6857 330.00 APPLICANE DISPOSAL 8/15/20 Appliance Disposal N 50-000-000-0130-6857 370.00 APPLICANE DISPOSAL 8/20/20 Appliance Disposal N 01-121-000-0000-6239 718.37 VET LINK COASTERS 6641 MDVA Grant N 50-000-000-0170-6859 695.81 MISC RECYCLING 4426 Electronic Disposal N 50-000-000-0170-6859 1,733.79 MISC RECYCLING 4474 Electronic Disposal N 50-000-000-0110-6859 2,336.38 MISC RECYCLING 4522 Electronic Disposal N 01-042-000-0000-6406 56.00 A2RJVV5AA0WI1P PLATE ENVELOPES 1YVJ-3J7P-36CN Office Supplies N 01-091-000-0000-6406 47.98 A2RJVV5AA0WI1P FLASH DRIVES 1QTV-PLW3-F1DV Office Supplies N 01-122-000-0000-6406 99.99 A2RJVV5AA0WI1P WIRELESS EARBUD 1XFR-F6FJ-XQY9 Office Supplies N 01-201-000-0000-6406 15.39 A2RJVV5AA0WI1P BATTERIES 17L6-4XYH-6Y1X Office Supplies N 01-280-000-0000-6818 128.87 A2RJVV5AA0WI1P NITRILE GLOVES 1K3T-DJMT-9YL4 Contingency Incident Event Costs N 10-302-000-0000-6406 59.96 SUPPLIES-ACCT#A2RJVV5AA0WI1P 1THM-HKJT-4YMH Office Supplies N 10-304-000-0000-6406 449.70 SUPPLIES-ACCT#A2RJVV5AA0WI1P 1THM-HKJT-4YMH Office Supplies N 50-399-000-0000-6306 199.95 A2RJVV5AA0WI1P FORKLIFT SEAT 1M1W-L3DP-3R46 Repair/Maint. Equip N 50-000-000-0120-6290 30.00 ACCT 160002806 1602039827 Contracted Services.N 50-000-000-0120-6290 30.00 ACCT 160002806 1602060227 Contracted Services.N 50-000-000-0120-6290 30.00 ACCT 160002806 1602060227 Contracted Services.N 50-000-000-0000-6290 19.04 ACCT 160002035 1602066041 Contracted Services N 50-390-000-0000-6290 19.03 ACCT 160002035 1602066041 Contracted Services.N 50-399-000-0000-6290 33.06 ACCT 160002035 1602066041 Contracted Services.N 10-304-000-0000-6300 422.50 SERVICE 320 Building And Grounds Maintenance N 13408 A&A RECYCLING LLC 700.0013408 13877 ADMFG INC 718.3713877 14813 ALBANY RECYCLING CENTER 4,765.9814813 14386 AMAZON CAPITAL SERVICES INC 1,057.8414386 13620 AMERIPRIDE SERVICES INC 161.1313620 15213 ANDERSEN BUILDERS OF OTC LLC Page 2Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 2 Transactions 1 Transactions 3 Transactions 8 Transactions 6 Transactions A&A RECYCLING LLC ADMFG INC ALBANY RECYCLING CENTER AMAZON CAPITAL SERVICES INC AMERIPRIDE SERVICES INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba Road And Bridge Fund Copyright 2010-2020 Integrated Financial Systems 01-201-000-0000-6304 102.99 ACCT 507600 BATTERY 5278460 Repair And Maintenance N 10-302-000-0000-6500 0.98 PARTS 5277044 Supplies N 10-304-000-0000-6572 44.91 SUPPLIES 5277280 Repair And Maintenance Supplies N 10-304-000-0000-6406 74.92 SUPPLIES 5278684 Office Supplies N 10-304-000-0000-6572 49.94 PARTS 5278684 Repair And Maintenance Supplies N 10-304-000-0000-6406 35.97 SUPPLIES 5278688 Office Supplies N 10-304-000-0000-6572 21.98 PARTS 5278688 Repair And Maintenance Supplies N 10-304-000-0000-6572 200.99 PARTS 5278716 Repair And Maintenance Supplies N 10-304-000-0000-6572 61.98 PARTS 5278717 Repair And Maintenance Supplies N 10-304-000-0000-6572 319.98 BATTERY 5279869 Repair And Maintenance Supplies N 01-201-000-0000-6171 250.00 REF 9157 VIRTUAL TRAINING 14618 Tuition And Education Expenses N LIEN/ERIC7652 01-201-000-0000-6171 75.00 REF 9157 VIRTUAL TRAINING 14619 Tuition And Education Expenses N LIEN/ERIC7652 50-000-000-0110-6290 10.00 COOLER RENT 4649 Contracted Services.N 50-000-000-0130-6290 10.00 COOLER RENT 4778 Contracted Services.N 01-201-000-0000-6396 150.00 TOW CF 20025733 8/13/20 33227 Special Investigation N 01-201-000-0000-6396 200.00 TOW CF 20025921 8/24/20 33535 Special Investigation N 01-201-000-0000-6304 150.00 TOW UNIT 308 8/24/20 33536 Repair And Maintenance N 01-201-000-0000-6526 119.35 GUN MAGAZINES 8/17/20 Uniforms N 422.5015213 102 AUTO VALUE FERGUS FALLS 914.64102 15204 BCA TRAINING & AUDITING 325.0015204 1755 BEN HOLZER UNLIMITED WATER LLC 20.001755 31803 BEYER BODY SHOP INC 500.0031803 3095 BRANDNER/STEVE 119.353095 Page 3Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 10 Transactions 2 Transactions 2 Transactions 3 Transactions 1 Transactions ANDERSEN BUILDERS OF OTC LLC AUTO VALUE FERGUS FALLS BCA TRAINING & AUDITING BEN HOLZER UNLIMITED WATER LLC BEYER BODY SHOP INC BRANDNER/STEVE Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba Solid Waste Fund Copyright 2010-2020 Integrated Financial Systems 50-399-000-0000-6304 356.52 ACCT 100331 UNIT 11805 REPAIRS 059774 Repair And Maint-Vehicles N 50-399-000-0000-6304 424.00 ACCT 100331 CAPPED CASINGS 059804 Repair And Maint-Vehicles N 50-399-000-0000-6304 366.65 ACCT 100331 UNIT 17373 SERVICE 059890 Repair And Maint-Vehicles N 50-399-000-0000-6304 1,240.63 ACCT 100331 UNIT 17373 REPAIRS 059907 Repair And Maint-Vehicles N 50-399-000-0000-6304 427.13 ACCT 100331 UNIT 16558 REPAIRS 059913 Repair And Maint-Vehicles N 50-399-000-0000-6450 4,364.15 ACCT 1128 WIRE 46296 Baling Wire N 01-201-000-0000-6396 226.00 TOW CF 20025610 8/12/20 45432 Special Investigation N 01-201-000-0000-6396 120.00 TOW CF 20025921 8/14/20 45458 Special Investigation N 10-304-000-0000-6306 37.06 SERVICE 45534 Repair/Maint. Equip N 01-280-000-0000-6818 750.00 HAND SANITIZER 071420 Contingency Incident Event Costs N 50-000-000-0000-6240 7.50 SOLID WASTE ATTENDANT 10495 Publishing & Advertising N 01-122-000-0000-6304 26.46 UNIT 19296 TIRE REPAIR 056853 Repair And Maintenance N 01-112-000-0000-6560 24.26 ACCT 716131 PREMIUM 8/7/20 40815 Gasoline & Oil N 01-112-000-0000-6560 25.40 ACCT 716131 UNLEADED 8/7/20 40818 Gasoline & Oil N 01-112-106-0000-6572 64.90 ACCT 716131 SOLAR SALT 40819 Repair And Maint Supplies N 3423 BUY-MOR PARTS & SERVICE LLC 2,814.933423 296 CENTRAL STATES WIRE PRODUCTS INC 4,364.15296 8930 CERTIFIED AUTO REPAIR 383.068930 16142 CHIPPEWA VALLEY ETHANOL CO LLLP 750.0016142 5580 CITIZEN'S ADVOCATE 7.505580 32655 COLLEGE WAY AUTO 26.4632655 12485 COOP SERVICES INC 114.5612485 32603 COOPER'S OFFICE SUPPLY INC Page 4Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 5 Transactions 1 Transactions 3 Transactions 1 Transactions 1 Transactions 1 Transactions 3 Transactions BUY-MOR PARTS & SERVICE LLC CENTRAL STATES WIRE PRODUCTS INC CERTIFIED AUTO REPAIR CHIPPEWA VALLEY ETHANOL CO LLLP CITIZEN'S ADVOCATE COLLEGE WAY AUTO COOP SERVICES INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba General Revenue Fund Copyright 2010-2020 Integrated Financial Systems 01-044-000-0000-6406 66.07 ACCT 2189988010 SUPPLIES 448998 Office Supplies N 01-044-000-0000-6406 59.61 ACCT 2189988010 SUPPLIES 449135 Office Supplies N 01-044-000-0000-6406 23.84 ACCT 2189988010 SUPPLIES 449142 Office Supplies N 01-044-000-0000-6406 58.77 ACCT 2189988010 LABELS 449445 Office Supplies N 01-044-000-0000-6406 389.00 ACCT 2189988010 STOOL 449498 Office Supplies N 01-201-000-0000-6406 100.06 ACCT 2189988555 SUPPLIES 449517 Office Supplies N 50-000-000-0120-6290 26.00 ACCT 267-03388972-1 9/20/20 Contracted Services.N 50-000-000-0170-6485 63.89 ACCT 227162 PAPER TOWELS 70009 Custodian Supplies N 01-201-000-0000-6304 584.00 ACCT 5146 TIRES FOR UNIT 1609 501253 Repair And Maintenance N 01-044-000-0000-6304 16.94 WIPER BLADES 51055 Repair And Maintenance Y 01-201-000-0000-6304 60.95 UNIT 1907 OIL CHANGE 78411 Repair And Maintenance N 10-302-000-0000-6505 1,996.96 RIP RAP ROCK 30576 Aggregates N 01-280-000-0000-6818 480.00 FACE SHIELDS 89155 Contingency Incident Event Costs N 649.6732603 2364 CULLIGAN OF WADENA 26.002364 36 DACOTAH PAPER CO 63.8936 6708 DAKOTA WHOLESALE TIRE INC 584.006708 1496 DAN'S TOWING & REPAIR 16.941496 33013 DICK'S STANDARD 60.9533013 941 EGGE CONSTRUCTION INC 1,996.96941 9952 EXCEL PLASTICS LLC 480.009952 13026 EZWELDING LLC Page 5Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates - 6 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions COOPER'S OFFICE SUPPLY INC CULLIGAN OF WADENA DACOTAH PAPER CO DAKOTA WHOLESALE TIRE INC DAN'S TOWING & REPAIR DICK'S STANDARD EGGE CONSTRUCTION INC EXCEL PLASTICS LLC Otter Tail County Auditor FOTH INFRASTRUCTURE & ENVIRONMENT LLC COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba Solid Waste Fund Copyright 2010-2020 Integrated Financial Systems 50-399-000-0000-6306 1,069.00 REPAIRS TO ROLLOFF #101 000050 Repair/Maint. Equip Y 50-399-000-0000-6306 707.00 REPAIR BIN #111 51 Repair/Maint. Equip Y 01-112-000-0000-6369 847.55 ACCT 115000 CLEAR SHIELDING SI012821 Miscellaneous Charges N 50-399-000-0000-6304 109.88 ACCT 13050 WIPERS/GREASE 785023 Repair And Maint-Vehicles N 10-304-000-0000-6406 194.28 SUPPLIES MNFER129299 Office Supplies N 10-304-000-0000-6572 249.00 BATTERY MNFER129561 Repair And Maintenance Supplies N 50-000-000-0000-6330 73.60 MILEAGE 8/26-8/31/20 9/8/20 Mileage N 50-000-000-0000-6330 138.00 MILEAGE 8/1-8/25/20 9/8/20 Mileage N 01-063-000-0000-6240 55.80 ACCT 46896 PUBLIC ACCURACY 2217194 Publishing & Advertising N 50-000-000-0120-6278 3,615.82 HENNING 2020 TECH/GW SERVICES 68485 Engineering & Hydrological Testing N 50-000-000-0130-6278 8,723.28 NE OT 2020 TECH/GW SERVICES 68486 Engineering & Hydrological Testing N 50-000-000-0000-6276 4,420.76 OTTER TAIL FACILITY SWPPP'S 68487 Professional Services N 50-000-000-0000-6276 18,109.67 SOLID WASTE MANAGEMENT PLAN 68489 Professional Services N 01-112-101-0000-6572 781.25 ACCT OTT100 VERIFY VFD SIGNALS 118433 Repair And Maintenance Supplies N 1,776.0013026 3297 FARGO GLASS & PAINT CO INC 847.553297 373 FARNAM'S GENUINE PARTS INC 109.88373 2997 FASTENAL COMPANY 443.282997 8002 FIELD/TERRY 211.608002 14517 FORUM COMMUNICATIONS COMPANY 55.8014517 387 34,869.53387 2 G & R CONTROLS INC 781.252 Page 6Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 2 Transactions 1 Transactions 1 Transactions 2 Transactions 2 Transactions 1 Transactions 4 Transactions 1 Transactions FOTH INFRASTRUCTURE & ENVIRONMENT LLC EZWELDING LLC FARGO GLASS & PAINT CO INC FARNAM'S GENUINE PARTS INC FASTENAL COMPANY FIELD/TERRY FORUM COMMUNICATIONS COMPANY G & R CONTROLS INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba General Revenue Fund Copyright 2010-2020 Integrated Financial Systems 01-201-000-0000-6526 15.91 ACCT 1002151493 LOCKING FORK 016215523 Uniforms N WUNDERLICH/MICHAEL5283 01-201-000-0000-6526 199.31 ACCT 1002151493 TROUSERS 016247560 Uniforms N 50-000-000-0170-6290 116.00 ACCT 12465 RODENT CONTROL 147769 Contracted Services.N 50-000-000-0170-6290 116.00 ACCT 12465 RODENT CONTROL 150998 Contracted Services.N 50-399-000-0000-6290 120.75 ACCT 7152 RODENT CONTROL 150957 Contracted Services.N 50-399-000-0000-6290 9.45 ACCT 7152 ODOR UNIT 151133 Contracted Services.N 01-112-000-0000-6275 20.25 ACCT MN01166 15 TICKETS 0081279 Fiber Locating Service N 01-063-000-0000-6406 2,081.21 VOTED BALLOT ENVELOPES 0323292 Office Supplies N 01-112-101-0000-6572 455.50 ACCT 813640729 SUPPLIES 9618423538 Repair And Maintenance Supplies N 01-112-104-0000-6572 1,682.43 ACCT OTTC03 A/C REPAIRS W14119 Repair And Maintenance Supplies N 01-041-000-0000-6342 373.13 AGREE 025-1114829-000 27661215 Service Agreements N 01-042-000-0000-6342 124.37 AGREE 025-1114829-000 27661215 Service Agreements N 01-044-000-0000-6342 279.37 AGREE 013-1212517-000 27729996 Service Agreements N 50-390-000-0000-6290 1,819.34 ACCT S1311 MISC RECYCLING 20-5465 Contracted Services.N 392 GALLS LLC 215.22392 5066 GODFATHER'S EXTERMINATING INC 362.205066 5089 GOPHER STATE ONE CALL 20.255089 14619 GOVERNMENT FORMS & SUPPLIES 2,081.2114619 52564 GRAINGER INC 455.5052564 10411 GRANT'S MECHANICAL INC 1,682.4310411 13522 GREATAMERICA FINANCIAL SVCS 776.8713522 10416 GREEN LIGHTS RECYCLING INC Page 7Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 2 Transactions 4 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 3 Transactions GALLS LLC GODFATHER'S EXTERMINATING INC GOPHER STATE ONE CALL GOVERNMENT FORMS & SUPPLIES GRAINGER INC GRANT'S MECHANICAL INC GREATAMERICA FINANCIAL SVCS Otter Tail County Auditor HEALTHCARE ENVIRONMENTAL SERVICES INC COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba Solid Waste Fund Copyright 2010-2020 Integrated Financial Systems 10-303-000-0000-6330 225.40 MILEAGE (8/24 TO 8/27/20)Mileage N 01-112-109-0000-6572 90.00 ACCT OT SHERIFF HOLDING TANK 26996 Repair And Maintenance Supplies N 01-112-109-0000-6572 90.00 ACCT OT SHERIFF HOLDING TANK 28212 Repair And Maintenance Supplies N 50-000-000-0000-6379 52.00 ACCT 140 WASTE DISPOSAL 56893 Miscellaneous Charges N 50-390-000-0000-6863 506.00 ACCT 140 WASTE DISPOSAL 56893 Disposal Costs N 01-091-000-0000-6369 80.00 56-CR-20-1383 SUBPOENA 85038 Miscellaneous Charges N 10-304-000-0000-6572 31.98 SUPPLIES 30207692 Repair And Maintenance Supplies N 10-304-000-0000-6572 1.79 PARTS 30207940 Repair And Maintenance Supplies N 10-304-000-0000-6406 16.27 SUPPLIES 30208266 Office Supplies N 10-304-000-0000-6572 3.99 SUPPLIES 30208266 Repair And Maintenance Supplies N 10-304-000-0000-6406 7.99 SUPPLIES 30208360 Office Supplies N 10-304-000-0000-6406 3.00 SUPPLIES 30208572 Office Supplies N 50-399-000-0000-6426 67.38 STEEL TOE SHOES 8/18/20 Clothing Allowance N 10-304-000-0000-6306 976.75 REPAIR 68321 Repair/Maint. Equip N 1,819.3410416 16122 GREWE/TUCKER 225.4016122 9453 HAWES SEPTIC TANK PUMPING LLC 180.009453 37755 558.0037755 37037 HENNEPIN CO SHERIFF 80.0037037 2001 HILLTOP LUMBER INC 65.022001 5748 HINTERMEISTER/SUZIE 67.385748 3372 HOTSY EQUIPMENT OF MN 976.753372 Page 8Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 2 Transactions 2 Transactions 1 Transactions 6 Transactions 1 Transactions 1 Transactions HEALTHCARE ENVIRONMENTAL SERVICES INC GREEN LIGHTS RECYCLING INC GREWE/TUCKER HAWES SEPTIC TANK PUMPING LLC HENNEPIN CO SHERIFF HILLTOP LUMBER INC HINTERMEISTER/SUZIE HOTSY EQUIPMENT OF MN Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba General Revenue Fund Copyright 2010-2020 Integrated Financial Systems 01-201-000-0000-6406 305.55 ACCT 9988526 SUPPLIES 056246 Office Supplies N 50-000-000-0000-6406 165.61 ACCT 565373 SUPPLIES 056231 Office Supplies N 10-304-000-0000-6572 253.69 PARTS C002084003:01 Repair And Maintenance Supplies N 01-149-000-0000-6406 3,080.00 ACCT 200185379 LABOR LAW POST 9105230513 Office Supplies N 01-507-000-0000-6300 540.00 TOILET RENTAL/CLEANING 9342 Building And Grounds Maintenance Y 50-000-000-0110-6290 140.00 TOILET RENTAL 9295 Contracted Services.Y 50-000-000-0130-6290 180.00 TOILET RENTAL/CLEANING 9295 Contracted Services.Y 01-013-000-0000-6262 230.00 56-PT-17-691 D DEFIEL 1952799 Public Defender Y 01-013-000-0000-6262 30.00 56-P2-06-001358 R GILBERTSON 1952800 Public Defender Y 01-013-000-0000-6262 15.00 56-PR-18-3232 J HUNT 1952801 Public Defender Y 01-013-000-0000-6262 160.00 56-PR-10-950 T TORELL 1952802 Public Defender Y 10-304-000-0000-6572 558.80 PARTS 8021564 Repair And Maintenance Supplies N 10-304-000-0000-6572 94.00 PARTS 8027049 Repair And Maintenance Supplies N 10-304-000-0000-6572 57.28 PARTS 8171009 Repair And Maintenance Supplies N 01-205-000-0000-6273 175.00 ACCT OTAUD TECH SERVICES 1274 Coroner Expense 6 01-205-000-0000-6273 600.00 ACCT OTAUD TECH SERVICES 1275 Coroner Expense 6 01-205-000-0000-6273 600.00 ACCT OTAUD TECH SERVICES 1276 Coroner Expense 6 01-205-000-0000-6273 16,204.00 ACCT OTAUD AUTOPSY ASSIST 1281 Coroner Expense 6 38100 INNOVATIVE OFFICE SOLUTIONS 471.1638100 12716 INTERSTATE POWER SYSTEMS INC 253.6912716 6979 J J KELLER & ASSOCIATES INC 3,080.006979 11098 JAKE'S JOHNS LLC 860.0011098 10408 JONES LAW OFFICE 435.0010408 1002 KIMBALL MIDWEST 710.081002 79 LAKE REGION HEALTHCARE Page 9Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 2 Transactions 1 Transactions 1 Transactions 3 Transactions 4 Transactions 3 Transactions INNOVATIVE OFFICE SOLUTIONS INTERSTATE POWER SYSTEMS INC J J KELLER & ASSOCIATES INC JAKE'S JOHNS LLC JONES LAW OFFICE KIMBALL MIDWEST Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba General Revenue Fund Copyright 2010-2020 Integrated Financial Systems 01-205-000-0000-6273 600.00 ACCT OTAUD TECH SERVICES 1282 Coroner Expense 6 50-000-000-0110-6565 105.12 ACCT 009080 FIELDMASTER 8/26 10741 Fuels N 50-000-000-0130-6565 236.39 ACCT 009080 LP GAS COMMERCIAL 66178 Fuels N 10-304-000-0000-6306 223.64 REPAIR 4638 Repair/Maint. Equip N 50-399-000-0000-6291 500.00 CARDBOARD 8/21/20 73809 Contract Transportation N 50-399-000-0000-6291 500.00 CARDBOARD 8/24/20 73822 Contract Transportation N 50-399-000-0000-6291 500.00 CARDBOARD 8/26/20 73823 Contract Transportation N 50-399-000-0000-6291 500.00 CARDBOARD 8/28/20 73829 Contract Transportation N 50-399-000-0000-6291 500.00 CARDBOARD 9/1/20 73836 Contract Transportation N 10-304-000-0000-6526 27.97 2019 CLOTHING ALLOWANCE Uniforms N 01-061-000-0000-6330 89.70 MILEAGE JUL-AUG 2020 AUG2020 Mileage N 50-390-000-0000-6240 84.00 DROP OFF DATES DEER CREEK 165573-1 Publishing & Advertising N 50-390-000-0000-6240 108.00 DROP OFF DATES PELICAN RAPIDS 165560-1 Publishing & Advertising N 50-390-000-0000-6240 96.00 DROP OFF DATES PELICAN RAPIDS 165561-1 Publishing & Advertising N 50-390-000-0000-6240 108.00 DROP OFF DATES ROTHSAY 165562-1 Publishing & Advertising N 50-390-000-0000-6240 96.00 DROP OFF DATES ROTHSAY 165563-1 Publishing & Advertising N 18,179.0079 10350 LAKES AREA COOPERATIVE 341.5110350 15705 LAKES AREA TRUCK REPAIR INC 223.6415705 81 LARRY OTT INC TRUCK SERVICE 2,500.0081 2204 LARSON/DEAN 27.972204 41525 LARUM/PAT 89.7041525 10883 LEIGHTON BROADCASTING/DL 84.0010883 198 LEIGHTON BROADCASTING/FF Page 10Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 5 Transactions 2 Transactions 1 Transactions 5 Transactions 1 Transactions 1 Transactions 1 Transactions LAKE REGION HEALTHCARE LAKES AREA COOPERATIVE LAKES AREA TRUCK REPAIR INC LARRY OTT INC TRUCK SERVICE LARSON/DEAN LARUM/PAT LEIGHTON BROADCASTING/DL Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba Solid Waste Fund Copyright 2010-2020 Integrated Financial Systems 50-390-000-0000-6240 96.00 DROP OFF DATES DEER CREEK 165568-1 Publishing & Advertising N 50-390-000-0000-6240 108.00 DROP OFF DATES PARKERS PRAIRIE 165577-1 Publishing & Advertising N 50-390-000-0000-6240 96.00 DROP OFF DATES PARKERS PRAIRIE 165578-1 Publishing & Advertising N 50-390-000-0000-6240 108.00 DROP OFF DATES HENNING 165579-1 Publishing & Advertising N 50-390-000-0000-6240 96.00 DROP OFF DATES HENNING 165581-1 Publishing & Advertising N 50-390-000-0000-6240 108.00 DROP OFF DATES BLUFFTON 165582-1 Publishing & Advertising N 50-390-000-0000-6240 96.00 DROP OFF DATES BLUFFTON 165583-1 Publishing & Advertising N 50-399-000-0000-6240 490.00 COVID STIMULUS B2B AUGUST 163738-1 Advertising N 50-399-000-0000-6240 490.00 COVID STIMULUS B2B AUGUST 163741-1 Advertising N 50-399-000-0000-6240 385.00 COVID STIMULUS B2B AUGUST 163744-1 Advertising N 50-000-000-0130-6858 475.20 ACCT 60635 TIRE DISPOSAL 1876376 Tire Disposal Y 50-000-000-0130-6858 356.40 ACCT 60635 TIRE DISPOSAL 1882165 Tire Disposal Y 01-201-000-0000-6396 280.00 TOW CF 20026287 8/17/20 9167 Special Investigation Y 10-304-000-0000-6572 489.54 PARTS 359054 Repair And Maintenance Supplies N 01-044-000-0000-6406 218.05 ACCT 23-52N4 MEASURING WHEEL 0287202-IN Office Supplies N 01-112-000-0000-6572 36.00 ACCT 23-52A23 BUG REPELLENT 0287111-IN Repair And Maintenance Supplies N 10-302-000-0000-6572 50.00 SUPPLIES 0286807-IN Repair And Maintenance Supplies N 10-302-000-0000-6500 276.00 SUPPLIES 0287139-IN Supplies N 10-303-000-0000-6501 276.90 SUPPLIES 0287112-IN Engineering And Surveying Supplies N 10-304-000-0000-6406 59.11 SUPPLIES 0286538-IN Office Supplies N 10-304-000-0000-6572 359.96 SUPPLIES 0286538-IN Repair And Maintenance Supplies N 10-304-000-0000-6406 45.97 SUPPLIES 0286771-IN Office Supplies N 10-304-000-0000-6406 129.91 SUPPLIES 0286807-IN Office Supplies N 2,481.00198 10094 LIBERTY TIRE RECYCLING LLC 831.6010094 5837 LITTLE BEAR TOWING 280.005837 1022 LITTLE FALLS MACHINE INC 489.541022 41638 LOCATORS & SUPPLIES INC 1,451.9041638 511 M-R SIGN COMPANY INC. Page 11Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 14 Transactions 2 Transactions 1 Transactions 1 Transactions 9 Transactions LEIGHTON BROADCASTING/FF LIBERTY TIRE RECYCLING LLC LITTLE BEAR TOWING LITTLE FALLS MACHINE INC LOCATORS & SUPPLIES INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba Road And Bridge Fund Copyright 2010-2020 Integrated Financial Systems 10-302-000-0000-6515 136.00 SUPPLIES 208858 Signs And Posts N 10-302-000-0000-6515 60.31 SUPPLIES 209473 Signs And Posts N 10-302-000-0000-6515 145.40 SUPPLIES 209519 Signs And Posts N 10-303-000-0000-6501 402.66 SUPPLIES 209344 Engineering And Surveying Supplies N 10-303-000-0000-6501 56.04 SUPPLIES 209514 Engineering And Surveying Supplies N 10-303-000-0000-6501 252.18 SUPPLIES 209515 Engineering And Surveying Supplies N 10-303-000-0000-6501 224.16 SUPPLIES 209520 Engineering And Surveying Supplies N 01-122-000-0000-6342 167.96 ACCT 35700038 CN 500-0491119 422119073 Service Agreements N 01-149-000-0000-6354 123.00 ACCT 1140 ADD CEQ TRACTOR 4377 Insurance Claims N 50-000-000-0130-6306 79.00 ACCT OTCHSW PARTS 245211 Repair/Maint. Equip N 01-044-000-0000-6304 36.70 ACCT 2607 OIL CHANGE 753066 Repair And Maintenance N 13-012-000-0000-6455 218.00 ACCT F002603 REFERENCES 1073372 Reference Books & Literature N 01-112-106-0000-6342 10.00 ACCT 833641 PRESSURE VESSEL ABR0236275X Service Agreements N 01-112-108-0000-6342 20.00 ACCT 833641 2 BOILERS ABR0236594X Service Agreements N 01-112-101-0000-6342 40.00 ACCT 833641 PRESSURE VESSEL ABR0236710X Service Agreements N 01-112-101-0000-6342 10.00 ACCT 833641 PRESSURE VESSEL ABR0236849X Service Agreements N 01-112-106-0000-6342 10.00 ACCT 833641 PRESSURE VESSEL ABR0237204X Service Agreements N 01-112-101-0000-6342 10.00 ACCT 833641 PRESSURE VESSEL ABR02373699X Service Agreements N 50-399-000-0000-6290 10.00 ACCT 833641 PRESSURE VESSEL ABR0236711X Contracted Services.N 1,276.75511 36132 MARCO INC ST LOUIS 167.9636132 546 MCIT 123.00546 1463 MID-CENTRAL EQUIPMENT INC 79.001463 42863 MINNESOTA MOTOR COMPANY 36.7042863 3147 MN CONTINUING LEGAL EDUCATION 218.003147 928 MN DEPT OF LABOR & INDUSTRY Page 12Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 7 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions M-R SIGN COMPANY INC. MARCO INC ST LOUIS MCIT MID-CENTRAL EQUIPMENT INC MINNESOTA MOTOR COMPANY MN CONTINUING LEGAL EDUCATION Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba Solid Waste Fund Copyright 2010-2020 Integrated Financial Systems 50-399-000-0000-6290 10.00 ACCT 833641 PRESSURE VESSEL ABR0237370X Contracted Services.N 50-399-000-0000-6306 1,162.91 ACCT 3381101 SUPPLIES 409031 Repair/Maint. Equip N 50-000-000-0130-6306 1,080.00 REPAIRS TO LOADOUT PUMP 1308 Repair/Maint. Equip N 01-112-106-0000-6485 593.59 ACCT 655-794996 SUPPLIES 23597 Custodian Supplies N 01-112-101-0000-6485 640.63 ACCT 655-790197 SUPPLIES 69970 Custodian Supplies N 50-000-000-0000-6240 7.50 SOLID WASTE ATTENDANT 10557 Publishing & Advertising N 01-201-000-0000-6304 151.95 BATTERY FOR UNIT 1710 022881 Repair And Maintenance N 01-112-101-0000-6572 10,014.68 RELOCATED VFD'S 13059 Repair And Maintenance Supplies N 01-280-000-0000-6818 404.54 PICKING UP HAND SANITIZER 2020-23 Contingency Incident Event Costs N 01-204-000-0000-6304 101.92 UNIT 1805 INSTALL TIRES 123561 Repair And Maintenance N 01-204-000-0000-6304 24.66 UNIT 1403 TIRE REPAIR 123583 Repair And Maintenance N 120.00928 15806 MOTION INDUSTRIES 1,162.9115806 16250 NELSON ELECTRIC MOTOR REPAIR INC 1,080.0016250 595 NETWORK SERVICES COMPANY 1,234.22595 13242 NEW YORK MILLS DISPATCH 7.5013242 3758 OLSON TIRE & OIL INC 151.953758 10890 OTTER ELECTRIC LLC 10,014.6810890 126 OTTER TAIL CO TREASURER 404.54126 49008 OTTER TAIL TIRE INC 126.5849008 Page 13Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 8 Transactions 1 Transactions 1 Transactions 2 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 2 Transactions MN DEPT OF LABOR & INDUSTRY MOTION INDUSTRIES NELSON ELECTRIC MOTOR REPAIR INC NETWORK SERVICES COMPANY NEW YORK MILLS DISPATCH OLSON TIRE & OIL INC OTTER ELECTRIC LLC OTTER TAIL CO TREASURER OTTER TAIL TIRE INC Otter Tail County Auditor PEAK PERFORMANCE ROOFING & EXTERIORS COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba Solid Waste Fund Copyright 2010-2020 Integrated Financial Systems 50-000-000-0120-6291 3,298.24 HAULING CHARGES 8/12/20 39258 Contract Transportation N 50-000-000-0170-6291 8,416.48 HAULING CHARGES 8/12/20 39258 Contract Transportation N 50-000-000-0120-6291 3,298.24 HAULING CHARGES 8/19/20 39260 Contract Transportation N 50-000-000-0170-6291 8,608.56 HAULING CHARGES 8/19/20 39260 Contract Transportation N 50-000-000-0120-6291 4,122.80 HAULING CHARGES 8/26/20 39262 Contract Transportation N 50-000-000-0170-6291 9,833.20 HAULING CHARGES 8/26/20 39262 Contract Transportation N 50-399-000-0000-6291 2,970.40 HAULING CHARGES 8/12/20 39258 Contract Transportation N 50-399-000-0000-6291 2,970.40 HAULING CHARGES 8/19/20 39260 Contract Transportation N 50-399-000-0000-6291 1,485.20 HAULING CHARGES 8/26/20 39262 Contract Transportation N 50-000-000-0150-6565 9.00 ACCT 1630248 DIESEL PREMIUM 26824 Fuels N 50-000-000-0150-6565 9.00 ACCT 1630248 DIESEL PREMIUM 29139 Fuels N 01-112-104-0000-6572 200.00 CLEANED RAIN GUTTERS 8/1/20 Repair And Maintenance Supplies N 50-399-000-0000-6306 1,250.00 BLAST & REPAINT DUMPSTER 383 Repair/Maint. Equip Y 50-399-000-0000-6306 1,250.00 BLAST & REPAINT DUMPSTER #2016 385 Repair/Maint. Equip Y 01-112-000-0000-6572 24.90 WATER TUBE 88691 Repair And Maintenance Supplies N 50-000-000-0170-6300 3,228.08 ACCT 70375 MOTORS 0172653 Building And Grounds Maintenance N 01-112-109-0000-6342 595.00 2020 VEGETATION MANAGEMENT 23524 Service Agreements N 7392 OTTERTAIL TRUCKING INC 45,003.527392 45022 PARK REGION CO OP 18.0045022 7303 200.007303 7145 PETE'S AUTOBODY LLC 2,500.007145 45072 PINE PLAZA TV & APPLIANCE 24.9045072 16237 POLLARDWATER 3,228.0816237 9971 PRAIRIE RESTORATIONS INC Page 14Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 9 Transactions 2 Transactions 1 Transactions 2 Transactions 1 Transactions 1 Transactions PEAK PERFORMANCE ROOFING & EXTERIORS OTTERTAIL TRUCKING INC PARK REGION CO OP PETE'S AUTOBODY LLC PINE PLAZA TV & APPLIANCE POLLARDWATER Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba General Revenue Fund Copyright 2010-2020 Integrated Financial Systems 10-304-000-0000-6342 1,007.75 SERVICE 200-1027052 Service Agreements N 50-000-000-0120-6565 59.07 ACCT 988529 DIESEL 88060975 Fuels N 01-149-000-0000-6210 2,568.24 LEASE N17052652 PYMT N8446811 Postage & Postage Meter N 14-043-000-0000-6687 7,121.10 LEASE N18021053 PYMT N8455464 Equipment- Current Year N 01-112-000-0000-6487 1,152.41 ACCT 0313001 BLOWER ATTACHMENT P0783449 Tools & Minor Equipment N 01-112-000-0000-6572 90.57 ACCT 0313001 WHEEL KIT P0820449 Repair And Maintenance Supplies N 01-112-000-0000-6572 41.61 ACCT 6629-9141-3 PAINT 7874-8 Repair And Maintenance Supplies N 01-112-000-0000-6572 41.55 ACCT 6629-9141-3 PAINT 8243-5 Repair And Maintenance Supplies N 14-201-000-0000-6687 1,160.00 GRAPHICS FOR UNITS 2007 & 2008 5997 Equipment-Current Year Y 01-112-108-0000-6485 99.00 ACCT 00224002 NITRILE GLOVES 860284-1 Custodian Supplies N 01-112-108-0000-6485 99.00 ACCT 00224000 NITRILE GLOVES 860286-2 Custodian Supplies N 01-112-101-0000-6485 95.34 ACCT 00224000 SUPPLIES 862473-1 Custodian Supplies N 01-112-108-0000-6485 99.00 ACCT 00224002 NITRILE GLOVES 862474-1 Custodian Supplies N 01-112-108-0000-6485 344.71 ACCT 00224002 SUPPLIES 863375 Custodian Supplies N 01-112-101-0000-6485 96.37 ACCT 00224000 SUPPLIES 863376 Custodian Supplies N 01-112-108-0000-6485 163.00 ACCT 00224002 SUPPLIES 864315 Custodian Supplies N 595.009971 12526 PRECISE MRM LLC 1,007.7512526 45475 PRO AG FARMERS CO OP 59.0745475 12047 QUADIENT LEASING USA INC 9,689.3412047 9166 RDO EQUIPMENT CO 1,242.989166 159 SHERWIN WILLIAMS 83.16159 48638 SIGNWORKS SIGNS & BANNERS LLC 1,160.0048638 48183 STEINS INC Page 15Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 1 Transactions 2 Transactions 2 Transactions 2 Transactions 1 Transactions PRAIRIE RESTORATIONS INC PRECISE MRM LLC PRO AG FARMERS CO OP QUADIENT LEASING USA INC RDO EQUIPMENT CO SHERWIN WILLIAMS SIGNWORKS SIGNS & BANNERS LLC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba General Revenue Fund Copyright 2010-2020 Integrated Financial Systems 01-112-101-0000-6485 244.69 ACCT 00224000 SUPPLIES 864317 Custodian Supplies N 01-112-000-0000-6572 169.58 ACCT 00224002 SUPPLIES 864323 Repair And Maintenance Supplies N 01-507-000-0000-6300 230.51 ACCT 00252200 SANITIZER/STAND 860383 Building And Grounds Maintenance N 01-112-106-0000-6253 233.28 ACCT 511470014963 AUG2020 Garbage N 01-112-109-0000-6253 125.63 ACCT 511470045328 AUG2020 Garbage N 10-303-000-0000-6683 6,950.00 SERVICE 1019 Right Of Way, Ect.N 10-302-000-0000-6500 74.65 PARTS 295633 Supplies N 01-201-000-0000-6526 422.88 ACCT 974 SHIRTS/PANTS/KNIFE I1446906 Uniforms N SEIM/GREG4026 01-201-000-0000-6526 114.98 ACCT 974 HOLSTER I1447884 Uniforms N PETERSON/PAUL11971 01-201-000-0000-6526 69.99 ACCT 974 TEX TROP SHIRT I1448619 Uniforms N SEIM/GREG4026 01-201-000-0000-6392 94.00 SEW PATCHES ON SHIRTS/HEM PANT 572409 Mobile Field Force N 10-302-000-0000-6500 80.00 SUPPLIES 00551493 Supplies N 13-012-000-0000-6455 753.24 ACCT 1000551281 JUL 2020 842737831 Reference Books & Literature N 1,641.2048183 166 STEVE'S SANITATION INC 358.91166 14918 STORM RIGHT OF WAY SOLUTIONS LLC 6,950.0014918 725 STRAND ACE HARDWARE 74.65725 168 STREICHERS 607.85168 16253 STROMME/DEANNA 94.0016253 16120 STRUCTURAL MATERIALS INC 80.0016120 183 THOMSON REUTERS - WEST Page 16Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 10 Transactions 2 Transactions 1 Transactions 1 Transactions 3 Transactions 1 Transactions 1 Transactions STEINS INC STEVE'S SANITATION INC STORM RIGHT OF WAY SOLUTIONS LLC STRAND ACE HARDWARE STREICHERS STROMME/DEANNA STRUCTURAL MATERIALS INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba Law Library Fund Copyright 2010-2020 Integrated Financial Systems 13-012-000-0000-6455 942.27 ACCT 1000551281 LIBRARY PLAN 842832042 Reference Books & Literature N 13-012-000-0000-6455 753.24 ACCT 1000551281 AUG 2020 842909285 Reference Books & Literature N 50-399-000-0000-6306 1,984.66 ACCT 2498658 BUCKET/CUT EDGE 2498658 Repair/Maint. Equip N 01-601-000-0000-6342 403.80 ACCT 3691600057 SEP 2020 5011583971 Service Agreements N 10-302-000-0000-6330 30.48 MILEAGE Mileage N 10-303-000-0000-6330 332.40 MILEAGE Mileage N 01-201-000-0000-6304 595.96 ACCT 568303 TIRES 2713003 Repair And Maintenance N 01-201-000-0000-6304 548.38 UNIT 1808 BRAKE REPAIRS 14922 Repair And Maintenance N 01-201-000-0000-6304 66.04 UNIT 1808 OIL CHANGE 14926 Repair And Maintenance N 01-063-000-0000-6406 267.67 ACCT 7497 LABELS/YELLOW PAPER 1135013 Office Supplies N 50-000-000-0170-6300 288.34 REPLACE DAMAGED HINGES 64446 Building And Grounds Maintenance N 50-000-000-0110-6852 1,654.74 ACCT 3-85099-73002 0002685-0010-5 Msw By Passed Expense N 50-000-000-0120-6852 7,845.64 ACCT 3-85099-73002 0002685-0010-5 Msw By Passed Expense N 2,448.75183 379 TITAN MACHINERY INC 1,984.66379 14497 TOSHIBA FINANCIAL SERVICES 403.8014497 15997 TSCHIDA/CRAIG 362.8815997 11064 US AUTOFORCE 595.9611064 3592 VAUGHN AUTO & MARINE CO 614.423592 51002 VICTOR LUNDEEN COMPANY 267.6751002 5045 VIKING GARAGE DOOR COMPANY INC 288.345045 2278 WASTE MANAGEMENT Page 17Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 3 Transactions 1 Transactions 1 Transactions 2 Transactions 1 Transactions 2 Transactions 1 Transactions 1 Transactions THOMSON REUTERS - WEST TITAN MACHINERY INC TOSHIBA FINANCIAL SERVICES TSCHIDA/CRAIG US AUTOFORCE VAUGHN AUTO & MARINE CO VICTOR LUNDEEN COMPANY VIKING GARAGE DOOR COMPANY INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 10:51:25AM9/8/2020 csteinba Solid Waste Fund Copyright 2010-2020 Integrated Financial Systems 50-000-000-0130-6852 1,435.10 ACCT 3-85099-73002 0002685-0010-5 Msw By Passed Expense N 50-000-000-0150-6852 1,036.87 ACCT 3-85099-73002 0002685-0010-5 MSW By-Passed Expense N 50-000-000-0170-6852 17,934.84 ACCT 3-85099-73002 0002685-0010-5 Msw By Passed Expense N 50-000-000-0170-6306 73.20 ACCT 6842300 PARTS PC020310503 Repair/Maint. Equip N 50-000-000-0150-6379 5.53 ACCT 6842300 KEY PC020310504 Miscellaneous Charges N 50-000-000-0170-6306 1,566.33 ACCT 6842300 OUTRIGGER PAD SW020119674 Repair/Maint. Equip N 50-399-000-0000-6306 1,289.92 ACCT 6842300 MAINTENANCE SW020119413 Repair/Maint. Equip N 29,907.192278 2086 ZIEGLER INC 2,934.982086 234,124.98 Page 18Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 5 Transactions 4 Transactions Final Total ............112 Vendors 262 Transactions WASTE MANAGEMENT ZIEGLER INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES10:51:25AM9/8/2020 csteinba Solid Waste Fund Copyright 2010-2020 Integrated Financial Systems Page 19Audit List for Board Otter Tail County Auditor Amount 57,139.62 General Revenue Fund 1 18,143.08 Road And Bridge Fund 10 2,666.75 Law Library Fund 13 8,281.10 Capital Improvement Fund 14 147,894.43 Solid Waste Fund 50 234,124.98 NameFundRecap by Fund All Funds Total Approved by,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMISSIONER'S VOUCHERS ENTRIES9/17/2020 csteinba N Y D 4 N Otter Tail County Auditor Audit List for Board Page 1 Print List in Order By: Save Report Options?: Type of Audit List: on Audit List?: Paid on Behalf Of Name Explode Dist. Formulas?: D - Detailed Audit List S - Condensed Audit List 1 - Fund (Page Break by Fund) 2 - Department (Totals by Dept) 3 - Vendor Number 4 - Vendor Name 3:12:17PM AL ROGGENKAMP EXCAVATING & TRENCHING 1VNH-RXGW-RDKK COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Road And Bridge Fund Copyright 2010-2020 Integrated Financial Systems 10-304-000-0000-6565 39.13 PROPANE 01143226 Fuels - Diesel N 10-304-000-0000-6572 96.50 SUPPLIES 01145188 Repair And Maintenance Supplies N 50-000-000-0150-6857 400.00 APPLIANCE DISPOSAL 9/3/20 Appliance Disposal N 10-302-000-0000-6350 480.00 SERVICE 893063 Maintenance Contractor N 50-000-000-0110-6859 3,044.91 MISC RECYCLING 4559 Electronic Disposal N 50-000-000-0140-6290 599.73 ACCT 1478400 AUG 2020 2184154 Contracted Services.N 01-043-000-0000-6406 41.97 A2RJVV5AA0WI1P HEADSETS 113Y-HD3M-KGJV Office Supplies N 01-061-000-0000-6406 49.96 A2RJVV5AA0WI1P P-TOUCH TAPE 11JG-T6GQ-MGX3 Office Supplies N 01-061-000-0000-6680 1,139.97 A2RJVV5AA0WI1P 4K FIRE TVS 1HRH-XNCH-16VG Computer Hardware N 01-061-000-0000-6680 148.70 A2RJVV5AA0WI1P LAPTOP BAGS 1K9F-VVQY-7X6D Computer Hardware N 01-061-000-0000-6406 45.99 A2RJVV5AA0WI1P LAPTOP BATTERY 1V6R-WRWT-17G6 Office Supplies N 01-061-000-0000-6406 139.98 A2RJVV5AA0WI1P ADAPTERS Office Supplies N 01-061-000-0000-6406 58.50 A2RJVV5AA0WI1P CISCO HANDSETS 1Y9T-GCPG-17LT Office Supplies N 01-091-000-0000-6406 78.90 A2RJVV5AA0WI1P LABEL STICKERS 17L6-4XYH-6QL3 Office Supplies N 01-201-000-0000-6406 63.98 A2RJVV5AA0WI1P DOC HOLDERS 1HJN-FJ1D-G4JR Office Supplies N 01-201-000-0000-6433 9.99 A2RJVV5AA0WI1P CELLOPHANE BAGS 1JY9-Y6NM-VNGF Special Medical N 01-201-000-0000-6406 63.87 A2RJVV5AA0WI1P PHONE SUPPLIES 1WV6-T1XW-FLQC Office Supplies N 01-250-000-0000-6369 319.99 A2RJVV5AA0WI1P TONER CARTRIDGE 17T6-WPCM-4NCC Miscellaneous Charges N 01-250-000-0000-6432 34.35 A2RJVV5AA0WI1P GATORADE 17T6-WPCM-QLGT Medical Incarcerated N 01-280-000-0000-6818 1,075.20 A2RJVV5AA0WI1P THERMOMETERS 194H-RVVJ-DJVX Contingency Incident Event Costs N 50-000-000-0000-6848 14.23 A2RJVV5AA0WI1P SILICONE SPRAY 1CR3-MTMC-49CV Public Education N 14522 A-OX WELDING SUPPLY CO INC 135.6314522 13408 A&A RECYCLING LLC 400.0013408 11399 480.0011399 14813 ALBANY RECYCLING CENTER 3,044.9114813 7588 ALEX RUBBISH & RECYCLING INC 599.737588 14386 AMAZON CAPITAL SERVICES INC Page 2Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 2 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions - AL ROGGENKAMP EXCAVATING & TRENCHING A-OX WELDING SUPPLY CO INC A&A RECYCLING LLC ALBANY RECYCLING CENTER ALEX RUBBISH & RECYCLING INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Solid Waste Fund Copyright 2010-2020 Integrated Financial Systems 01-201-000-0000-6491 71.50 ACCT AA822 FIRE EXTINGUISHER 07278921 General Supplies N 10-304-000-0000-6572 137.89 PARTS 0726481 Repair And Maintenance Supplies N 10-304-000-0000-6572 33.95 SUPPLIES 07273726 Repair And Maintenance Supplies N 10-304-000-0000-6300 26.00 SERVICE 07299051 Building And Grounds Maintenance N 10-304-000-0000-6572 10.00 SHOP TOWELS - ACCT #160001537 Repair And Maintenance Supplies N 10-304-000-0000-6572 19.71 SHOP TOWELS - ACCT #160001540 Repair And Maintenance Supplies N 10-304-000-0000-6572 30.00 SHOP TOWELS - ACCT #160001539 Repair And Maintenance Supplies N 10-304-000-0000-6572 50.00 SHOP TOWELS - ACCT #220000970 Repair And Maintenance Supplies N 10-304-000-0000-6572 39.42 SHOP TOWELS - ACCT #160001536 Repair And Maintenance Supplies N 10-304-000-0000-6572 92.12 SHOP TOWELS - ACCT #160001535 Repair And Maintenance Supplies N 10-304-000-0000-6572 40.00 SHOP TOWELS - ACCT #160001538 Repair And Maintenance Supplies N 10-304-000-0000-6572 30.00 SHOP TOWELS - ACCT #160001541 Repair And Maintenance Supplies N 50-000-000-0120-6290 30.00 ACCT 160002806 1602066799 Contracted Services.N 10-000-000-0000-2270 250.00 RETURN WORKING IN ROW DEPOSIT PERMIT #2020-0 Customer Deposits N 01-013-000-0000-6262 918.00 CLIENT SERVICES AUG 2020 AUG2020 Public Defender Y 01-250-000-0000-6677 5,974.50 ACCT 125630 CARTRIDGES/HOLSTER 1679442 Office Furniture And Equipment-Minor N 01-091-000-0000-6369 135.04 PREPARE CASE FILE - STEWART 73327 Miscellaneous Charges N 3,265.6014386 765 AMERICAN WELDING & GAS INC 269.34765 13620 AMERIPRIDE SERVICES INC 341.2513620 16264 ANDERSON/BRIAN 250.0016264 15262 AVERY, ATTORNEY AT LAW/JILL 918.0015262 7086 AXON ENTERPRISE INC 5,974.507086 1711 BACHMAN PRINTING 135.041711 Page 3Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 15 Transactions 4 Transactions 9 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions AMAZON CAPITAL SERVICES INC AMERICAN WELDING & GAS INC AMERIPRIDE SERVICES INC ANDERSON/BRIAN AVERY, ATTORNEY AT LAW/JILL AXON ENTERPRISE INC BACHMAN PRINTING Otter Tail County Auditor General Fund Dedicated Accounts COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Copyright 2010-2020 Integrated Financial Systems 02-225-000-0000-6369 1,295.00 OTTERTA001 SOFTWARE SUPPORT 200019 Miscellaneous Charges N 01-250-000-0000-6171 120.00 CPR TRAINING 128 Tuition And Education Expenses N 10-303-000-0000-6278 3,651.74 SAP 056-689-001 RURAL - ENGRG 2020-036 Engineering & Hydrological Testing N 10-303-000-0000-6278 21,910.49 SAP 056-689-001 MUN - ENGRG 2020-036 Engineering & Hydrological Testing N 10-303-000-0000-6651 429,191.95 EST #6 SAP 056-689-001 MUN 2020-036 Construction Contracts N 10-303-000-0000-6651 5,647.75 EST #6 SAP 056-689-001 MUN STO 2020-036 Construction Contracts N 10-303-000-0000-6651 13,198.35 EST #6 SAP 056-689-001 RURAL 2020-036 Construction Contracts N 50-000-000-0130-6290 13.00 DRINKING WATER AH2236 Contracted Services.N 10-304-000-0000-6572 69.50 TIRE REPAIR 2426 Repair And Maintenance Supplies N 10-304-000-0000-6565 1,655.68 DIESEL FUEL 71849 Fuels - Diesel N 01-124-000-0000-6140 300.00 PER DIEM 9/9/20 Per Diem Y 01-124-000-0000-6330 98.33 MILEAGE 9/9/20 Mileage Y 01-201-000-0000-6341 150.00 ACCT O2750 FCC LICENSE INV28062 Radio Tower Rental N 10-304-000-0000-6315 5,555.68 NEW RADIOS, UNIT #304 & #305 INV-28055 Radio Repair Charges N 14-250-000-0000-6687 34,196.00 ACCT O2750 PORTABLE RADIOS INV28120 Equipment-Current Year N 7319 BAN-KOE SYSTEMS INC 1,295.007319 14351 BARNESVILLE AMBULANCE 120.0014351 802 BATTLE LAKE/CITY OF 473,600.28802 1755 BEN HOLZER UNLIMITED WATER LLC 13.001755 31780 BLUFFTON OIL CO 1,725.1831780 11652 BOYER/RODNEY 398.3311652 24 BRANDON COMMUNICATIONS INC 39,901.6824 386 BRAUN INTERTEC CORPORATION Page 4Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 5 Transactions 1 Transactions 2 Transactions 2 Transactions 3 Transactions BAN-KOE SYSTEMS INC BARNESVILLE AMBULANCE BATTLE LAKE/CITY OF BEN HOLZER UNLIMITED WATER LLC BLUFFTON OIL CO BOYER/RODNEY BRANDON COMMUNICATIONS INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Road And Bridge Fund Copyright 2010-2020 Integrated Financial Systems 10-303-000-0000-6278 6,047.00 SERVICE B223452 Engineering & Hydrological Testing N 01-112-000-0000-6404 480.00 20 CASES OF WALLINGFORD COFFEE 045464 Coffee Supplies N 10-304-000-0000-6252 9.00 DRINKNG WATER 138360 Water And Sewage N 10-304-000-0000-6252 7.00 DRINKING WATER 138361 Water And Sewage N 02-612-000-0000-6330 101.20 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 50-000-000-0170-6300 52.70 ACCT 655 REPLACE PART IN DOOR 2110 Building And Grounds Maintenance N 10-304-000-0000-6572 87.78 TIRES 059735 Repair And Maintenance Supplies N 10-304-000-0000-6572 1,456.00 TIRES 059809 Repair And Maintenance Supplies N 10-304-000-0000-6572 1,456.00 TIRES 059847 Repair And Maintenance Supplies N 10-304-000-0000-6572 198.88 TIRES 059884 Repair And Maintenance Supplies N 10-304-000-0000-6572 117.36 TIRES 059911 Repair And Maintenance Supplies N 10-304-000-0000-6572 1,722.32 TIRES 059933 Repair And Maintenance Supplies N 10-304-000-0000-6572 58.68 TIRES 059957 Repair And Maintenance Supplies N 10-304-000-0000-6572 91.50 TIRES 059988 Repair And Maintenance Supplies N 10-304-000-0000-6572 877.32 PARTS 060037 Repair And Maintenance Supplies N 10-304-000-0000-6306 1,281.26 REPAIR 060048 Repair/Maint. Equip N 50-399-000-0000-6304 524.17 ACCT 100331 UNIT 11805 REPAIRS 059992 Repair And Maint-Vehicles N 22-622-000-0641-6369 300.00 3 BEAVERS TRAPPED IN DITCH 41 8/10/20 Miscellaneous Charges Y 10-302-000-0000-6350 65.00 SERVICE 118375 Maintenance Contractor N 6,047.00386 3957 BRAUN VENDING INC 496.003957 8095 BUELOW/DAVID 101.208095 9863 BUGBEE'S LOCKSMITH 52.709863 3423 BUY-MOR PARTS & SERVICE LLC 7,688.273423 6316 CARLUND/RICHARD 300.006316 1227 CARR'S TREE SERVICE INC Page 5Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 3 Transactions 1 Transactions 1 Transactions - 11 Transactions 1 Transactions BRAUN INTERTEC CORPORATION BRAUN VENDING INC BUELOW/DAVID BUGBEE'S LOCKSMITH BUY-MOR PARTS & SERVICE LLC CARLUND/RICHARD Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Road And Bridge Fund Copyright 2010-2020 Integrated Financial Systems 10-302-000-0000-6350 25,130.71 SPRAYING 118411 Maintenance Contractor N 10-302-000-0000-6350 8,920.63 SPRAYING 118478 Maintenance Contractor N 10-303-000-0000-6651 255,213.70 19:212 SRTS, EST #1 ADDT'L EST #1A Construction Contracts N 01-201-000-0000-6304 84.32 UNIT 1703 OIL CHG/WIPERS 45563 Repair And Maintenance N 01-201-000-0000-6304 31.39 UNIT 1704 OIL CHANGE 45584 Repair And Maintenance N 01-201-000-0000-6304 31.39 UNIT 1606 OIL CHANGE 45598 Repair And Maintenance N 10-304-000-0000-6306 43.67 SERVICE 45627 Repair/Maint. Equip N 10-304-000-0000-6572 4,326.85 SUPPLIES 7043472 Repair And Maintenance Supplies N 01-250-000-0000-6432 668.00 DETOX ADMITION - J MAGNOTTE 9/2/20 Medical Incarcerated N 50-000-000-0000-6290 1,183.00 OFFICE CLEANING AUG 2020 PA045585 Contracted Services Y 01-201-000-0000-6304 265.00 CABLES & CLIPS FOR CAMERAS 5464 Repair And Maintenance N 01-201-000-0000-6304 140.46 UNIT 1808 BATTERY SOLENOID 5741 Repair And Maintenance N 01-201-000-0000-6304 80.58 UNIT 1804 BATTERY SOLENOID 5747 Repair And Maintenance N 01-201-000-0000-6408 46.20 ACCT 4931 BOARDING FOR MOJO 161339 Canine Supplies N 34,116.341227 143 CENTRAL SPECIALTIES INC 255,213.70143 8930 CERTIFIED AUTO REPAIR 190.778930 1756 CHEMSEARCH 4,326.851756 304 CLAY CO AUDITOR-TREASURER 668.00304 12058 CLEAN SWEEP COMMERCIAL SERVICES 1,183.0012058 9087 CODE 4 SERVICES INC 486.049087 32659 COMPANION ANIMAL HOSPITAL 46.2032659 Page 6Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 3 Transactions 1 Transactions 4 Transactions 1 Transactions 1 Transactions 1 Transactions 3 Transactions 1 Transactions CARR'S TREE SERVICE INC CENTRAL SPECIALTIES INC CERTIFIED AUTO REPAIR CHEMSEARCH CLAY CO AUDITOR-TREASURER CLEAN SWEEP COMMERCIAL SERVICES CODE 4 SERVICES INC COMPANION ANIMAL HOSPITAL Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Capital Improvement Fund Copyright 2010-2020 Integrated Financial Systems 14-201-000-0000-6687 36,384.00 10 TOUCHSCREEN NOTEBOOKS IN213391 Equipment-Current Year N 10-304-000-0000-6565 17.98 SUPPLIES 12437 Fuels - Diesel N 10-304-000-0000-6572 3.69 SUPPLIES 12437 Repair And Maintenance Supplies N 10-304-000-0000-6572 9.48 SUPPLIES 17393 Repair And Maintenance Supplies N 10-304-000-0000-6406 65.96 SUPPLIES 25152 Office Supplies N 10-304-000-0000-6572 39.48 SUPPLIES 25152 Repair And Maintenance Supplies N 10-304-000-0000-6406 19.99 SUPPLIES 27809 Office Supplies N 01-250-000-0000-6406 24.93 ACCT 2189988556 SUPPLIES 449569 Office Supplies N 01-250-000-0000-6526 94.46 ACCT OTSHER POLO SHIRT 032306 Uniforms N 01-250-000-0000-6526 43.98 ACCT OTSHER LONG SLEEVE SHIRT 032339 Uniforms N 10-304-000-0000-6252 93.00 DRINKING WATER Water And Sewage N 50-000-000-0170-6290 33.50 ACCT 327-00028118-5 8/31/20 Contracted Services.N 10-304-000-0000-6252 69.75 DRINKING WATER Water And Sewage N 01-204-000-0000-6304 570.00 TIRES FOR #10 PONTOON TRAILER 4841 Repair And Maintenance N 11310 COMPAR INC 36,384.0011310 12485 COOP SERVICES INC 156.5812485 32603 COOPER'S OFFICE SUPPLY INC 24.9332603 16269 COWING ROBARDS INC 138.4416269 3710 CULLIGAN OF DETROIT LAKES 93.003710 5407 CULLIGAN OF ELBOW LAKE 33.505407 2364 CULLIGAN OF WADENA 69.752364 16260 CUTTING EDGE OF PERHAM Page 7Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 6 Transactions 1 Transactions 2 Transactions 1 Transactions 1 Transactions 1 Transactions COMPAR INC COOP SERVICES INC COOPER'S OFFICE SUPPLY INC COWING ROBARDS INC CULLIGAN OF DETROIT LAKES CULLIGAN OF ELBOW LAKE CULLIGAN OF WADENA Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba General Revenue Fund Copyright 2010-2020 Integrated Financial Systems 01-061-000-0000-6202 350.00 CREDIT CLERK SUPPORT 300459 County Website N 01-061-000-0000-6202 464.00 TAX WEBSITE SUPPORT 300460 County Website N 50-399-000-0000-6485 54.89 ACCT 227162 SUPPLIES 80835 Custodian Supplies N 02-612-000-0000-6330 88.55 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 01-201-000-0000-6304 48.83 UNIT 1602 OIL CHANGE 51007 Repair And Maintenance Y 01-201-000-0000-6304 19.00 UNIT 1201 TIRE REPAIR 51024 Repair And Maintenance Y 01-201-000-0000-6304 871.65 UNIT 1602 TIRES/BATTERY/WIPERS 51081 Repair And Maintenance Y 01-201-000-0000-6304 145.95 UNIT 1609 OIL CHG/INSTALL TIRE 51083 Repair And Maintenance Y 01-201-000-0000-6304 39.58 UNIT 1201 OIL CHANGE 51268 Repair And Maintenance Y 10-304-000-0000-6306 119.81 SERVICE 52865 Repair/Maint. Equip N 02-612-000-0000-6330 184.00 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 50-399-000-0000-6290 2,842.94 ACCT 223 TIPPING FEES 4741 Contracted Services.N 01-507-000-0000-6253 141.57 ACCT 1122 GARBAGE SEP 2020 9/1/20 Garbage N 570.0016260 9018 D & T VENTURES LLC 814.009018 36 DACOTAH PAPER CO 54.8936 15732 DAHL/ISABEL 88.5515732 1496 DAN'S TOWING & REPAIR 1,244.821496 13986 DANZEISEN/LLOYD 184.0013986 14946 DEM-CON MATERIALS RECOVERY LLC 2,842.9414946 1261 DENZEL'S REGION WASTE INC 141.571261 33013 DICK'S STANDARD Page 8Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 2 Transactions 1 Transactions 1 Transactions 6 Transactions 1 Transactions 1 Transactions 1 Transactions CUTTING EDGE OF PERHAM D & T VENTURES LLC DACOTAH PAPER CO DAHL/ISABEL DAN'S TOWING & REPAIR DANZEISEN/LLOYD DEM-CON MATERIALS RECOVERY LLC DENZEL'S REGION WASTE INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Road And Bridge Fund Copyright 2010-2020 Integrated Financial Systems 10-304-000-0000-6306 41.45 SERVICE 78739 Repair/Maint. Equip N 10-304-000-0000-6572 784.00 TIRES 78739 Repair And Maintenance Supplies N 01-201-000-0000-6526 208.95 3 PAIRS OF PANTS/SHIRT 8/6/20 Uniforms N 01-123-000-0000-6140 150.00 PER DIEM 9/10/20 Per Diem N 01-123-000-0000-6330 86.25 MILEAGE 9/10/20 Mileage N 01-013-000-0000-6262 298.10 56-JV-19-2430 J MEEK AUG2020 Public Defender N 01-013-000-0000-6262 163.50 56-JV-19-2430 J MEEK JUN2020 Public Defender N 01-013-000-0000-6262 501.30 56-JV-19-3651 A NOOR JUN2020 Public Defender N 10-302-000-0000-6350 1,187.50 SERVICE 30212 Maintenance Contractor N 10-302-000-0000-6350 750.00 SERVICE 30627 Maintenance Contractor N 02-612-000-0000-6330 63.83 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 02-612-000-0000-6330 137.42 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 10-302-000-0000-6500 108.86 SUPPLIES C131913 Supplies N 10-302-000-0000-6500 47.74 SUPPLIES C131931 Supplies N 10-304-000-0000-6572 27.99 SUPPLIES B95715 Repair And Maintenance Supplies N 825.4533013 13965 DOLL/CARLA 208.9513965 15993 DONOHO/MICHAEL 236.2515993 16246 DUTCHER LAW OFFICE LLC 962.9016246 941 EGGE CONSTRUCTION INC 1,937.50941 15733 ELDIEN/HUNTER 63.8315733 14640 ELDRIDGE/TRACY 137.4214640 364 EVERTS LUMBER CO Page 9Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 2 Transactions 1 Transactions 2 Transactions 3 Transactions 2 Transactions 1 Transactions 1 Transactions - DICK'S STANDARD DOLL/CARLA DONOHO/MICHAEL DUTCHER LAW OFFICE LLC EGGE CONSTRUCTION INC ELDIEN/HUNTER ELDRIDGE/TRACY Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Road And Bridge Fund Copyright 2010-2020 Integrated Financial Systems 50-399-000-0000-6565 925.11 ACCT 727196 DIESEL 8/14/20 4628 Fuels N 10-304-000-0000-6572 20.24 PARTS - ACCT #13025 782522 Repair And Maintenance Supplies N 10-304-000-0000-6572 16.98 PARTS - ACCT #13025 782751 Repair And Maintenance Supplies N 10-304-000-0000-6572 37.50 PARTS - ACCT #13025 784593 Repair And Maintenance Supplies N 10-304-000-0000-6572 58.97 SUPPLIES - ACCT #13025 784594 Repair And Maintenance Supplies N 10-302-000-0000-6500 15.65 SUPPLIES MNWAD72978 Supplies N 10-303-000-0000-6501 30.00 SUPPLIES MNFER130577 Engineering And Surveying Supplies N 01-002-000-0000-6818 314.46 ACCT 530695 BOC MTG 8.5 1488222 Board Contingency N 01-002-000-0000-6818 209.64 ACCT 530695 BOC MTG 8.12 1489176 Board Contingency N 01-002-000-0000-6818 174.70 ACCT 530695 BOC MTG 8.22 1494154 Board Contingency N 01-044-000-0000-6240 177.00 ACCT 529337 APPRAISER AD 315893 Publishing & Advertising N 01-123-000-0000-6240 174.70 ACCT 530699 BA MTG AD 9/10/20 1500673 Publishing & Advertising N 01-124-000-0000-6240 69.88 ACCT 530699 PC MTG AD 9/9/20 1500672 Publishing & Advertising N 02-612-000-0000-6369 134.00 ACCT 524111 LAKES JOURNAL AUG 1493392 Miscellaneous Charges N 50-000-000-0130-6863 8,968.00 ACCT 18240 LEACHATE JUL 2020 34911 Leachate Disposal N 22-622-000-0621-6369 390.00 JETTING SERVICE 9/1/20 43947 Miscellaneous Charges N 50-000-000-0130-6863 615.00 LEACHATE HAULING 9/1-2/20 43973 Leachate Disposal N 89.11364 35594 FARMERS CO-OP OIL 925.1135594 373 FARNAM'S GENUINE PARTS INC 133.69373 2997 FASTENAL COMPANY 45.652997 35011 FERGUS FALLS DAILY JOURNAL 1,254.3835011 32679 FERGUS FALLS/CITY OF 8,968.0032679 2153 FERGUS POWER PUMP INC 1,005.002153 Page 10Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 3 Transactions 1 Transactions 4 Transactions 2 Transactions 7 Transactions 1 Transactions 2 Transactions EVERTS LUMBER CO FARMERS CO-OP OIL FARNAM'S GENUINE PARTS INC FASTENAL COMPANY FERGUS FALLS DAILY JOURNAL FERGUS FALLS/CITY OF FERGUS POWER PUMP INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba General Revenue Fund Copyright 2010-2020 Integrated Financial Systems 01-123-000-0000-6140 150.00 PER DIEM 9/10/20 Per Diem Y 01-123-000-0000-6330 93.73 MILEAGE 9/10/20 Mileage Y 02-612-000-0000-6330 188.03 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 01-123-000-0000-6240 117.80 ACCT 101446 BA MTG AD 8/13/20 2214723 Publishing & Advertising N 01-124-000-0000-6240 49.60 ACCT 352588 PC MTG AD 8/12/20 2216450 Publishing & Advertising N 10-303-000-0000-6342 44.24 SERVICE AGREEMENT 220176-0 Service Agreements N 01-124-000-0000-6140 225.00 PER DIEM 9/9/20 Per Diem Y 01-124-000-0000-6330 39.68 MILEAGE 9/9/20 Mileage Y 02-612-000-0000-6330 52.32 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 01-124-000-0000-6140 150.00 PER DIEM 9/9/20 Per Diem Y 01-124-000-0000-6330 53.48 MILEAGE 9/9/20 Mileage Y 01-201-000-0000-6526 169.98 ACCT 1002151493 APEX PANTS 016297409 Uniforms N SHEILS/RICK1897 01-201-000-0000-6526 36.98 ACCT 1002151493 WAIST BELT 016358883 Uniforms N PETERSON/PAUL11971 15555 FISCHER/JUDD 243.7315555 16136 FORMANEK/ROBERT 188.0316136 14517 FORUM COMMUNICATIONS COMPANY 167.4014517 15050 FRANZ REPROGRAPHICS INC 44.2415050 13304 FRAZIER/BRENT 264.6813304 15168 FREDERICK/PHILIP 52.3215168 12835 GABE/RICHARD 203.4812835 392 GALLS LLC Page 11Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 2 Transactions 1 Transactions 2 Transactions 1 Transactions 2 Transactions 1 Transactions 2 Transactions FISCHER/JUDD FORMANEK/ROBERT FORUM COMMUNICATIONS COMPANY FRANZ REPROGRAPHICS INC FRAZIER/BRENT FREDERICK/PHILIP GABE/RICHARD Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba General Revenue Fund Copyright 2010-2020 Integrated Financial Systems 01-201-000-0000-6526 22.99 ACCT 1002151493 CAR DOOR OPEN 016388704 Uniforms N BRASEL/RYAN10519 01-204-000-0000-6526 94.98 ACCT 1002151493 POLOS 016372209 Uniforms N 01-250-000-0000-6526 46.18 ACCT 5287917 STEEL CUFFS 016156272 Uniforms N 01-250-000-0000-6526 20.26 ACCT 5287917 LOCKING BUCKLE 016205958 Uniforms N 01-250-000-0000-6526 90.57 ACCT 5287917 CUFFS/TROUSERS 016206273 Uniforms N 01-250-000-0000-6526 77.48 ACCT 5287917 EAR MOLDS 016215425 Uniforms N 01-250-000-0000-6526 294.81 ACCT 5287917 TROUSERS 016264031 Uniforms N 01-250-000-0000-6526 109.98 ACCT 5287917 SUPER SHIRTS 016312597 Uniforms N 01-250-000-0000-6526 535.12 ACCT 5287917 BADGES 016313618 Uniforms N 01-250-000-0000-6491 14.85 ACCT 5287917 MASKS 016360129 Jail Supplies N 01-250-000-0000-6491 25.26 ACCT 5287917 SEAT BELT CUTTER 016368310 Jail Supplies N 01-605-000-0000-6140 75.00 PER DIEM 9/2/20 Per Diem N 01-063-000-0000-6406 671.90 REGISTERED VOTOR RECEIPTS 0323442 Office Supplies N 01-112-104-0000-6572 576.00 ACCT 813640729 LIGHT INVERTERS 9634390232 Repair And Maintenance Supplies N 01-201-000-0000-6315 1,900.24 ACCT 03188 REPLACE BATTERIES 150007413-1 Radio Repair Charges N 02-612-000-0000-6330 69.00 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 10-303-000-0000-6278 59,510.87 SERVICE 0049962 Engineering & Hydrological Testing N 10-303-000-0000-6278 21,386.98 SERVICE 0049963 Engineering & Hydrological Testing N 1,539.44392 7611 GIBBS/ANN 75.007611 14619 GOVERNMENT FORMS & SUPPLIES 671.9014619 52564 GRAINGER INC 576.0052564 11754 GRANITE ELECTRONICS INC 1,900.2411754 14641 GUNDERSON/GARY 69.0014641 5835 HOUSTON ENGINEERING INC Page 12Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 13 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions GALLS LLC GIBBS/ANN GOVERNMENT FORMS & SUPPLIES GRAINGER INC GRANITE ELECTRONICS INC GUNDERSON/GARY Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Road And Bridge Fund Copyright 2010-2020 Integrated Financial Systems 10-303-000-0000-6278 14,155.00 SERVICE 0049964 Engineering & Hydrological Testing N 10-303-000-0000-6278 1,898.00 SERVICE 0049965 Engineering & Hydrological Testing N 01-204-000-0000-6304 94.63 ACCT 64633 BOAT #4 ROLLERS 5038 Repair And Maintenance N 01-204-000-0000-6304 444.75 ACCT 64633 BOAT #3 WINTERIZE 5150 Repair And Maintenance N 01-250-000-0000-6526 15.00 PATCHES SEWN ON SHIRTS 91510 Uniforms N 10-304-000-0000-6300 95.00 SERVICE 12845 Building And Grounds Maintenance N 02-612-000-0000-6330 140.30 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 22-622-000-0655-6369 200.00 2 BEAVERS TRAPPED IN DITCH 55 8/9/20 Miscellaneous Charges Y 02-612-000-0000-6330 18.98 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 01-205-000-0000-6273 8,695.00 ACCT OTAUD CORONER SERVICES 1295 Coroner Expense 6 01-205-000-0000-6273 1,100.00 ACCT OTAUD SEC/ASSIST 1296 Coroner Expense 6 01-250-000-0000-6432 95.27 GILLES, JAZZE T 1/16/20 Medical Incarcerated 6 01-250-000-0000-6432 6.41 WEAVER, JACOB N 7/19/20 Medical Incarcerated 6 01-250-000-0000-6432 377.49 WEAVER, JACOB N 7/19/20 Medical Incarcerated 6 01-250-000-0000-6432 89.46 WEAVER, JACOB N 7/19/20 Medical Incarcerated 6 01-250-000-0000-6432 35.13 RANDKLEV, ANTHONY D 7/28/20 Medical Incarcerated 6 96,950.855835 6074 J & K MARINE 539.386074 39324 JK SPORTS 15.0039324 1008 KOEP'S SEPTIC LLC 95.001008 16137 KRESS/JEFF 140.3016137 15197 KUGLER/DOUGLAS 200.0015197 8169 KUGLER/JOSEPHINE 18.988169 79 LAKE REGION HEALTHCARE Page 13Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 4 Transactions 2 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions HOUSTON ENGINEERING INC J & K MARINE JK SPORTS KOEP'S SEPTIC LLC KRESS/JEFF KUGLER/DOUGLAS KUGLER/JOSEPHINE Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba General Revenue Fund Copyright 2010-2020 Integrated Financial Systems 10-302-000-0000-6350 46,260.00 OLAF LAKE PIPELINE REPAIR Maintenance Contractor N 50-399-000-0000-6291 500.00 CARDBOARD 7/2/20 73701 Contract Transportation N 50-399-000-0000-6291 500.00 CARDBOARD 9/4/20 73837 Contract Transportation N 50-399-000-0000-6291 500.00 CARDBOARD 9/9/20 73855 Contract Transportation N 50-399-000-0000-6291 500.00 CARDBOARD 9/11/20 73856 Contract Transportation N 01-250-000-0000-6331 114.40 MEALS - DEFENSE TRAINING 9/4/20 Meals And Lodging N 01-123-000-0000-6140 150.00 PER DIEM 9/10/20 Per Diem Y 01-123-000-0000-6330 77.05 MILEAGE 9/10/20 Mileage Y 01-123-000-0000-6140 225.00 PER DIEM 9/10/20 Per Diem Y 01-123-000-0000-6330 81.08 MILEAGE 9/10/20 Mileage Y 10-304-000-0000-6572 954.09 PARTS 359185 Repair And Maintenance Supplies N 01-122-000-0000-6406 134.95 ACCT 23-52A26 LEVELING ROD 0287069-IN Office Supplies N 10-302-000-0000-6500 185.90 SUPPLIES 0287329-IN Supplies N 10-303-000-0000-6501 98.97 SUPPLIES 0287247-IN Engineering And Surveying Supplies N 10-303-000-0000-6501 177.00 SUPPLIES 0287330-IN Engineering And Surveying Supplies N 10,398.7679 9606 LANDWEHR CONSTRUCTION INC 46,260.009606 81 LARRY OTT INC TRUCK SERVICE 2,000.0081 14927 LARSON/ASHLEY 114.4014927 15078 LARSON/DOUG 227.0515078 11658 LEE/THOMAS 306.0811658 1022 LITTLE FALLS MACHINE INC 954.091022 41638 LOCATORS & SUPPLIES INC Page 14Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 7 Transactions 1 Transactions 4 Transactions 1 Transactions 2 Transactions 2 Transactions 1 Transactions LAKE REGION HEALTHCARE LANDWEHR CONSTRUCTION INC LARRY OTT INC TRUCK SERVICE LARSON/ASHLEY LARSON/DOUG LEE/THOMAS LITTLE FALLS MACHINE INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Road And Bridge Fund Copyright 2010-2020 Integrated Financial Systems 02-612-000-0000-6330 28.18 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 10-304-000-0000-6572 1,955.00 PARTS 209725 Repair And Maintenance Supplies N 01-061-000-0000-6342 1,989.18 ACCT 35700038 CN 500-0614025 423037530 Service Agreements N 01-250-000-0000-6342 307.39 ACCT 35700038 CN 500-0461307 422896241 Service Agreements N 01-061-000-0000-6342 1,611.40 ACCT OT00 CN 115529-03 7902902 Service Agreements N 01-061-000-0000-6680 731.94 ACCT OT00 FAX KIT 7911569 Computer Hardware N 50-000-000-0000-6406 36.49 HANGING FILES 8/17/20 Office Supplies N 50-000-000-0000-6242 220.00 SW ONLINE COURSE FROM U OF M 8/19/20 Registration Fees N 50-000-000-0000-6331 28.33 MEALS WHILE AT WADENA CO 8/27/20 Meals And Lodging N 01-250-000-0000-6449 13,758.33 HEALTHCARE SERVICES SEP 2020 5098 Medical Agreements Y 01-201-000-0000-6526 159.00 MASKS W/ SHERIFF LOGO 1570 Uniforms N 01-250-000-0000-6526 162.00 MASKS W/ SHERIFF LOGO 1570 Uniforms N 01-112-101-0000-6673 20,000.00 EXTERIOR BUILDING REPAIRS 43380-01 Remodeling Project-Ct House N 596.8241638 15172 LOE/DORIS 28.1815172 511 M-R SIGN COMPANY INC. 1,955.00511 36132 MARCO INC ST LOUIS 2,296.5736132 2721 MARCO TECHNOLOGIES LLC 2,343.342721 14277 McCONN/CHRISTOPHER 284.8214277 10425 MEND CORRECTIONAL CARE 13,758.3310425 16255 METALLIC GORILLA 321.0016255 15939 MID-CONTINENTAL RESTORATION CO INC Page 15Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 4 Transactions 1 Transactions 1 Transactions 2 Transactions 2 Transactions 3 Transactions 1 Transactions 2 Transactions LOCATORS & SUPPLIES INC LOE/DORIS M-R SIGN COMPANY INC. MARCO INC ST LOUIS MARCO TECHNOLOGIES LLC McCONN/CHRISTOPHER MEND CORRECTIONAL CARE METALLIC GORILLA Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Capital Improvement Fund Copyright 2010-2020 Integrated Financial Systems 14-112-000-0000-6687 35,740.00 EXTERIOR BUILDING REPAIRS 43380-01 Equipment N 02-281-801-0000-6240 6,452.61 HOUSING ASSISTANCE POSTCARDS 6599 Publishing & Advertising N 02-281-801-0000-6240 513.00 ENVELOPES & FLYERS 6605 Publishing & Advertising N 02-612-000-0000-6330 103.50 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 01-122-000-0000-6304 66.55 ACCT 9988095 OIL CHANGE 752404 Repair And Maintenance N 01-122-000-0000-6304 96.77 ACCT 9988095 OIL CHG/ELEMENT 752486 Repair And Maintenance N 01-127-000-0000-6304 46.45 ACCT 9988312 OIL CHANGE 755602 Repair & Maintenance N 01-201-000-0000-6304 997.98 ACCT 2900 UNIT 1804 GENERATOR 752489 Repair And Maintenance N 01-201-000-0000-6304 46.45 ACCT 2900 UNIT 1910 OIL CHANGE 752868 Repair And Maintenance N 01-201-000-0000-6304 68.82 ACCT 2900 UNIT 1907 ELEMENT 753079 Repair And Maintenance N 10-304-000-0000-6306 49.70 SERVICE 753000 Repair/Maint. Equip N 10-304-000-0000-6306 50.89 SERVICE 753913 Repair/Maint. Equip N 10-304-000-0000-6306 49.70 SERVICE 754111 Repair/Maint. Equip N 01-043-000-0000-6369 20.00 ACCT 1143-13 SHREDDING SERVICE 417706 Miscellaneous Charges N 01-201-000-0000-6342 25.00 ACCT 1159 SHREDDING SERVICE 417712 Service Agreements N 01-112-108-0000-6342 10.00 ACCT 147674 PRESSURE VESSEL ABR0239481X Service Agreements N 01-061-000-0000-6342 6,624.00 REAL ASSET MGMT LICENSE 2008028 Service Agreements N 55,740.0015939 87003 MIDWEST PRINTING CO 6,965.6187003 16138 MILLER/JACOB 103.5016138 42863 MINNESOTA MOTOR COMPANY 1,473.3142863 7661 MINNKOTA ENVIRO SERVICES INC 45.007661 928 MN DEPT OF LABOR & INDUSTRY 10.00928 548 MNCCC LOCKBOX 6,624.00548 Page 16Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 2 Transactions 2 Transactions 1 Transactions 9 Transactions 2 Transactions 1 Transactions 1 Transactions MID-CONTINENTAL RESTORATION CO INC MIDWEST PRINTING CO MILLER/JACOB MINNESOTA MOTOR COMPANY MINNKOTA ENVIRO SERVICES INC MN DEPT OF LABOR & INDUSTRY MNCCC LOCKBOX Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba General Revenue Fund Copyright 2010-2020 Integrated Financial Systems 01-201-000-0000-6315 2,842.00 ACCT 1000631219 RADIO REPAIR 8330165264 Radio Repair Charges N 02-612-000-0000-6330 94.30 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 10-302-000-0000-6350 1,650.00 SERVICE 943 Maintenance Contractor N 01-044-000-0000-6304 400.50 ACCT OTTE017 EVAP FILTER 6235621 Repair And Maintenance N 01-201-000-0000-6304 632.42 ACCT 7365421 UNIT 1501 REPAIRS 6234059 Repair And Maintenance N 01-201-000-0000-6304 806.11 ACCT 7365421 UNIT 1805 REPAIRS 6234205 Repair And Maintenance N 01-201-000-0000-6304 117.43 ACCT 7365421 UNIT 1907 MAINT 6234321 Repair And Maintenance N 01-201-000-0000-6304 425.00 ACCT 7365421 UNIT 1706 REPAIRS 6234481 Repair And Maintenance N 10-304-000-0000-6572 16.00 PARTS 5057408 Repair And Maintenance Supplies N 10-304-000-0000-6306 1,893.66 REPAIR 6233892 Repair/Maint. Equip N 10-304-000-0000-6306 600.00 REPAIR 6234861 Repair/Maint. Equip N 10-304-000-0000-6306 600.00 REPAIR 6234863 Repair/Maint. Equip N 14-201-000-0000-6687 39,551.64 2020 FORD EXPEDITION F0372 Equipment-Current Year N 14-201-000-0000-6687 39,551.64 2020 FORD EXPEDITION F0373 Equipment-Current Year N 50-000-000-0130-6306 3,777.50 REPAIRS TO LOADOUT PUMP 1338 Repair/Maint. Equip N 01-112-101-0000-6572 300.00 PAINT EXTERIOR RAILINGS 4431 Repair And Maintenance Supplies N 01-123-000-0000-6140 225.00 PER DIEM 9/10/20 Per Diem Y 01-123-000-0000-6330 112.71 MILEAGE 9/10/20 Mileage Y 6260 MOTOROLA SOLUTIONS INC 2,842.006260 15174 MUCHOW/GREGORY 94.3015174 7389 MUNICIPAL SERVICE CO, INC 1,650.007389 43227 NELSON AUTO CENTER 84,594.4043227 16250 NELSON ELECTRIC MOTOR REPAIR INC 3,777.5016250 11384 NEWMAN PAINTING INC 300.0011384 14655 NEWVILLE/DARREN Page 17Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 1 Transactions 11 Transactions 1 Transactions 1 Transactions MOTOROLA SOLUTIONS INC MUCHOW/GREGORY MUNICIPAL SERVICE CO, INC NELSON AUTO CENTER NELSON ELECTRIC MOTOR REPAIR INC NEWMAN PAINTING INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba General Revenue Fund Copyright 2010-2020 Integrated Financial Systems 01-112-108-0000-6572 216.50 HONEYWELL PRESSURETROL 37826 Repair And Maintenance Supplies N 50-399-000-0000-6300 1,260.00 ACCT 27883 INSPECTIONS 35072 Building And Grounds Maintenance N 10-304-000-0000-6572 681.30 PARTS 3220207P Repair And Maintenance Supplies N 10-304-000-0000-6572 326.55 BATTERY 3220819P Repair And Maintenance Supplies N 10-304-000-0000-6572 46.00 PARTS CM3220207P Repair And Maintenance Supplies N 10-304-000-0000-6572 69.00 BATTERY CM3220819P Repair And Maintenance Supplies N 01-061-000-0000-6201 2,100.00 ACCT 100A05602 AUG 2020 20080395 Communication Fees -N 01-201-000-0000-6304 383.45 UNIT 1802 BRAKE PADS/ROTORS 151448 Repair And Maintenance N 01-201-000-0000-6304 638.04 UNIT 1802 TIRES 151449 Repair And Maintenance N 01-605-000-0000-6140 75.00 PER DIEM 9/2/20 Per Diem N 01-605-000-0000-6330 27.60 MILEAGE 9/2/20 Mileage N 50-000-000-0120-6290 147.88 ACCT 408 HAULING BACKHOE 2875 Contracted Services.N 50-399-000-0000-6290 867.24 ACCT 461 CLASS 5/GRADING 2877 Contracted Services.N 337.7114655 606 NORTHWEST IRON FIREMEN INC 216.50606 1295 NOVA FIRE PROTECTION 1,260.001295 10104 NUSS TRUCK & EQUIPMENT 892.8510104 4106 OFFICE OF MNIT SERVICES 2,100.004106 1464 OK TIRE OF PERHAM INC 1,021.491464 14932 OLSON/BRENDA 102.6014932 126 OTTER TAIL CO TREASURER 1,015.12126 49008 OTTER TAIL TIRE INC Page 18Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 2 Transactions 1 Transactions 1 Transactions - - 4 Transactions 1 Transactions 2 Transactions 2 Transactions 2 Transactions NEWVILLE/DARREN NORTHWEST IRON FIREMEN INC NOVA FIRE PROTECTION NUSS TRUCK & EQUIPMENT OFFICE OF MNIT SERVICES OK TIRE OF PERHAM INC OLSON/BRENDA OTTER TAIL CO TREASURER Otter Tail County Auditor PAW PUBLICATIONS LLC BATTLE LAKE REVIEW COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba General Revenue Fund Copyright 2010-2020 Integrated Financial Systems 01-201-000-0000-6304 32.30 UNIT 1801 OIL CHANGE 123734 Repair And Maintenance N 01-201-000-0000-6304 370.17 UNIT 1201 BRAKE PADS/ROTORS 123869 Repair And Maintenance N 50-000-000-0000-6304 640.10 UNIT 14745 TIRES 123929 Repair And Maintenance N 02-219-000-0000-6369 109.50 ROLLS FOR CONSORTIUM CLASS 7307-39 Miscellaneous Charges N 50-000-000-0120-6291 2,734.83 HAULING CHARGES 9/3/20 39264 Contract Transportation N 50-000-000-0170-6291 6,963.68 HAULING CHARGES 9/3/20 39264 Contract Transportation N 50-399-000-0000-6291 2,970.40 HAULING CHARGES 9/3/20 39264 Contract Transportation N 01-201-000-0000-6491 90.00 ACCT 630256 TANK RENT 7147 General Supplies N 50-000-000-0140-6290 325.00 5 SHIFTS AUG2020 Contracted Services.N 01-123-000-0000-6240 68.75 BA MTG AD 9/10/20 AUG2020 Publishing & Advertising N 01-124-000-0000-6240 55.00 PC MTG AD 9/9/20 AUG2020 Publishing & Advertising N 01-201-000-0000-6396 548.00 TOW CF 20028657 9/3/20 9/3/20 Special Investigation N 01-123-000-0000-6240 92.21 ACCT 396 BA MTG AD 9/10/20 81095 Publishing & Advertising N 1,042.5749008 9510 OTTERTAIL BAKERY 109.509510 7392 OTTERTAIL TRUCKING INC 12,668.917392 45022 PARK REGION CO OP 90.0045022 862 PARKERS PRAIRIE/CITY OF 325.00862 156 123.75156 15810 PELICAN PETE BODY SHOP & TOWING INC 548.0015810 45047 PELICAN RAPIDS PRESS 92.2145047 1093 PERHAM STEEL & WELDING Page 19Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 3 Transactions 1 Transactions 3 Transactions 1 Transactions 1 Transactions 2 Transactions 1 Transactions 1 Transactions PAW PUBLICATIONS LLC BATTLE LAKE REVIEW OTTER TAIL TIRE INC OTTERTAIL BAKERY OTTERTAIL TRUCKING INC PARK REGION CO OP PARKERS PRAIRIE/CITY OF PELICAN PETE BODY SHOP & TOWING INC PELICAN RAPIDS PRESS Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Road And Bridge Fund Copyright 2010-2020 Integrated Financial Systems 10-303-000-0000-6369 25.00 SERVICE Miscellaneous Charges N 10-304-000-0000-6306 65.44 SERVICE 34490 Repair/Maint. Equip N 02-612-000-0000-6330 74.18 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 01-250-000-0000-6491 631.49 JAIL SUPPLIES 20861 Jail Supplies N 01-112-000-0000-6572 130.92 PARTS FOR ICE MACHINE 88727 Repair And Maintenance Supplies N 10-304-000-0000-6572 249.78 PARTS P0514249 Repair And Maintenance Supplies N 10-304-000-0000-6572 906.01 PARTS P9449754 Repair And Maintenance Supplies N 50-399-000-0000-6565 529.42 ACCT 71928252 PROPANE 98730273 Fuels N 01-149-000-0000-6369 1,160.00 ACCT 679827 5MB DATA PLAN 1026730 Miscellaneous Charges N 01-149-000-0000-6369 1,160.00 ACCT 679827 5MB DATA PLAN 1026800 Miscellaneous Charges N 01-149-000-0000-6369 1,200.00 ACCT 679827 5MB DATA PLAN 1027053 Miscellaneous Charges N 10-304-000-0000-6572 441.10 PARTS 200-1026970 Repair And Maintenance Supplies N 50-000-000-0150-6290 20.54 ACCT 376004 AUG 2020 AUG2020 Contracted Services.N 25.001093 475 PETE'S AMOCO 65.44475 16140 PETERSON/KADEN 74.1816140 11290 PHOENIX SUPPLY 631.4911290 45072 PINE PLAZA TV & APPLIANCE 130.9245072 8842 POWERPLAN OIB 1,155.798842 3867 PRAXAIR DISTRIBUTION INC 529.423867 12526 PRECISE MRM LLC 3,961.1012526 3730 PREMIUM WATERS INC Page 20Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 2 Transactions 1 Transactions 4 Transactions PERHAM STEEL & WELDING PETE'S AMOCO PETERSON/KADEN PHOENIX SUPPLY PINE PLAZA TV & APPLIANCE POWERPLAN OIB PRAXAIR DISTRIBUTION INC PRECISE MRM LLC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Solid Waste Fund Copyright 2010-2020 Integrated Financial Systems 02-102-000-0000-6369 3,900.00 FIDLAR INTEGRATION 004583 Miscellaneous Charges N 01-705-000-0000-6276 3,000.00 GOV AFFAIRS SEP 2020 2020-009 Professional Services N 01-204-000-0000-6491 43.99 ATTD POLE ANGLE 14"124395 General Supplies N 10-304-000-0000-6572 1,063.15 PARTS 737030F Repair And Maintenance Supplies N 10-304-000-0000-6572 43.53 PARTS 737030FX1 Repair And Maintenance Supplies N 10-304-000-0000-6572 56.22 PARTS 737030FX2 Repair And Maintenance Supplies N 10-304-000-0000-6572 108.10 PARTS 737061F Repair And Maintenance Supplies N 10-304-000-0000-6572 79.32 PARTS 737178F Repair And Maintenance Supplies N 10-304-000-0000-6572 46.80 PARTS 737191F Repair And Maintenance Supplies N 10-304-000-0000-6572 130.50 PARTS 737383F Repair And Maintenance Supplies N 10-304-000-0000-6572 142.45 PARTS 737610F Repair And Maintenance Supplies N 10-304-000-0000-6572 287.92 PARTS 737657F Repair And Maintenance Supplies N 10-304-000-0000-6572 58.06 PARTS 737762F Repair And Maintenance Supplies N 10-304-000-0000-6572 174.97 PARTS 737777F Repair And Maintenance Supplies N 10-304-000-0000-6572 46.95 PARTS 737812F Repair And Maintenance Supplies N 10-304-000-0000-6572 65.43 PARTS 737818F Repair And Maintenance Supplies N 10-304-000-0000-6572 695.23 PARTS 738269F Repair And Maintenance Supplies N 10-304-000-0000-6572 72.60 PARTS 738441F Repair And Maintenance Supplies N 10-304-000-0000-6572 414.04 PARTS 738693F Repair And Maintenance Supplies N 10-304-000-0000-6572 32.20 PARTS CM725588F Repair And Maintenance Supplies N 10-304-000-0000-6572 32.20 PARTS CM72701FB Repair And Maintenance Supplies N 10-304-000-0000-6572 64.40 PARTS CM734195F Repair And Maintenance Supplies N 50-000-000-0000-6242 200.00 7 WEBINARS 510836 Registration Fees N 20.543730 1836 PRO-WEST & ASSOCIATES INC 3,900.001836 15407 PSICK CAPITOL SOLUTIONS INC 3,000.0015407 15293 RAYS SPORT & MARINE - PERHAM 43.9915293 8622 RDO TRUCK CENTERS 3,356.478622 2907 RECYCLING ASSOC OF MN Page 21Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 1 Transactions 1 Transactions - - - 19 Transactions PREMIUM WATERS INC PRO-WEST & ASSOCIATES INC PSICK CAPITOL SOLUTIONS INC RAYS SPORT & MARINE - PERHAM RDO TRUCK CENTERS Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Solid Waste Fund Copyright 2010-2020 Integrated Financial Systems WALTERS/CEDAR15405 10-304-000-0000-6572 3,932.08 PARTS 10044MN Repair And Maintenance Supplies N 01-605-000-0000-6140 75.00 PER DIEM 9/2/20 Per Diem Y 22-622-000-0652-6369 1,400.00 DITCH 52 APPEAL - R CHODEK 316968 Miscellaneous Charges Y 02-612-000-0000-6330 83.38 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 01-124-000-0000-6140 150.00 PER DIEM 9/9/20 Per Diem Y 01-124-000-0000-6330 18.40 MILEAGE 9/9/20 Mileage Y 10-304-000-0000-6526 212.98 SHOES Uniforms N 01-149-000-0000-6354 102.97 ACCT 497137 WINDSHIELD REPAIR 05537-648146 Insurance Claims N 02-612-000-0000-6330 138.00 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 200.002907 14593 REEDSBURG HARDWARE COMPANY 3,932.0814593 12946 RETHEMEIER/CAROL 75.0012946 10842 RINKE NOONAN LAW FIRM 1,400.0010842 14645 ROLLIE/WILLIAM 83.3814645 13859 ROSENTHAL/JACK 168.4013859 15725 ROTZ/SAMUEL 212.9815725 9012 SAFELITE FULFILLMENT INC 102.979012 14646 SALATHE/HUNTER 138.0014646 15178 SALATHE/KELVIN Page 22Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 2 Transactions 1 Transactions 1 Transactions 1 Transactions RECYCLING ASSOC OF MN REEDSBURG HARDWARE COMPANY RETHEMEIER/CAROL RINKE NOONAN LAW FIRM ROLLIE/WILLIAM ROSENTHAL/JACK ROTZ/SAMUEL SAFELITE FULFILLMENT INC SALATHE/HUNTER Otter Tail County Auditor General Fund Dedicated Accounts COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Copyright 2010-2020 Integrated Financial Systems 02-612-000-0000-6330 109.25 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 02-612-000-0000-6330 105.23 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 01-605-000-0000-6140 75.00 PER DIEM 9/2/20 Per Diem Y 50-000-000-0120-6290 2,640.00 EQUIP HRS/SALARY HENNING TSF 104373 Contracted Services.N 50-000-000-0130-6290 5,080.00 EQUIP HRS/SALARY NE LANDFILL 104373 Contracted Services.N 10-302-000-0000-6306 661.40 SERVICE 1118 Repair/Maint. Equip N 01-002-000-0000-6818 1,590.67 LRSP SEVICES AUG 2020 11025.00-32 Board Contingency N 10-303-000-0000-6278 5,705.83 SERVICE 13058.00-11 Engineering & Hydrological Testing N 50-000-000-0000-6290 4,925.94 SW MGMT PLAN AUG 2020 12682.00-11 Contracted Services N 01-002-000-0000-6818 1,912.50 CONSULTING SERVICES AUG 2020 AUG2020 Board Contingency N 10-304-000-0000-6406 94.84 SUPPLIES 864190 Office Supplies N 10-304-000-0000-6572 1,079.00 SUPPLIES 864190 Repair And Maintenance Supplies N 10-304-000-0000-6253 92.68 WASTE DISPOSAL Garbage N 109.2515178 15192 SCHWANTZ/CHRISTOPHER 105.2315192 11508 SCHWARTZ/STEVEN 75.0011508 697 SCOTT HOFLAND CONSTRUCTION INC 7,720.00697 15436 SOPP CONTROL SERVICES INC 661.4015436 6321 SRF CONSULTING GROUP INC 12,222.446321 9691 STEFANEK-PETERS/HEATHER 1,912.509691 48183 STEINS INC 1,173.8448183 166 STEVE'S SANITATION INC Page 23Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 1 Transactions 2 Transactions 1 Transactions 3 Transactions 1 Transactions 2 Transactions SALATHE/KELVIN SCHWANTZ/CHRISTOPHER SCHWARTZ/STEVEN SCOTT HOFLAND CONSTRUCTION INC SOPP CONTROL SERVICES INC SRF CONSULTING GROUP INC STEFANEK-PETERS/HEATHER STEINS INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Solid Waste Fund Copyright 2010-2020 Integrated Financial Systems 50-000-000-0110-6291 3,349.00 ACCT 20479 BATTLE LAKE AUG2020 Contract Transportation N 50-000-000-0120-6291 1,380.00 ACCT 20489 HENNING AUG2020 Contract Transportation N 50-000-000-0130-6291 2,496.00 ACCT 20487 NEW YORK MILLS AUG2020 Contract Transportation N 50-000-000-0150-6291 2,450.00 ACCT 20477 PELICAN RAPIDS AUG2020 Contract Transportation N 01-201-000-0000-6526 190.00 ACCT 974 ID PATCH/TAC POUCHES I1449153 Uniforms N 01-201-000-0000-6481 290.00 ACCT 974 9MM MARKING ROUNDS I1449416 Radar, Weapons Etc.N 01-201-000-0000-6526 289.00 ACCT 974 ID PATCH/TAC POUCHES I1449661 Uniforms N WING/MICHAEL15790 01-201-000-0000-6526 13.00 ACCT 974 ID PATCHES I1450213 Uniforms N SEIM/GREG4026 01-201-000-0000-6526 91.00 ACCT 974 ID PATCH/TAC POUCHES I1450214 Uniforms N 01-250-000-0000-6526 164.97 ACCT 46698 UNIFORM SHIRTS I1447380 Uniforms N 01-250-000-0000-6269 4,377.59 C1252000 MEALS 8/22-28/20 INV2000089161 Professional Services-Kitchen N 01-250-000-0000-6269 4,230.04 C1252000 MEALS 8/29-9/4/20 INV2000089730 Professional Services-Kitchen N 01-204-000-0000-6369 26.55 ACCT 01372 PLAQUE 215831R Miscellaneous Charges N 01-250-000-0000-6369 160.00 ACCT 01372 ROUND BRASS TAGS 215636D Miscellaneous Charges N 14-061-000-0000-6680 390.00 CAMERA INSTALL CONFIGURATION 41742 Computer Hdwe And Disks N 14-061-000-0000-6680 9,220.00 CABLLING & CAMERA INSTALL 41755 Computer Hdwe And Disks N 01-002-000-0000-6240 349.20 ACCT 1981 SALE & REMOVE BLDG 61539 Publishing & Advertising N 01-002-000-0000-6240 349.20 ACCT 1981 EXCESS LAND SALE 61539 Publishing & Advertising N 01-002-000-0000-6240 349.20 ACCT 1981 SALE & REMOVE BLDG 61603 Publishing & Advertising N 01-002-000-0000-6240 349.20 ACCT 1981 EXCESS LAND SALE 61603 Publishing & Advertising N 01-201-000-0000-6240 58.20 ACCT 1968 DEPUTY SHERIFF 61465 Publishing & Advertising N 9,767.68166 168 STREICHERS 1,037.97168 6642 SUMMIT FOOD SERVICE, LLC 8,607.636642 8718 TAG UP 186.558718 5965 TECH CHECK LLC 9,610.005965 42537 THIS WEEKS SHOPPING NEWS Page 24Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 5 Transactions 6 Transactions 2 Transactions 2 Transactions 2 Transactions STEVE'S SANITATION INC STREICHERS SUMMIT FOOD SERVICE, LLC TAG UP TECH CHECK LLC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba General Revenue Fund Copyright 2010-2020 Integrated Financial Systems 01-091-000-0000-6455 1,417.73 ACCT 1000520140 AUG 2020 842912826 Reference Books & Literature N 01-201-000-0000-6348 392.49 ACCT 1003940771 AUG 2020 842937662 Software Maintenance Contract N 01-250-000-0000-6432 15.00 ACCT 749765 MED CART RENTAL AUG2020 Medical Incarcerated N 01-250-000-0000-6432 1,375.27 ACCT 756389 MEDICATIONS AUG2020 Medical Incarcerated N 01-112-101-0000-6342 662.47 ACCT 50366 BRONZE SERVICE 3005443698 Service Agreements N 50-000-000-0120-6306 149.24 HOSE & AIR FILTERS 033779 Repair/Maint. Equip N 10-304-000-0000-6572 668.58 PARTS 430389 Repair And Maintenance Supplies N 10-304-000-0000-6572 35.76 PARTS 431002 Repair And Maintenance Supplies N 10-302-000-0000-6350 2,612.15 SERVICE Maintenance Contractor N 01-250-000-0000-6526 87.68 4 PAIRS OF BLACK PANTS 8/3/20 Uniforms N 01-149-000-0000-6215 21.80 SHIPPER 556562 CONTROL 564X 0000556562360 Freight, Ups And Trucking Charges N 1,455.0042537 183 THOMSON REUTERS - WEST 1,810.22183 7249 THRIFTY WHITE PHARMACY 1,390.277249 77 THYSSENKRUPP ELEVATOR CORPORATION 662.4777 1999 TNT REPAIR INC 149.241999 9693 TOWMASTER 704.349693 9302 TRI-STATE DIVING 2,612.159302 745 TUNGSETH/CHRISTINE 87.68745 176 UPS 21.80176 Page 25Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 5 Transactions 2 Transactions 2 Transactions 1 Transactions 1 Transactions 2 Transactions 1 Transactions 1 Transactions 1 Transactions THIS WEEKS SHOPPING NEWS THOMSON REUTERS - WEST THRIFTY WHITE PHARMACY THYSSENKRUPP ELEVATOR CORPORATION TNT REPAIR INC TOWMASTER TRI-STATE DIVING TUNGSETH/CHRISTINE UPS Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba General Revenue Fund Copyright 2010-2020 Integrated Financial Systems 01-201-000-0000-6304 560.00 ACCT 568303 TIRES 2753743 Repair And Maintenance N 10-302-000-0000-6500 11.61 SUPPLIES D21875 Supplies N 10-304-000-0000-6572 19.97 PARTS D20775 Repair And Maintenance Supplies N 01-063-000-0000-6406 124.92 ACCT 7497 SUPPLIES 1135726 Office Supplies N 10-302-000-0000-6511 215,488.00 HOT MIX Bituminous Mix N 10-304-000-0000-6369 1,560.00 HOT MIX Miscellaneous Charges N 01-091-000-0000-6369 75.00 SUBPOENA SERVICE 20-267 Miscellaneous Charges N 01-124-000-0000-6140 300.00 PER DIEM 9/9/20 Per Diem Y 01-124-000-0000-6330 85.68 MILEAGE 9/9/20 Mileage Y 50-000-000-0110-6853 1,397.55 ACCT 3-85099-73002 0002704-0010-4 MSW BY PASSED EXPENSE LANDFILL N 50-000-000-0120-6853 9,241.50 ACCT 3-85099-73002 0002704-0010-4 MSW BY PASSED EXPENSE LANDFILL N 50-000-000-0130-6853 1,384.19 ACCT 3-85099-73002 0002704-0010-4 MSW BY PASSED EXPENSE LANDFILL N 50-000-000-0150-6853 900.62 ACCT 3-85099-73002 0002704-0010-4 MSW BY PASSED EXPENSE LANDFILL N 50-000-000-0170-6853 562.05 ACCT 3-85099-73002 0002704-0010-4 MSW BY PASSED EXPENSE LANDFILL N 10-304-000-0000-6306 489.20 REPAIR 3503112203 Repair/Maint. Equip N 11064 US AUTOFORCE 560.0011064 2068 VERGAS HARDWARE 31.582068 51002 VICTOR LUNDEEN COMPANY 124.9251002 2071 WADENA ASPHALT INC 217,048.002071 52000 WADENA CO SHERIFF 75.0052000 12465 WASS/DAVID F 385.6812465 2278 WASTE MANAGEMENT 13,485.912278 13519 WD LARSON COMPANIES LTD INC Page 26Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 2 Transactions 1 Transactions 2 Transactions 1 Transactions 2 Transactions 5 Transactions US AUTOFORCE VERGAS HARDWARE VICTOR LUNDEEN COMPANY WADENA ASPHALT INC WADENA CO SHERIFF WASS/DAVID F WASTE MANAGEMENT Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 3:12:17PM9/17/2020 csteinba Road And Bridge Fund Copyright 2010-2020 Integrated Financial Systems 10-304-000-0000-6306 5,095.59 REPAIR 3503112313 Repair/Maint. Equip N 01-124-000-0000-6140 150.00 PER DIEM 9/9/20 Per Diem Y 01-124-000-0000-6330 43.13 MILEAGE 9/9/20 Mileage Y 02-612-000-0000-6330 70.73 AIS INSPECTOR MILEAGE 8/31/20 Mileage N 01-250-000-0000-6369 675.00 INSPECT SMOKEGAURD UNITS 7300 Miscellaneous Charges N 10-304-000-0000-6572 188.75 PARTS PC020310309 Repair And Maintenance Supplies N 5,584.7913519 11653 WILSON/WARREN R 193.1311653 13985 WISKOW/MICHAEL 70.7313985 11405 WL HALL CO INTERIOR SERVICE 675.0011405 2086 ZIEGLER INC 188.752086 1,599,096.29 Page 27Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 2 Transactions 2 Transactions 1 Transactions 1 Transactions 1 Transactions Final Total ............182 Vendors 392 Transactions WD LARSON COMPANIES LTD INC WILSON/WARREN R WISKOW/MICHAEL WL HALL CO INTERIOR SERVICE ZIEGLER INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES 3:12:17PM9/17/2020 csteinba Road And Bridge Fund Copyright 2010-2020 Integrated Financial Systems Page 28Audit List for Board Otter Tail County Auditor Amount 121,369.71 General Revenue Fund 1 14,254.49 General Fund Dedicated Accounts 2 1,188,170.13 Road And Bridge Fund 10 195,033.28 Capital Improvement Fund 14 2,290.00 County Ditch Fund 22 77,978.68 Solid Waste Fund 50 1,599,096.29 NameFundRecap by Fund All Funds Total Approved by,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMISSIONER'S VOUCHERS ENTRIES9/3/2020 LHart Y N D 4 N Otter Tail County Auditor Audit List for Board Page 1 Print List in Order By: Save Report Options?: Type of Audit List: on Audit List?: Paid on Behalf Of Name Explode Dist. Formulas?: D - Detailed Audit List S - Condensed Audit List 1 - Fund (Page Break by Fund) 2 - Department (Totals by Dept) 3 - Vendor Number 4 - Vendor Name 11:11:06AM COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 11:11:06AM9/3/2020 LHart Human Services Copyright 2010-2020 Integrated Financial Systems 11-420-605-0000-6040 37.50 07-20 CCAP CL100 Recoveries A300MC56210l State Share Of Maxis Refunds To State 10 N 07/01/2020 07/31/2020 11-430-720-2112-6061 3,079.00 07-20 CCAP A300MC56210l Bsf County Match 9 N 07/01/2020 07/31/2020 11-406-000-0000-6406 65.91 Inv 114828990001 114828990001 Office Supplies 1 N 08/13/2020 08/13/2020 11-420-640-0000-6297 35.00 Case #20200889/Party #001 Iv-D Sheriff's Costs 11 N 08/25/2020 08/25/2020 11-420-650-0000-6001 40.00 Case #20200885 / Party #001 Ma Cost Eff 3 N 08/24/2020 08/24/2020 11-420-601-0000-6271 1,784.32 Andy 72020 Fraud Investigation Costs 6 N 07/01/2020 07/31/2020 11-420-601-0000-6272 5,104.00 Crystal 72020 Fraud Prevention Officer Expense (FPI) 4 N 07/01/2020 07/31/2020 11-420-601-0000-6272 2,352.96 Karen 72020 Fraud Prevention Officer Expense (FPI) 5 N 07/01/2020 07/31/2020 11-430-700-0000-6304 108.74 Acct 139 6046868 Motor Vehicle Service And Repair 7 N 08/12/2020 08/12/2020 11-406-000-0000-6200 518.12 Acct #780691296-00001 9861187-497 Telephone Probation 8 N 08/20/2020 08/20/2020 43022 MN DEPT OF HUMAN SERVICES 3,116.5043022 51120 OFFICE DEPOT 65.9151120 44010 OTTER TAIL CO SHERIFF 75.0044010 44003 OTTER TAIL CO TREASURER 9,241.2844003 46006 QUALITY TOYOTA 108.7446006 9820 VERIZON WIRELESS 518.129820 Page 2Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 2 Transactions 1 Transactions 2 Transactions 3 Transactions 1 Transactions 1 Transactions MN DEPT OF HUMAN SERVICES OFFICE DEPOT OTTER TAIL CO SHERIFF OTTER TAIL CO TREASURER QUALITY TOYOTA VERIZON WIRELESS Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 11:11:06AM9/3/2020 LHart Human Services Copyright 2010-2020 Integrated Financial Systems 11-420-640-0000-6297 70.00 Return # 68799 Iv-D Sheriff's Costs 2 N 08/10/2020 08/10/2020 52383 WRIGHT CO SHERIFF 70.0052383 13,195.55 Page 3Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions Final Total ............7 Vendors 11 Transactions WRIGHT CO SHERIFF Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES11:11:06AM9/3/2020 LHart Human Services Copyright 2010-2020 Integrated Financial Systems Page 4Audit List for Board Otter Tail County Auditor Amount 13,195.55 Human Services 11 13,195.55 NameFundRecap by Fund All Funds Total Approved by,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMISSIONER'S VOUCHERS ENTRIES9/3/2020 LHart Y N D 4 N Otter Tail County Auditor Audit List for Board Page 1 Print List in Order By: Save Report Options?: Type of Audit List: on Audit List?: Paid on Behalf Of Name Explode Dist. Formulas?: D - Detailed Audit List S - Condensed Audit List 1 - Fund (Page Break by Fund) 2 - Department (Totals by Dept) 3 - Vendor Number 4 - Vendor Name 11:41:32AM INDEPENDENT CONTRACT SERVICES OF FF LLC COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 11:41:32AM9/3/2020 LHart Human Services Copyright 2010-2020 Integrated Financial Systems 11-407-100-0018-6200 42.53 ACCT #045/JUN CTC CELL 4255 Ctc Outr Telephone 18 N 08/30/2020 08/30/2020 11-407-100-0018-6200 43.16 ACCT #045/JUL CTC CELL 4255 Ctc Outr Telephone 19 N 08/30/2020 08/30/2020 11-407-600-0090-6379 598.83 ACCT #045/JUN FINANCE SHARON 4255 Miscellaneous Charges 17 N 08/30/2020 08/30/2020 11-407-500-0085-6330 40.25 AUG2020 MILEAGE/NUISANCE 70 AUG2020 MILEAG Mileage Nuisance 20 N 08/31/2020 08/31/2020 11-407-200-0027-6330 5.75 AUG2020 MILEAGE/HFA 10 AUG2020 MILEAG HFA Mileage 21 N 08/31/2020 08/31/2020 11-407-500-0080-6330 101.20 AUG2020 MILEAGE/FPL 176 AUG2020 MILEAG FPL mileage 22 N 08/31/2020 08/31/2020 11-407-400-0078-6330 37.95 AUG2020 MILEAGE/COVID-19 66 AUG2020 MILEAG COVID-19 Mileage 23 N 08/31/2020 08/31/2020 11-407-100-0030-6330 38.76 AUG2020 MILEAGE/MNCHOICE 67.4 AUG2020 MILEAG Mileage - PAS/MNChoices 25 N 08/31/2020 08/31/2020 11-407-400-0078-6330 82.86 AUG2020 MILEAGE/COVID-19 144.1 AUG2020 MILEAG COVID-19 Mileage 24 N 08/31/2020 08/31/2020 11-407-100-0017-6488 5,416.67 DENTAL - AUGUST 2008031 Innovations Grant Blue Cross prog supply 28 Y 32663 CLAY CO HEALTH DEPT 684.5232663 15052 DEMMER/ANDREA 40.2515052 15857 ELLENSON/MATTIE 5.7515857 14398 GEORGESON/ANTHONY 101.2014398 7611 GIBBS/ANN 37.957611 36425 GUCK/AMY 121.6236425 8471 Page 2Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 3 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 2 Transactions CLAY CO HEALTH DEPT DEMMER/ANDREA ELLENSON/MATTIE GEORGESON/ANTHONY GIBBS/ANN GUCK/AMY Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 11:41:32AM9/3/2020 LHart Human Services Copyright 2010-2020 Integrated Financial Systems 08/31/2020 08/31/2020 11-407-100-0018-6240 358.00 AUG2020 ADVERTISING/KBOT-FM 160621-5 Ctc Outr Pub & Adv 29 N 08/31/2020 08/31/2020 11-407-200-0027-6488 300.00 INFANT MNTL HLTH - AUG MIECHV AUGUST HFA Program Supplies 30 Y 08/31/2020 08/31/2020 11-407-300-0071-6488 260.65 ACCT #58724712/ DPC SUPPLIES 17022899 Imz Program Supplies 1 N 08/21/2002 08/21/2020 11-407-300-0071-6488 115.34 ACCT #58724712 17024557 Imz Program Supplies 27 N 08/25/2020 08/25/2020 11-407-400-0078-6488 87.30 CUST #1976-AD 48767 COVER FACE 61287 COVID-19 Supplies 2 N 08/23/2020 08/23/2020 11-407-600-0090-6406 88.50 ACCT #71423628/MISC OFFICE 115406241001 Office Supplies 3 N 09/13/2020 09/13/2020 11-407-600-0090-6406 39.99 ACCT #71423628 - RETURN MONITO 116554396001 Office Supplies 4 N 08/14/2020 08/14/2020 11-407-100-0015-6488 29.98 ACCT #71423628 - INK 117131719001 MCH/ECS Program Supplies 5 N 08/18/2020 08/18/2020 11-407-600-0090-6406 21.78 ACCT #71423628 - BATTERIES ETC 117131719001 Office Supplies 6 N 08/18/2020 08/18/2020 11-407-100-0018-6200 34.83 ACCT #680689848-00001/CTC 9861177179 Ctc Outr Telephone 15 N 5,416.678471 10883 LEIGHTON BROADCASTING/DL 358.0010883 16107 LYSNE CONSULTING & COUNSELING, LLC 300.0016107 14198 MCKESSON MEDICAL - SURGICAL 375.9914198 13389 MIDWEEK INC/THE 87.3013389 51120 OFFICE DEPOT 100.2751120 9820 VERIZON WIRELESS Page 3Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 1 Transactions 2 Transactions 1 Transactions - 4 Transactions INDEPENDENT CONTRACT SERVICES OF FF LLC LEIGHTON BROADCASTING/DL LYSNE CONSULTING & COUNSELING, LLC MCKESSON MEDICAL - SURGICAL MIDWEEK INC/THE OFFICE DEPOT Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 11:41:32AM9/3/2020 LHart Human Services Copyright 2010-2020 Integrated Financial Systems 08/20/2020 08/20/2020 11-407-200-0024-6200 92.88 ACCT #680689848-00001/NFP 9861177179 NFP Telephone 9 N 08/20/2020 08/20/2020 11-407-200-0027-6200 232.20 ACCT #680689848-00001/HFA 9861177179 HFA Telephone 11 N 08/20/2020 08/20/2020 11-407-200-0053-6200 11.61 ACCT #680689848-00001/CHW 9861177179 CHW Telephone 16 N 08/20/2020 08/20/2020 11-407-300-0070-6200 46.44 ACCT #680689848-00001/DP&C 9861177179 Telephone 12 N 08/20/2020 08/20/2020 11-407-400-0078-6488 46.44 ACCT #680689848-00001/COVID 9861177179 COVID-19 Supplies 8 N 08/20/2020 08/20/2020 11-407-400-0083-6200 46.44 ACCT #680689848-00001/PHEP 9861177179 Telephone 7 N 08/20/2020 08/20/2020 11-407-500-0080-6488 92.88 ACCT #680689848-00001/FPL 9861177179 FPL Prog Supplies 13 N 08/20/2020 08/20/2020 11-407-500-0081-6488 46.44 ACCT #680689848-00001/WELLS 9861177179 Prog Supplies Well Delegation 10 N 08/20/2020 08/20/2020 11-407-600-0090-6200 46.44 ACCT #680689848-00001/ADMIN 9861177179 Telephone 14 N 08/20/2020 08/20/2020 11-407-400-0078-6330 23.58 AUG2020 MILEAGE/COVID-19 41 AUG2020 MILEAG COVID-19 Mileage 26 N 08/31/2020 08/31/2020 696.609820 11821 WENTWORTH/KRISTI 23.5811821 8,349.70 Page 4Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 10 Transactions 1 Transactions Final Total ............14 Vendors 30 Transactions VERIZON WIRELESS WENTWORTH/KRISTI Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES11:41:32AM9/3/2020 LHart Human Services Copyright 2010-2020 Integrated Financial Systems Page 5Audit List for Board Otter Tail County Auditor Amount 8,349.70 Human Services 11 8,349.70 NameFundRecap by Fund All Funds Total Approved by,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMISSIONER'S VOUCHERS ENTRIES9/17/2020 Bonstad Y N D 4 N Otter Tail County Auditor Audit List for Board Page 1 Print List in Order By: Save Report Options?: Type of Audit List: on Audit List?: Paid on Behalf Of Name Explode Dist. Formulas?: D - Detailed Audit List S - Condensed Audit List 1 - Fund (Page Break by Fund) 2 - Department (Totals by Dept) 3 - Vendor Number 4 - Vendor Name 9:57:30AM COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 9:57:30AM9/17/2020 Bonstad Human Services Copyright 2010-2020 Integrated Financial Systems 11-420-601-0000-6677 27.19 Acct 2RJVV5AA0Wl1P 16G7-KHCM-K9L3 Office Furniture And Equipment - Im 1 N 08/05/2020 08/05/2020 11-420-601-0000-6406 75.64 Acct 2RJVV5AA0Wl1P 1G67-G3FH-R3ML Office Supplies 3 N 08/12/2020 08/12/2020 11-420-601-0000-6406 15.80 Acct A2RJVV5AA0Wl1P 1YVJ-3J7P-FPX6 Office Supplies 6 N 08/12/2020 08/12/2020 11-430-740-4890-6072 317.99 Acct #A2RJVV5AA0Wl1P 1479-MCX4-31CG Mh Respite 5 N 06/16/2020 06/16/2020 11-430-700-0000-6677 34.61 Acct 2RJVV5AA0Wl1P 16G7-KHCM-K9L3 Office Furniture And Equipment - Ss 2 N 08/05/2020 08/05/2020 11-430-710-1921-6093 354.02 Acct #A2RJVV5AA0Wl1P 19X1-QCPX-NCCW Kinship Navigator Grant expenses 43 N 08/31/2020 08/31/2020 11-430-700-0000-6406 96.28 Acct 2RJVV5AA0Wl1P 1G67-G3FH-R3ML Office Supplies 4 N 08/12/2020 08/12/2020 11-430-710-1921-6093 341.59 Acct #A2RJVV5AA0Wl1P 1H97-QMKY-4X1W Kinship Navigator Grant expenses 37 N 08/31/2020 08/31/2020 11-430-710-1921-6093 197.91 Acct A2RJVV5AA0Wl1P 1LYL-CNMW-TN4F Kinship Navigator Grant expenses 51 N 09/11/2020 09/11/2020 11-430-710-1921-6093 1,478.18 Acct # A2RJVV5AA0Wl1P 1X71-6QRX-YM3Q Kinship Navigator Grant expenses 42 N 09/03/2020 09/03/2020 11-430-700-0000-6406 20.10 Acct A2RJVV5AA0Wl1P 1YVJ-3J7P-FPX6 Office Supplies 7 N 08/12/2020 08/12/2020 11-430-700-0000-6331 15.00 Meal Meals & Lodging - Ss Adm 15 N 08/07/2020 08/26/2020 11-430-700-0000-6331 13.95 Meal Meals & Lodging - Ss Adm 16 N 08/07/2020 08/26/2020 11-430-710-1621-6097 17.44 Client Meal In Home Service - Brief 14 N 08/07/2020 08/26/2020 11-420-601-0000-6406 64.65 Acct #2189988150 449317 Office Supplies 62 N 08/12/2020 08/12/2020 11-420-601-0000-6406 85.22 Acct #2189988150 449538 Office Supplies 60 N 14386 AMAZON CAPITAL SERVICES INC 2,323.3314386 13727 COLE/MELANIE 46.3913727 32603 COOPER'S OFFICE SUPPLY INC Page 2Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates - 11 Transactions 3 Transactions AMAZON CAPITAL SERVICES INC COLE/MELANIE Otter Tail County Auditor INDEPENDENT CONTRACT SERVICES OF FF LLC COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 9:57:30AM9/17/2020 Bonstad Human Services Copyright 2010-2020 Integrated Financial Systems 08/30/2020 08/30/2020 11-430-700-0000-6406 82.29 Acct #2189988150 449317 Office Supplies 63 N 08/12/2020 08/12/2020 11-430-700-0000-6406 108.47 Acct #2189988150 449538 Office Supplies 61 N 08/30/2020 08/30/2020 11-420-640-0000-6298 147.00 Inv #8964982020 8964982020 Child Support Blood Test Charge 59 N 07/20/2020 08/13/2020 11-420-601-0000-6379 83.16 Client #529337 316469 Miscellaneous Charges Im Adm 52 N 08/17/2020 08/17/2020 11-430-700-0000-6379 105.84 OSS Super Ad 316469 Miscellaneous Charges - Ss Adm 53 N 08/17/2020 08/17/2020 11-430-700-0000-6304 22.00 Acct #2461 364013 Motor Vehicle Service And Repair 30 N 08/11/2020 08/11/2020 11-409-000-0021-6379 150.00 IDI Group Debrief Tech Assist 1 Community Equity & Support 32 Y 08/03/2020 08/03/2020 11-409-000-0010-6261 583.33 LCTS Coordination 20-0901 Lcts Coordination 10 Y 09/01/2020 09/30/2020 11-409-440-0000-6091 175.00 Program Coordination 20-0901 Parent Support Outreach 11 Y 09/01/2020 09/30/2020 11-409-000-0000-6261 5,359.50 Sept Collab Coord & Support 92481 Collaborative Coordination 31 N 340.6332603 11695 DNA DIAGNOSTICS CENTER INC 147.0011695 35011 FERGUS FALLS DAILY JOURNAL 189.0035011 35018 FERGUS TIRE CENTER INC 22.0035018 16267 FNWN NETWORK, LLC 150.0016267 8471 758.338471 41450 LAKES COUNTRY SERVICE CO OP Page 3Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 4 Transactions 1 Transactions 2 Transactions 1 Transactions 1 Transactions 2 TransactionsINDEPENDENT CONTRACT SERVICES OF FF LLC COOPER'S OFFICE SUPPLY INC DNA DIAGNOSTICS CENTER INC FERGUS FALLS DAILY JOURNAL FERGUS TIRE CENTER INC FNWN NETWORK, LLC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 9:57:30AM9/17/2020 Bonstad Human Services Copyright 2010-2020 Integrated Financial Systems 09/01/2020 09/30/2020 11-409-440-0000-6091 48.88 Program Mileage 0 Parent Support Outreach 9 Y 07/01/2020 07/31/2020 11-409-000-0021-6379 487.50 IDI Debriefs 20200803 Community Equity & Support 33 Y 08/03/2020 08/28/2020 11-406-000-0000-6261 510.00 Aug Monitoring - Adult 0820532 Ream Electronic Monitoring 36 N 08/31/2020 08/31/2020 11-406-000-0000-6435 165.00 Inv #DT 0820140 DT0820140 Drug Testing 34 N 08/31/2020 08/31/2020 11-406-000-0000-6379 97.50 Inv #13002 13002 Miscellaneous Charges 44 N 08/01/2020 08/26/2020 11-420-601-0000-6406 25.00 Cust #1143-Shredding Services 417704 Office Supplies 46 N 08/01/2020 08/31/2020 11-420-601-0000-6406 123.51 Cust #1143-Shredding Services 417704 Office Supplies 47 N 08/01/2020 08/31/2020 11-430-700-0000-6406 157.19 Cust #1143-Shredding Services 417704 Office Supplies 48 N 08/01/2020 08/31/2020 11-430-700-0000-6265 9,485.00 CY 2020-SSIS Fiscal Support 00000623665 Data Processing Costs - Ss Adm 19 N 08/28/2020 08/28/2020 5,359.5041450 9654 MARTIN/MICHAEL 48.889654 15856 MCWANE-CREEK/VICTORIA R 487.5015856 8089 MIDWEST MONITORING & SURVEILANCE 675.008089 42110 MINNESOTA MONITORING INC 97.5042110 7661 MINNKOTA ENVIRO SERVICES INC 305.707661 43022 MN DEPT OF HUMAN SERVICES Page 4Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 1 Transactions 2 Transactions 1 Transactions 3 Transactions LAKES COUNTRY SERVICE CO OP MARTIN/MICHAEL MCWANE-CREEK/VICTORIA R MIDWEST MONITORING & SURVEILANCE MINNESOTA MONITORING INC MINNKOTA ENVIRO SERVICES INC Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 9:57:30AM9/17/2020 Bonstad Human Services Copyright 2010-2020 Integrated Financial Systems 11-420-601-0000-6379 130.24 Birth/Death Certificates Miscellaneous Charges Im Adm 12 N 07/01/2020 07/31/2020 11-420-601-0000-6379 21.56 Birth/Death Certificates Miscellaneous Charges Im Adm 38 N 08/01/2020 08/31/2020 11-430-700-0000-6379 165.76 Birth/Death Certificates Miscellaneous Charges - Ss Adm 13 N 07/01/2020 07/31/2020 11-430-700-0000-6379 27.44 Birth/Death Certificates Miscellaneous Charges - Ss Adm 39 N 08/01/2020 08/31/2020 11-420-640-0000-6297 90.00 Case #20200892/Party 001 Iv-D Sheriff's Costs 45 N 09/01/2020 09/01/2020 11-420-601-0000-6271 4,209.88 Andy Renner FFPD 82020 Fraud Investigation Costs 24 N 08/01/2020 08/31/2020 11-420-601-0000-6272 5,486.80 Crystal 82020 Fraud Prevention Officer Expense (FPI) 21 N 08/01/2020 08/31/2020 11-420-601-0000-6272 2,765.76 Karen 82020 Fraud Prevention Officer Expense (FPI) 22 N 08/01/2020 08/31/2020 11-420-601-0000-6272 357.03 Mileage/MFIA dues/$75 bank fee 82020 Fraud Prevention Officer Expense (FPI) 23 N 08/01/2020 08/31/2020 11-420-601-0000-6379 417.56 Acct #684 SIN173282 Miscellaneous Charges Im Adm 49 N 08/01/2020 08/31/2020 11-430-700-0000-6379 531.44 Acct #684 SIN173282 Miscellaneous Charges - Ss Adm 50 N 08/01/2020 08/31/2020 11-406-000-0000-6435 130.60 Cust #3395727 L3324253 Drug Testing 35 N 9,485.0043022 44086 OTTER TAIL CO RECORDER 345.0044086 44010 OTTER TAIL CO SHERIFF 90.0044010 44003 OTTER TAIL CO TREASURER 12,819.4744003 45540 PACIFIC INTERPRETERS 949.0045540 14747 PREMIER BIOTECH LABS LLC Page 5Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 4 Transactions 1 Transactions 4 Transactions 2 Transactions MN DEPT OF HUMAN SERVICES OTTER TAIL CO RECORDER OTTER TAIL CO SHERIFF OTTER TAIL CO TREASURER PACIFIC INTERPRETERS Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 9:57:30AM9/17/2020 Bonstad Human Services Copyright 2010-2020 Integrated Financial Systems 09/08/2020 09/08/2020 11-420-601-0000-6260 4,268.86 IM Monthly Admin Cost INV00064924 Ma Trans Prog Adm Services 28 N 06/01/2020 07/02/2020 11-420-650-0000-6041 430.00 No Load Trip Charge INV00064924 Ma Trans Nonload 27 N 06/01/2020 07/02/2020 11-420-650-0000-6050 1,847.72 MA Transportation INV00064924 Ma Trans Charges Fed Rate 26 N 06/01/2020 07/02/2020 11-420-601-0000-6260 3,717.56 IM Monthly Admin Cost INV00064989 Ma Trans Prog Adm Services 57 N 07/01/2020 08/07/2020 11-420-650-0000-6041 290.00 No load trip charge INV00064989 Ma Trans Nonload 56 N 07/01/2020 08/07/2020 11-420-650-0000-6050 1,422.98 MA Transportation INV00064989 Ma Trans Charges Fed Rate 55 N 07/01/2020 08/07/2020 11-430-760-0000-6378 726.61 SS Monthly Admin Cost INV00064924 Misc Exp Trans Prog 29 N 06/01/2020 07/02/2020 11-430-760-6160-6050 1,196.42 Title XX Transportation INV00064924 Title Xx Transportation 25 N 06/01/2020 07/02/2020 11-430-760-0000-6378 1,277.91 SS Monthly Admin Cost INV00064989 Misc Exp Trans Prog 58 N 07/01/2020 08/07/2020 11-430-760-6160-6050 1,397.62 Title XX Transportation INV00064989 Title Xx Transportation 54 N 07/01/2020 08/07/2020 11-430-700-0000-6331 75.36 Meals Meals & Lodging - Ss Adm 17 N 06/29/2020 08/19/2020 11-430-710-1621-6097 2.54 Client meal In Home Service - Brief 18 N 06/29/2020 08/19/2020 11-409-000-0000-6379 167.00 LCTS Copies for Training 1134922 Meeting Expenses 8 N 08/28/2020 08/28/2020 11-420-601-0000-6406 123.05 Acct #4872 441435 Office Supplies 40 N 08/18/2020 08/18/2020 130.6014747 25082 PRODUCTIVE ALTERNATIVES INC 16,575.6825082 13803 ULSCHMID/LIZA 77.9013803 51002 VICTOR LUNDEEN COMPANY Page 6Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 10 Transactions 2 Transactions PREMIER BIOTECH LABS LLC PRODUCTIVE ALTERNATIVES INC ULSCHMID/LIZA Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 9:57:30AM9/17/2020 Bonstad Human Services Copyright 2010-2020 Integrated Financial Systems 11-420-601-0000-6406 184.80 Acct #4872 441710 Office Supplies 20 N 09/02/2020 09/02/2020 11-430-700-0000-6406 156.60 Acct #4872 441435 Office Supplies 41 N 08/18/2020 08/18/2020 631.4551002 52,054.86 Page 7Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 4 Transactions Final Total ............23 Vendors 63 Transactions VICTOR LUNDEEN COMPANY Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES 9:57:30AM9/17/2020 Bonstad Human Services Copyright 2010-2020 Integrated Financial Systems Page 8Audit List for Board Otter Tail County Auditor Amount 52,054.86 Human Services 11 52,054.86 NameFundRecap by Fund All Funds Total Approved by,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMISSIONER'S VOUCHERS ENTRIES9/17/2020 Bonstad Y N D 4 N Otter Tail County Auditor Audit List for Board Page 1 Print List in Order By: Save Report Options?: Type of Audit List: on Audit List?: Paid on Behalf Of Name Explode Dist. Formulas?: D - Detailed Audit List S - Condensed Audit List 1 - Fund (Page Break by Fund) 2 - Department (Totals by Dept) 3 - Vendor Number 4 - Vendor Name 11:10:22AM NATIONAL ENVIRONMENTAL HLTH ASSOCIATION COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 11:10:22AM9/17/2020 Bonstad Human Services Copyright 2010-2020 Integrated Financial Systems 11-407-400-0078-6488 228.74 ACCT #59769564/CONF CALLS 150377740 COVID-19 Supplies 2 N 09/01/2020 09/01/2020 11-407-400-0078-6488 75.00 ACCT #71975/SOCIAL DISTANCE AD D-17020320 COVID-19 Supplies 1 N 06/25/2020 06/25/2020 11-407-600-0090-6091 666.67 DR LOKKEN/JULY 2020 IVC00001294 Medical Consultant 5 6 08/27/2020 08/27/2020 11-407-600-0090-6488 30.00 CUST #1143 /NYM SHREDDING 417705 Phn Program Supplies 6 N 08/31/2020 08/31/2020 11-407-500-0080-6488 100.00 ID #248020/TONY GEORGESON 8200 FPL Prog Supplies 3 N 09/08/2020 09/08/2020 11-407-200-0024-6488 26.00 CUST #682 / NFP-LINDA SIN173253 Nfp Program Supplies 7 N 08/31/2020 08/31/2020 11-407-200-0027-6488 20.80 CUST #682 / HFA-SARAH SIN173253 HFA Program Supplies 8 N 08/31/2020 08/31/2020 11-407-200-0027-6242 340.00 HFA Virtual Conf - EBHV MN22LC20 HFA Registrations 4 N 09/09/2019 09/09/2019 12224 CENTURY LINK 228.7412224 14517 FORUM COMMUNICATIONS COMPANY 75.0014517 7512 LAKE REGION HEALTHCARE 666.677512 7661 MINNKOTA ENVIRO SERVICES INC 30.007661 10972 100.0010972 45540 PACIFIC INTERPRETERS 46.8045540 13446 PREVENT CHILD ABUSE AMERICA 340.0013446 Page 2Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates 1 Transactions 1 Transactions 1 Transactions 1 Transactions 1 Transactions 2 Transactions 1 Transactions NATIONAL ENVIRONMENTAL HLTH ASSOCIATION CENTURY LINK FORUM COMMUNICATIONS COMPANY LAKE REGION HEALTHCARE MINNKOTA ENVIRO SERVICES INC PACIFIC INTERPRETERS PREVENT CHILD ABUSE AMERICA Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES Account/Formula 11:10:22AM9/17/2020 Bonstad Human Services Copyright 2010-2020 Integrated Financial Systems 1,487.21 Page 3Audit List for Board Account/Formula Description Rpt Invoice #Warrant DescriptionVendorName 1099 Paid On Bhf #Accr Amount On Behalf of NameNo.Service Dates Final Total ............7 Vendors 8 Transactions Otter Tail County Auditor COMMISSIONER'S VOUCHERS ENTRIES11:10:22AM9/17/2020 Bonstad Human Services Copyright 2010-2020 Integrated Financial Systems Page 4Audit List for Board Otter Tail County Auditor Amount 1,487.21 Human Services 11 1,487.21 NameFundRecap by Fund All Funds Total Approved by,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82%84%80%80%77%75%76% 84%80%83%81%78%79% 18%16%20%20%23%25%24%16%20%17%19%22%21% 2007 n=501 2008 n=671 2009 n=669 2010 n=992 2011 n=1285 2012 n=1296 2013 n=1515 2014 n=1756 2015 n=1562 2016 n=1395 2017 n=1316 2018 n=1752 2019 n=1747 Early Childhood Dental Network (ECDN) 2007-2019 Minnesota Health Care Programs (MHCP) Patients Served by Age Group 0-2 yrsold3-5 yrs oldApple Tree Dental (ATD) Children’s Dental Services (CDS) Caring Hands Dental Clinics (CHDC) ATD ATD ATD ATD CDS ATD CDS ATD CDS ATD CDS CHDC ATD CDS CHDC ATD CDS CHDC ATD CDS CHDC ATD CDS CHDC ATD CDS CHDC ATD CDS CHDC 90 107 134 198 296 324 364 281 312 237 253 378 371 411 564 535 794 989 972 1,151 1,475 1,250 1,158 1,063 1,374 1,376 501 671 669 992 1,285 1,296 1,515 1,756 1,562 1,395 1,316 1,752 1,747 - 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 YEAR Early Childhood Dental Network (ECDN) 2007-2019 Minnesota Health Care Programs (MHCP) Patients Served by Age Group 0-2 yrs old 3-5 yrs old Total Linear (0-2 yrs old) Linear (3-5 yrs old) Linear (Total) 0 0 3 27 44 45 58 10 22 7 3 29 11302431 53 97 103 118 77 108 84 81 133 120 59 83 103 119 153 180 188 191 182 152 169 216 240 136 198 163 235 295 289 343 280 296 277 264 328 344 174 214 207 297 364 339 379 624 426 388 355 463 447 102 152 162 261 332 340 429 574 528 487 444 583 585 0 100 200 300 400 500 600 700 2007 n=501 2008 n=671 2009 n=669 2010 n=992 2011 n=1285 2012 n=1296 2013 n=1515 2014 n=1756 2015 n=1562 2016 n=1395 2017 n=1316 2018 n=1752 2019 n=1747 Early Childhood Dental Network (ECDN) 2007-2019 Minnesota Health Care Programs (MHCP) Patients Served by Age < 1 yr old 1 yr old 2 yrs old 3 yrs old 4 yrs old 5 yrs old 1,553 1,450 312 141 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 Number and % of Children by Service Provided n=1,747 89%83% 18% 8% < 1 yr old 11 1 yr old 120 2 yrs old 240 3 yrs old 344 4 yrs old 447 5 yrs old 585 Number of Children Treated by Age n=1,747 2019 Profile Routine Exams (D0150, D0120, D0145) Fluoride Treatment (D1206, D1208) Restorative Treatment (D2XXX) Specialist Referrals 0 210 2 217 11 367 5 307 0 50 100 150 200 250 300 350 400 0-2 year olds 3-5 year olds Children Receiving Restorative Treatment 2016 2017 2018 2019 * * 185 1,114 176 957 295 1,300 260 1,190 0 200 400 600 800 1,000 1,200 1,400 0-2 year olds 3-5 year olds Children Receiving Fluoride Treatment 2016 2017 2018 2019 241 1,082 253 922 347 1,218 311 1,242 0 200 400 600 800 1,000 1,200 1,400 0-2 year olds 3-5 year olds Children Receiving Comprehensive and/or Periodic Oral Evaluations 2016 2017 2018 2019 2016-2019 Children by Service Provided and Age Group * In 2019, 141 children were referred out for treatment Clay 33% Otter Tail 18% Becker 17% Douglas 13% Wilkin 7% Grant 3% Pope 4% Stevens 4%Traverse 1%Number and Percentage of ECDN Children (ages 0-5) Receiving Dental Services by County in 2019 County Patients Clay 583 Otter Tail 323 Becker 297 Douglas 225 Wilkin 123 Pope 70 Stevens 63 Grant 48 Traverse 15 297 583 225 48 323 70 63 15 123 593 810 355 89 669 129 98 33 85 1,734 2,873 1,149 247 2,437 434 345 165 280 Becker Clay Douglas Grant Otter Tail Pope Stevens Traverse Wilkin - 500 1,000 1,500 2,000 2,500 3,000 CountyMHCP Children 0-5 years old2019 ECDN patients (ages 0-5) compared to state MHCP recipient data, by county Dental visit at an ECDN clinic MHCP Receiving Dental MHCP Total Enrolled Minnesota Department of Human Services (2019). Minnesota Health Care Programs Dental Services Recipients by County of Residence, Program Category and Age. Collected by the Minnesota Oral Health Program. St. Paul, Minnesota: Received May, 2020. Dental visit at an ECDN clinic 18% Dental visit with another provider 12% Did not receive a dental visit 70% Where MHCP Recipients (ages 0-5) Received their Dental Care in 2019 Minnesota Department of Human Services (2019).Minnesota Health Care Programs Dental Services Recipients by County of Residence, Program Category and Age. Collected by the Minnesota Oral Health Program. St. Paul, Minnesota: Received May, 2020. Dental Innovations Work Plan (September 1, 2020) Strategic Priority Innovate, plan and manage dental expansion solutions in the Partnership4 Health (P4H) region for Minnesota Health Care Program (MHCP) recipients. Goal Improve access to dental care for all MHCP recipients in the P4H region. Objective 1: By December 31, 2020 P4H will develop a process for identifying and maintaining a current list of dental care services available for MHCP patients in the region, as well as identify gaps in services, and strategies to address the gaps. Benchmark and Method of Measuring Success: Action Steps (Deliverables) with Time Frame By When Resources Needed Status with Dates Dental Services Coordinator (DSC) to develop a strong understanding of available resources through health plans, fee-for-service and other dental resources July 2020 1) Training for DSC from BCBS 2) Info from partners and gathered by DSC on services available in P4H region 3) Discussions and information sharing with other statewide DSCs and BCBS dental services case managers 4) Outreach to all dental providers in the region to gain information on services, strengths and needs. 1) Beth Nelson/BCBS completed/on-going. 2) Gathered/on-going. Dental offices report challenges with re-instating mobile services due to COVID; new ATD clinic opened in FF in September 3) Conversation with PrimeWest Health DSC completed. New DSC hired for Morrison County in September. Regional collaborations are growing quickly. 4) Conversations with all non-profit dental providers in the region been completed. Monthly contact with providers giving updates and gathering input regarding service delivery occurring. On-going challenges for some providers to re-instate service 2 Action Steps (Deliverables) with Time Frame By When Resources Needed Status with Dates Determine baseline of available resources for MHCP recipients in the region and identify a streamlined process to continually maintain an accurate listing of available of services accepting appointments for MHCP patients July 2020 List obtained from PH; additional information to be provided by BCBS on private providers who are making claims to the state. Create a map of the region showing available resources. DSC is working with BCBS. A map is available and being updated monthly showing the services available and the location of those services. It will be updated and distributed monthly. Services stopped due to COVID are slowing being reinstated, however, some schools are still not allowing the mobile clinics to operate. Identify gaps in dental resources in P4H region and identify strategies to address gaps August 2020 Need input from P4H partners to identify gaps and possible strategies based on current high need areas and lack of available resources. Community planning sessions have been held as well as a community survey distributed throughout the region. Feedback has been minimal, but consistent. The primary concerns continue to be: lack of available appointments for new patients needing care, distance that people have to travel to see a dentist, and now a growing concern about delays in people scheduling their dental appointments (routine exams and restorative care) due to COVID concerns. Objective 2: By December 31, 2020 P4H will expand dental access through bringing dental resources to the community/region. Benchmark and Method of Measuring Success: Click or tap here to enter text. 3 Action Steps (Deliverables) with Time Frame By When Resources Needed Status with Dates Facilitate on-going discussions for development of a new non-profit dental clinic in Detroit Lakes/Becker County October – December 2020 Funding to obtain a feasibility study pending a grant application that has been submitted DSC has conducted three meetings pertaining to the original discussion. Outreach was conducted to non-profit providers in the region to see if there was interest in pursuing this. Two non-profit providers have indicated interest in participating in the exploration of options. At least one provider has capacity to expand in the region, pending a full feasibility study to determine actual needs vs perception of needs. DSC is currently doing outreach to private dental offices to determine their support. DSC and Dr. Kivi will be presenting information on oral health needs to Detroit Lakes Breakfast Rotary Club in October. 4 Action Steps (Deliverables) with Time Frame By When Resources Needed Status with Dates Explore and implement tele-dentistry options in community based settings including work sites, primary care and senior living communities December 2020 Dental Service providers available to implement tele-dentistry strategies Written materials developed through DSC and providers explaining the concept Community-based settings willing to engage in pilot programs to implement tele-dentistry within their facilities. ATD, CDS and other providers have already implemented tele- dentistry protocols and wish to expand this option to increase access to care DSC has gathered materials and they have been distributed to LTC facilities in Wilkin and a few in Otter Tail County. This will be a slow roll out to accommodate limited capacity for dental providers. Identify barriers and assist as needed with the reinstatement of mobile dental outreach clinics for CDS/Apple Tree/and others for preventive and routine dental services. December 2020 Current priority is to reinstate mobile dental services that were available prior to COVID. Once providers are functioning at their pre-COVID level, we will reassess gaps in services to determine new areas of focus. Mobile clinics resumed scheduling care at Public Health in Breckenridge (not at the school yet), Essentia Clinic Detroit Lakes, Public Health in Moorhead, the school in Pelican Rapids and Public Health in New York Mills beginning 7-8-20. Additional mobile sites continue to re-open as allowed by schools and PH partners. Coordinate with Family Home Visiting Programs, WIC, Senior Living Communities, Human Service Agencies, Primary Care clinics and others to increase referrals to care December 2020 Process developed among DSC, P4H and community organizations to establish communication protocols for making referrals. Initial discussions have already taken place with PH and C&TC coordinators. Additional planning and development of an action plan will be completed by December. 5 Objective 3: By December 31, 2020 P4H will develop and implement a plan to increase education and awareness about the importance and availability of dental care resources and how to access them for persons on MHCP. Benchmark and Method of Measuring Success: Click or tap here to enter text. Action Steps (Deliverables) with Time Frame By When Resources Needed Status with Dates Determine needs in each of the P4H counties for community outreach and education on the importance of routine oral health care October 2020 Education and outreach materials regarding the importance of oral health care A plan for community education and outreach is in process and will be finalized by October 2020. A priority will be on elder care and the availability of teledentistry options. 6 Action Steps (Deliverables) with Time Frame By When Resources Needed Status with Dates Completion of a plan for distributing information on dental care resources for persons on MHCP December 2020 Accurate and maintained list of available resources for MHCP recipients Monthly contact is in place between the DSC and both non- profit and private dentists in the region. Each month they are contacted and asked to provide updates on whether or not they are accepting new patients and accepting MHCP insurances. Updated brochure distributed each month to all C&TC coordinators, dental providers and other community partners. Dental providers that do not accept MHCP or are not taking new MHCP patients have agreed to make referrals to providers that are accepting/taking new patients. 7 Action Steps (Deliverables) with Time Frame By When Resources Needed Status with Dates Community education and outreach on the importance of good oral health, availability of resources and on-going identification of needs to address oral health disparities December 2020 Education and outreach tools – BCBS and Health partners have designated oral health supplies to be used in the region. Social media strategies- need for limited budget to support social media campaigns Maintained list of providers accepting MHCP distributed through community partners Community feedback tools have been developed and distributed electronically in the region. Exploring oral health education and outreach options via social media presence through county websites Presentations scheduled to P4H County Boards and Community Health Board and local service clubs Engaging public officials/leaders to do education/outreach activities DSC attending regular C&TC meetings, and other community/county meetings to discuss resources DONATION OF USED POLICE EQUIPMENT TO LOCAL LAW ENFORCEMENT AND FIRE DEPARTMENTS Otter Tail County Resolution No. 2020 - WHEREAS, The Otter Tail County Sheriff’s Office requests to donate used Police Style equipment to organizations within the County to include local Police Departments and Fire Departments for official use. WHEREAS, Minnesota Statute 465.03 requires a county to adopt via resolution in order to donate real or personal property WHEREAS, it is requested to donate the following items: 1-Liberty lightbar to the Vergas Fire Department NOW, THEREFORE, BE IT RESOLVED that the Otter Tail County Board of Commissioners does accept the above described resolution to donate the above items to local agencies. OTTER TAIL COUNTY BOARD OF COMMISSIONERS Dated: __________________ By: ______________________________ Attest: _________________________ Board Chair Nicole Hansen, Clerk BUFFALO-RED RIVER WATERSHED ONE WATERSHED, ONE PLAN PRIORITY ISSUES 2 ▪Focus of initial implementation efforts ▪Receive measurable goals 3 What can be accomplished in 10 years? Where is this goal the biggest priority? What resources are the biggest priority? 11 Goals What is the long-term goal? TYPES OF ACTIONS ▪Many types of actions will be pursued to make progress towards goals ▪These groups form Implementation Programs to fund actions PLANNING REGION PROJECTS Targeted Projects and Practices ▪Most cost-effective projects and practices are mapped ▪Cost and progress towards goals summarized by planning region WHAT’S NEXT Internal Review Policy Committee Approval 60 Day Notification Public Hearing BWSR Regional Board BWSR Approval LOCAL ADOPTION You Are Here Questions? OTTER TAIL COUNTY PLANNING COMMISSION Otter Tail County Government Services Center, 540 West Fir, Fergus Falls, MN 56537 218-998-8095 September 9, 2020 Meeting of the Otter Tail County Planning Commission was held on September 9, 2020 at 6:30 P.M.; the hearing was held via Go To Meeting due to the health pandemic and declared emergency in accordance with Minn. Stat. Sec. 13D.021. Roll Call: Members Present: Rod Boyer, Judd Fischer, Brent E. Frazier, Richard Gabe, Jack Rosenthal, Bruce Stone, David Trites, David Wass and Rick Wilson. Members Absent: None. Michelle Eldien represented the County Attorney's Office and Chris LeClair represented the Land & Resource Management Office. Minutes of August 12, 2020: A motion by Frazier, second by Wass to approve the August 12, 2020 Minutes as presented. Voting By Roll Call: All members in favor. “Windmill Hill Second Addition” / Joel Dotzenrod – Approved As Presented: A Preliminary Plat of “Windmill Hill Second Addition”, consisting of 5 Single Family Residential Non-Riparian Lots, 1 Block. The project is located West of 27848 County Hwy 83, Section 6 of Everts Township; Deer Lake (56-298), Recreational Development (RD). Joel Dotzenrod and David Anderson (Anderson Land Surveying) represented the Application. All correspondence has been forwarded to the Planning Commission for their review. David Todd questioned the proposed use (single family residential or pole sheds). Glen Mills asked if the Township would maintain or plow the existing road. Sandra Hanson expressed concerns on the County being contacted for access off CSAH 83, drainage & run-off from development, and if there are options for classification if it is not used as residential. Motion: A motion by Trites, second by Rosenthal to approve as presented, provided the County Highway Department approves access off of CSAH 83; note that only Lot 1 has access off of 348th Avenue which is a dedicated road right of way, the remainder of the lots abut CSAH 83. Voting By Roll Call: All Members in favor. Ottertail Beach Club, Inc./ Stacy Rindy President – Approved As Presented: A Conditional Use Permit Application (as stated by the Applicant on the Application): We would like to replace the existing cabin, patio and storage building having a combined 849 square feet of impervious surface with a cabin having a total impervious surface of 732 square feet. To better utilize the limited green space, we proposed to increase the height of the cabin from 14 feet to 20 feet allowing for a loft and storage in the upper level, with the roof sloping from front to back to allow all water to shed back onto the lot. To bring the cabin into compliance with Shore Impact Zone allowances, patio will be eliminated and cabin location will also be moved away from adjoining lot line and lake as far as possible, while maintaining the present setback for resorts/PUD’s of 10 feet from other structures and trailers (Variance Approved August 13, 2020). The project is located at 39692 County Hwy 1, Section 12, of Amor Township; Otter Tail (56-242), General Development (GD). Otter Tail County, Planning Commission September 9, 2020; Page 2 Dean and Stacy Rindy represented the Application. All correspondence has been forwarded to the Planning Commission for their review. Motion: A motion by Fischer, second by Gabe to approve as presented. Voting By Roll Call: All Members in favor. Adjourn: At 7:13 P.M., Chairman Wilson adjourned the Meeting. The next Meeting is scheduled for 6:30 P.M. on October 14, 2020. Respectfully submitted, Marsha Bowman Recording Secretary MEMORANDUM OF AGREEMENT This agreement (Agreement) is made and entered into by and between: The Counties of Douglas, Morrison, Todd, and Otter Tail by and through their respective County Board of Commissioners, and The Douglas, Morrison, Todd, East and West Otter Tail Soil and Water Conservation Districts, by and through their respective Soil and Water Conservation District Board of Supervisors Collectively referred to as the “Parties.” WHEREAS, the Counties of this Agreement are political subdivisions of the State of Minnesota, with authority to carry out environmental programs and land use controls, pursuant to Minnesota Statutes Chapter 375 and as otherwise provided by law; and WHEREAS, the Soil and Water Conservation Districts (SWCDs) of this Agreement are political subdivisions of the State of Minnesota, with statutory authority to carry out erosion control and other soil and water conservation programs, pursuant to Minnesota Statutes Chapter 103C and as otherwise provided by law; and WHEREAS, the parties to this Agreement have a common interest and statutory authority to prepare, adopt, and assure implementation of a comprehensive watershed management plan in the Long Prairie River Watershed to conserve soil and water resources through the implementation of practices, programs, and regulatory controls that effectively control or prevent erosion, sedimentation, siltation and related pollution in order to preserve natural resources, ensure continued soil productivity, protect water quality, reduce damages caused by floods, preserve wildlife, protect the tax base, and protect public lands and waters; and WHEREAS, with matters that relate to coordination of water management authorities pursuant to Minnesota Statutes Chapters 103B, 103C, and 103D with public drainage systems pursuant to Minnesota Statutes Chapter 103E, this Agreement does not change the rights or obligations of the public drainage system authorities. WHEREAS, the Parties have formed this Agreement for the specific goal of developing a plan pursuant to Minnesota Statutes § 103B.801, Comprehensive Watershed Management Planning, also known as One Watershed, One Plan. NOW, THEREFORE, the Parties hereto agree as follows: 1. Purpose: The Parties to this Agreement recognize the importance of partnerships to plan and implement protection and restoration efforts for the Long Prairie River Watershed. The purpose of this Agreement is to collectively develop and adopt, as local government units, a coordinated watershed management plan for implementation per the provisions of the Plan. Parties signing this agreement will be collectively referred to as Long Prairie River Watershed Collaboration. 2. Term: This Agreement is effective upon signature of all Parties in consideration of the Board of Water and Soil Resources (BWSR) Operating Procedures for One Watershed, One Plan; and will remain in effect until adoption of the plan by all parties unless canceled according to the provisions of this Agreement or earlier terminated by law. 3. Adding Additional Parties: A qualifying party desiring to become a member of this Agreement shall indicate its intent by adoption of a board resolution prior to a date that is six months from the BWSR One Watershed, One Plan Planning Grant Agreement execution. The party agrees to abide by the terms and conditions of the Agreement; including but not limited to the bylaws, policies and procedures adopted by the Policy Committee. 4. Withdrawal of Parties: A party desiring to leave the membership of this Agreement shall indicate its intent in writing to the Policy Committee in the form of an official board resolution. Notice must be made at least 30 days in advance of leaving the Agreement. 5. General Provisions: a. Compliance with Laws/Standards: The Parties agree to abide by all federal, state, and local laws; statutes, ordinances, rules and regulations now in effect or hereafter adopted pertaining to this Agreement or to the facilities, programs, and staff for which the Agreement is responsible. b. Indemnification: Each party to this Agreement shall be liable for the acts of its officers, employees or agents and the results thereof to the extent authorized or limited by law and shall not be responsible for the acts of any other party, its officers, employees or agents. The provisions of the Municipal Tort Claims Act, Minnesota Statute Chapter 466 and other applicable laws govern liability of the Parties. To the full extent permitted by law, actions by the Parties, their respective officers, employees, and agents pursuant to this Agreement are intended to be and shall be construed as a “cooperative activity.” It is the intent of the Parties that they shall be deemed a “single governmental unit” for the purpose of liability, as set forth in Minnesota Statutes § 471.59, subd. 1a(a). For purposes of Minnesota Statutes § 471.59, subd. 1a(a) it is the intent of each party that this Agreement does not create any liability or exposure of one party for the acts or omissions of any other party. c. Records Retention and Data Practices: The Parties agree that records created pursuant to the terms of this Agreement will be retained in a manner that meets their respective entity’s records retention schedules that have been reviewed and approved by the State in accordance with Minnesota Statutes § 138.17. The Parties further agree that records prepared or maintained in furtherance of the agreement shall be subject to the Minnesota Government Data Practices Act. At the time this agreement expires, all records will be turned over to Todd County for continued retention. d. Timeliness: The Parties agree to perform obligations under this Agreement in a timely manner and keep each other informed about any delays that may occur. e. Extension: The Parties may extend the termination date of this Agreement upon agreement by all Parties. 6. Administration: a. Establishment of Committees for Development of the Plan. The Parties agree to designate one representative, who must be an elected or appointed member of the governing board, to a Policy Committee for development of the watershed-based plan and may appoint one or more technical representatives to a Technical Advisory Committee for development of the plan in consideration of the BWSR Operating Procedures for One Watershed, One Plan. i. The Policy Committee will meet as needed to decide on the content of the plan, serve as a liaison to their respective boards, and act on behalf of their Board. Each representative shall have one vote. ii. Each governing board may choose one alternate to serve on the Policy Committee as needed in the absence of the designated member. iii. The Policy Committee will establish bylaws within 90 days of the execution of the Memorandum of Agreement to describe the functions and operations of the committee(s). iv. The Steering Committee will be comprised of staff from local agencies formally participating in 1W1P by signing the MOA and BWSR staff acting as advisors. The Steering Committee will provide the logistical organization of the planning process and associated meetings. They may make recommendations to the Technical Advisory Committee and to the Policy Committee. v. The Technical Advisory Committee will meet monthly or as needed to assist and provide technical support and make recommendations to the Policy Committee on the development and content of the plan. Members of the Technical Advisory Committee may not be a current board member of any of the Parties. b. Submittal of the Plan. The Policy Committee will recommend the plan to the Parties of this agreement. The Policy Committee will be responsible for initiating a formal review process for the watershed-based plan conforming to Minnesota Statutes Chapters 103B and 103D, including public hearings. Upon completion of local review and comment, and approval of the plan for submittal by each party, the Policy Committee will submit the watershed-based plan jointly to BWSR for review and approval. c. Adoption of the Plan. The Parties agree to adopt and begin implementation of the plan within 120 days of receiving notice of state approval, and provide notice of plan adoption pursuant to Minnesota Statutes Chapters 103B and 103D. 7. Fiscal Agent: Morrison SWCD will act as the fiscal agent for the purposes of this Agreement and agrees to: a. Accept all responsibilities associated with the implementation of the BWSR grant agreement for developing a watershed-based plan. b. Perform financial transactions as part of grant agreement and contract implementation. c. Annually provide a full and complete audit report. d. Provide the Policy Committee with the records necessary to describe the financial condition of the BWSR grant agreement. e. Retain fiscal records consistent with the agent’s records retention schedule until termination of the agreement (at that time, records will be turned over to Todd County. 8. Grant Administration: Douglas SWCD will act as the grant administrator for the purposes of this Agreement and agrees to provide the following services: a. Accept all day-to-day responsibilities associated with the implementation of the BWSR grant agreement for developing a watershed-based plan, including being the primary BWSR contact for the One Watershed, One Plan Grant Agreement and being responsible for BWSR reporting requirements associated with the grant agreement. b. Provide the Policy Committee with the records necessary to describe the planning condition of the BWSR grant agreement. 9. The following parties agree to provide the following services: a. Project Coordinator/Grant Administrator: Douglas SWCD b. Fiscal Agent: Morrison SWCD c. Outreach Coordinator: Todd SWCD d. Notifications Coordinator: Todd County e. Land & Water Resources Inventory Data Consolidator/Organizer: Consultant TBD f. Meeting Facilitator (Non-Technical): Todd County g. Meeting Facilitator (Technical): Consultant TBD h. Note Taker: Todd County / Consultant TBD i. Plan Writer: Consultant TBD In the event of a vacancy of the above listed roles, the party responsible for the role will determine if there is adequate capacity within the organization to fulfil the listed role. If it is determined by the partner agency they no longer have capacity and would like to relinquish their duties they must inform the Steering Committee. The Steering Committee will then reassign the service to another party with the capacity to fulfil the grant agreement. 10. Authorized Representatives: The following persons will be the primary contacts for all matters concerning this Agreement: Douglas County Douglas SWCD Dave Rush or successor Jerome Haggenmiller or successor Land & Resource Management Director District Coordinator 305 8th Ave. W, Alexandria, MN 900 Robert St. Suite 102, Alexandria, MN Telephone: 320-762-3863 Telephone: 320-763-3191 x3 Morrison County Morrison SWCD Amy Kowalzek or successor Shannon Wettstein or successor Director of Land Services District Manager 213 1st Ave. SE, Little Falls, MN 16776 Heron Road, Little Falls, MN Telephone: 320-632-0170 Telephone: 320-631-3551 Todd County Todd SWCD Adam Ossefoort or successor Deja Anton or successor Division Director District Manager 215 1st Ave. S Suite 103, Long Prairie, MN 215 1st Ave. S Suite 104, Long Prairie, MN Telephone: 320-732-2644 Telephone: 320-732-2644 Otter Tail County East Otter Tail SWCD Chris LeClair or successor Darren Newville or successor Land & Resource Management Director District Administrator 540 Fir Ave. W, Fergus Falls, MN 801 Jenny Ave. SW, Suite 2, Perham, MN Telephone: 218-998-8105 Telephone: 218-346-4260 x110 West Otter Tail SWCD Brad Mergens or successor District Administrator 506 Western Ave. N, Fergus Falls, MN Telephone: 218-998-5300 IN TESTIMONY WHEREOF the Parties have duly executed this agreement by their duly authorized officers. PARTNER: _Douglas County APPROVED: BY: ______________________________________________ Board Chair Date BY: ______________________________________________ County Coordinator /Administrator Date APPROVED AS TO FORM BY: ______________________________________________ County Attorney Date IN TESTIMONY WHEREOF the Parties have duly executed this agreement by their duly authorized officers. PARTNER: _Douglas Soil and Water Conservation District APPROVED: BY: ______________________________________________ Board Chair Date ATTESTED BY: BY: ______________________________________________ Board Secretary Date IN TESTIMONY WHEREOF the Parties have duly executed this agreement by their duly authorized officers. PARTNER: _Morrison County APPROVED: BY: ______________________________________________ Board Chair Date BY: ______________________________________________ County Coordinator /Administrator Date APPROVED AS TO FORM BY: ______________________________________________ County Attorney Date IN TESTIMONY WHEREOF the Parties have duly executed this agreement by their duly authorized officers. PARTNER: _Morrison Soil and Water Conservation District APPROVED: BY: ______________________________________________ Board Chair Date ATTESTED BY: BY: ______________________________________________ Board Secretary Date IN TESTIMONY WHEREOF the Parties have duly executed this agreement by their duly authorized officers. PARTNER: _Todd County APPROVED: BY: ______________________________________________ Board Chair Date BY: ______________________________________________ County Coordinator /Administrator Date APPROVED AS TO FORM BY: ______________________________________________ County Attorney Date IN TESTIMONY WHEREOF the Parties have duly executed this agreement by their duly authorized officers. PARTNER: _Todd Soil and Water Conservation District APPROVED: BY: ______________________________________________ Board Chair Date ATTESTED BY: BY: ______________________________________________ Board Secretary Date IN TESTIMONY WHEREOF the Parties have duly executed this agreement by their duly authorized officers. PARTNER: _Otter Tail County APPROVED: BY: ______________________________________________ Board Chair Date BY: ______________________________________________ County Coordinator /Administrator Date APPROVED AS TO FORM BY: ______________________________________________ County Attorney Date IN TESTIMONY WHEREOF the Parties have duly executed this agreement by their duly authorized officers. PARTNER: _East Otter Tail Soil and Water Conservation District APPROVED: BY: ______________________________________________ Board Chair Date ATTESTED BY: BY: ______________________________________________ Board Secretary Date IN TESTIMONY WHEREOF the Parties have duly executed this agreement by their duly authorized officers. PARTNER: _West Otter Tail Soil and Water Conservation District APPROVED: BY: ______________________________________________ Board Chair Date ATTESTED BY: BY: ______________________________________________ Board Secretary Date Attachment A Attachment B Scope of Services Provided by Individual Parties Douglas SWCD Danielle Anderson Project/Notification Coordinator Point person for all 1W1P activities, orchestrates the planning process, develops public notifications and works directly with the consultant. Douglas County Rebecca Sternquist Participant Attend Meetings, provide input, other duties as assigned East Otter Tail SWCD Ben Underhill Participant Attend Meetings, provide input, other duties as assigned West Otter Tail SWCD Brad Mergens Participant Attend Meetings, provide input, other duties as assigned Otter Tail County Chris LeClair Participant Attend Meetings, provide input, other duties as assigned Todd SWCD Deja Anton Outreach Coordinator Develops materials and strategies for public outreach, gathers information and assures all parties are represented well. Todd County Adam Ossefoort Meeting Facilitator Works directly with the Project Coordinator. Conducts an efficient, organized meeting, assures all voices are heard. Utilized for meetings before consultant is hired or where the consultant is determined not to be needed. Wadena SWCD Ben Underhill Participant Attend Meetings, provide input, other duties as assigned Wadena County Deana Malone Participant Attend Meetings, provide input, other duties as assigned Morrison SWCD Shannon Wettstein Fiscal Agent/Data Collector Develops a draft budget, maintains the grant account balance, makes payments, and collects in kind match information. Takes inventory of all existing data sources, works directly with consultant implementing data into the plan. Morrison County Amy Kowalzek Participant Attend Meetings, provide input, other duties as assigned Consultant TBD Plan Writer Writes the plan based on information received, develops maps, and conducts modeling, formatting and design of plan. Consultant TBD Plan Facilitator Works directly with the Project Coordinator. Conducts an efficient, organized meeting, assures all voices are heard. Todd County / Consultant TBD Note Taker Take meetings notes and draft minutes for review. Utilized for meetings before consultant is hired or where the consultant is determined not to be needed. Resolution to Adopt and Implement The Leaf, Wing, Redeye One Watershed, One Plan (Comprehensive Watershed Management Plan) Whereas, the Otter Tail County is a member of the Redeye Planning Memorandum of Agreement; and Whereas, the Otter Tail County has been an active participant in the development of Leaf, Wing, Redeye River One Watershed, One Plan (Plan), also known as a comprehensive watershed management plan; and Whereas, the Otter Tail County recommended the Redeye Policy Committee submit the Plan for State approval on July 13th, 2020; and Whereas, the Redeye Policy Committee submitted the Plan for State approval on July 14th, 2020; and Whereas, the Board of Water and Soil Resources (BWSR) North Region Committee met on August 5, 2020 and decided to recommend the Plan be approved according to Minnesota Statutes 103B.101, subdivision 14 at the BWSR meeting on August 26, 2020; Whereas, the Board of Water and Soil Resources (BWSR) met on August 26, 2020 and approved the Plan according to Minnesota Statutes 103B.101, subdivision 14; Now; Therefore, Be it Resolved, the Otter Tail County hereby adopts and will begin implementation of the Plan for the area of the county identified within the Plan and serve as a substitute for the county local water management plan as per 103B for the duration of the state approved Plan. CERTIFICATION STATE OF MINNESOTA Otter Tail County I do hereby certify that the foregoing resolution is a true and correct copy of the resolution presented to and adopted by Otter Tail County at a duly authorized meeting therefore held on the (date) of (month), 2020. ___________________________________ Chairman, Leland Rogness Acknowledgements One Watershed One Plan Project Partners East Otter Tail SWCD Otter Tail County Wadena SWCD Wadena County Becker SWCD Planning Team Darren Newville, East Otter Tail SWCD & Wadena SWCD Ben Underhill, East Otter Tail SWCD & Wadena SWCD Anne Oldakowski, East Otter Tail SWCD & Wadena SWCD Pete Waller, BWSR Jeff Hrubes, BWSR Tad Erickson, Region 5 Moriya Rufer, Houston Engineering, Inc Contributors Mitch Brinks, Technical Service Area 8 Dain Erickson, Red Canoe Cre8tive Tad Erickson, Region 5 Prepared by Moriya Rufer Houston Engineering, Inc 7550 Meridian Circle North, Suite 120 Maple Grove, MN 55369 Prepared for East Otter Tail Soil & Water Conservation District 801 Jenny Ave SW, Suite #2 Perham, MN 56573   Acknowledgements Acknowledgements Participating Local Governments East Otter Tail SWCD Otter Tail County Wadena SWCD Wadena County Becker SWCD Todd SWCD Todd County Advisory Committee Darren Newville, East Otter Tail SWCD & Wadena SWCD Ben Underhill, East Otter Tail SWCD & Wadena SWCD Anne Oldakowski, East Otter Tail SWCD & Wadena SWCD Chris LeClair, Otter Tail County Deanna Malone, Wadena County Deja Anton, Todd SWCD Adam Ossefoort, Todd County Peter Mead, Becker SWCD Phil Doll, Becker SWCD Ed Clem, Becker SWCD Pete Waller, BWSR George Minerich, MDH Annette Drewes, DNR Julie Aadland, DNR Anna Bosch, MPCA Luke Steuwe, MDA State Agencies Minnesota Board of Water and Soil Resources (BWSR) Minnesota Department of Agriculture (MDA) Minnesota Department of Health (MDH) Minnesota Department of Natural Resources (DNR) Minnesota Pollution Control Agency (MPCA) Citizen Advisory Committee Tim Nolte Russell Johnson Andy Dombeck Darwin Huwe Terry Marthaler Craig Folkestad Garth Albers David Anderson Jeff Stabnow Mack Olson Austin Johnson Wayne Leaderbrand Kent Solberg Kevin Hoeper Allan Lynk Policy Committee Lyle Dittmann, East Otter Tail SWCD Doug Huebch, Otter Tail County Brett Dailey, Wadena SWCD Tom Schulz, Wadena SWCD Alternate Chuck Horsager, Wadena County Tony Beck, Becker SWCD Table of Contents i Table of Contents Section 1. Executive Summary ................................................................................................................. 1 Section 2. Land and Water Resource Narrative ..................................................................................... 14 Section 3. Issue Prioritization ................................................................................................................... 25 Section 4. Resource Prioritization ............................................................................................................ 36 Section 5. Goals and Implementation Schedule ..................................................................................... 59 Section 6. Implementation Programs ...................................................................................................... 101 Section 7. Plan Administration and Coordination ................................................................................ 115 Section 8. Appendices ................................................................................................................................ 128 A.Plan Summary (a stand-alone document) .......................................................................... 129 B.First Biennium Priorities.................................................. ...................................................... 135 C.Landscape Stewardship Plan Summary .............................................................................. 138 D.Agriculture and Groundwater Workshop Summary ........................................................ 140 E.NRCS Work Group Rankings .............................................................................................. 142 F.Public Survey Results ............................................................................................................. 150 G.Protection Potential Table .................................................................................................... 157 H.PTMApp Benefits Summary ................................................................................................ 161 I.Local Ordinances and Standards ......................................................................................... 165 J.Memorandum of Agreement ............................................................................................... 167 K.Glossary of Terms .................................................................................................................. 177 L.References ............................................................................................................................... 179 Section 1: Executive Summary “I believe it (Soil Conservation District) would help the citizens of the area to maintain their moral responsibility. We all recognize that it is a criminal act to shorten the life of a person to hinder his usefulness in life, and I think we are beginning to see that it is a criminal act to shorten the life of our soil and natural resources for future generations. I heartily endorse the organization of such a group.” - Rev. Truthawny of Parkers Prairie at a public hearing on the December 19, 1957, in New York Mills Executive Summary 1 Section 1. Executive Summary The Redeye River Watershed consists of three main rivers: the Redeye, Leaf, and Wing (Figure 1-1), and is a mosaic of pastures, cultivated lands, and forests. To better frame the watershed for local residents, this plan refers to the area as the Leaf, Wing, Redeye Watershed (LWR Watershed). The Leaf, Wing, Redeye Watershed Local Comprehensive Watershed Management Plan is locally referred to as the One Watershed One Plan (LWR1W1P) The focus of the LWR1W1P is Stewardship. This focus is captured in the plan’s Vision Statement. Implementation of the LWR1W1P is voluntary, and outreach and incentives will be used to assist with voluntary implementation on private lands. Vision Statement With an appreciation of the rural character and a strong connection to the land and water, we show a united effort to be good stewards of our water and land for agricultural, economic, and environmental sustainability. Figure 1-1. The Leaf, Wing, Redeye Watershed. The understanding that it is our collective responsibility to care for the land, air, water and biodiversity, and to manage it in a way that conserves all of its values, be they environmental, economic, social, or cultural. Cultural Heritage Redeye River The Redeye River’s name originates from the Native Americans in the area, who saw many red-eye fish in the River (Minnesota Historical Society). Leaf River Leaf River was the principal river route serving west- central Minnesota. The Dakota and Ojibwe used its course and the Otter Tail Portage — connecting West Leaf Lake with Otter Tail Lake — to access the waterways associated with the Red River of the North. Executive Summary 2 To frame where to work on a smaller scale, the watershed was divided into four planning regions (Figure 1-2). The planning regions are based on the HUC-10 subwatershed scale, with a couple of the HUC-10s combined due to similar land uses and resources. Planning Regions Figure 1-2. Planning Regions in the LWR1W1P. Redeye The Redeye Planning region includes the Redeye River and tributaries and City of Sebeka. Wing The Wing Planning Region includes the Wing River, the Lower Leaf River, and the watershed pour point. Cities include Parkers Prairie, Hewitt, and Verndale. Middle Leaf The Middle Leaf Planning Region includes Bluff Creek and the middle portion of the Leaf River. Cities include New York Mills, Bluffton, and Wadena. Upper Leaf The Upper Leaf Planning Region includes the Leaf Lake Chain and the headwaters of the Leaf River. Cities include Henning and Deer Creek.   Executive Summary 3 Purpose, Roles and Responsibilities The purpose of the One Watershed One Plan process is to align local water planning along major watershed boundaries, not just local jurisdictions. The LWR1W1P planning effort began with a Memorandum of Agreement (MOA) between East Otter Tail Soil and Water Conservation District (SWCD), Otter Tail County, Wadena SWCD, Wadena County, and Becker SWCD (Appendix J). Todd SWCD participated in the Advisory Committee as well. Douglas County and Douglas SWCD were offered the opportunity to participate in both the planning and implementation MOAs but declined due to such a small percentage of land area of the watershed (<1%). A representative from each MOA governmental unit was appointed by each county and SWCD board to serve on the Policy Committee, which is the decision-making body for this plan (Figure 1-3). The East Otter Tail SWCD was the fiscal agent for this project. The plan content was generated by the Advisory Committee, which consisted of the counties and SWCDs in the MOA, Todd SWCD, State Agencies, and other local stakeholders. The Citizen Advisory Committee, made up of local stakeholders including lake groups and agricultural producers, provided input on the plan priorities and content (Figure 1-3). Figure 1-3. Committees and roles in the LWR1W1P. Policy Committee • One representative from each entity of MOA • Decision-making body for the LWR1W1P Planning Team • Staff from East Otter Tail SWCD, Wadena SWCD, BWSR, Consultants • Guided the process and produced deliverables Citizen Advisory Committee • Local stakeholders including lake groups, agricultural producers, and residents • Provided input on plan content Advisory Committee • Local stakeholders including state agencies and counties • Drafted all plan content   Executive Summary 4 Community Engagement The LWR1W1P began with a Community Picnic at Burlington Northern park in Wadena. At the event, tables were set up for each of the planning regions with large maps. Participants were encouraged to find the planning region that they lived in and talk about issues and opportunities for that area. They also completed a survey indicating their priorities for the watershed (Appendix F). Figure1-4. Community Picnic on June 6, 2019 in Wadena. The Citizen Advisory Committee met in late June and prioritized issues in the LWR Watershed (Appendix F). They also contributed brainstorming for the Vision Statement by answering the question, “What do you value about the watershed?” and “What do you want the watershed to look like in 50 years?”. Responses are summarized in the word clouds below (Figures 1-5 & 1-6). Figure 1-5. Word cloud generated from responses to the question, “What do you value about the watershed?” at the Citizen Advisory Committee meeting, June 24, 2019. Figure 1-6. Word cloud generated from responses to the question, "What do you want the watershed to look like in 50 years?" at the Citizen Advisory Meeting, June 24, 2019.   Executive Summary 5 Issue Prioritization The issues for the LWR Watershed were generated and prioritized with a variety of input from the general public, the Advisory Committee, the Policy Committee, State agencies, and existing local and regional plans (Figure 1-7). Figure 1-7. Issue prioritization process for the LWR Watershed.   Executive Summary 6 The comprehensive list of issues was grouped into four resource categories to help frame the concerns: Groundwater, Surface Water, Land Stewardship, and Habitat. These categories are described below and are used throughout the plan. Resource Categories Groundwater Includes all groundwater resources such as the aquifer and drinking water. Habitat Includes habitat for wildlife, game, birds, and fish. Surface Water Includes all water on the surface such as lakes, streams, and wetlands. Land Stewardship Includes multiple benefits of managing the land for healthy soils, groundwater, surface water, and habitat quality. The comprehensive list of issues in the watershed was then prioritized by the Citizen Advisory Committee (Figure 1-8) and the Advisory Committee and divided into three tiers. The Advisory Committee recommended to the Policy Committee that Tier 1 and Tier 2 issues should be addressed in plan goals. Tier 3 issues are included in the plan, but not a priority for implementation during the 10- year plan. The Tier 1 issues also matched well with the priority concerns from the local NRCS Working Groups from East Otter Tail SWCD, Wadena SWCD, Becker SWCD and Todd SWCD (Appendix E). The Policy Committee approved this approach. Figure 1-8. Citizen Advisory Committee prioritizing issues on June 24, 2019. Executive Summary 7 Tier 1 issues are the focus of implementation efforts in the LWR1W1P. Tier 2 issues are important and will be implemented as time and funding allows. Table 1-1. Priority issues in the LWR1W1P. Category Resource Issue Statement Tier 1 Issue Statements Drinking water Shallow groundwater is highly vulnerable to contamination from numerous sources. Streams, Lakes Soil erosion and runoff can cause sediment and nutrient enrichment and low dissolved oxygen in lakes and streams. Streams E.coli impairments in streams can make them unsafe for recreation. Lakes Projected development pressure and conversion of seasonal properties to fulltime homes has the potential to negatively affect lake water quality and riparian habitat. Agricultural land Soil health has the potential to impact agricultural productivity and water- holding capacity. Forests, Grasslands Fragmentation and degradation of upland habitat by changes in land use can cause a loss of perennial vegetative cover and impact land resilience, habitat, surface, and ground water quality. Tier 2 Issue Statements Wetlands Wetlands are in continued need of protection, which helps with precipitation storage, maintaining lake water levels, and habitat. Shallow lakes Lakes with identified high phosphorus sensitivity, outstanding biological significance, wild rice, and shallow depths may not be sufficiently protected, which affects fish and wildlife habitat quality. Streams Connectivity barriers in streams (culverts & dams) are impacting fish habitat and stream geomorphology. Streams Altered hydrology associated with a change in the water quantity, timing, and variability of flow in water courses can impact stream geomorphology, channel stability, and cause streambank erosion. Aquifer Groundwater sustainability is vulnerable in the face of increased irrigation withdrawal.   Executive Summary 8 Resource Prioritization Resources in the LWR Watershed were prioritized to determine where to work first. Because there are no phosphorus or turbidity impairments in the watershed, most of the management focus is to protect or enhance existing resources. Water quality begins on the land. The Advisory Committee developed a land prioritization, that prioritizes where to add more practices based on risk of soil erosion and forest loss (1st Priority Unknown Management) and acknowledges current land management practices occurring on the landscape (Known Management). The term “Unknown Management” was used because there could be land management practices occurring on those acres that are not known to the local agencies. The Policy Committee provided input as well and approved the final prioritization (Figure 1-9).     Figure 1-9. Land management prioritization for the LWR1W1P. Executive Summary 9 Goals Measurable goals identify the desired change in the resource and indicate how progress will be measured. Goals are developed to address all the issues. The quantity of how much progress implementation can make toward goals and changes to the resource condition are determined with models and data analysis. Some goals such as Bacteria Reduction and Drinking Water Protection were determined using eLINK data. Other goals such as Nitrogen Management, Land Management, and Phosphorus Reduction were measured using the Prioritize, Target, and Measure Application (PTMApp). The measurable goals were developed over the course of three Advisory Committee meetings. Because the focus of this plan is stewardship, the main goal of this plan is increasing land management practices on the landscape, for example cover crops, reduced tillage, irrigation water management, nutrient management, pasture management, and forest management. These land management practices provide multiple benefits to water quality, reduce soil erosion, improve soil aggregation, enhance habitat, and store more water in the soil from resulting deeper root depth (Figure 1-9). Benefits from these land management practices on cultivated land are measured in PTMApp at edge-of-field for individual BMPs and also summarized at the watershed pour point to show cumulative downstream effects and compare with long-term monitoring data (Appendix H). Figure 1-9. Illustration of different agricultural land management practices as related to root depth and water storage (source: University of Nebraska, Lincoln). The goals for the LWR1W1P are listed in two tiers. Tier 1 goals address primary Tier 1 issues and will be the focus of implementation in this plan. Tier 2 goals address Tier 2 issues will be implemented as time and funding allow. Since there are no turbidity or phosphorus impairments in the watershed, many of these goals are to increase land management practices that prevent any further degradation or increase the use of land protection programs and recognize existing unknown management practices. Conventional Crop and Livestock No Till Cover Crop Crop Rotation Perennial Executive Summary 10 Tier 1 Goals Tier 2 Goals Land Management Promote and increase known land management, including soil health practices, sustainable grazing practices and forest management by 20% in first priority acres identified per planning region. Land Protection Increase protection and enhancement of forest cover, water quality, habitat, and surficial sand aquifers by 10% in priority Nitrogen Management Implement nutrient management practices on 12% of first priority acres with high nitrogen infiltration risk to maintain nitrates in public and private wells below the state standard of 10 mg/L. minor watersheds based on the protection goals from the Redeye Watershed Landscape Stewardship Plan. Wetland Protection Maintain current coverage of wetlands within watershed and increase awareness of wetland protections. Drinking Water Protection Protect drinking water by sealing 30 unused wells, protecting DWSMAs, and addressing emerging contaminants. Groundwater Sustainability Increase understanding of irrigation patterns and management to be able to maintain an aquifer which is sustainable for natural, economic, and human consumption uses. Bacteria Reduction Develop and implement 20 bacteria management projects (i.e. manure management, fencing, SSTS compliance) to address sources of bacteria and make progress towards delisting impairments. Riparian Habitat Enhancement Enhance 1.2 miles of riparian vegetation on streams and lakes with over 40% disturbed area, biological impairments Phosphorus Reduction Reduce phosphorus loading to lakes with declining water quality trends by 5% through implementing best management practices within the lakeshed. and/or a declining water quality trend through outreach to private citizens. Aquatic Habitat Enhancement Improve aquatic habitat connectivity by fixing 3 culverts that are affecting resource condition and modifying Hewitt Dam to allow for fish passage. Water Retention Maintain the current average discharge relative to climate norms of 368,196 acre- feet at the pour point of the watershed.   Executive Summary 11 Implementation The implementation activities and costs are laid out in Section 5. The Advisory and Policy Committees recognize that stewardship practices are already occurring on the landscape. The implementation focus of the LWR1W1P is to encourage additional best management practices in priority areas for soil and forest loss and give credit for current known best management practices in the watershed. Some examples of plan actions are provided below (Table 1-2). Table 1-2. Summary of plan actions and how they relate to goals in the LWR Watershed. Resource Categories: Examples of Implementation: Groundwater: protecting drinking water, minimizing nitrates, and increasing understanding of sustainable groundwater use.  Well sealing  Nutrient management  Irrigation management Land Stewardship: increasing land best management practices on cultivated land, pasture, and forests.  Cover crops, reduced tillage  Sustainable grazing practices  Forest enhancement and protection Surface water: addressing E.coli impairments, maintaining wetlands and working to improve the water quality in the Leaf Lake Chain.  Septic system compliance  Urban stormwater management  Agricultural Best Management Practices Habitat: enhancing riparian vegetation and improving aquatic habitat connectivity.  Riparian habitat enhancement  Shoreline restoration  Fixing culverts and dams   To implement the full extent of this plan, additional state or federal funding and capacity over current levels will be necessary. The implementation table labels implementation actions as funding level 1, 2, or 3 (Table 1-3). Table 1-3. Funding levels in the LWR Watershed. Funding Level Description 1 Current baseline funding for all watershed programs. 2 Watershed-based funding and competitive grants. 3 Partner funding (MPCA, DNR, TNC, COLA, Lake Associations, etc) Executive Summary 12 Existing programs will be utilized for implementing plan actions and are organized into four categories: Planned Landscape Management (“Manage It”), Protected Lands Maintenance (“Keep It”), Constructed Environmental Enhancements (“Fix It”) and Analysis and Information. For the LWR Watershed, the scale is tipped toward “Manage It” programs (Figure 1-11). Figure 1-11. Implementation programs for the LWR1W1P. Implementation: A Balancing Act Figure 1-12. The Leaf River. Executive Summary 13 Progress towards goals will be tracked in a variety of ways (Table 1-4). Plan activities will be recorded by watershed partners in a tracking system and summarized annually. Table 1-4. Description of how different activities will be measured during plan implementation. Level Description Redeye 1W1P Application Tracking Practices, Acres, Percentages of watersheds, Miles of River, Number of Lakes. Outcomes in Implementation Table (Section 5). Estimating Using lower resolution calculators and tools to give a sense of the collective impacts of projects. Benefits calculator (Appendix H). Modeling Incorporating landscape factors and project information to predict future conditions. PTMApp, HSPF in WRAPS Cycle 2 in 2021 Measuring Using field-collected information to assess the condition of the water. Lake Monitoring, Pollutant Load Monitoring Network stream monitoring at watershed pour point (S005-729), WRAPS Cycle 2 in 2021 Proving Having enough measurements to compare with standards and make a determination if it's improved. WRAPS Cycle 2 in 2021, Cycle 3 in 2031 Plan Administration and Coordination The LWR1W1P will be implemented by the Redeye Implementation Team (Section 7). The Redeye Implementation Team is a coalition of East Otter Tail SWCD, Otter Tail County, Wadena SWCD, Wadena County, Becker SWCD, Becker County and Todd SWCD. The Redeye Implementation Team previously entered into a Memorandum of Agreement (MOA) for planning the One Watershed One Plan for the LWR Watershed (Appendix J). The entities will draft a MOA for purposes of implementing this plan. The Policy Committee of the Redeye Implementation Team oversees the overall plan implementation with the advice and consent of the individual County and SWCD boards under the umbrella of the implementation MOA. Douglas County and Douglas SWCD were offered the opportunity to participate in both the planning and implementation MOAs but declined due to such a small percentage of land area of the watershed (<1%). The Redeye Implementation Team will complete the annual work plan, identify and apply for additional funding opportunities, update the Policy Committee on what projects are completed and where funding is spent, and implement the targeted implementation schedule. The Advisory Committee will continue to meet, review and identify collaborative funding and project opportunities. The Citizen Advisory Committee will continue to communicate the needs of local landowners, be a local supporter for the plan, and provide input for the annual work plans. Section 2: Land and Water Resource Narrative “The only distinction between groundwater and surface water is the water’s location at a particular time. The water underground and on the surface are parts of a large plumbing system, all portions of which are interconnected.” -Thomas Dunne and Luna Leopold Ws Land & Water Resource Narrative 15 Section 2. Land and Water Resource Narrative From a bird’s eye view, the Leaf, Wing, Redeye (LWR) Watershed is a mosaic of streams, wetlands, forests, pastures, farms and drumlins. This relatively flat land in the middle of Minnesota has a variety of landscape features and land uses. The LWR Watershed covers 575,360 acres (899 square miles) and lies mainly within Otter Tail and Wadena counties, with a small portion in Becker and Todd counties. The main towns include Wadena, Sebeka, Parkers Prairie, and New York Mills. The Watershed contains three primary rivers that join near the pour point of the watershed: the Redeye River, the Leaf River, and the Wing River (Figure 2-1). Figure 2-1. The Leaf, Wing, Redeye Watershed. Ws Land & Water Resource Narrative 16 Past Geomorphology About 30,000 years ago, glaciers covered much of Minnesota. For 20,000 years they advanced and receded, reshaping the landscape below. The LWR Watershed was partly covered by glacial activity, which contributed to the watershed’s unique geology. When the Wadena Lobe of the glaciated period melted and receded around 30,000 years ago, it shaped an expansive field of drumlins around Wadena and Hewitt. A drumlin is a streamlined deposit of glacial till shaped like a teardrop with the tapered, narrow end pointing in the direction of glacier movement (Minnesota River Basin Glaciation). The drumlins in the LWR Watershed point from northeast to southwest and spread out in a fan shape with a margin 70 miles long (Figure 2-2). Because a large portion of the watershed remained mostly glacier-free in the last advance of glaciation, it has fewer lakes when compared to its neighboring watersheds (Crow Wing, Otter Tail, Long Prairie). Soils Glaciation also left a mixture of soils in its wake. The outwash areas are level or else slope gently, with well-drained sandy soils. The till moraine has more varied elevation, and soils are generally loamy with some clay. This is where lakes tend to occur. The till plain is loamy glacial till soils with silty flood plain soils (Figure 2-2) (NRCS). Before humans settled the area, the vegetation was a mixture of conifer bogs and swamps, mixed forests, and prairie (Marschner). Figure 2-2. Geomorphology of the Leaf, Wing, Redeye Watershed showing drumlin features. Ws Land & Water Resource Narrative 17 Present Climate The climate of the LWR Watershed has cold winters and warm summers (Figure 2-4) with the majority of the precipitation falling in the summer (Figure 2-3). The frozen ground in the winter has implications for the growing season, limiting agricultural activities to approximately May through October (Figures 2-3 and 2-4). Precipitation is increasing by 0.23 inches per decade, the annual maximum temperature is increasing by 0.17 ◦F per decade and the annual minimum temperature is increasing by 0.29 ◦F per decade. (DNR Climate Data). These climate trends follow the trends occurring statewide. Hydrology The Redeye River originates from Wolf Lake in Becker County and flows southeast. The Leaf River originates from the chain of East, Middle, and West Leaf lakes and flows east. The Wing River starts north of Parker’s Prairie and flows northeast to meet the Leaf River before joining the Redeye and then the Crow Wing River, eventually draining into the Mississippi River. The Redeye and Wing rivers have a steeper slope than the Leaf River, which has a shallow slope and meanders through the middle of the watershed (Figure 2-5). The watershed has a large wetland complex that runs through the center from west to east with the northern half of the watershed being predominately hardwood forest and wetland with scattered agricultural lands. The southern half of the watershed is opposite, with predominately agricultural lands and scattered wetlands, hardwood forests, and lakes (SID Report). ‐20 0 20 40 60 80 100 JanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecemberTemperature (F)Average Monthly Temperature for  Wadena, MN Average High Average Low Figure 2-5. Elevation of the Leaf, Wing, Redeye Watershed. 0 1 2 3 4 5 JanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecemberPrecipitation (inches)Average Monthly Precipitation for  Wadena, MN Figure 2-4. Average monthly temperature for Wadena, MN (2000-2018). Figure 2-3. Average monthly precipitation for Wadena, MN (1891-2018). Ws Land & Water Resource Narrative 18 Streams The LWR Watershed is stream-based watershed, with a dynamic network of stream beds weaving their way through the landscape like branches on a tree. The watershed contains 633 river miles, with about half of those being perennial and half being intermittent. Perennial streams are tributaries that have consistent flow year-round and are in contact with the water table, whereas the flow of intermittent streams depends on rainfall and the depth of the water table. Stream Alteration and Erosion Water has tremendous power to erode the landscape, carrying away sediment and transporting it to other areas in the watershed. As rain falls and snow melts, the water infiltrates the ground where it can. But when the ground becomes so saturated that water has difficulty infiltrating or simply can’t anymore, the water starts flowing over the surface in sheet flow. If the flow reaches a dried depression or gully, it becomes an intermittent stream that eventually joins a perennial stream. Soil erosion can occur during any or all of these steps (Figure 2-6). Erosion can already be a challenge in natural habitats, but humans have increased the speed of waterflow in the watershed by installing culverts, dams, and ditches. These practices increase the amount of sediment and nutrients flowing downstream and can change the shape of the stream channel. Culverts and dams can also act as barriers to fish and invertebrate movement, which fragments their habitat. About 50% of the watercourses in the LWR Watershed are altered (Figure 2-7). There are five dams, with the Hewitt Dam being the most problematic to fish passage (WRAPS 2016). Vegetation along streambeds is Mother Nature’s way of protecting the stream from erosion, but this is another area where humans have made major impacts to the landscape. Activities like timber clearcutting, land clearing for agriculture, road construction, overgrazing, and Figure 2-7. Altered watercourses in the Leaf, Wing, Redeye Watershed. Figure 2-6. Soil erosion after rainfall. Ws Land & Water Resource Narrative 19 urbanization decrease vegetation and increase impervious surface and/or soil compaction, which in turn decreases infiltration and increases runoff. Lakes and Wetlands The lakes and wetlands in the watershed are just as vital to its overall health as the streams are. Seventy-three lakes of at least 10 acres in size exist throughout the watershed, and many of them have ecologically valuable features. Two lakes in the watershed meet the DNR’s criteria for Biological Significance: Gourd and Snow (Table 2-1). Wild rice, which is a vital nourishment for wildlife and waterfowl and of cultural significance to the region, can also be found in several lakes. While all lakes support wildlife needs, it is the shallow water zone, characterized by aquatic plants and generally less than 15 feet of depth, that provides the most important wildlife habitat. Shallow lakes and wetlands are a critical habitat for wildlife and waterfowl, and the DNR has identified priority shallow lakes for protection and wildlife habitat enhancement (Figure 2-8). About 80% of historical wetlands still exist in the watershed (Wadena County Water Plan). These wetlands act like a sponge, providing water storage. None of the lakes in the watershed are listed as impaired for nutrients (WRAPS 2016); however, West Leaf Lake has a declining trend in transparency. It is important to identify lakes with declining trends so that implementation projects can be completed to level out the trend before the lake reaches the impairment standard. Habitat Habitat in the watershed includes a mixture of forests, wooded wetlands, grasslands, riparian, and aquatic areas. Wooded wetlands are critical habitat for threatened species, such as the Blanding’s turtle. Fish surveys identified 47 species of fish including the pugnose shiner (threatened) and the least darter (of special concern) (Redeye Monitoring Report). There are two state forests in the watershed—the Smoky Hills State Forest and the Lyons State Forest (Figure 2-8)— Table 2-1: Ecologically valuable lakes in the Redeye Watershed. Lake Wild Rice Biologically Significant Deep Adley  Bear  Donalds  East Leaf  Edna Gourd   Grass  Horsehead Mary Middle Leaf  Mud  North Maple  Portage  Snow  South Maple  Tamarack  West Annalaide West Leaf  Wolf  Figure 2-8. Identified wild rice lakes (DNR), priority shallow lakes (DNR), other shallow lakes, state forests, Wildlife Management areas (DNR), Waterfowl Production Areas (USFWS), and Farm Services Agency Interest (FSA). Ws Land & Water Resource Narrative 20 and numerous Wildlife Management Areas (WMAs) and Wildlife Production Areas (WPAs), which provide recreation for hunters and trappers of small game, big game, and waterfowl. These areas also provide wildlife veiwing opportunities for upland birds, waterfowl, mammals, and more. It is important to maximize the size and abundance of habitat corridors and connections to continue to maintain recreational opportunities and homes to resident wildlife. Land Use and Economy Land use in the LWR Watershed is a mix of forests, agriculture, and wetlands (Figures 2-9 and 2-11). About a third of the watershed is forested in a mixture of pines, oaks, aspen, and birch (Figures 2-9 and 2-11). Forests play a crucial role in infiltrating rainfall into the ground, preventing runoff and soil erosion. They also provide important wildlife habitat and recreational opportunities. About half of the LWR Watershed is used for agricultural land in a mix of pasture, row crops, and animal feedlots (Figures 2-10 and 2-11). A large portion of this land is rated as Prime Farmland or Farmland of Statewide Importance by the USDA. Prime farmland is land that has the best combination of physical and chemical characteristics for producing food, feed, forage, fiber, and oilseed crops and is available for these uses (USDA). These areas are deemed of major importance in meeting the nation’s needs for food. Protecting the soils in these lands is imperative to preserving productivity and protecting the water quality of streams and lakes in 1%5% 30% 24% 25% 15% Land Use in the Leaf, Wing, Redeye Watershed Open Water Developed Forest/Shrub Pasture Cropland Wetland Figure 2-10. Animal feedlots in the Redeye River Watershed. the area. There are many in-field best management practices (BMPs) that can reduce soil erosion, build soil, and manage water to enhance soil performance and profitability (Todd County Water Plan 2016). Animal agriculture is also economically important to this watershed. There are six large animal feeding operations in the watershed that require National Pollutant Discharge Elimination System (NPDES) permits and numerous other animal agriculture operations (Figure 2-10). Figure 2-9. Land use in the Leaf, Wing, Redeye Watershed (WRAPS 2016). Ws Land & Water Resource Narrative 21 Balancing agricultural production with water quality through BMPs is the key to a healthy watershed. Water quality begins on the land. Some producers in the watershed are already implementing best management practices, and in this plan, these are referred to as “known management”. Increasing management practices on acres of “unknown management” can prevent future water quality impacts. There are some trends occurring in farming in Minnesota that could change the future land use in the watershed. “Crop producers have endured six years of low profits, which has led to a weakened financial position”, with dairy farms being hit the hardest (loss of over 15% dairy herds in 2018) (Norquist & VanNurden 2018). In addition, the loss of dairy farms has the potential to shift the types of forage that are grown in the area to cash crops. Figure 2-11. Land cover in the Leaf, Wing, Redeye Watershed (U of MN, 2013). Ws Land & Water Resource Narrative 22 Impairments The LWR Watershed went through the Minnesota Pollution Control Agency’s WRAPS process between 2012 and 2016. This process starts with monitoring and modeling and ends with a list of impairments and strategies to fix them. Seventeen lakes were assessed, and none were impaired for eutrophication (too much phosphorus). The study resulted in portions of the Redeye River, Bluff Creek, Leaf River, Oak Creek, Union Creek, Wing River, and Hay Creek being listed as impaired for aquatic recreation for E.coli (Figure 2-12). This means that E.coli levels are above the state standard for safe swimming. Portions of the Wing River, an Unnamed Creek, and South Bluff Creek were impaired for aquatic life, which means that the fish and invertebrate communities are not as diverse as they should be (Figure 2-12). Stressors (or causes of these impairments) include: lack of habitat due to sediment erosion, flow alteration, improperly placed culverts, and low dissolved oxygen from too many nutrients. Groundwater Much of the watershed contains a shallow aquifer. The combination of sandy soils and shallow groundwater result in a high sensitivity to contaminants, especially nitrates. Data show that nitrates in drinking water are elevated in this watershed (Figure 2-13). There are eight Drinking Water Supply Management Areas (DWSMAs) in the watershed set aside for protection. In addition, an increasing trend in groundwater withdrawals over time has been documented (WRAPS 2016) (Figure 2-15). There are numerous groundwater appropriation permits in the watershed, and most are for agricultural irrigation. Figure 2-13. Nitrate levels in tested wells in the Leaf, Wing, Redeye Watershed (MDA). Figure 2-12. Leaf, Wing, Redeye Watershed Impairments from the WRAPS, 2016. Ws Land & Water Resource Narrative 23 Future There are many trends in land use change occurring in the Leaf, Wing, Redeye Watershed over the past few decades that indicate where the watershed is heading: The population is decreasing in the towns and increasing around the Leaf Lake Chain (Figure 2- 14). The population estimates in 2007 show approximately 19,120 residents in the watershed. The largest population centers are the towns of Parkers Prairie, Wadena, and Sebeka (WRAPS 2016). The number of farms is decreasing while the size of farms is increasing. Larger commercial farms are growing in size with owners outside the area. In 2007, about half the farms in the watershed were less than 180 acres and half are more (NRCS). Forests are being converted to agricultural and developed lands. With proper management, these land uses can occur in harmony. Groundwater usage is increasing in the watershed, mainly through agricultural irrigation (Figure 2-15). Over the last 20 years, there has been a nationwide trend of expanding conversion of grasslands to cropland. Much of this conversion has occurred on land that is marginal compared to prime farmland. These grasslands are very important to the ecosystem and to cropland because they harbor greater plant, microbial, and animal diversity than croplands. They also generate higher levels of many agriculturally vital ecosystem services, such as pest suppression and pollination (Lark et al 2015). Looking toward the future, managing the landscape with an eye on conservation, balancing our need for food with our need for enjoying the outdoors, and preserving our natural resources will enable the LWR Watershed to maintain a healthy balance between the mosaic of streams, wetlands, pastures, and farms it has today. Figure 2-14. Population change in the LWR Watershed, 2000-2010. Figure 2-15. Groundwater usage changes from 1988-1992 to 2013-2017). Section 3: Issue Prioritization Issue Prioritization 25 Section 3. Issue Prioritization The Advisory, Policy, and Citizen committees thoughtfully produced and considered all issues in the watershed and determined the priority issues that will be addressed by the plan. The issues for the Leaf, Wing, Redeye Watershed were generated and prioritized with a variety of input from the general public, State agency letters, and existing local and regional plans (Figure 3-1). Figure 3-1. Input incorporated into the priority issues for the Leaf, Wing, Redeye 1W1P. Issue Prioritization 26 Issue Prioritization Process Issue compilation began with combing through existing plans and reports including the Otter Tail County Water Plan, Wadena County Water Plan, Becker County Water Plan, Todd County Water Plan, Redeye Watershed Restoration and Protection Strategy (WRAPS), Redeye Stressor Identification Report, Redeye Watershed Monitoring Report and Groundwater and Agriculture Report (Appendix D). At the May Advisory Committee meeting, participants brainstormed issues and opportunities as well. This compilation resulted in a comprehensive list of issues for the watershed (Figure 3-1). The issues were grouped into four resource categories to help frame the concerns: Groundwater, Surface Water, Land Stewardship, and Habitat. These categories are described below: Resource Categories Groundwater Includes all groundwater resources including the aquifer and drinking water. Habitat Includes habitat for wildlife, game, birds, and fish. Surface Water Includes all water on the surface such as lakes, streams, and wetlands. Land Stewardship Includes multiple benefits of managing the land for healthy soils, groundwater, surface water, and habitat quality. Issues were prioritized with public input. At the community discussion on June 6, 2019, participants were provided a survey where they indicated their priority issues and opportunities for the watershed (Appendix F). Their input stressed the importance of clean drinking water, wetland protection and restoration, groundwater withdrawal for irrigation, and soil erosion from cultivated fields. The Citizen Advisory Committee met on June 24, 2019 and reviewed the public input. Using sticky dots, they prioritized existing issues for the watershed and added additional issues (Appendix F) (Figure 3-2). Overall, the Citizen Advisory Committee agreed with the priorities from the community discussion. These priorities were taken to the Advisory Committee, who also considered the local NRCS Work Group priorities (Appendix E), and the state agency letters, and incorporated them into a priority issues list. The priorities that emerged from the community discussion, Citizen Advisory Committee, NRCS Work Group priorities and state agency letters had many commonalities. Issue Prioritization 27 The Advisory Committee then separated the priority issues into three tiers and determined that Tier 1 and Tier 2 issues would be addressed in plan goals. Tier 3 issues are included in the plan, but not a priority for implementation during the 10-year plan because they are emerging issues, already covered by a different plan, or a low priority. Tier 1 issues matched well with the priority concerns from the local NRCS Working Groups from East Otter Tail SWCD, Wadena SWCD, Becker SWCD and Todd SWCD (Appendix E). The Tier 1 and 2 priority issues were crafted into 11 issue statements that more fully describe the issue. These issue statements are listed in this section with the matching NRCS Resource Concerns. Matching with NRCS Resource Concerns can dovetail into the NRCS process and programs and leverage more federal funds for implementation. The NRCS is an important partner for contributing financial assistance for land management practices through the Environmental Quality Incentives Program (EQIP). In order to prioritize where to work on a smaller scale, the watershed was divided into four planning regions. The planning regions are based on the HUC-10 subwatershed scale, with a couple of the HUC- 10s combined due to similar land uses and resources. Figure 3-2. Community Discussion picnic on June 6, 2019 in Wadena, MN. Issue Prioritization 28 At the June Advisory Committee meeting, the issue statements were evaluated spatially in the watershed using maps of existing data, existing scientific studies, and local knowledge. This exercise resulted in a prioritization of the planning region(s) that each issue was the most relevant and urgent in the watershed. Planning Regions Redeye The Redeye Planning region includes the Redeye River and tributaries and City of Sebeka. Wing The Wing Planning Region includes the Wing River, the Lower Leaf River, and the watershed pour point. Cities include Parkers Prairie, Hewitt, and Verndale. Middle Leaf The Middle Leaf Planning Region includes Bluff Creek and the middle portion of the Leaf River. Cities include New York Mills, Bluffton, and Wadena. Upper Leaf The Upper Leaf Planning Region includes the Leaf Lake Chain and the headwaters of the Leaf River. Cities include Henning and Deer Creek. The issue statements in the following pages are prioritized as high, medium or low for each planning region. Numerous factors were considered in the prioritization, including but not limited to NRCS Resource Concerns identified by the local work groups (Appendix E), Citizen Advisory Committee prioritization (Appendix F), and water quality impairments (WRAPS 2016). High priority indicates the Planning Region where this issue will be addressed first during implementation. The issue statements were then reviewed by the Policy Committee in July 2019 for their input. They accepted the list as presented with a few minor revisions and additions. All these efforts have resulted in the final issue statements list in this section. Issue Prioritization 29 Tier 1 Issues Tier 1 are the most important issues that will be the focus of implementation efforts in the 10-year plan. They had a “high” ranking in at least one planning region and lined up with NRCS Resource Concerns. Planning Region priority is noted with: High; Medium; Low. Category Resource Issue Statement NRCS Resource Concern Planning Region Drinking water Shallow groundwater is highly vulnerable to contamination from numerous sources. Water Quality Degradation – Excess nutrients in groundwater f r Streams, Lakes Soil erosion and runoff can cause sediment and nutrient enrichment and low dissolved oxygen in lakes and streams. Soil Erosion – sheet rill; Water Quality Degradation – Excessive sediment in surface waters Streams E.coli impairments in streams can make them unsafe for recreation. Water Quality Degradation - Excess pathogens/chemicals from manure, biosolids or compost Lakes Projected development pressure and conversion of seasonal properties to fulltime homes has the potential to negatively affect lake water quality and riparian habitat. Water Quality Degradation – Excess nutrients in surface water Agricultural land Soil health has the potential to impact agricultural productivity and water-holding capacity. Soil Erosion – Organic matter depletion Forests, Grasslands Fragmentation and degradation of upland habitat by changes in land use can cause a loss of perennial vegetative cover and impact land resilience, habitat, surface, and ground water quality. Inadequate Habitat for Fish & Wildlife – Habitat Degradation & Habitat Continuity Issue Prioritization 30 Tier 2 Issues Tier 2 issues are important and will be addressed as time and funding allows. They received “medium” ranking in at least one planning region but no “high” rankings and do not line up as directly with NRCS Resource Concerns. Planning Region priority is noted with: High; Medium; Low. Category Resource Issue Statement Planning Region Wetlands Wetlands are in continued need of protection, which helps with precipitation storage, maintaining lake water levels, and habitat. Shallow lakes Lakes with identified high phosphorus sensitivity, outstanding biological significance, wild rice, and shallow depths may not be sufficiently protected, which affects fish and wildlife habitat quality. Streams Connectivity barriers in streams (culverts & dams) can negatively impact fish habitat and stream geomorphology. Streams Altered hydrology associated with a change in the water quantity, timing, and variability of flow in water courses can impact stream geomorphology, channel stability, and cause streambank erosion. Aquifer Groundwater sustainability, the amount of groundwater available, may be vulnerable in the face of increased agricultural irrigation withdrawal. Issue Prioritization 31 Tier 3 Issues Tier 3 issues were identified in the planning process but will not be a priority in this 10-year plan. This is because they are either a low priority, emerging issues, and/or already addressed in other existing plans. •Aquatic invasive species (AIS)– being covered by AIS plans and AIS funding •Flooding –low risk and low damage in this watershed •Increased public access to hunting land and public waters – public access has limited or no link to water quality and was a low priority for citizens •Beaver dams are affecting stream flow and connectivity – addressed in the connectivity issue and implementation table on page 98 of this plan. •Road salts and water softener salts can affect water quality and habitat – emerging issue Emerging Issues Contaminants of Emerging Concern Since the dawn of the industrial age, humans have been creating new chemicals for numerous uses. Water quality studies and monitoring in Minnesota have found contaminants from products or sources we never expected in places we never expected, like lakes, rivers, groundwater, and drinking water. These contaminants include pharmaceuticals, estrogenic compounds, pesticides, Teflon, perfluorooctanoic acid (PFOA), PFCs in fire-fighting foam, microplastics, and many others. These contaminants are an emerging concern in drinking water, and with a surficial sand aquifer, the LWR Watershed is vulnerable to contamination. The Minnesota Department of Health has a Contaminants of Emerging Concern program that can be found on their web page: https://www.health.state.mn.us/communities/environment/risk/guidance/dwec/index.html Keeping Water Local Minnesota is blessed to have abundant surface and groundwater resources. Other areas of North America have insufficient water for their desired land uses, and there have been attempts in the past to obtain water from Minnesota. This plan supports keeping water local. Chlorides Too much chloride in lakes and streams can be harmful to fish and aquatic life and contaminate groundwater. In dense metropolitan areas such as Minneapolis, chloride is a major issue for water quality. In the LWR Watershed, it is a Tier 3 issue of which to be vigilant. Chloride can come from numerous sources including road salts, water softener salt, fertilizer, manure, and dust suppressant. The Minnesota Pollution Control Agency has a chloride program that can be found on their website: https://www.pca.state.mn.us/water/chloride-salts Issue Prioritization 32 Rural Stormwater Systems Much of Minnesota’s farmland was originally too wet to farm. Drainage systems, including ditches, have been installed to drain agricultural lands, and provide conveyance systems for large rain events in rural areas. Statute 103E.005 defines drainage systems as “a system of ditch or tile, or both, to drain property, including laterals, improvements, and improvements of outlets, established and constructed by a drainage authority. Drainage system includes the improvement of a natural waterway used in the construction of a drainage system and any part of a flood control plan proposed by the United States or its agencies in the drainage system”. In the LWR Watershed there are different types of ditches including public and private ditches. Public ditches are administered by the local drainage authority as per 103E, and construction and maintenance are funded by property owners benefitting from that ditch. Public ditches include county ditches, which lie within a county, and judicial ditches, which cross county lines. Altered watercourses are any stream or ditch that has locations that have been straightened. Private ditches are privately managed by the landowner. It is important for the public to understand what type of ditches are in their area (Figure 3-3). Figure 3-3. Ditches in the LWR Watershed. Issue Prioritization 33 Invasive Species Both aquatic and terrestrial invasive species continue to be an issue in Minnesota. As of winter 2019, there is one infested waterbody in the LWR Watershed—Adley Lake by Parkers Prairie is infested with zebra mussels. Otter Tail, Becker, Wadena and Todd counties all have aquatic invasive species programs involved in many prevention activities such as lake access inspections, public service announcements, decontamination units, and dock/lift registration. Because these programs are already in place and have their own dedicated funding source, aquatic invasive species are a Tier 3 issue in the LWRW 1W1P. See the county websites for more details on their program: https://ottertailcountymn.us/department/aquatic-invasive-species https://www.wadenaswcd.org https://www.co.becker.mn.us/dept/soil_water/ais.aspx https://www.co.todd.mn.us/divisions/soil-water-conservation-and-development/aquatic-invasive-species Terrestrial invasive species can also impact the watershed. They can cause damage to perennial vegetative cover; harm the natural heritage of wetlands, prairies, and forests; and decrease the ability to enjoy recreational pursuits such as hunting, bird watching, and hiking. Invasive plants such as buckthorn, garlic mustard, spotted knapweed, or noxious weeds can decrease the biological diversity of beneficial native plants, harm soils, and harm wildlife. The local SWCDs, townships, and cities manage terrestrial invasive species with the County Ag Inspector through the Minnesota Noxious Weed Law (MN Statutes 18.75-18.91), which defines a noxious weed as an annual, biennial, or perennial plant that the Commissioner of Agriculture designates to be injurious to public health, the environment, public roads, crops, livestock, or other property. Learn more here: http://www.eotswcd.org/ag-inspector https://www.wadenaswcd.org/ag-weed-inspecting https://www.co.becker.mn.us/dept/soil_water/ag_inspector.aspx https://www.co.todd.mn.us/divisions/public-works-services/ditch-ag-inspector Figure 3-4. Tamarack Forest in the LWR Watershed along Highway 10 east of Wadena, MN. Issue Prioritization 34 Climate Change Minnesota’s climate is already changing and will continue to do so in the future; therefore, it should be considered in a long-term planning effort, as encouraged in the BWSR Climate Change Trends and Action Plan. The changes most visible so far include: Warming during winter and at night. Minnesota has warmed by 2.9◦F between 1895 and 2017. Increased precipitation and heavier downpours. Long-term observation sites have seen increases in >1-inch rains, >3-inch rains, and the size of the heaviest rainfall of the year. The LWR Watershed data shows similar trends as the statewide data. The annual precipitation is increasing by 0.23 inches per decade, the annual maximum temperature is increasing by 0.17 ◦F per decade and the annual minimum temperature is increasing by 0.29 ◦F per decade. (DNR Climate Data) (Figure 3-5 A and B). Warmer temperatures and increased precipitation can affect habitat suitability for native fish, wildlife, plant, and tree species. Warmer winters can allow for northern encroachment of invasive species such as the Emerald ash borer, crop diseases, and pests such as corn rootworm, and forest pests such as the Eastern larch beetle (Tamarack forests). Warmer summers have the potential to increase the irrigation needed to cultivate crops, which uses more groundwater. Increased precipitation can overwhelm rural stormwater systems, such as ditches, 0 5 10 15 20 25 30 35 40 189519021909191619231930193719441951195819651972197919861993200020072014Annual Precipitation (inches)Precipitation Trend for the LWR Watershed Precip (in) Linear (Precip (in)) 20 25 30 35 40 45 50 55 60 189519021909191619231930193719441951195819651972197919861993200020072014Temperature (F)Trends in Annual Maximum and Minimum Temperatures in the LWR Watershed Max Temp (°F) Min Temp (°F) Linear (Max Temp (°F))Linear (Min Temp (°F)) Figure 3-5 A and B. Annual precipitation (a) and maximum and minimum temperature trends (b) for the LWR Watershed from 1895 - 2018 (DNR Climate Data). Issue Prioritization 35 that are conveyance systems for larger rain events. Increased precipitation can contribute to more runoff from the landscape into lakes and streams, having the potential to impact crop yields and water quality. The LWR Watershed has over 80% of historical wetlands remaining and sandy soils, which helps hold water on the landscape and infiltrate precipitation into the ground. To address the temperature and precipitation trends in the watershed, the activities implemented in this plan aim to include both mitigation (practices that mitigate the effects of climate change by storing carbon in the soil) and adaptation (enhancing the resiliency of the watershed to future changes) (BWSR 2019). These activities are addressed in Goal 11. Water Retention (100) and include: Increasing the use of cover crops, which have deep roots to infiltrate precipitation, maintain soil moisture (water storage), and store carbon from the atmosphere. Maintaining current wetland cover to maintain storage in the watershed. Maintaining and enhancing forests in the watershed, especially in areas of high groundwater recharge. Maintaining and enhancing stream, ditch, and lakeshore buffers to minimize erosion during storm events. Keeping surface and groundwater local, and not allowing it to be transported out of state. Figure 3-6. Wooded wetlands in the Leaf River Valley along Highway 106. Section 4: Resource Prioritization   Resource Prioritization 37 Section 4. Resource Prioritization Introduction During the planning process the Advisory Committee prioritized resources in the watershed depending on their management needs. Three management strategies were identified for the LWR Watershed - Protect, Enhance, and Restore - and are defined below. Major resources in the watershed in the four resource categories (Surface Water, Groundwater, Habitat, and Land Stewardship) were prioritized according to their current condition and assigned a management focus based on what type of strategies will be implemented in this ten-year plan. The Policy Committee approved this prioritization based on the Advisory Committee recommendations. Strategy Definitions Strategy: Increase or maintain current management and permanent protection practices. The level of risk and value of the resource will determine whether to improve or maintain current conditions. The resource is in good condition (well above the State standard and/or high quality for habitat and biodiversity). Project examples: Private forest management, conservation easements, maintain native vegetation, protect with zoning, rules and ordinances. Strategy: Improve resource condition through land management practices. The resource is not impaired for sediment, phosphorus, or bacteria but has a biological impairment, a declining water quality trend, or some land disturbance. Project examples: Improvement projects and land management that reduce nutrient and sediment loading, increase perennial vegetation, and/or improve resource condition. Strategy: Restore impaired resource condition to meet state standards through targeted land management practices. The resource is impaired (surface water), over the state standard (groundwater) or land highly disturbed. Project examples: Improvement projects and land management that reduce the specific impaired parameter (specifically E.coli in surface water and nitrates in drinking water). PROTECT ENHANCE RESTORE Resource Prioritization 38 Resource Prioritization The groundwater in much of the LWR Watershed is shallow, which paired with sandy soils is sensitive to pollution from land practices. Two groundwater contaminants found in the LWR Watershed are arsenic and nitrates. Arsenic is naturally occurring, and an arsenic reduction unit can be installed in homes to filter out this contaminant, so it will be just an educational focus in this plan. Nitrates found in groundwater are generally from human activities, and nitrate concentrations are over the State standard (10 mg/L) in some areas of the watershed (Figure 5-6, page 72). In addition to groundwater quality, agricultural irrigation in the watershed can effect groundwater quantity. The SWCDs work with local producers on groundwater sustainability practices such as irrigation scheduling and precision technology. This plan includes management strategies to protect the drinking water supply, address nitrate levels, and keep sustainable use of the aquifer in the watershed. Groundwater Resources Drinking Water Supply Management Areas (DWSMA). DWSMA boundaries establish a protection area through extensive evaluation that determines the ten-year time of travel of groundwater that supplies a public water supply well. Private wells. Unused, unsealed wells can provide a conduit for contaminants from the land surface to reach the sources of drinking water. Non-community Public Water Supplies. Non-community public water supplies provide drinking water to people at their places of work or play (schools, offices, campgrounds, etc.). Land use and management activities should consider effects on these public water systems. Aquifer sustainability. Agricultural productivity in the LWR Watershed requires irrigation because of the sandy soils. Many irrigators exist in the watershed and usage is tracked by the Minnesota DNR. Groundwater usage has increased in the watershed from 1988-2017 (Figure 2-15, Land & Water Resource Narrative) and this increased usage could affect sustainability. Figure 4-1. Center pivot irrigation in the LWR Watershed. Resource Prioritization 39 Groundwater Contamination Prioritization and Management Strategy Resource prioritization for the LWR Watershed examines the vulnerability of the aquifer to contamination to determine the level of management required to protect groundwater quality (next page). For example, a highly vulnerable setting requires many different types of land uses be managed, where a low vulnerability setting focuses on a few land uses due to the long recharge time and protective geologic layer. Areas on the landscape and DWSMAs were prioritized for specific management actions and targeted as to where management is needed on the landscape (next page, Figures 4-2 and 4-3). Groundwater contamination is a Tier 1 issue (Section 3). Land was prioritized with a nitrogen infiltration risk analysis, which considers the land use practices and soil types (infiltration potential) to identify areas on the landscape that are most vulnerable to nitrogen infiltration. The results were summarized on a HUC-14 scale for targeting land management practices that reduce nitrogen infiltration such as nutrient management and irrigation water management (Figure 4-2). This analysis also yielded the identification of areas with high infiltration and low nitrogen risk, showing the highest priority areas to protect for groundwater recharge (Figure 4-3). These high recharge areas can be targeted for forest management and protection. DWSMAs were prioritized by the Advisory Committee for management in agreement with the Minnesota Department of Health (MDH) and Minnesota Department of Agriculture’s (MDA) identified priorities. The Verndale and Wadena DWSMAs are considered vulnerable by the MDH and MDA, and therefore are targeted for practices that reduce nitrogen infiltration such as nutrient management and irrigation water management (Figure 4-2). The MDA is currently working with Wadena SWCD on communication with agricultural stakeholders there. The remaining DWSMAs are considered moderate or low vulnerability and are targeted for protection. There may be additional DWSMAs classified in the watershed in the future (MDA). This prioritization of areas is illustrated in the flow chart on the next page. Plan Goals developed to address these areas are noted in the flow chart and explained in detail in Section 5. Goals and Implementation. Resource Prioritization 40 Strategy: Implement nutrient management and irrigation water management practices to reduce nitrates in drinking water. Resources: Subwatersheds with High and Moderately High Nitrogen Infiltration Risk (Fig. 4-2) High risk of nitrogen infiltration Goal 2: Nitrogen Management High groundwater recharge value Strategy: Implement forest and continuous vegetation protection practices. Resources: Subwatersheds with High and Moderately High Nitrogen Infiltration Risk (Fig. 4-2) PROTECT Goal 6: Land Protection High Vulnerability DWSMAs Moderate to low vulnerability DWSMAs Strategy: Implement nutrient management and irrigation water management practices. Seal unused wells and old public water supply wells. Resources: Verndale DWSMA Wadena DWSMA Strategy: Implement sealing of unused wells and old public water supply wells. Resources: New York Mills DWSMA Parkers Prairie DWSMA Henning DWSMA Deer Creek DWSMA Hewitt DWSMA Sebeka DWSMA PROTECT Goal 2: Nitrogen Management Goal 3: Drinking Water Protection Goal 3: Drinking Water Protection Tier 1 Issue: Groundwater Contamination RESTORE RESTORE Resource Prioritization 41 Figure 4-2. Nitrogen infiltration risk in the LWR Watershed. This analysis shows areas across the landscape that are most vulnerable to high nitrogen infiltration. (HEI). This map targets cultivated lands for nutrient management and irrigation management practices. Figure 4-3. Recharge value in the LWR Watershed. This analysis shows areas across the landscape that have high groundwater recharge potential, but low nitrogen infiltration risk. (HEI). This map targets forested lands for management and protection. Resource Prioritization 42 Groundwater Sustainability Prioritization and Management Strategy There is increasing pressure on our water resources, and concerns about the sustainable use of groundwater is increasing. In this plan, "Groundwater Sustainability" refers to groundwater quantity. Irrigation can be done more precisely by improving when irrigation is applied (irrigation scheduling) and where it is applied (variable rate irrigation). Variable rate irrigation (VRI) is the ability to spatially vary water application amounts across a field to address specific soil, crop and/or other conditions (Evans, 2013). Local SWCDs currently assist agricultural producers with irrigation scheduling and would like to increase the adoption of precision irrigation technologies like VRI. Groundwater sustainability is a Tier 2 issue (Section 3). Groundwater usage is highest in the Wing River subwatershed and there is additional usage potential in the current groundwater appropriation permits (Figures 4-4, 4-5). Groundwater sustainability is not fully understood due to the hidden resource, so the goal is to better understand what is sustainable and continue irrigation scheduling and other sustainable practices. High agricultural irrigation usage potential Strategy: Implement irrigation scheduling and variable rate irrigation practices. Resources: Subwatersheds with high usage potential (Fig. 4 -5) Goal 8: Groundwater Sustainability Tier 2 Issue: Groundwater Quantity PROTECT Resource Prioritization 43 Figure 4-4. Groundwater appropriation permits in the LWR Watershed by type (MN DNR). Figure 4-5. Water usage potential based on current groundwater appropriation permits (DNR MPARS 2017). Resource Prioritization 44 The surface water resources in the LWR Watershed include streams, lakes, and wetlands, and overall, they are in good condition. This good condition is likely due to many factors including but not limited to forest cover, sandy soils (good infiltration), and over 80% of historical wetlands remaining. The planning process prioritized streams and lakes for management strategies, but not individual wetlands. Streams. There are a wide range of stream conditions in the LWR Watershed, but overall, they are in good condition. Lakes. The lakes in the LWR Watershed are mainly small and shallow with good quality fish and wildlife habitat. Wetlands. The LWR Watershed has over 80% of historical wetlands remaining on the landscape (personal communication, East Otter Tail SWCD), and public surveys and the Citizens Advisory Committee indicated that wetlands were a valuable resource in the watershed. Wetlands have many protections including the Wetland Conservation Act, DNR and protected waters, and the Army Corps of Engineers. The management focus for wetlands in this plan is PROTECT. Streams The LWR Watershed is a stream-based watershed, with 633 stream miles. There are eight stream reaches impaired for bacteria and six Aquatic Life (IBI) impairments, but no impairments for phosphorus or sediment. This puts the watershed, overall, in a PROTECT and ENHANCE focus. E.coli is a bacteria that originates in the guts of warm-blooded animals and can cause humans to become sick. A bacteria impairment indicates that a water body has more bacteria than the state standard. The most common sources of E. coli are humans, livestock, and birds. The bacteria impairments in the LWR Watershed are relatively close to the standards, and in the Total Maximum Daily Load (TMDL) Study all but one reach (Bluff Creek) had the required reductions at high flows. In general, impairments at high flow conditions can indicate bacteria loading from runoff, while impairments at low flow conditions can indicate a chronic bacteria problem or point sources. The WRAPS identified six stream reaches that were a high priority for protection due to their healthy fish and macroinvertebrate community and high habitat quality (Redeye WRAPS). There are also five designated trout streams in the watershed, although none currently support trout. Resource Prioritization 45 Stream Prioritization and Management Strategy The stream reaches in the watershed were prioritized by Tier 1 vs Tier 2 issues, and management strategies were developed to address the waterbody’s current condition (Figure 4-6). The number in parentheses after the stream name is the specific numerical code for that stream reach or Assessment Unit Identification (-AUID). IBI Impairments Stressor: Connectivity Bacteria Impairments No Impairments IBI Impairments Stressors: sediment, dissolved oxygen Strategy: E.coli load reduction through projects such as SSTS maintenance, and cattle fencing. Strategy: ENHANCE Modify Hewitt Dam to fishway Strategy: ENHANCE Sediment load reduction through land management practices Strategy: PROTECT Protect and enhance riparian habitat, preserving catchment land Tier 2 Issues: Connectivity & Habitat PROTECT ENHANCE ENHANCE RESTORE Goal 4: Bacteria Reduction 24 Stream Reaches Assessed (Figure 1) Goal 1: Land Management Goal 10: Aquatic Habitat Enhancement Goal 6: Land Protection Goal 9: Riparian Habitat Enhancement Resources: Bluff Creek (-515) Oak Creek (-516) Wing River (-560) Trib to Redeye River (-526) Redeye River (-503) Leaf River (-514) Leaf River (-505) Union Creek (-508) Resources: Leaf River (-506) South Bluff Creek (-553) Trib. to Leaf River (-557) Trib. to East Leaf Lake (-554) Resources: Wing River (-559) Resources: Redeye River (-502, 503) Blue Creek (-541) South Bluff Creek (-530) Deer Creek (-511) Willow Creek (-525) Leaf River (-501, 504) Hay Creek (-513) Trib to South Bluff Creek (-528) Unnamed Creek (-539) Tier 1 Issues: Bacteria & Soil Erosion Resource Prioritization 46 Figure 4-6. Assessed stream reaches in the Redeye WRAPS showing prioritization. Resource Prioritization 47 Lakes There are 73 lakes of at least 10 acres in surface area in the LWR Watershed and none of them are impaired for eutrophication (over the State standards for phosphorus, chlorophyll a and transparency) (Redeye WRAPS). In fact, most of the lakes are small and shallow and classified as Natural Environment Lakes. Natural Environment Lakes have greater protections than the other classifications in the County Shoreland Ordinances, such as setbacks and lot size requirements (Table 4-1). The Leaf Lake Chain includes East, Middle and West Leaf lakes, and are the only lakes in the watershed that are classified as Recreational Development Lakes. West Leaf Lake has a declining trend in transparency from 1996-2019, with a decrease of approximately 1.4 feet per decade (MPCA website). Table 4-1. The different Lake Shoreland Classifications in Minnesota and differing requirements for building in the County Shoreland Management Ordinances. General Development Recreational Development Natural Environment Definition (MN DNR) General Development Lakes usually have more than 225 acres of water per mile of shoreline and 25 dwellings per mile of shoreline, and are more than 15 feet deep. Recreational Development Lakes usually have between 60 and 225 acres of water per mile of shoreline, between 3 and 25 dwellings per mile of shoreline, and are more than 15 feet deep. Natural Environment Lakes usually have less than 150 total acres, less than 60 acres per mile of shoreline, and less than three dwellings per mile of shoreline. They may have some winter kill of fish; may have shallow, swampy shoreline; and are less than 15 feet deep. Minimum Water Frontage and Lot Width Otter Tail, Todd, Becker: 100 ft Wadena: 300 ft Otter Tail, Todd, Becker: 150 ft Wadena: 300 ft Otter Tail, Todd: 200 ft Becker: 250-350 ft* Wadena: 300 ft Minimum Lot Area Otter Tail, Todd, Becker: 20,000 ft2 Wadena: 80,000 ft2 Otter Tail, Todd, Becker: 40,000 ft2 Wadena: 80,000 ft2 Otter Tail, Todd, Wadena: 80,000 ft2 Becker: 120,000-140,000 ft2* Minimum Setback from Ordinary High Water Level All: 75 ft All: 100 ft Otter Tail: 200 ft Todd, Becker, Wadena: 150 ft Number of lakes in the LWR Watershed 0 3 (Leaf Lake Chain) 70 *Becker county NE lakes are separated into 3 tiers and each has a different lot width and minimum lot area. Resource Prioritization 48 Lake Prioritization and Management Strategy The lakes in the watershed were prioritized by Tier 1 vs Tier 2 issues, and management strategies were developed to address the waterbody’s current condition. 73 Lakes Tier 1 Issue: Development pressure on lakes Tier 2 Issues: Phosphorus sensitivity, shallow, wild rice, biological significance 70 lakes, Stable, improving, or not enough data Natural Environment 3 lakes, Declining trend Recreational Development Strategy: Increase protection in catchments Strategy: Reduce phosphorus load Strategy: Protected by NE status and wetlands PROTECT ENHANCE Resources: West Leaf Middle Leaf East Leaf Resources: Gourd Snow Grass Mud North Maple South Maple Tamarack Wolf Goal 5: Phosphorus Reduction Goal 6: Land Protection No specific goal PROTECT Resources: All other lakes Resource Prioritization 49 The land in the LWR Watershed is a mosaic of cultivated lands, pastures, wetlands, forests, and grasslands. The land condition has changed from past conditions due to human settlement, which can decrease soil productivity, animal and plant species diversity, surface and groundwater quality, and increase erosion. A primary focus of this plan is to promote land management practices that allow us to be better stewards of the landscape. This focus is highlighted in the watershed vision statement (page 1). Feedback from local farmers and land managers in both the Agriculture and Groundwater report (Appendix D) and the NRCS Work Group ranking (Appendix E) suggests a willingness to implement and receive recognition for implementing land stewardship practices. Land Resources Forests. Forests are important for habitat, minimizing erosion, and infiltrating precipitation. Forests on average produce about 55% less runoff than cultivated land with conventional tillage methods (Anderson & Kean 2004). About a third of the LWR watershed is forested in a mixture of pines, oaks, aspen, and birch. Much of these forested lands have a low likelihood of conversion to other land uses, but there are some marginal areas that have suitable soils for non-forested land uses such as agriculture. Grasslands. Like forests, grasslands are important for habitat, minimizing erosion, and infiltrating precipitation. Grasslands on average produce about 50% less runoff than cultivated land with conventional tillage methods (Anderson & Kean 2004). About a quarter of the watershed is in pasture and grassland. There are a variety of land management practices for grasslands including rotational grazing, Conservation Reserve Program (CRP), Conservation Reserve Easement Program (CREP), and Reinvest in Minnesota (RIM). CRP contributes to the amount of grassland in the watershed. Rotational grazing can be a great way to maintain perennial vegetation while improving soil health and maintaining economic sustainability. Cultivated lands. Cultivated lands are paramount to our survival as they produce the nation’s food supply. There are various land management practices that can enhance soil health while also reducing soil erosion to streams and lakes and minimize impacts to groundwater including cover crops and reduced tillage practices. CRP is also a way to add continuous vegetative cover to cultivated lands for the period of the CRP contract. Resource Prioritization 50 Tier 1 issues in the Land Stewardship category include soil health, erosion and loss of perennial vegetative cover. In each of the land resources above, there are different ways to manage the land that is also good for maintaining water quality and habitat. These management practices have differing time periods and levels of enhancement and protection (Table 4-2). Table 4-2. Management strategies and their time period for different land covers. Management Practice Practice Time Period Forest Grass- land Crop Land Management Strategy Goal Soil health practices including cover crops and tillage management Annual Goal 1. Land Management Goal 2. Nitrogen Reduction Irrigation best management practices and precision agriculture technologies Annual Nutrient best management practices Annual Rotational Grazing Annual Forest 2C tax classification Annual Forest Stewardship Plan 10 years Conservation Reserve Program (CRP) 10-15 years Sustainable Forest Incentive Act (SFIA) 8, 20 or 50 years Goal 6. Land Protection Conservation Easements Permanent Fee Title Acquisition Permanent ENHANCE ENHANCE RESTORE ENHANCE ENHANCE ENHANCE ENHANCE PROTECT PROTECT PROTECT Figure 4-7. Agricultural land in the LWR Watershed. Resource Prioritization 51 Land Management Prioritization During plan development, the Advisory Committee needed to determine a way to prioritize where to add management and protection in each land type (forests, pasture, cultivated). This discussion spanned four meetings and included determining where is the most risk and need for new management practices, and where best management practices are currently being implemented. First, land cover and land ownership data were obtained from the Redeye Watershed Landscape Stewardship Plan to determine what acres are permanently protected. In this plan, permanently protected land includes public water, wetlands (WCA), public land, Sustainable Forest Incentive Act lands (SFIA), easements, and buffers (Buffer Law). These acres were labeled “Protected Land”. The Groundwater and Agriculture report and discussions at the Advisory Committee and Policy Committee recognized that beneficial land stewardship practices are already occurring on the landscape. Data summarizing known management practices were obtained from NRCS, USDA (CRP), and BWSR. These acres were labeled “Known Management”. The Advisory Committee acknowledged that the remaining acres of the watershed could either 1) not have best management practices; or 2) have best management practices that aren’t recorded in the local data. For this reason, these acres were called “Unknown Management”. To narrow down the “Unknown Management” category for targeting new management practices in this plan, two analyses were used. For forests, an analysis to determine where forests are most at risk for conversion to non-forested land uses (based on soils conducive to farming) was completed (Figure 4-10). For pasture and cultivated lands, an analysis to determine the top 25% of pasture and cropland acres with the most erosion risk was completed (Figure 4-11). In a second step, PTMApp was used to quantify benefits for implementing source reduction practices (cover crops and nutrient management) on these pasture and cropland acres. The acres determined to have the most risk for affecting surface and groundwater quality based on the two analyses were labelled “1st Priority Unknown Management”. The remaining acres that were not deemed high risk are “2nd Priority Unknown Management”. These acres are low risk because they have lower potential for soil erosion and forest loss. This land prioritization will guide the majority of the implementation work in this plan, and plan goals are targeted in the “1st Priority Unknown Management” acres (Figure 4-8, 4-9). Figures 4-10 and 4-11 will guide where to start implementation first. Watershed partners will start in the red and orange areas first, which show the most “1st Priority Unknown Management” acres to work on. Appendix B provides the numbers of each analysis shown in Figure 4-10 and 4-11 and can be used for tracking progress during implementation.   Resource Prioritization 52   Figure 4-8. Land Prioritization.   Resource Prioritization 53 Figure 4-9. Implementation focus and activities for Land Prioritization. Resource Prioritization 54 Figure 4-10. Forest lands at risk for conversion to agricultural practices. Figure 4-11. Soil loss risk in the LWR Watershed. This analysis identifies the top 25% of cultivated and pasture acres with the most erosion potential (HEI Tech Memo). Resource Prioritization 55 Habitat in the LWR Watershed is tied to both surface water resources and land resources and is included in those prioritizations in the previous pages. Quality habitat is essential for biodiversity (Figure 4-12) and ecosystem services. Ecosystem services are the benefits to people from nature. These benefits include food, water purification, carbon sequestration, soil stabilization, recreation, increased infiltration for water storage, and cultural values, among others (The Nature Conservancy). There are three main categories of habitat, and in all of them the more diverse the landscape, the more biodiversity is possible (Figure 4-12). There are two Tier 2 habitat issues: protecting shallow lakes and restoring connectivity (Section 3). Habitat is an added benefit in many of the plan goals including Land Management, Land Protection, Riparian Habitat, and Connectivity. Currently, there is not an adequate way to measure ecosystem services, but this concept is emerging and there will likely be a way to measure it in the next decade. Habitat Resources Aquatic. Aquatic habitat in the LWR Watershed consists of streams, lakes, and wetlands. This habitat is important for fish, aquatic insects, and other aquatic organisms. Barriers such as dams and culverts can fragment aquatic habitat. Riparian. Riparian habitat in the watershed is important for reptiles and amphibians including frogs and turtles, wildlife such as otters and fishers, and shorebirds. Riparian vegetation is also important in filtering sediment from runoff and stabilizing the stream banks to prevent erosion. Upland. Upland habitat in the watershed is important for wildlife such as foxes and deer, songbirds, birds of prey, pollinators, and more. A recent Breeding Bird Survey* indicated that out of 210 Minnesota bird species, 58% of those species show negative population trends. A lack of suitable habitat is a major cause of decline in these species. Habitat protection and enhancement, CRP, CREP, and precision farming techniques are listed as ways to protect and bring back Minnesota Bird populations (MPR News). Upland habitat management and protection is addressed in Goal 1. Land Management and Goal 6. Land Protection. *The Breeding Bird Survey is jointly coordinated by the USGS Patuxent Wildlife Research Center, the Canadian Wildlife Service, and the National Wildlife Research Center. Resource Prioritization 56 Figure 4-12. Habitat diversity related to biodiversity. Resource Prioritization 57 “Enhance” Focus Summary A summary of the ENHANCE priority areas for all LWR Watershed resource categories (Surface Water, Groundwater, Habitat, and Land Stewardship) are highlighted in the map below (Figure 4-13). Resources are color-coded based on their reason for being categorized as “Enhance”. Figure 4-13. Summarization of the “Enhance” management focus areas. Resource Prioritization 58 “Protect” Focus Summary A summary of the PROTECT priority areas for all LWR Watershed resource categories (Surface Water, Groundwater, Habitat, and Land Stewardship) are highlighted in the map below (Figure 4-14). Resources are color-coded based on their reason for being categorized as “Protect”. Figure 4-14. Summarization of the “Protect” management focus areas. Section 5: Goals and Implementation Goals and Implementation 60 Section 5. Goals and Implementation The LWR1W1P Targeted Implementation Schedule is organized by goal, so this section combines goals and implementation by: 1.highlighting each Measurable Goal, 2.showing where implementation will take place on the targeting map(s), and 3.listing the Targeted Implementation Schedule actions and costs. The Advisory Committee thought this formatting layout will allow this plan to be easily used in implementation, because each goal and implementation table can stand alone from the plan and easily fit into grant applications. The information can also be used for targeted outreach efforts specific to a particular goal. Measurable Goals Measurable goals identify the desired change in the resource of concern and indicate how progress will be measured. Goals are developed to address all the issues, although it is not a one-to-one process as a single goal can address multiple issues. The quantity of how much progress implementation can make toward goals and changes to the resource condition are determined with models and data analysis. Some goals such as E. coli and Drinking Water Protection were determined using eLINK data. Other goals such as Nitrogen Management, Land Management, and Phosphorus Reduction were determined using the Prioritize, Target, and Measure Application (PTMApp). The measurable goals were developed by the Advisory Committee over the course of three meetings. They started with general concepts, and then became measurable when data and analyses were agreed upon for measuring the goals. The goals are listed in two tiers. Tier 1 goals address primary Tier 1 issues and will be the focus of implementation in this plan. Tier 2 goals will be implemented as time and funding allow. Since there are no turbidity or phosphorus impairments in the watershed, many of these goals are to increase land management to prevent any further degradation, maintain current conditions, or increase protection. Tier 1 Goals Tier 2 Goals 1.Land Management 2.Nitrogen Management 3.Drinking Water Protection 4.Bacteria Reduction 5.Phosphorus Reduction 6.Land Protection 7.Wetland Protection 8.Groundwater Sustainability 9.Riparian Habitat Enhancement 10.Aquatic Habitat Enhancement 11.Water Retention Goals and Implementation 61 This section describes each goal along with the following items. Description: The basis for the goal and how it will be addressed in implementation. Issues Addressed: Which plan issues this goal addresses. NRCS Resource Concerns: Which NRCS Resource Concerns this goal addresses. Prioritization and Targeting: Where the first priority is for implementation and what resources will be targeted. Planning Region priorities are identified by color coding (Figure 5-1). Short-term Goal: The quantity of how much will be achieved during the 10-year plan time period, indicated in a circle (Figure 5-1). Long-term Goal: The desired future condition. Targeted Implementation Schedule The Targeted Implementation Schedule outlines the actions that will be taken during implementation of the plan to achieve each goal, who will do them, where they will be targeted, and how much it will cost. Funding is summarized in three categories (Table 5-1). Each action in the Targeted Implementation Schedule has a funding level associated with it. If there is cost-share funding involved, sometimes an action has two or three funding levels. A funding level of 1,2 means that it is an action that LGUs are currently doing that they will do more of with increased watershed-based funding. Table 5-1. Funding levels in the LWR Watershed. Funding Level Description 1 Current baseline funding for the watershed for all programs. 2 Obtain watershed-based funding and competitive grants. 3 Partner funding (NRCS, MPCA, DNR, CRP, etc). The implementation of this plan will take coordination between watershed partners and multiple funding sources. Implementation is a balancing act between planned landscape management (“Manage It”), protected lands maintenance (“Keep It”), constructed environmental enhancements (“Fix It”) and Wing Planning Region: Short-term Goal Figure 5-1. Example showing Planning Region Prioritization and short-term goal for a specific planning region. Planning region color coding: High Medium Low.   Goals and Implementation 62 “Analysis and Information” (Figure 5-2). In the LWR Watershed, the pressure is mostly applied to the “Manage It” strategy. Each action in the Targeted Implementation Schedule has an Implementation Program associated with it. The LWR1W1P drew on actions from existing local plans, along with additional actions added by the Advisory and Policy Committees. Each action in the Targeted Implementation Schedule notes the source of that action. Acronyms are listed in Table 5-2. Table 5-2. Existing plans and reports that actions were drawn from for the LWR Watershed 1W1P. Plan/Report Acronym Plan/Report Name WRAPS MPCA Watershed Restoration and Protection Strategy LSP Landscape Stewardship Plan GWA Groundwater and Agriculture Report NRCSWG Local NRCS Work Group priorities WP Existing Otter Tail, Wadena, Todd and Becker County Water Plans 1W1P This current One Watershed One Plan effort GRAPS MDH Groundwater Restoration and Protection Strategy NFMP Nitrogen Fertilizer Management Plan Implementation: A Balancing Act Figure 5-2. Implementation programs for the Redeye 1W1P. Goals and Implementation 63 Goals 1 and 2: Multiple Benefits “Water quality begins on the land.” – Kent Solberg, Citizen Advisory Committee member The Advisory and Policy Committees recognize that the land management practices that will be implemented through this plan have multiple benefits and can make progress towards multiple plan goals. Land management practices can be stacked on the landscape to provide benefits to both surface and ground water quality. For example, Goal 1 focuses on practices that reduce erosion to surface water and build soil aggregate formation including cover crops and reduced tillage. Goal 2 focuses on practices that reduce nitrogen infiltration to the groundwater such as nitrogen management and irrigation water management. Goals 1 and 2 complement each other and together comprise a holistic management of surface and groundwater resources (Venn Diagram Figure 5-3 and Map Figure 5-4). Land Management Goal 1 Goal 2 Nitrogen Reduction Surface Water Resource focus Resource focus Ground Water Highest Soil Erosion Potential Target Target Highest Nitrogen Infiltration Potential Add soil health practices to 20% of acres with highest soil erosion potential, starting with those with the best sediment reduction benefit. Short-term Goal Short-term Goal Nutrient Management and Irrigation Water Management on the acres that overlap with Goal 1 acres. Add soil health practices to all acres with highest soil erosion potential. Long-term Goal Long-term Goal Nutrient Management and Irrigation Water Management on all acres with highest nitrogen infiltration risk. Figure 5-3. Holistic look at Goals 1 and 2 and how they overlap. These acres are mapped on the next page, Figure 5-4.   Goals and Implementation 64 Figure 5-4. Targeted acres for Goals 1 and 2. Goals and Implementation 65  Goal 1. Land Management Promote and increase known land management, including soil health practices, sustainable grazing practices, and forest management, in 20% of 1st priority unknown management acres identified per planning region. Description There are no phosphorus or turbidity impairments in the LWR Watershed, so this goal addresses increasing management practices (e.g. forest stewardship plans, grazing plans, cover crops) on the landscape to prevent future impairments. The Agriculture and Groundwater report and the NRCS local work group priorities highlight the need for additional technical and financial assistance for landowners to implement these practices. These practices provide multiple benefits such as increased soil aggregation, reduced wind erosion, continuous vegetative cover on the landscape, and carbon storage, while reducing phosphorus, sediment, and nitrogen to lakes and streams. Issues Addressed Soil Health Soil Erosion & Runoff Loss of Perennial Vegetative Cover NRCS Resource Concerns Soil Erosion - Organic matter depletion Soil Erosion - Sheet rill Inadequate Habitat for Fish & Wildlife – Habitat Degradation & Habitat Continuity Metric Number of acres of cover crops, tillage management, grazing plans, and forest stewardship plans. Prioritization and Targeting Planning Region Prioritization: High Medium In Section 4, planning regions were prioritized by land resources using a soil erosion risk analysis for cultivated and pastureland (Figure 4-10) and a risk of conversion analysis for forested land (Figure 4-11). This goal focuses on implementing management practices on the landscape (e.g. forest stewardship plans, grazing plans, cover crops, reduced tillage) in these targeted areas. The short-term goal is 20% of the long-term goal acreage. Phosphorus, sediment, and nitrogen benefits to surface water of source reduction practices on these priority acres were measured with PTMApp at edge- of-field and are illustrated on page 67. Upper Leaf: 7,146 acres Middle Leaf: 3,998 acres Redeye: 3,459 acres Wing: 6,846 acres Goals and Implementation 66 The land prioritization (pages 51-52) determined the long-term goal for land management. The Advisory Committee determined they could make 20% progress as the short-term goal during this 10-year plan based on effort and available funding (Table 5-1). Table 5-1. Long-term goal acreage for the watershed. The short-term goal is to implement management practices on 20% of the long-term acres. Planning Region Redeye Upper Leaf Middle Leaf Wing Long- term Goal Short- term Goal Long- term Goal Short- term Goal Long- term Goal Short- term Goal Long- term Goal Short- term Goal Forests 6,231 1,246 4,025 805 4,207 841 5,395 1,079 Grassland & Pasture 7,246 1,449 9,591 1,918 6,330 1,266 5,724 1,145 Cultivated Land 3,817 763 22,112 4,422 9,454 1,891 23,111 4,622 Total 17,294 3,459 35,728 7,146 19,991 3,998 34,230 6,846 To measure water quality benefits from land management practices PTMApp source reduction was run for the targeted grassland, pasture and cultivated land. Benefits are summarized for the long-term goal and short-term goal in Appendix H. In order to summarize benefits for the short-term goal, all the source reduction practices were ranked per planning region based on median sediment benefit. Practices were summed until they met the acreage of the short-term goal. These short-term goal benefits are summarized on the next page for each planning region (Figure 5-5). Benefits are tracked at edge-of-field for each individual BMP, but water quality benefits are also summarized at the pour point of the watershed to relate the BMPs to resource condition. There is a Watershed Pollutant Load Monitoring Network (WPLMN) long-term water quality monitoring site at the pour point of the watershed that can track changes in nutrient loads leaving the watershed over time. Management recommendations for targeted forests were taken from the Redeye Watershed Landscape Stewardship Plan, which includes recommendations for targeting enhancement, restoration and protection of forests per Planning Region of the LWR Watershed (Figure 5-5). The number of forest stewardship plans was determined by using the average size of plan from the LSP (124 acres/plan). LSP Definitions: Enhance: Changing forest species composition. Restore: Establishing new forest. Goal 1. Land Management Goals and Implementation 67 Land Management Implementation Short-term Goal Benefits Summary Figure 5-5. Targeted acres and benefits for land management practices. The map shows the acres that comprise the long-term goal to provide flexibility on where to work. The benefits reported are for the short-term goal. Middle Leaf Cultivated and Pasture Land Median Edge of Field Benefits: 3,946 acres; 61 parcels 521 lbs phosphorus 4,178 lbs nitrogen 1,180 tons sediment Forest Management Summary: 841 acres; 7 plans Enhance wildlife habitat in the central and northern portions of the planning region and along the Leaf River. Upper Leaf Cultivated and Pasture Land Median Edge of Field Benefits: 7,925 acres; 121 parcels 1,022 lbs phosphorus 8,189 lbs nitrogen 3,184 tons sediment Forest Management Summary: 805 acres; 7 plans Enhance habitat along the Leaf River Corridor. Redeye Cultivated and Pasture Land Median Edge of Field Benefits: 2,765 acres; 99 parcels 359 lbs phosphorus 2,875 lbs nitrogen 1,138 tons sediment Forest Management Summary: 1,246 acres; 10 plans Restore a 1-2 mile wide buffer around the Redeye River, restore and enhance a buffer around Hay Creek, carry out a crop tree release of oaks and clear-cut stands of 50-60 yr old aspen south of Sebeka. Wing Cultivated and Pasture Land Median Edge of Field Benefits: 7,208 acres; 148 parcels 948 lbs phosphorus 7,601 lbs nitrogen 2,505 tons sediment Forest Management Summary: 1,079 acres; 9 plans Restore a 1-2 mile wide buffer around the Redeye River. Watershed Pour Point Benefits: 1,585 lbs phosphorus 12,740 lbs nitrogen 1,110 tons sediment Goals and Implementation 68 The Advisory Committee decided to have an individual line item for a minimum of one staff full-time-equivalent (FTE) devoted to technical assistance. The rest of the actions are the cost for just the implementation of the action. The outreach activity costs were determined by taking the total the Planning Team wanted to spend on outreach and dividing it by the number of individual outreach actions. When there is more than one funding level for an action, the costs are additive not cumulative. A level ½ means that this action is currently occurring, but it will be increased with watershed-based funding. Implementation Action Source Program Funding Level Targeted Resources 10-yearMeasurable Outcome Lead/ Supporting entities 2021-2022 2023-2024 2025-2026 2027-2028 2029-2030 Total 10-year cost General $795,000 Design and maintain a method to inventory current practices and track new practices. GWA, 1W1P 2-- Complete tracking system SWCDs, NRCS ● ● ● ● ● $15,000 Provide Technical Assistance for land management programs (crops, pasture and forest) GWA, 1W1P 21st Priority Acres (Tbl 5-1, Fig 5-5) Minimum of 1 Staff FTE SWCDs ● ● ● ● ● $750,000 Develop a media campaign about land management options. 1W1P 2 Absentee landowners in 1st Priority Acres (Fig 5-5) 1 complete media campaign strategy SWCDs ● ● ● ● ● $15,000* Hold an annual land use coordination meeting to update on any ordinance changes. 1W1P 2-- Annual meeting Counties, SWCDs, cities, townships ● ● ● ● ● $15,000* Update comprehensive plan and consider county-wide zoning. 1W1P 2Otter Tail County Plan adopted OT County ● ● $0 Pasture $2,600,000 Provide financial assistance for writing and assisting in rotational grazing plans. 1W1P, WRAPS, NRCSWG 1st Priority Acres (Tbl 5-1, Fig 5-5) 2 systems/year SWCDs, NRCS ● ● ● ● ● $500,000 $500,000 Establish a managed pasture program (similar to an SFIA model). 1W1P 1st Priority Acres (Tbl 5-1, Fig 5-5) 5% of priority pasture acres (Table 5-1) SWCDs, BWSR, TNC ● ● ● $800,000 $800,000 *This outreach action is an equal portion of the full outreach budget. Table continued on next page… Goal 1. Land Management Implementation Schedule Goals and Implementation 69 Implementation Action Source Program Funding Level Targeted Resources 10-yearMeasurable Outcome Lead/ Supporting entities 2021-2022 2023-2024 2025-2026 2027-2028 2029-2030 Total 10-year cost Cropland $3,020,000 Implement soil health practices such as cover crops, reduced tillage, etc. GWA, WRAPS, 1W1P, NRCSWG 1st Priority Acres (Tbl 5-1, Fig 5-5) 20% of Priority Cultivated Acres (Table 5-1). Pace: 1,000 acres/year 40 parcels/year SWCDs, NRCS ● ● ● ● ● $10,000 $745,000 $745,000 Connect members of the public and lake associations with farmers to build relationships. GWA All Annual Breakfast on the farm and farm demonstration Community members, SWCD, OTC, OTCOLA, Lake Assoc., Co-ops ● ● ● ● $5,000 $15,000* Develop individual farm plans that are resource driven and incorporate long-term management practices. GWA 21st Priority Acres (Tbl 5-1, Fig 5-5) 2 plans/year SWCDs, NRCS ● ● ● ● ● Included in tech assistance Facilitate and foster a peer to peer learning exchange and crop advisory teams. GWA, 1W1P 2All 1 complete media campaign strategy SWCDs, landowners ● ● ● ● $15,000* Provide education and outreach to co-ops and producers to build trust and increase coordination. 1W1P 2All 1 meeting/year SWCDs, NRCS ● ● ● ● ● $15,000* Implement the Conservation Reserve Program (CRP). 1W1P 3 1st Priority Acres (Tbl 5-1, Fig 5-5) Maintain current acres (22,000 acres in 2019) FSA, SWCD, USDA, BWSR, TNC ● ● ● $1,275,000 Increase the number of farms and acres with Minnesota Ag Water Quality Certification Program. 1W1P 3 1st Priority Acres (Tbl 5-1, Fig 5-5) 2 Farms/year SWCDs, MDA ● ● ● ● ● $200,000 Support and encourage the development of local markets for alternative crops (barley, hemp, hops). GWA, 1W1P 3All Completed market analysis Universities, CLC ● ● ● ● ● NA Conduct university research locally and promote more research in the watershed. GWA 3All At least 1 local research plot Universities, SWCDs ● ● ● ● ● NA Goal 1. Land Management Implementation Schedule Goals and Implementation 70 These totals are for the whole goal (last 3 pages). Implementation Action Source Program Funding Level Targeted Resources 10-yearMeasurable Outcome Lead/ Supporting entities 2021-2022 2023-2024 2025-2026 2027-2028 2029-2030 Total 10-year cost Forests $222,000 Continue the SWCD Tree Sale. WP 1-- Continue local program SWCDs ● ● ● ● ● $10,000 Develop forest stewardship plans. LSP 1st Priority Acres (Tbl 5-1, Fig 5-5) 20% of 1st Priority Forest Acres (Table 5-1) Pace: 400 acres/yr 3 plans/yr SWCDs, DNR, FRC, Forest Consultants ● ● ● ● ● $10,000 $50,000 $50,000 Integrate forest health, water quality, and habitat benefits into Forest Stewardship Plan format. LSP -- Revised Forest Stewardship Plan format SWCDs, DNR ● ● ● ● ● $1,000 $1,000 Increase forest stand improvement implementation (FSI). LSP, NRCSWG 1st Priority Acres (Tbl 5-1, Fig 5-5) 200 Acres DNR, SWCDs ● ● ● ● ● $50,000 $50,000 Urban $70,000 Implement urban best management practices (rain gardens, salt BMPs, stormwater management, inventory stormwater outlets, urban tree planting). WRAPS Union Creek through Wadena 5 practices Pace: 1 practice every other year SWCD, MPCA, municipalities ● ● ● ● ● $20,000 $50,000 Level 1 Funding Sources: SWCD, BWSR | Total Level 1 $35,000 Level 2 Funding Sources: SWCD, BWSR | Total Level 2 $3,006,000 Level 3 Funding Sources: NRCS, FSA, DNR, Municipalities, MDA, TNC | Total Level 3 $3,671,000 Goal 1. Land Management Implementation Schedule Goals and Implementation 71      Description Nitrate in drinking water is one of the top concerns in the LWR Watershed and has been mentioned in the Agriculture and Groundwater report and the NRCS local work group priorities. Nitrates in drinking water are a public health issue. Well testing has shown that nitrates are over the State standard (10 mg/L) in some areas of the watershed where there is a combination of a surficial sand aquifer and land uses that apply nitrogen to the landscape (Figure 5-6). The MDA has identified the Verndale DWSMA for implementation of Part 2 of the Groundwater Protection Rule. Implementing nutrient management practices, such as precision techniques, in these high nitrate areas can make progress toward reducing nitrate concentrations in wells. Issues Addressed Groundwater Contamination NRCS Resource Concerns Water Quality Degradation – Excess nutrients in groundwater Metric Acres of nutrient management practices Upper Leaf: 1,888 acres Redeye: 283 acres Middle Leaf: 1,816 acres Prioritization and Targeting Planning Region Prioritization: High; Medium; Low Planning Regions were prioritized by the number of townships at or above the drinking water standard (Figure 5- 6). The short-term goal and targeted acreage is the total of the acres where the high and moderately high nitrogen infiltration risk categories overlap with the priority management acres from Goal 1 (Figure 5-7). The long-term goal is to implement practices on all acres with high and moderately high nitrogen infiltration risk (Figure 5-7). PTMApp was used to measure phosphorus, sediment, and nitrogen benefits to surface water by implementing nutrient management practices on these targeted acres at edge-of-field. Data shows practices could yield the following total benefits for the watershed (median): Nitrogen reduction: 12,770 lbs/year Phosphorus reduction: 1,594 lbs/year Sediment reduction: 5,274 tons/year Goal 2. Nitrogen Management Implement nitrogen management practices on 12% of acres with high nitrogen infiltration risk to maintain nitrates in public and private wells below the state standard of 10 mg/L. Wing: 5,389 acres Goals and Implementation 72Figure 5-6. Township testing results showing the percentage of wells over the state standard of 10 mg/L. Figure 5-7. Nitrogen infiltration risk in the LWR Watershed showing where nitrogen has the highest potential to reach groundwater based on soils, land use, and recharge potential. Goal 2. Nitrogen Management Goals and Implementation 73 Figure 5-8. Nitrogen infiltration risk in the Verndale DWSMA and a one mile buffer around it, showing where nitrogen has the highest potential to reach groundwater based on soils, land use, and recharge potential. Figure 5-9. Nitrogen infiltration risk in the Wadena DWSMA and a one mile buffer around it, showing where nitrogen has the highest potential to reach groundwater based on soils, land use, and recharge potential. Goals and Implementation 74 *This outreach action is an equal portion of the full outreach budget. Implementation Action Source Program Funding Level Targeted Resources 10-year Measurable Outcome Lead/ Supporting entities 2021-2022 2023-2024 2025-2026 2027-2028 2029-2030 Total 10-year cost Continued screening of wells and nitrate testing clinics. 1W1P, WRAPS -- 1 clinic/year; MDA Central Sands Nitrate Testing SWCD, MDH, MDA ● ● ● ● ● Included in tech assistance, Goal 2 Provide financial assistance to implement nutrient management plans. GWA 1st Priority Acres (Goal 1) with high nitrogen infiltration including within DWSMAs (orange, Figs. 5-7, 5-8, 5-9) Redeye: 293 ac U. Leaf: 1,888 ac M Leaf: 1,816 ac Wing: 5,389 ac Pace: 1,000 acres/yr 10 landowners/yr SWCDs, NRCS ● ● ● ● ● $50,000 $112,500 $112,000 Provide financial assistance to implement irrigation water management. GWA SWCDs, U of MN, MDA, CLC, NRCS ● ● ● ● ● Included in Goal 8, Groundwater Quantity Provide financial assistance for precision agriculture practices. GWA Add 2 more producers/year SWCD, NRCS ● ● ● ● ● $50,000 $50,000 Implement the Nutrient Management Initiative (NMI) program. NFMP Add 2 more producers/year MDA, SWCD ● ● ● ● ● $50,000 $50,000 Develop a media campaign and conduct workshops with farmers and lawn care businesses about fertilizer application. 1W1P 2 -- 1 workshop/year, 1 complete media campaign strategy SWCD, TSAs ● ● ● ● $15,000* Increase staff knowledge and expertise with new technologies such as precision fertilizer application. 1W1P 2 -- Maintain Job Approval Authority for at least one technical staff SWCD, UofM, CLC ● ● ● ● ● $5,000 Purchase equipment and materials for nitrate screening. 1W1P -- Purchase one additional Hach meter and/or supplies SWCD, MDA ● $5,000 $5,000 Level 1 Funding Sources: SWCD, BWSR | Total Level 1 $50,000 Level 2 Funding Sources: SWCD, BWSR | Total Level 2 $217,500 Level 3 Funding Sources: NRCS, MDA | Total Level 3 $167,500 Goal 2. Nitrogen Management Implementation Schedule Goals and Implementation 75      Description Safe drinking water is imperative to human health. This goal aims to protect public and private drinking water sources in the watershed, Drinking Water Supply Management Areas (DWSMAs), and Non- Community Public Water Supplies. Unused wells that are not properly sealed can pose a safety, health, and environmental threat to the community. Sealing these wells protects the groundwater from contamination. Other implementation activities aimed at protecting groundwater include well monitoring, outreach to private landowners, upgrading noncompliant septic systems, protecting DWSMAs through land management practices that keep continuous vegetative cover on the landscape, and the future testing of any emerging contaminants. Issues Addressed Groundwater Contamination NRCS Resource Concerns Water Quality Degradation – Excess nutrients in groundwater Metrics Number of wells sealed Land Practices in the DWSMA Upper Leaf: seal 5 wells Redeye: seal 5 wells Middle Leaf: seal 5 wells Wing: seal 15 wells Prioritization and Targeting Planning Region Prioritization: High; Medium; Low Planning Regions were prioritized by their pollution sensitivity (Figure 5-10). Minnesota Department of Health prioritization shows that the Verndale and Wadena Drinking Water Supply Management Areas (DWSMAs) have high vulnerability to contamination. Well-sealing is a priority watershed wide. eLINK records show that 25 wells were sealed in the watershed in the last 10 years. This plan aims to slightly increase that rate and seal an additional 30 wells in the 10-year plan timeframe. The long-term goal is for all drinking water in the watershed to be below state standards and safe for consumption. Targeted Resources: Verndale DWSMA ● Wadena DWSMA ● Private Wells Goal 3. Drinking Water Protection Protect groundwater by sealing 30 unused wells, protecting DWSMAs, and addressing emerging contaminants. Goals and Implementation 76 Figure 5-10. Pollution sensitivity of near-surface materials and locations of DWSMAs in the watershed. Goal 3. Drinking Water Protection Measurable Goals 77 Implementation Action Source Program Funding Level Targeted Resources 10-yearMeasurable Outcome Lead/ Supporting entities 2021-2022 2023-2024 2025-2026 2027-2028 2029-2030 Total 10-year cost Continue to provide cost share to seal private unused wells. 1W1P 1DWSMAs and Areas with shallow aquifer (Fig 5-10). Seal 3 wells/year SWCDs, MDH ●●●●●$15,000 Develop a media campaign to reach private drinking well owners on wellhead protection including arsenic and any emerging contaminants. WRAPS 1DWSMAs, Areas with shallow aquifer (Fig 5-10) 1 complete media campaign strategy SWCDs, MDH, MDA ● ● ● ● ● $15,000* Continue household hazardous waste program. 1W1P 1-- Continue local program Counties ● ● ● ● ● $50,000 Participate in wellhead protection teams. 1W1P 1Verndale and Wadena DWSMAs 5 meetings SWCDs, MDH, MDA, cities ● ● ● ● ● $5,000 Continue low interest loan and grants program for upgrading Subsurface Sewage Treatment Systems. 1W1P DWSMAs, Areas with shallow aquifer (Fig 5-10) 2/year Counties, SWCDs, Region 5, MDA ● ● ● ● ● $2,000 $2,000 Implement land use change in the DWSMA to minimize drinking water contamination. 1W1P 2DWSMAs (Fig 5-10) Goal 2 Cities, SWCDs, MDH, MDA ● ● ● ● ● Included in Goal 2 Consider point of sale SSTS compliance in Becker County. 1W1P 2-- Discussion with county board Becker County ● ● ● ● $0 Level 1 Funding Sources: SWCD, BWSR, Counties | Total Level 1 $87,000 Level 2 Funding Sources: SWCDs, Region 5, MDH, Counties | Total Level 2 $2,000 Total Level 3 $0 *This outreach action is an equal portion of the full outreach budget. Goal 3. Drinking Water Protection Implementation Schedule. Goals and Implementation 78  Goal 4. Bacteria Reduction Develop and implement 20 bacteria management projects to address sources of bacteria and make progress toward delisting impairments. Description E.coli exists in the guts of warm-blooded animals such as humans, livestock, birds, and pets. When it reaches high levels in the environment, it can make humans sick. Water quality monitoring has identified eight E. coli impairments in the watershed (over the State standard). This goal aims to implement bacteria management projects in areas with impairments with the intent to decrease E. coli concentrations in impaired streams. Bacteria management projects (i.e. projects) include cattle restriction from streams; improving pasture management; manure management BMPs; septic system permitting and record-keeping; and continued monitoring. Issues Addressed E.coli Impairments NRCS Resource Concerns Water Quality Degradation - Excess pathogens/chemicals from manure, biosolids, or compost Metric Number of projects implemented (i.e. feet of cattle exclusion fence installed, number of manure management BMPs, and percentage of compliant SSTS). Prioritization and Targeting Planning Region Prioritization: High; Medium; Low Planning regions were prioritized by where there are impaired streams. Project locations along these streams were targeted with a windshield feedlot survey in Wadena County and areas where there is pasture adjacent to impaired streams (Figure 5-11). The short-term goal was determined using eLINK data to see what has been implemented in the past 10 years and then discussions with the Advisory and Policy committees resulted in decisions as to what is reasonable to implement in the next 10 years. The long-term goal is to implement projects at all potential bacteria loading sites. Impaired Streams: Bluff Creek (-515) ● Oak Creek (-516) ● Wing River (-560) Trib to Redeye River (-526) ● Leaf River (-514) Leaf River (-505) ● Union Creek (-508) ● Redeye River (-503) Middle Leaf: 5 projects Upper Leaf: No Impairments Redeye: 10 projects Wing: 5 projects Goals and Implementation 79 Figure 5-11. LWR Watershed showing impaired streams, targeted project locations from the windshield feedlot survey, and stretches of pasture along impaired streams. Goal 4. Bacteria Reduction Goals and Implementation 80 Implementation Action Source Program Funding Level Targeted Resources 10-yearMeasurable Outcome Lead/ Supporting entities 2021-2022 2023-2024 2025-2026 2027-2028 2029-2030 Total 10-year cost Enforce ordinances related to Subsurface Sewage Treatment Systems (SSTS). WRAPS 1Impaired streams Continue local program Counties, MPCA ● ● ● ● ● $670,000 Enforce ordinances and rules related to feedlot compliance. 1W1P 1Continue local program MPCA, WCo, TCo ● ● ● ● ● $30,000 Implement manure management BMPs and waste systems in priority feedlots. WRAPS, NRCSWG 2 projects SWCDs, NRCS ● ● ● ● ● $200,000 $200,000 Conduct feedlot windshield surveys in Otter Tail and Becker counties. WRAPS 22 completed surveys SWCDs, MPCA ● ● $15,000 Implement prescribed grazing, cattle fencing, and watering facilities. WRAPS 10 projects SWCD, NRCS ● ● ● ● ● $20,000 $20,000 Enhance riparian buffers near impaired streams (beyond buffer law). 1W1P 7 projects SWCD, NRCS ● ● ● ● ● $20,000 $20,000 Close inactive or failing manure pits. 1W1P 1 project SWCD, NRCS, MPCA ● ● ● ● ● $5,000 $5,000 Conduct DNA source testing in WRAPS Cycle 2. 1W1P 33 sites MPCA, SWCD ● $10,000 Level 1 Funding Sources: County, SWCD | Total Level 1: $900,000 Level 2 Funding Sources: BWSR, SWCDs | Total Level 2: $260,000 Level 3 Funding Sources: MPCA , NRCS | Total Level 3: $55,000 Goal 4. Bacteria Reduction Implementation Schedule Goals and Implementation 81   Goal 5. Phosphorus Reduction Reduce phosphorus loading to lakes with declining water quality trends by 5% through implementing BMPs within the lakeshed. Description Because of the way the glaciers moved through the area, there are very few large lakes in the LWR Watershed compared to its neighboring watersheds (Otter Tail, Crow Wing, and Long Prairie). There are no lakes impaired for eutrophication (too many nutrients) in the watershed, but West Leaf Lake has a declining water quality trend. This goal focuses on reducing phosphorus loading to the Leaf Lake Chain to stabilize the trend and prevent impairment. Implementation activities will include stormwater BMPs, land management practices in the lakeshed (Goal 2), and shoreline restoration (Goal 9). Wolf Lake is a large, shallow wild rice lake at the watershed headwaters. Long-term trend analysis is needed to determine future water quality. Issues Addressed Development Pressure Lakes with high phosphorus sensitivity, outstanding biological significance, wild rice, and shallow depths NRCS Resource Concern Water Quality Degradation – Excess nutrients in surface water Metric Annual phosphorus load reduction. Trend analysis of monitoring data. Monitor Wolf Lake West Leaf Lake: 53 lbs reduction Middle Leaf Lake: 90 lbs reduction Prioritization and Targeting Planning Region Prioritization: High; Medium; Low Lakes were prioritized by water quality trend and shoreland development classification (Section 4, page 48). The Leaf Lake Chain has declining water quality trends and are designated Recreational Development. Existing annual phosphorus loads were modeled in PTMApp. The long-term goal is based on the Lakes of Phosphorus Sensitivity Significance (LPSS) target load (Radomski, DNR), and the short-term goal is what is reasonable to achieve during this 10-year plan. The PTMApp implementation scenario shows that the short- term goal can be met with identified practices (Table 5-2, Figure 5-12). Goals and Implementation 82  The Land Prioritization (Section 4) resulted in the targeted cultivated parcels for source reduction practices (i.e. cover crops and nutrient management) addressed in Goal 1. To meet this Phosphorus Reduction goal, the benefits of these same targeted parcels were summarized in the Leaf Lakes lakeshed (land area directly draining to the lake) (Figure 5-12). There are enough opportunities for source reduction practices (identified in blue in Figure 5-12) in the lakesheds to meet the Phosphorus Reduction goal (Table 5-2). Table 5-2. Phosphorus loading summarization based on PTMApp. Lake Priority Resource Point (PTMApp) Existing Load (PTMApp) 5% Goal Short-term LPSS target load Long-term Load Reduction potential from PTMApp West Leaf 14 1,063 lbs/yr 53 lbs/yr 202 lbs (19%) 236 lbs P/year East/Middle Leaf 13 1,802 lbs/yr 90 lbs/yr 234 lbs (13%) 209 lbs P/year Figure 5-12. Priority lakes for phosphorus reduction in the LWR Watershed and targeted source reduction BMPs from PTMApp. Goal 5. Phosphorus Reduction Implementation Goals and Implementation 83 Implementation Action Source Funding Level Targeted Resources 10-yearMeasurable Outcome Lead/ Supporting entities 2021-2022 2023-2024 2025-2026 2027-2028 2029-2030 Total 10-year cost Continue to enforce shoreland ordinances. 1W1P 1All Continue local program Counties ● ● ● ● ● $300,000 Install near-shore stormwater infiltration BMPs on developed lots (rain gardens, etc). 1W1P Leaf Lake Chain 5 projects EOTSWCD, OTCOLA, Leaf Lakes Assoc. ● ● ● ● ● $5,000 $20,000 Develop a media campaign for outreach to lakeshore owners about good land management choices and BMP options. 1W1P 2All 1 complete media campaign strategy EOTSWCD, OTCOLA, Leaf Lakes Assoc. ● ● ● ● ● $15,000* Implement agricultural land management practices in the Leaf Lake Chain lakesheds. PTMApp 2Leaf Lake Chain (Fig. 5-12) 53+90 lbs annual phosphorus reduction EOTSWCD, OTCOLA, Leaf Lakes Assoc. ● ● ● ● ● Included in Goal 2 Complete Score Your Shore on lakes and use as an outreach tool for shoreline restoration projects. 1W1P 3Leaf Lake Chain Score Your Shore completed for 25% of parcels OTCOLA, EOTSWCD Leaf Lakes Assoc. ● ● -- Continue long-term water quality monitoring on Leaf Lake Chain and begin on Wolf Lake (phosphorus, chlorophyll a, transparency). WRAPS 3Leaf Lake Chain, Wolf Lake 10-year TrendAnalysisOTCOLA, Leaf Lakes Assoc., MPCA, DNR ● ● ● ● ● $7,500 Level 1 Funding Sources: Counties, SWCDs | Total Level 1: $305,000 Level 2 Funding Sources: BWSR, SWCDs | Total Level 2: $35,000 Level 3 Funding Sources: Lake Associations, COLA, DNR, MPCA| Total Level 3: $7,500 *This outreach action is an equal portion of the full outreach budget Goal 5. Phosphorus Reduction Implementation Schedule Program Goals and Implementation 84   Description The LWR Watershed has a diverse landscape including >80% remaining historical wetlands, large areas of forests, and shallow lakes with wild rice and high biological significance. This goal addresses permanently protecting high value areas to preserve surface water, groundwater, and habitat quality. Implementation activities will include establishing easements and enrolling private landowners in the Sustainable Forest Incentive Act (SFIA). Issues Addressed Loss of perennial vegetative cover Lakes with high phosphorus sensitivity, outstanding biological significance, wild rice, and shallow depths Groundwater contamination Soil erosion and runoff NRCS Resource Concerns Inadequate Habitat for Fish & Wildlife – Habitat Degradation Soil Erosion – sheet rill Metric Acres of protection: wetlands, buffers, easements, public waters, public land, and SFIA. Upper Leaf: 553 acres Redeye: 1,095 acres Middle Leaf 0 acres Wing: 1,062 acres Prioritization and Targeting Planning Region Prioritization: High; Medium; Low The Redeye Watershed Landscape Stewardship Plan (LSP) contains protection goals for each minor watershed. These goals will be used to measure implementation. Areas targeted are where the Priority Acres (Goal 1) overlap with priorities for forest protection, high groundwater recharge, protection priority streams and wild rice, and biologically significant lakes (Figure 5-13). The short-term goal is to make 10% progress toward LSP goals in 1st Priority Acres (Goal 1). The long-term goal is for all minor watersheds to achieve their protection goal from the LSP (Appendix G). Targeted Resources: Gourd Lake ● Snow Lake ● Grass Lake ● Mud Lake ● Wolf Lake North Maple Lake ● Lake South Maple Lake ● Tamarack Lake Blue Creek (-541) ● Redeye River (-502, 503) ● South Bluff Creek (-530) Deer Creek (-511) ● Willow Creek (-525) Goal 6. Land Protection Increase protection of forest cover, water quality, habitat, and surficial sand aquifers by 10% in priority minor watershed based on the protection goals from the Redeye Landscape Stewardship Plan. Goals and Implementation 85 Figure 5-13. Protection area priorities in the LWR Watershed. Goal 6. Land Protection Goals and Implementation 86 Implementation Action Source Program Funding Level Targeted Resources 10-year MeasurableOutcome Lead/ Supporting entities 2021-2022 2023-2024 2025-2026 2027-2028 2029-2030 Total 10-year cost Maintain 100% compliance with the Minnesota Buffer Law through monitoring, education, and buffer installation assistance. BWSR 1 All 100% compliance SWCDs, Counties ● ● ● ● ● $560,000 Develop a media campaign for private landowners about land protection programs. 1W1P 2 -- 1 complete media campaign strategy SWCDs ● ● ● ● ● $15,000* Permanently protect undeveloped land with conservation easements or acquisition. LSP, WRAPS 2 1st Priority Acres from Goal 1 located in priority minor watersheds of the LSP (Figs. 5-5, 5-13) 200 acres SWCD, MN Land Trust, Lessard Sams, BWSR, TNC ● ● ● ● ● $822,000 Sustainable Forest Incentive Act (SFIA) to encourage private landowners to keep their wooded areas undeveloped. LSP 3 1,510 acres, 30 landowners SWCD, DNR ● ● ● ● ● $145,000 Protect wild rice stands by protecting land in the minor watersheds of wild rice designated lakes. WRAPS, 1W1P, LSP 3 North & South Maple, Wolf, Mud, Gourd, Tamarac, Grass 10% of nearshore habitat within targeted lakesheds SWCDs, BWSR, Lessard Sams, DNR, MN Land Trust, OTCOLA, Lake Associations ● ● ● ● ● Included in all above Implement land retirement programs (CREP, RIM). 1W1P DWSMAs, marginal crop land 1,000 acres BWSR, MDA ● ● ● ● ● NA Level 1 Funding Sources: BWSR, SWCD | Total Level 1 $560,000 Level 2 Funding Sources: BWSR, SWCD | Total Level 2 $837,000 Level 3 Funding Sources: CRP, State General Fund, Lessard Sams, DNR, Legacy Funding | Total Level 3 $145,000 *This outreach action is an equal portion of the full outreach budget. Goal 6. Land Protection Implementation Schedule Goals and Implementation 87      Description Wetlands act as a sponge on the landscape and provide multiple benefits such as water storage, fish and wildlife habitat, and nutrient and sediment settling. Woody wetlands, which are abundant in the LWR Watershed, provide habitat for unique species including Tamarac trees and Blandings turtles. The LWR Watershed has >80% of historical wetlands remaining, so the main focus of this goal is to maintain the current wetland coverage. This goal can be implemented by continuing to enforce the Wetland Conservation Act (WCA). Issues Addressed Wetlands Metric WCA reporting Prioritization and Targeting Planning Region Prioritization: Medium This goal is watershed-wide as wetlands are widespread throughout the plan area (Figure 5-14). The short-term and long-term goals both involve maintaining current wetland coverage by enforcing the Wetland Conservation Act (WCA). WCA reporting will be tracked on a watershed-wide basis. Goal 7. Wetland Protection Maintain current coverage of wetlands within watershed and increase awareness of wetland protections. Middle Leaf: Maintain Upper Leaf: Maintain Wing: Maintain Redeye: Maintain Goals and Implementation 88 Figure 5-14. Wetland coverage in the LWR Watershed (NWI 2018). Goal 7. Wetland Protection Goals and Implementation 89 Implementation Action Source Program Funding Level Targeted Resources 10-yearMeasurable Outcome Lead/ Supporting entities 2021-2022 2023-2024 2025-2026 2027-2028 2029-2030 Total 10-year cost Enforce the Wetland Conservation Act (WCA). 1W1P 1 wetlands Continue local program Becker SWCD, Otter Tail County, Wadena SWCD, Todd County, BWSR ● ● ● ● ● $360,000 Work with landowners on wetland restoration projects through site visits, project reviews, permit applications, and agency coordination. 1W1P, WRAPS 1 wetlands Maintain current wetland coverage SWCDs ● ● ● ● ● Included in above Develop a media campaign for outreach to realtors (brochures, workshops, training credits). 1W1P 2 wetlands 1 complete media campaign strategy SWCDs ● ● ● ● $15,000* Level 1 Funding Sources: WCA, SWCD, BWSR | Total Level 1 $360,000 Level 1 Funding Sources: SWCD, BWSR | Total Level 2 $15,000 Total Level 3 $0 Goal 7. Wetland Protection Implementation Schedule Goals and Implementation 90   Description The LWR Watershed has sandy soils, so many cultivated fields are irrigated to improve crop yields. Groundwater usage is regulated by DNR groundwater appropriation permits (Figure 5-15). There is an increasing trend in groundwater usage in the watershed over the past few decades. Currently, it is unknown if the water use is sustainable with groundwater recharge. This goal aims to gain a better understanding of sustainable use of the aquifer in addition to continuing and increasing the current conservation programs such as irrigation scheduling and precision irrigation. Issues Addressed Groundwater Sustainability Metrics Complete Geologic Atlas for the watershed and receive training on how to use it. Irrigation scheduling (acres) Irrigation water management on first priority acres (Goal 1). Upper Leaf: Recharge Priority Redeye: Recharge priority Middle Leaf: Water Conservation Priority Wing: Water Conservation Priority Prioritization and Targeting Planning Region Prioritization: Medium This is a watershed-wide goal but includes some priority focus areas. The Redeye and Upper Leaf planning regions are priorities for protecting groundwater recharge based on a recharge value analysis (Figure 5-16), while the Middle Leaf and Wing planning regions are a priority for water conservation practices such as irrigation scheduling based on the number of groundwater appropriation permits and the surficial sand aquifer (Figure 5-15). The short-term goal is to complete the geologic atlas and receive local training on how to use it. The long-term goal is water use at a sustainable rate at which natural recharge occurs. There is an action to complete a study to understand what use is sustainable. This study is a general ask and could be completed by any agency or organization. Goal 8. Groundwater Sustainability Increase understanding of groundwater usage and recharge and continue current conservation programs to be able to maintain an aquifer that is sustainable for natural, economic, and human consumption uses. Goals and Implementation 91 Figure 5-15. Groundwater appropriation permits by use category (source: DNR) Figure 5-16. Groundwater recharge areas in the LWR Watershed (Source: HEI). Goal 8. Groundwater Sustainability Goals and Implementation 92 Implementation Action Source Program Funding Level Targeted Resources 10-year MeasurableOutcome Lead/ Supporting entities 2021-2022 2023-2024 2025-2026 2027-2028 2029-2030 Total 10-year cost Develop a media campaign for outreach and host irrigation workshops. 1W1P 1 Groundwater One workshop/year, 1 complete media campaign strategy SWCDs ● ● ● ● ● $15,000* Provide financial assistance to implement irrigation water management. GWA High nitrogen risk acres (Fig 5-7) Goal 2 acres: Redeye: 293 ac U. Leaf: 1,888 acM Leaf: 1,816 ac Wing: 5,389 acSWCDs, U of MN, MDA, CLC, NRCS ● ● ● ● ● $140,000 $90,000 $90,000 Increase the number of people participating in rain gage networks. 1W1P 2-- 5 more participants DNR, SWCDs, MDA, ● ● ● ● ● $0 Develop a media campaign for outreach to homeowners and cities for water conservation practices. 1W1P 2-- 1 complete media campaign strategy SWCDs, cities, DNR ● ● ● $15,000* Provide financial assistance to install precision irrigation technology. GWA Vulnerable Groundwater 5 units SWCDs, NRCS ● ● ● ● ● $50,000 $50,000 Create or obtain a watershed-wide database for water level monitoring (cities, observation wells, others). 1W1P 3Aquifer Completed database DNR, TSA cities ● ● $10,000 Complete the Geologic Atlas for the full watershed and utilize the contents. 1W1P 3Aquifer Completed Geologic Atlas MGS, DNR ● ● ● ● ● In process Complete a study to better understand sustainable withdrawal from aquifer. 1W1P 3Aquifer Completed Study DNR, MDA, MDH, UMN, MGS ● ● $100,000 Level 1 Funding Sources: SWCD, BWSR | Total Level 1 $155,000 Level 2 Funding Sources: SWCD, BWSR, | Total Level 2 $155,000 Level 3 Funding Sources: DNR, Cities, MDH, MDA, CLC, UMN, DNR, MGS | Total Level 3 $250,000 *This outreach action is an equal portion of the full outreach budget.Goal 8. Groundwater Sustainability Implementation Schedule Goals and Implementation 93    Description Ecosystems are communities formed by the interaction between living (plants, animals, microbes) and non-living organisms (air, water, mineral soil). Human beings are both part of ecosystems and benefit from ecosystems in many ways, and the benefits are known as ecosystem services. Ecosystem services benefits include pollination, erosion prevention, fish and wildlife habitat, nutrient cycling, soil fertility, carbon storage, and many more. The shoreland zone in Otter Tail and Wadena counties is 300 feet on either side of the streams. This goal aims to enhance riparian vegetation and habitat in that zone, which provides the ecosystem services listed above. Projects include shoreline restoration, streambank restoration, and buffer enhancement. Issues Addressed Loss of Perennial Vegetative Cover Soil Erosion & Runoff Development Pressure Metric Miles of riparian land with shoreline restoration, streambank restoration, and/or buffer enhancement. Upper Leaf: 0.5 miles Redeye: 0 miles Middle Leaf: 0.7 miles Wing: 0 miles Prioritization and Targeting Planning Region Prioritization: Medium; Low Riparian areas were prioritized by determining the amount of disturbance (developed, pasture, and cultivated crops) in each catchment touching a lake or stream and then clipping it to a 300-foot buffer. The short-term goal is to enhance 10% of targeted riparian miles (listed below). The long-term goal is to restore all riparian miles with over 40% disturbance, biological impairments, and declining trends (Table 5-3). Target areas to focus on first include 1) Union Creek because it is over 40% disturbed and is a designated trout stream and 2) West Leaf Lake because it has a declining transparency trend (Figure 5-17). Union Creek (-509) near Wadena ● West Leaf Lake Goal 9. Riparian Habitat Enhancement Enhance 1.2 miles of riparian vegetation on streams and lakes with more than 40% disturbed area, biological impairments, and/or a declining water quality trend through outreach to private citizens. Goals and Implementation 94 Table 5-3. Long-term and short-term goal documentation based on stream and lake riparian miles. Planning Region Middle Leaf Redeye River Upper Leaf Streams Upper Leaf Lakes Wing River Short-term Goal 0.7 miles 0.5 miles Long-term Goal 6.8 miles 3.8 miles 9.5 miles 5.5 miles 2.6 miles Union Creek Figure 5-17. Percent of land disturbance within 300 feet on either side of the stream (disturbance = developed, pasture and cultivated land). Goal 9. Riparian Habitat Enhancement West Leaf Lake Goals and Implementation 95 Implementation Action Source Program Funding Level 10-yearMeasurable Outcome Targeted Resources Lead/ Supporting entities 2021-2022 2023-2024 2025-2026 2027-2028 2029-2030 Total 10-year cost Install riparian buffers and expand the size, diversity, and coverage of buffers to enhance pollinator and wildlife habitat and water quality along Union Creek and West Leaf Lake. WRAPS 1.2 miles enhanced Union Creek through Wadena; West Leaf Lake (Figure 5-17) SWCD, TNC, City of Wadena, Leaf Lakes Assoc, NRCS, DNR, BWSR ● ● ● $20,000 $500,000 Install riparian buffers and expand the size, diversity, and coverage of buffers to enhance pollinator and wildlife habitat and water quality. 1W1P 10% of total (Table 5-3) Areas with stream disturbance over 40% (Figure 5-17) SWCD, TNC, NRCS, DNR, BWSR ● $20,000 $500,000 Use land retirement programs to develop habitat corridors/larger blocks. 1W1P 310% of total (Table 5-3) Union Creek through Wadena; West Leaf Lake; Biologically impaired streams TNC, SWCD, NRCS, DNR, BWSR ● ● ● ● $500,000 Total Level 1 $0 Level 2 Funding Sources: SWCD, BWSR | Total Level 2 $40,000 Level 3 Funding Sources: TNC, Lessard Sams, Legacy Funds, DNR | Total Level 3 $1,500,000 Goal 9. Riparian Habitat Enhancement Implementation Schedule Goals and Implementation 96   Description Many aquatic species rely on movement up and down streams for their life cycle. For example, many fish species move for spawning, feeding and hiding. Connectivity barriers—such as dams and perched, clogged, and undersized culverts—prevent this movement, while also disrupting the temperature regime and sediment transport process. They can cause changes in fish and macroinvertebrate communities (Cummins, 1979). Implementation activities to reduce connectivity barriers include modifying Hewitt Dam to rapids, improving poor or clogged culverts, and working with townships and counties to replace problem culverts that affect fish passage with correct sizing and elevation. Issues Addressed Connectivity Barriers Metric Number of culverts replaced or enhanced and dams modified. Upper Leaf: 1 culvert Redeye: 0 culverts Middle Leaf: 2 culverts Wing: Hewitt Dam 0 culverts Prioritization and Targeting Planning Region Prioritization: Medium; Low Planning regions were prioritized by the Redeye Watershed Stressor Identification report, and the Advisory and Policy Committees agreed with this prioritization. Project locations were targeted with physical connectivity as a stressor in the Redeye Stressor Identification report, and the Redeye WRAPS strategies table (Figure 5-18). In addition, this goal can address high priority culverts identified by the counties and townships that are affecting resource condition. Wing River (-559) ● ditch #49 to East Leaf Lake (-554) Bluff Creek (-515) ● tributary to Leaf River (-505) T151 Goal 10. Aquatic Habitat Enhancement Enhance aquatic habitat connectivity by fixing 3 culverts that are affecting resource condition and modifying Hewitt Dam to allow for fish passage. Goals and Implementation 97 Figure 5-18. IBI Impairments in the LWR Watershed (Source Redeye WRAPS). Goal 10. Aquatic Habitat Enhancement Goals and Implementation 98 Implementation Action Source Program Funding Level 10-yearMeasurable Outcome Targeted Resources Lead/ Supporting entities 2021-2022 2023-2024 2025-2026 2027-2028 2029-2030 Total 10-year cost Conduct a culvert inventory in Otter Tail, Becker, and Todd Counties (Wadena is completed for county roads). 1W1P 2Completed inventory -- Counties, SWCDs, DNR, Road Authorities ● $100,000 Work with townships to correctly install culverts and restore poor and fair road crossings and culverts. WRAPS 2Replace 3 culverts Co Ditch #49 to East Leaf Lake (-554); Bluff Creek (-515); tributary to Leaf River (-505) T151 Road Authorities, Counties, SWCDs Townships, DNR, ● ● ● $250,000 Remove beaver dams that are acting like a fish barrier or causing local flooding. WRAPS 3 Remove dams prohibiting fish passage Beaver dam at highway 210 in Hewitt Townships, County, DNR ● ● -- Modify the Hewitt Dam to construct fish passage. WRAPS 3Dam modification Hewitt Dam DNR, Todd SWCD, Hewitt ● $500,000 Restore degraded sections of stream impacted by ditching with goal of improving natural channel flow. WRAPS 31 project Blue Creek, Oak Creek, Union Creek DNR, SWCD, TSA ● $500,000 Total Level 1 $0 Level 2 Funding Sources: SWCD, BWSR, Counties | Total Level 2 $350,000 Level 3 Funding Sources: DNR, Lessard Sams | Total Level 3 $1,000,000 Goal 10. Aquatic Habitat Enhancement Implementation Schedule ● ● Goals and Implementation 99    Prioritization and Targeting Planning Region Prioritization: Medium This water retention goal applies to the watershed outlet. The outlet is located near Staples, MN where the Redeye River joins the Crow Wing River. The current monitored discharge at the watershed outlet is 368,196 acre-feet. The short-term goal is to maintain this current average discharge, build resilience to increasing precipitation trends with soil health practices, and continue the Watershed Pollutant Load Monitoring Network program at site S001-931. The land management practices implemented in Goal 1 will provide a storage benefit of 3,020 acre- feet. Estimated storage benefits per planning region are shown above. Description Historical alterations to the flow of water on the landscape, such as ditching and wetland loss, has decreased the water storage on the landscape in Minnesota. In the LWR Watershed these historical changes have been minimal and much of the natural storage has been preserved. To address the temperature and precipitation trends in the watershed due to climate change, the activities implemented in this plan aim to enhance the resiliency of the watershed to future changes. These activities include: Increasing the use of cover crops, which have deep roots to infiltrate precipitation and maintain soil moisture [Goal 2]. Maintaining and enhancing forests in the watershed, especially in areas of high groundwater recharge [Goals 2, 6]. Maintaining current wetland cover to maintain storage in the watershed [Goal 7]. Maintaining and enhancing stream, ditch, and lakeshore buffers to minimize erosion during storm events [Goal 10] Issues Addressed Altered Hydrology Runoff Metric Acre-feet discharge as monitored at the watershed outlet. Goal 11. Water Retention Maintain the current average monitored discharge relative to climate norms of 368,196 acre-feet at the pour point of the watershed. Redeye: 265 acre-feet Watershed Outlet: 3,020 acre-feet Middle Leaf: 627 acre-feet Upper Leaf: 984 acre-feet Goals and Implementation 100 Implementation Action Source Program 10-year MeasurableOutcome Lead/ Supporting entities 2021-2022 2023-2024 2025-2026 2027-2028 2029-2030 Total 10-year cost Quantify storage from soil health practices [Goal 2]. 1W1P 3,020-acre feet SWCDs, NRCS ● ● ● ● ● Cost included in Goal 2 Maintain and enhance forests in the watershed, especially in areas of high groundwater recharge [Goals 2, 6]. 1W1P Goals 2, 6 SWCDs, NRCS, BWSR, DNR ● ● ● ● ● Cost included in Goals 2, 6 Maintain current wetland cover to maintain storage in the watershed [Goal 7]. 1W1P Goal 7 SWCDs, NRCS, BWSR ● ● ● ● ● Cost included in Goal 7 Maintain and enhance stream, ditch, and lakeshore buffers to minimize erosion during storm events [Goal 9]. 1W1P Goal 9 SWCDs, Lake Associations, COLAs, BWSR ● ● ● ● ● Cost included in Goal 9. Keep water local to maintain local aquifer. 1W1P Goal 8 DNR ● ● ● ● ● Goal 8 Goal 11. Water Retention Implementation Schedule Section 6: Implementation Programs Implementation Programs 102 Section 6. Implementation Programs This section of the plan describes the programs that will be used for implementing this plan. There are four main categories: Planned Landscape Management (“Manage It”), Protected Lands Maintenance (“Keep It”), Constructed Environmental Enhancements (“Fix It”) and Analysis and Information. For the Leaf, Wing, Redeye Watershed, the scale is tipped toward “Manage It” programs. Figure 6-2. Landscape in the LWR Watershed. Implementation: A Balancing Act Figure 6-1. Implementation Programs for the LWR1W1P. Implementation Programs 103 Manage It Planned Landscape Management “Manage It” programs involve continual management of the landscape including soil health practices such as cover crops and reduced tillage, nutrient management, pasture management, irrigation management, forest stewardship plans, and ordinances. Applicable Goals: Land Management Implementation of this plan will involve programs that will be actively targeted to prioritized areas for management (Section 4 Land Prioritization). Non-priority areas will be considered on an opportunity basis. Cost-Share Programs Cost-share programs or projects are those where the cost of installing a project is shared with the landowner(s). Implementing soil health practices such as cover crops and reduced tillage, forest enhancement, or irrigation water management are applicable examples that meet plan goals. Private Forest Management Forest Stewardship Plans Forest owners can manage their woods through Woodland Stewardship Plans through coordination with the Minnesota Department of Natural Resources’ (DNR) Forest Stewardship Program. Forest goals can be developed in coordination with trained foresters to create wildlife habitat, increase natural beauty, enhance environmental benefits, or harvest timber. Plans must be prepared by a DNR-approved plan writer, which may include SWCD staff and private foresters. Forest 2C Designation Landowners with DNR-registered Woodland Stewardship Plans are then eligible for 2C Classification, which is a state program that provides a reduced tax rate to forested property of 20 acres or more. This is an annual program. Sustainable Forest Incentive Act (SFIA) SFIA is considered in the “Keep It” program because most people that start with an 8-year covenant move to a 50-year covenant. In addition, the SFIA covenant is more restrictive than 2C designation. Conservation Reserve Program (CRP) CRP is administered by the Farm Service Agency of the USDA. It is a voluntary program that contracts with agricultural produces so that environmentally sensitive agricultural land is not farmed or ranched, but instead devoted to conservation benefits. CRP participants establish long-term, resource-conserving plant species to control soil erosion, improve water quality and develop wildlife habitat. In return, FSA provides participants with rental payments and cost-share assistance. Contract duration is 10-15 years. Implementation Programs 104 Regulation and Enforcement Counties and cities will meet once a year to discuss ordinances and counties will notify each other of any proposed ordinance amendments. Activities will be tracked by the individual counties. An effort will be made to compile the information watershed-wide. A full comparison of Otter Tail, Wadena, Todd, and Becker County Ordinances is provided in Appendix I. Applicable Goals: Land Management, Bacteria Reduction, Phosphorus Reduction Aggregate Management The MPCA oversees air permits, hazardous waste licenses, stormwater and wastewater management, and storage tanks (https://www.pca.state.mn.us/regulations/aggregate-sand-and-gravel). Local ordinances are in place in Otter Tail, Wadena, and Todd counties that include additional guidelines for aggregate management in those jurisdictions. Regulations: Minnesota Statutes 298.75, 394.25 Bluffland Protection Blufflands are managed under several State programs including programs for shoreland management and Wild and Scenic Rivers. Minimum structure setbacks from bluffs and related development standards apply to land in shoreland for this watershed. The State-wide shoreland program includes land within 1,000 feet of any public water body or 300 feet of any public water river or stream, or the landward extent of their floodplains. Only land around public waters with a shoreland classification are regulated. There are differences between the ordinances between each county (setback, height, practices allowed, etc.) (Appendix I). Construction Soil Erosion Temporary construction erosion control is the practice of preventing and/or reducing the movement of sediment from a site during construction. All construction projects should follow construction BMPs, but projects disturbing one acre or more of land will require a National Pollutant Discharge Elimination System (NPDES) Permit from the MPCA. Otter Tail County has local oversight over construction erosion control for areas within the designated shoreland management areas. Todd and Wadena Counties write construction soil erosion related conditions into County-issued permits and approvals. In Becker County an ordinance addresses construction soil erosion. Regulations: Minnesota Rules, chapter 7090 Implementation Programs 105 Feedlots MPCA rules govern the collection, transportation, storage, processing, and land application of animal manure and other livestock operation wastes. Wadena, Todd, and Becker counties hold their own ordinances for feedlots. Wadena and Todd counties are in the MPCA County Feedlot Program. The state has jurisdiction over the feedlot enforcement in Becker and Otter Tail counties. Regulations: Minnesota Rules Chapter 7020 Groundwater Use The DNR administers groundwater appropriation permits for all users who withdraw more than 10,000 gallons of water per day or 1 million gallons per year. SWCD, Counties, and municipalities cooperate with the state and are offered the opportunity to comment on landowners’ permit applications. Regulations: Minnesota Statute 103G for appropriation; 103H, 1989 Groundwater Act Groundwater Protection Rule The MDA administers the Groundwater Protection Rule, which went into effect on June 24, 2019. The rule has two parts: Part 1 restricts the application of nitrogen fertilizer in the fall and on frozen soils; Part 2 responds to public water supply wells and elevated nitrate. Both Parts 1 and 2 apply in the LWR Watershed. Regulations: Minnesota Statute 14.16 Hazard Management Hazard mitigation may be defined as any action taken to eliminate or reduce the future risk to human life and property from natural and human-caused hazards. Climate change adaptation also plays a part in hazard management. These requirements direct the state to administer cost-sharing. Hazard Mitigation Local Emergency Management Programs are deployed in each of the contributing counties within the 1W1P boundary. Regulations: Minnesota Statute, chapter 12 Invasive Species Invasive species, both aquatic and terrestrial can cause ecological and economic damage to water resources and forests. The DNR has regulatory authority over aquatic plants and animals, and terrestrial animals. For aquatic species, permits are required by the general public for transporting lake water, invasive species, and for treating invasive species. Otter Tail County has aquatic invasive species prevention and management regulations prescribed under its Dock and Riparian Use Ordinance administered by the Land and Resources Department. In Wadena, Todd, and Becker counties the SWCDs oversee aquatic invasive species prevention and management. Regulations: Minnesota Statute 84D Implementation Programs 106 Noxious Weed Law Noxious weeds affect the natural, native balance of ecological functions. The Noxious Weed Law in Minnesota is administered by the MDA through SWCDs. The State maintains noxious weed lists of those species to eradicate, control, restrict, and specially regulated plants. Becker County also maintains its own additional noxious weed list, as approved by the MDA. Regulations: Minnesota Statutes 18.75-18.91 Public Drainage Systems: Establishment, Improvement, Re-routing, Repairs, and Impoundments Minnesota Drainage Law enables multiple landowners to collectively construct, improve, and repair drainage systems across property boundaries and governmental boundaries. These drainage systems can be open ditches and/or subsurface tile. Drainage systems have their own laws and requirements that LGUs must uphold. These ditches are managed by the county for the benefit of the landowners. Otter Tail County Highway and Land and Resource Departments; Wadena County Highway Department; Todd County Public Works Department through the County’s Drainage System Management Policy; and Becker County Highway Department through the Becker County Zoning Ordinance Chapter 10, address public drainage systems in the plan boundary. Regulations: Minnesota Statute 103E Shoreland Management Minnesota has shoreland management rules that are administered by the DNR. Local governmental units are required to have land use controls that protect shorelands along lakes and rivers, and they can adopt more strict ordinances than the state’s if desired. Otter Tail, Wadena, Todd, and Becker counties have DNR Approved Ordinances, but they are slightly different. The DNR published an Innovative Shoreland Standards Showcase website that may be helpful to local governments as they implement this plan: https://www.dnr.state.mn.us/waters/watermgmt_section/shoreland/innovative-standards.html. Regulations: Minnesota Statute 103F and Minnesota Rules 6120.2500-3900 Subsurface Sewage Treatment Systems The Subsurface Sewage Treatment System (SSTS) Programs are required by Minnesota State Statute in order to protect the public health and environment. Counties are required to have an ordinance that regulates SSTS enforced at the county level. Cities and townships may administer their own programs but must be as strict as their county’s ordinance. Low interest loans and low-income grants are available through the SWCD, County or Region 5. Otter Tail, Wadena and Todd counties require SSTS inspections on point-of-sale, while Becker County does not. Regulations: Minnesota Statutes 115.55 and 115.56, Minnesota Rules Chapters 7080, 7081, 7082, 7083 Implementation Programs 107 Waste Management Each County has a Solid Waste Management Plan (10-year Plan) that is approved by the MPCA. Solid Waste Management in MN is managed at the County Level and includes programs related to Mixed Municipal Solid Waste, Industrial waste and non-landfill programs such as recycling to include paper, plastics, metal, tires, electronics, appliances and other recyclable items. As part of this plan, each county manages a household hazardous waste programs (HHW) that receives some state funding to implement – Counties also received SCORE funds from the state to help cover some of the cost of recycling. Regulations: Minnesota Statutes 115.55, Minnesota Rules Chapters 7001, 7035, 7045, 7150, 7151, 9215, 9220 Wellhead Protection The purpose of the Wellhead Protection Program is to prevent contamination of public drinking water supplies by identifying water supply recharge areas and implementing management practices for potential pollution sources found within those areas. The program has since expanded to Source Water Protection to include supplies which rely on surface water. Wellhead Protection is mostly administered at the city level. Regulations: Minnesota Statutes, chapter 103l; Minnesota Rules, chapter 4720; Federal Safe Drinking Water Act, US Code, Title 42, Chapter 6A, Subchapter XII, Part E, Section 300j-13; Minnesota Rules, chapter 4725. Operations and Maintenance After projects are installed, regular on-site inspections and maintenance to ensure the project’s continued function and success is required by the BWSR Grants Administration Manual. These details, along with records including notes and photos should be included with each project’s Operations and Maintenance Plan. BWSR’s recommended inspection plans, according to the Grants Administration Manual, include the following: Conservation practice with a minimum effective life of 10 years: The ends of Years 1, 3, and 9 after the certified completion are recommended. Capital-improvement projects with a minimum effective life of 25 years: The ends of Years 1, 8, 17, and 24 after certified completion is a recommended minimum. Figure 6-3. Leaf River along Highway 29. Implementation Programs 108 Keep It Protected Lands Maintenance “Keep it” programs are those that involve permanent landscape protection. This includes conservation easements, Aquatic Management Areas, public land ownership, and Sustainable Forest Incentive Act covenant lands. Applicable Goals: Goal 5. Land Protection Implementation of this plan will involve programs that will be actively targeted to prioritized areas for protection (Goal 6, page 84). Non-priority areas will be considered on an opportunity basis. Conservation Easements Conservation easements are voluntary, legal agreements between a landowner and governmental or nonprofit organization, whereby land use and development are limited on a property while conserving natural values that reside upon that landscape. The easements are individually tailored agreements with an organization such as the BWSR, DNR, Minnesota Land Trust, or the Nature Conservancy. Sustainable Forest Incentive Act The Sustainable Forest Incentive Act (SFIA) provides annual incentive payments for the landowner recording a covenant taking away some of the rights of the land (development and farming, for example). Private landowners can receive a payment for each acre of qualifying forest land they enroll in SFIA. In return, they follow the covenant for a set period of time: either 8, 20, or 50 years. Data on current enrollees shows that landowners who start with an 8-year covenant commonly move up to a 50-year covenant (DNR), which is why this program is considered under “Keep It”. Wetlands Wetlands are protected by the Minnesota Wetland Conservation Act (WCA). The overall goal of the act is no net loss of wetlands. Draining, filling and in some cases, excavating in wetlands is prohibited unless (a) the drain, fill, or excavation activity is exempt from requiring replacement or (b) wetlands are replaced by restoring or creating wetland areas of at least equal public value. Replacement can be buying credits or creating/restoring a wetland (usually credits are encouraged over an on-site replacement). Wadena SWCD, Becker SWCD, Todd SWCD, and Otter Tail County serve as the local LGU for implementing WCA. Regulations: Minnesota Rules, part 8420.0105 Buffers In 2015, Minnesota enacted legislation requiring buffers of perennial vegetation of an average of 50 feet with a minimum of 30 feet on public waters and 16.5 feet for public drainage systems. This program is regulated by BWSR and implemented at the county level. Each county has an ordinance for buffer management. Regulations: Minnesota Statutes 103B and 103F.48 Subd. 4 Implementation Programs 109 Land Acquisition For areas with unique and important resources that meet state goals, the DNR, United States Fish and Wildlife Service (USFWS), counties, cities, townships, and other entities may purchase and manage the land. Examples include Aquatic Management Areas that are used for fish spawning habitat and Wildlife Management Areas that are used for small game hunting and waterfowl migration. Fix It Constructed Environmental Enhancements “Fix it” programs include installation of on-the-ground, usually permanent or long-term constructed enhancements including septic system upgrades, erosion control, rain gardens, cattle fencing, and well sealing. Low-Interest Loans Low-interest loans may be made available for septic system replacement, small community wastewater treatment systems, agricultural best management practices, and other projects that meet eligibility criteria for funding. Applicable Goals: Bacteria Reduction, Land Management Cost-Share Programs Cost-share programs can also be used for structural practices. Implementing fencing and water sources for grazing cattle away from streams, shoreline restorations on lakeshore, and well sealing are applicable examples that meet the goals of this plan. Implementation of this plan will involve cost-share programs that will be actively targeted to prioritized areas for projects (see goals below). Non-priority areas will be considered on an opportunity basis. Applicable Goals: Bacteria Reduction, Drinking Water Protection, Groundwater Sustainability, Phosphorus Reduction Capital Improvements Capital improvements are large projects that require significant investment and have longer lifespan than that for cost-share programs. These types of projects and activities often require feasibility studies before design and construction can proceed. Capital improvement projects often involve collaboration amongst multiple public and private organizations or governmental departments and are often good candidates for state or federal grant funding. Modifying Hewitt Dam, stream restoration, ditch improvement, and urban stormwater projects are examples of capital improvement projects within the plan boundary. Applicable Goals: Riparian Habitat Operations and Maintenance “Fix It” programs also follow the Operations and Maintenance plan requirements as listed on page 107. Implementation Programs 110 Info Analysis and Information “Analysis and information” programs are integral to achieving the plan’s goals. Programs are those that include inventories, monitoring, and public outreach efforts. Data Collection and Monitoring Data collection, inventories, and monitoring are crucial for determining where projects are needed, investigating problems, and tracking progress towards the measurable goals of this plan. Current data collection and monitoring efforts are described, along with data gaps that have actions for implementation in this plan. Targeted screening, inventory, monitoring and outreach actions are listed under each goal in Section 5. Current Data Collection and Monitoring Efforts Currently, a wide variety of monitoring is carried out on multiple government and local organization levels (Table 6-1). These existing data helped determine the current conditions of surface water, groundwater, habitat, and land resources in this plan and developed a starting point for measuring goals moving forward. Because these are already established projects, they don’t cost additional funds for this plan. Table 6-1. Summary of ongoing water quality & quantity monitoring programs. RS = rivers & streams, L = lakes, W = wetlands, and GW = groundwater. Parameters MPCA DNR MDH MDA County & SWCD Lake Associations Nutrients RS, L, W RS, L RS, GW GW RS, L Suspended Solids RS, L, W RS RS Productivity RS, L RS RS, L Pesticides RS, L, W, GW Bacteria RS, L GW Biology RS, L, W RS, L Water level/Flow RS, L RS, L Algal Toxins L Invasive Species RS, L L RS, L Fish Contaminants RS L Chlorides RS, L, W RS RS, L, GW Sulfates RS, L, W RS, L RS, L, GW Implementation Programs 111  As part of the Intensive Watershed Approach, the MPCA conducts lake and stream monitoring in each watershed on a 10-year cycle. This assessment includes water chemistry and biological parameters, any Total Maximum Daily Loads (TMDL) needed, and results in numerous comprehensive reports. The LWR Watershed was first assessed in 2011 and is scheduled for Cycle 2 to begin in 2021.  The Leaf Lake Chain has a lake association that conducts general condition monitoring annually including total phosphorus, chlorophyll a, and transparency parameters. This monitoring is coordinated county-wide by the Otter Tail County Coalition of Lake Associations.  The MPCA Watershed Pollutant Load Monitoring Network (WPLMN) provides funding to local partners to assist with intensive water quality monitoring at long-term sites. The WPLMN site in the LWR Watershed is at the watershed’s pour point to the Crow Wing River (S005-729). Monitoring at this site can be used to track progress towards reduction of phosphorus, sediment, nitrogen, and water outflow during plan implementation.  The roles in groundwater monitoring in Minnesota are spread between four agencies: Image credit: DNR  The MDH monitors wells and drinking water supplies for public health, including bacteria, nitrates, and arsenic.  The DNR monitors groundwater availability and ecological impacts through the Cooperative Groundwater Monitoring network. There are 60 monitoring observation wells in the LWR Watershed.  The MDA monitors groundwater for agricultural chemicals and fertilizer contamination.  The MPCA monitors groundwater for industrial contamination.  The SWCDs have participated in the MDA’s Township Testing Program and Central Sands Private Well Network that work with property owners to test their wells. Results from this testing were used in Goal 2 of this plan (Figure 5-6). Implementation Programs 112  Bird populations are monitored by a DNR program (Loons), Audubon Society (marshbirds, other birds), US Fish & Wildlife Service (migratory birds), and the National Breeding Bird Survey (all birds).  During the MPCA’s intensive monitoring cycle, the rivers in the watershed are tested for biological parameters including fish and macroinvertebrate habitat. Any biological impairments are assigned a stressor that is likely causing the reduction in diversity. Stressors include loss of habitat, loss of connectivity, sediment, dissolved oxygen, and altered hydrology.  Forest habitat is described in the Redeye Watershed Landscape Stewardship Plan. Areas for restoration and enhancement and recommended species assemblages are outlined in the plan.  Land Stewardship practices are tracked in eLINK and NRCS databases. Records of existing practices were used in this plan in the Land Management Prioritization (Section 4, page 51).  The Redeye Watershed Landscape Stewardship Plan provides the current number of acres in each minor watershed that are protected, the potential acres for additional protection, and a per minor watershed protection goal. These numbers were used in this plan in the Land Protection Goal, and as these statistics get updated in the future it will show progress toward this goal. Filling Data Gaps This planning process has identified data gaps to be filled through implementation of this plan. The following inventory and study activities are listed in Section 5: Goals and Implementation. The lead organization and specific goal are listed in brackets.  Determine a way to track progress towards the Land Management [SWCD, Goal 1. Land Management].  Conduct university research locally and promote more research in the watershed [Universities, Goal 1. Land Management].  Use DNA source testing to determine sources of E. coli impairments [MPCA, Goal 4. Bacteria Reduction].  Conduct feedlot and pasture windshield surveys in Otter Tail and Becker counties [SWCD, MPCA, Goal 4. Bacteria Reduction].  Participate in the completion of the Geologic Atlas for the full watershed and gain a better understanding of how to use it [SWCD, Goal 8. Groundwater Sustainability].  Complete a study to better understand sustainable withdrawal from aquifer. This study is a general ask and could be conducted by any agency, organization or partnership [Goal 8. Groundwater Sustainability].  Conduct a culvert inventory in Otter Tail and Todd Counties (start with hydroconditioning burn lines) [SWCD, Goal 10. Aquatic Habitat Enhancement]. Implementation Programs 113 Public Participation and Engagement Public participation and engagement are essential for successful implementation of this plan. One of the first actions of this plan will be to develop a media campaign (including social media and print) for targeted implementation. People reached and interactions with social media will be tracked. Section 5 highlights specific outreach actions for implementation of this plan related to each goal. Agricultural Producers  Create a peer to peer learning exchange and crop advisory teams [Goal 1. Land Management].  Outreach to co-ops, build trust, increase coordination [Goal 1. Land Management].  Provide outreach on timing and rates for fertilizer application [Goal 2. Nitrogen Management].  Outreach and irrigation workshops [Goal 8. Groundwater Sustainability. All Landowners  Connect members of the public and lake associations with farmers to build relationships (i.e. local field days, on-farm demonstrations) [Goal 1. Land Management]  Outreach to absentee landowners (targeted mailing) about land management options [Goal 1. Land Management].  Provide outreach to lawn care businesses about fertilizer use [Goal 2. Nitrogen Management].  Outreach for wellhead protection, arsenic, and any emerging contaminants [Goal 3. Drinking Water Protection].  Promote household hazardous waste program [Goal 3. Drinking Water Protection].  Outreach to private landowners about land protection programs [Goal 5. Land Protection].  Target realtors for home sales (brochures, workshops, training credits). [Goal 7. Wetland Protection].  Promote water conservation practices through outreach to homeowners and cities [Goal 8. Groundwater Sustainability]. Lakeshore Owners  Outreach to lakeshore owners about good land management choices and BMP options [Goal 5. Phosphorus Reduction].  Complete Score Your Shore on lakes and use as an outreach tool for shoreline restoration projects [Goal 5. Phosphorus Reduction]. Develop a media campaign to provide targeted outreach specific to plan goals. Implementation Programs 114 Achieving Plan Goals The focus of this plan is to add more management practices on the landscape in order to to protect and enhance drinking water, prevent any future turbidity and phosphorus impairments, enhance sustainable agricultural production, and enhance habitat. Table 6-2 summarizes the different levels of measuring progress and how it will be implemented in this plan. Projects will be tracked during plan implementation using a system set up for the watershed. Table 6-2. Description of how different activities will be measured during plan implementation. Level Description Redeye 1W1P Application Tracking Practices, Acres, Percentages of watersheds, Miles of River, Number of Lakes. Outputs in Targeted Implementation Schedule (Section 5). Projects will be tracked with a system and reported in eLINK during implementation. Estimating Using lower resolution calculators and tools to give a sense of the collective impacts of projects. Field edge benefits calculator (Appendix H). Modeling Incorporating landscape factors and project information to predict future conditions. PTMApp, HSPF in WRAPS Cycle 2 in 2021 Measuring Using field-collected information to assess the condition of the water. Lake Monitoring, Pollutant Load Monitoring Network stream monitoring at watershed pour point (S005- 729), WRAPS Cycle 2 in 2021 Proving Having enough measurements to compare with standards and decide if it's improved. Analysis of lake water quality trends, Analysis of loading at watershed pour point (S005-729), WRAPS Cycle 2 in 2021 A Note on Equity Equity or the fair and equal treatment of all individuals and communities, and the equal access and availability to resources that it takes to maintain and service those individuals and communities is gaining attention in modern planning of rural and urban settings. Equity throughout communities and in larger geographies is important, also, because of global climate change and the development of sustainable and resilient communities. Because water is a universal, free-flowing entity and a requirement for all life, addressing equity at the watershed scale is the most efficient way of exploring, delineating, and prescribing actions, unique to planning regions, for addressing the equitable management of natural resources for the welfare of all people in those communities within the plan boundaries. Though particular goals or actions directly addressing equity are not specifically prescribed in this plan, it is herein noted as an important aspect of consideration as this plan moves forward in implementation. Specific projects, funding, and planning subsequent of this plan, that specifically explores and addresses equity is encouraged (Figure 6-4). Figure 6-4. Illustration of equity (Sources: Variations of these images have been created by Craig Froehle of the Interaction Institute for Social Change. Section 7: Plan Administration and Coordination “There’s not a farmer in the county that doesn’t care about the environment. The purpose of this plan is to prevent future problems and access funding to do projects.” - Craig Folkestad, Citizen Advisory Committee Member, at a meeting, February 18, 2020 Plan Administration 116  Section 7. Plan Administration and Coordination Plan Administration describes how the plan will be implemented, how the watershed partners will work together, how the funding will move between them, and who will handle the administrative duties. The LWR1W1P will be implemented through a Memorandum of Agreement (MOA) between East Otter Tail SWCD, Otter Tail County, Wadena SWCD, Wadena County, Becker SWCD, Becker County and Todd SWCD. This MOA largely contains the same framework that was included in the MOA for developing this plan (Appendix J). Douglas County and Douglas SWCD were offered the opportunity to participate in both the planning and implementation MOAs but declined due to such a small percentage in the LWR1W1P area (<1%). Refinements to the implementation agreement that changed from the planning agreement include adding Becker County and Todd SWCD as signatories and clarifying the provisions and roles for implementing the plan. The LGUs in the implementation MOA will be collectively referred to as the Redeye Implementation Team. Decision-making and Staffing Implementation of the LWR1W1P will require increased capacity of plan partners, including increased staffing, funding, and coordination from current levels. Successful plan implementation will depend on generating active interest and partnerships within the watershed. The decision-making and staffing for implementing the LWR1W1P will be conducted based on the concepts outlined in this section of the plan. Presented below are the probable roles and functions related to plan implementation (Table 7-1). Expectations are that the roles of each committee will shift and change during implementation to best meet the needs of the Redeye Implementation Team. Fiscal and administrative duties for plan implementation will be assigned to an LGU through a Policy Committee decision as outlined in the formal agreement. Responsibilities for work planning and serving as the central fiscal agent will be revisited by the Policy Committee on a biennial basis. Figure 7-1. Citizen Advisory Committee drafting goals on June 24, 2019.   Plan Administration 117  Table 7-1: Roles for LWR1W1P Implementation. The Local Government Units will be collectively referred to as the Redeye Implementation Team. Committee Name Description Primary Implementation Role and Functions Redeye Implementation Team The collective group of LGUs in the MOA.  Combination of Policy Committee, LGU staff, and fiscal agent roles. Policy Committee One board member from each MOA entity.  Meet twice a year or as needed  Recommend approval of the annual work plan by the individual boards of the MOA members  Annual review and confirmation of Advisory Committee recommendations  Direction to Advisory Committee on addressing emerging issues  Recommend approval of the annual work plan by the individual boards of the MOA members  Review the implementation funds from plan participants Local Fiscal and Administrative Agent One of the participating LGUs as decided by the Policy Committee.  Convene committee meetings  Prepare the annual work plan  Prepare and submit grant applications/funding requests  Research opportunities for collaborative grants  Report on how funds were used  Compile annual results for annual assessment Advisory Committee One staff member from each MOA entity. State Agencies and local stakeholders are ex- officio members.  Meet annually or additionally as needed  Review the status of available implementation funds from plan participants  Review and identify collaborative funding opportunities  Review and provide input for the annual work plan submitted to BWSR  Biennial review and confirmation of priority issues  Evaluate and recommend response to emerging issues  Prepare plan amendments  Implement the targeted implementation schedule  Update on projects completed and where funding was spent (MOA entities and state agencies). Citizen Advisory Committee Local citizen stakeholders appointed by the Policy Committee.  Meet biennially or additionally as needed  Provide input for the annual work plan  Communicate the needs of local landowners  Be a local supporter for the plan Plan Administration 118  Collaboration Collaboration between LWR1W1P Implementation Partners The Redeye Implementation Team acknowledges the value of collaboration between planning partners to achieve successful plan implementation. Benefits of successful collaboration for the Redeye Implementation Team include consistent implementation of actions watershed-wide, increase likelihood of funding, and resource efficiencies gained. There is already a considerable amount of collaboration among the Redeye Implementation Team: East Otter Tail SWCD and Wadena SWCD have shared services and staff. East Otter Tail SWCD and Becker SWCD have a shared engineer. East Otter Tail SWCD and West Otter Tail SWCD have a shared shoreline specialist. East Otter Tail SWCD, West Otter Tail SWCD, Wadena SWCD, Otter Tail County and Wadena County have a shared Watershed Coordinator. Becker SWCD, East Otter Tail SWCD, Hubbard SWCD, Todd SWCD, and Wadena SWCD have collaborated to provide irrigation water management assistance across the five-county area. This collaboration is an advantage for implementation in the watershed. Where possible and feasible, the Redeye Implementation Team will pursue opportunities for collaboration with fellow Redeye Implementation Team members to gain program efficiencies, pursue collaborative grants, and provide technical assistance following a hierarchy approach (Figure 7-2). The Redeye Implementation Team will also review similarities and differences in local regulatory administration to identify local successes and identify changes needed in the future to make progress towards goals outlined in this plan. Figure 7-2. Hierarchy approach to collaboration in the LWR Watershed. Look Within •Example: Watershed Planner Look to Neighbors •Example: Shared engineer with Becker SWCD Look to the Region •Example: 5-County Irrigation Collaboration Look to the Technical Service Area •Example: GIS Analyst Plan Administration 119  Collaboration with Other Units of Government The Redeye Implementation Team will continue to coordinate and cooperate with other governmental units at all levels. Coordination with state agencies including BWSR, DNR, MDH, MDA, and the MPCA will continue as they are experts in many of the topic areas included in this plan, have been participating members of the planning Advisory Committee, and will be members of the implementation Advisory Committee. Cooperation with units of government such as NRCS, municipalities, city councils, township boards, county boards, joint powers boards, and other water management authorities are a practical necessity to facilitate watershed-wide activities. Examples of collaborative programs in the watershed include EQIP (NRCS), CRP (FSA), Minnesota Agriculture Water Quality Certification (MDA), Targeted Township Testing (MDA), Farm Bill Biologist (MDA), Wellhead Protection for city DWSMAS (MRWA and MDH), Minnesota Forest Resource Council and WRAPS (MPCA). LWR1W1P implementation actions and goals were developed through a collaborative process. Some agency goals, objectives, directions, and strategies for resource management within the plan area have not been selected as priority issues. The responsibility for achieving the goals associated with lower priority tier issues remains with the respective agency or organization. Tier 3 issues can be found on page 31. Collaboration with Others Local support and partnerships will drive the success of final outcomes of the actions prescribed for implementing this plan. Because this plan’s focus is voluntary land stewardship practices, collaborations with landowners in the watershed is of paramount importance. There are many actions in the plan that describe working with individual landowners on personalized farm plans and providing cost share and technical assistance for implementing land stewardship practices (Section 5). Many of the existing collaborations in the watershed have been involved in the development of this plan and are committed to protecting and enhancing the LWR Watershed resources. Partners for these collaborations include, but are not limited to, lake associations, Otter Tail Coalition of Lake Associations (COLA), The Nature Conservancy, Central Minnesota Irrigators (CMIC), Central Lakes College Agriculture and Energy Center (CLC), Ducks Unlimited, Trout Unlimited, MN Deer Hunters Association, Pheasants Forever, Pheasants Forevermore, Sportsman’s Clubs, National Wild Turkey Federation, Northwest AqwaTek Solutions, Minnesota Waters, Freshwater Society, local co-ops, University of Minnesota Extension, civic groups, private businesses, individuals, and foundations. The Redeye Implementation Team collaborates with these groups for education, outreach, monitoring, and project implementation. Plan Administration 120  Funding The Redeye Implementation Team will pursue funding opportunities collaboratively in order to implement the activities prescribed in the targeted implementation schedule (Section 5). Table 7-4 lists the most used programs and grants for executing the implementation programs described by this plan and used within the targeted implementation schedule. The funding grants and programs are cross- referenced to plan implementation programs, thereby showing potential sources of revenue for implementation. Programs will be coordinated uniformly throughout the watershed where possible. Current programs and funding (Level 1) will not be enough to meet the full targeted implementation schedule. The success of plan implementation will hinge on reliable non-competitive watershed-based funding being available for plan implementation in addition to competitive state, federal, and private grant dollars. A minimum of one additional staffing FTE is included in the implementation actions in the form of technical assistance (page 68). The Redeye Implementation Team acknowledges that additional staffing may be necessary to meet plan goals. Because implementation is occurring under an MOA, staff will be hired by existing local government units in the watershed. The current funding level (Level 1) is based on the annual revenue and expenditures for the following counties and SWCDs: Becker, Otter Tail, Wadena, and Todd. The current level of investment by each local government unit is expected to remain the same during the LWR1W1P ten-year time period. The current expenditure includes all the state program and conservation delivery grants, including the Natural Resources Block Grant and SWCD Local Capacity Building Grants. Level 2 funding describes additional funding that could be obtained to implement the plan, including noncompetitive watershed-based funding and competitive grants (Table 7-2). The total funding can also be broken out by management focus (Table 7-3). Figure 7-3. The Leaf Lake Chain and Leaf River valley aerial view. Plan Administration 121  Table 7-2: Estimated implementation funding for the LWR1W1P (per Levels 1-3) Funding Level Description Estimated Plan Total (10 years) Estimated Annual Average Level 1 Continue Current Programs $4,000,000 $400,000 Level 2 Obtain additional grant and capacity funding $4,900,000 $490,000 Level 3 Partner funding $6,800,000 $680,000 Total $15,700,000 $1,570,000 The total funding for Levels 1 and 2, which is just the funding that is administered by the Redeye Implementation Team, is $890,000 annually and $8,900,000 over the 10-year life of the LWR1W1P (Table 7-2). Table 7-3: Estimated implementation funding for the LWR1W1P (per program) Implementation Program Estimated Plan Total (10 years) Estimated Annual Average Manage It $9,563,000 $956,300 Fix It $2,514,000 $251,400 Inventory and Outreach $1,236,000 $123,600 Keep It $2,387,000 $238,700 Total $15,700,000 $1,570,000 The focus of this plan is stewardship in the form of land management, and 61% of the total funding is being spent on management activities (“Manage It”) while the remaining percentages are “Fix It”, 16%, “Keep It”, 15%, and “Inventory and Outreach”, 8% (Figure 7-4). Overall, 92% of the funding is being used for implementing conservation and 8% for inventory and outreach. Figure 7-4. Percentage of funding for each implementation program. 61%16% 15% 8% Funding Summary per Program Manage It Fix It Keep It Inventory and Outreach 92% going to implementing conservation practices  Plan Administration 122  Table 7-4: Funding sources available for implementing the LWR1W1P Source Organization Program/Fund Name Type of Assistance Form of Assistance STATE FUNDING BWSR Clean Water Fund Financial Grant BWSR Reinvest in Minnesota (RIM) Financial Easement BWSR Natural Resources Block Grant Financial Grant BWSR SWCD Local Capacity Service Grants Financial Grant BWSR Erosion Control & Mgmt Program Financial Grant DNR Conservation Partners Legacy Financial Grant DNR Aquatic Invasive Species Control Financial/Technical Grant DNR Forest Stewardship Program Technical Cost Share DNR Aquatic Management Area, Wildlife Management Area Financial Fee Title Acquisition DNR/Revenue Sustainable Forest Incentive Act Financial Incentive payment MPCA Clean Water Partnership Financial Grant MPCA State-Revolving Fund Financial Grant MPCA Surface Water Assessment Grant Financial Grant MDH Source Water Protection Grant Financial Grant MDA Nitrate Testing Technical Monitoring MDA Agricultural BMP Loan Program Financial Loan LSOHC Outdoor Heritage Funds Financial Grant LCCMR Environmental Trust Fund Financial Grant Legislature Bonding Financial Bond FEDERAL FUNDING FSA Conservation Reserve Program Financial Cost Share FSA Grassland Reserve Program Financial Cost Share NRCS Conservation Innovation Grant Financial Grant NRCS EQIP Financial Cost Share USGS Stream Gaging Network Technical Monitoring USACE Planning Assistance Technical Planning EPA State Revolving Fund Financial Loan OTHER FUNDING Ducks Unlimited Financial/Technical Easement/Cost Share Trout Unlimited Financial/Technical Easement/Cost Share Muskies, Inc Financial/Technical Easement/Cost Share The Nature Conservancy Financial Easement Minnesota Land Trust Financial Easement Plan Administration 123  Local Funding Funding derived from either the local property tax base or in-kind services of any personnel funded from the local tax base is local revenue. Local funding excludes general operating funds obtained from BWSR, fees for service and grants, or partnership agreements with the federal government or other conservation organizations. Local funds will be used for locally focused programs where opportunities for state and federal funding are lacking because of misalignment of a program’s purpose with state or federal objectives. These funds will also be used for matching grants where statutory authority already exists. Some examples include: Water Planning Authority for Special Projects (Minnesota Statute 103B.355): Counties have the authority to levy funds for priority projects and assist SWCDs with program implementation. Road Authorities: Counties can provide limited local funding to assist with the local share of road retention and other floodwater-retention projects. Drainage System Costs (Minnesota Statute 103E): Funding of all costs related to construction, maintenance, and improvement of drainage systems is apportioned to property owners within the drainage system based on the benefits received from the improved drainage. A drainage authority can accept and use funds from sources other than assessments from benefitted landowners for the purposes of flood control, wetland restoration, or water quality improvements. Minnesota Statutes Chapter 103E, Section 15, subdivision 1a requires drainage authorities to investigate the potential use of external funding for the purposes identified in Minnesota Statutes Chapter 103E, Section 11, subdivision 5. Figure 7-5. The Leaf River. Plan Administration 124  State Funding Leadership from the state agencies that are tasked with protection and restoration of Minnesota’s water resources came together and agreed on a set of high-level state priorities that align their programs and activities working to reduce nonpoint source pollution. The resulting Nonpoint Priority Funding Plan outlines a criteria-based process to prioritize Clean Water Fund investments. These high-level state priority criteria include: 1.Restoring those waters that are closest to meeting state water quality standards 2.Protecting those high-quality unimpaired waters at the greatest risk of becoming impaired 3.Restoring and protecting water resources for public use and public health, including drinking water State funding includes funds derived from the State tax base for state cost-share and regulatory purposes. State funding excludes general operating funds obtained from BWSR, counties, fees for service and grants, or partnership agreements with the federal government or other conservation organizations. Collaborative Grants The fiscal agent will apply for collaborative grants on behalf of the Redeye Implementation Team, which may be competitive or non-competitive. The assumption is that future base support for implementation will be provided to the LWR1W1P as one or more non-competitive implementation watershed-based funding allocations. Where the purpose of an initiative aligns with the objectives of various state, local, non-profit, or private programs, these dollars will be used to help fund the implementation programs described by this plan. Funding sources that are currently available at the time of developing this plan are listed in Table 7-4. Federal Funding Federal funding includes all funds derived from the federal tax base. This includes programs such as the EQIP administered by NRCS. Federal funding does not include general operating funds obtained from BWSR, counties, fees for service and grants or partnership agreements with state government or other conservation organizations. Federal agencies can be engaged following the approval of this plan and prior to implementation, to create an avenue to access federal resources for implementation. Opportunity may exist to leverage state dollars through some form of federal cost-share program. Where the purpose of an implementation program aligns with the objectives of various federal agencies, federal dollars will be used to help fund the implementation programs described by this plan. For example, the NRCS will likely provide support for agricultural best management practices such as EQIP, while the FSA may provide land-retirement program funds such as CRP (Table 7-4). Plan Administration 125  Other Funding Sources Foundations, nonprofit organizations, and private contributions (including landowners and corporate entities) will be sought for plan implementation activities. Local foundations may fund education, civic engagement, and other local priority efforts. Several conservation organizations are active in the watershed, such as The Nature Conservancy, the Otter Tail County Coalition of Lake Associations, Ducks Unlimited, Trout Unlimited, MN Deer Hunters Association, Pheasants Forever, Pheasants Forevermore, Sportsman’s Clubs, National Wild Turkey Federation, Northwest AqwaTek Solutions, Minnesota Waters, Freshwater Society, CLC Ag Center, and local co-ops (i.e., Breakfast on the Farm). These organizations acquire funding of their own and may have project dollars and technical assistance that can be leveraged. Major cooperators and funding sources are private landowners who typically contribute 25% of project costs and many donate land, services, or equipment for projects or programs. Work Planning This plan envisions collaborative implementation. Biennial work planning will be completed to align the priority issues addressed, the availability of funds, and the roles and responsibilities for implementation. Local Work Plan The Redeye Implementation Team will be responsible for completing a biennial work plan based on the targeted implementation schedule. Adjustments to the biennial work plan will be made through self- assessments. Then the biennial work plan will be presented to the Policy Committee, who is ultimately responsible for its approval. The purpose of these biennial work plans is to obtain BWSR watershed- based implementation funding, maintain collaborative progress towards completing the targeted implementation schedule and reaching the outcomes prescribed in the plan. Funding Request The Advisory Committe will collaboratively develop, review, and submit a watershed-based funding request from this plan. This request will be submitted to and ultimately approved by the Policy Committee prior to submittal to BWSR. The watershed-based funding request will be developed based on the 2021-2022 priority projects outlined in the targeted implementation schedule and any adjustments made through self-assessments. Assessment, Evaluation, and Reporting Accomplishment Assessment The Advisory Committee will provide the Policy Committee with an annual update on the progress of the plan’s implementation. For example, any additional acres of land best management practices will be tracked so that each year the Advisory Committee will report how many additional acres were managed in the watershed. A tracking system will be used to measure progress and will serve as a platform for plan Plan Administration 126  constituents and the public. Tracking these metrics will also make them available for supporting future work plan development, progress evaluation, and reporting. Partnership Assessment Biennially, the Advisory Committee will review the LWR1W1P goals and progress toward implementation, including fulfillment of committee purposes and roles, efficiencies in service delivery, collaboration with other units of government, and success in securing funding. During this review process, feedback will be solicited from the County and SWCD boards, Policy Committee, Citizen Advisory Committee, and partners such as state agencies and non-governmental organizations. This feedback will be presented to the Policy Committee to set the coming biennium’s priorities for achieving the plan’s goals and to decide on the direction for grant submittals. Also, this feedback will be documented and incorporated into the five-year evaluation. The Redeye Implementation Team intends to pursue watershed-based funding to meet goals and plan implementation schedules. Five-Year Evaluation Starting in 2021, this plan will be in effect for ten years. Over the course of the plan’s life cycle, progress toward reaching goals and completing the implementation schedule may vary. New issues may emerge as the plan progresses, and/or new monitoring data, models, or research may become available. Therefore, in 2026-2027, a five-year evaluation will be undertaken, as per the BWSR Order approving it, to determine if the current course of actions is sufficient to reach the goals of the plan, or if a change in the course of actions is necessary. At the 10-year mark, and every five years after, the plan will be fully re-evaluated. Reporting LGUs have several annual reporting requirements. Some of these reporting requirements will remain a responsibility of the LGUs. Reporting related to grants and programs developed collaboratively and administered under this plan will be reported by the plan’s fiscal agent (Table 7-1). In addition to annual reporting, the Advisory Committee will also develop a biennial State of the Watershed Report to present to the Policy Committee. This report will document progress toward reaching goals and completing the targeted implementation schedule and will describe any new emerging issues or priorities. The information needed to biennially update the State of the Watershed Report will be developed through the annual evaluation process. The fiscal agent is responsible for submitting all required reports and completing annual reporting requirements for LWR1W1P as required by state law and policy. The Advisory Committee will assist in developing the required reports and roles and responsibilities will be defined in the MOA Bylaws. Plan Administration 127  Plan Amendments The LWR1W1P is effective through 2030. Activities described in this plan are voluntary, not prescriptive, and are meant to allow flexibility in implementation. An amendment will not be required for addition, substitution, or deletion of any of the actions, initiatives, and projects if those changes will still produce outcomes that are consistent with achieving the plan goals. This provision for flexibility includes changes to the activities except for those of capital improvement projects. During the time this plan is in effect, it is likely that new data giving a better understanding of watershed issues and solutions will be generated. Administrative authorities, state policies, and resource concerns may also change. New information, significant changes to the projects, programs, or funding in the plan, or the potential impact of emerging concerns and issues may require activities to be added to the plan. If ammendments are required or requested by a member of the Redeye Implementation Team, the Policy Committee will initiate a plan amendment process following their implementation MOA Bylaws. Formal Agreements The Redeye Implementation Team is a coalition of East Otter Tail SWCD, Otter Tail County, Wadena SWCD, Wadena County, Becker SWCD, Becker County and Todd SWCD. The Policy Committee previously entered into a Memorandum of Agreement (MOA) for planning the One Watershed One Plan for the LWR Watershed (Appendix J). The entities will draft a MOA for purposes of implementing this plan. The Policy Committee of the Redeye Implementation Team oversees the overall plan implementation with the advice and consent of the individual County and SWCD boards under the umbrella of the implementation MOA. Douglas County and Douglas SWCD were offered the opportunity to participate in both the planning and implementation MOAs but declined due to such a small percentage of land area of the watershed (<1%). Appendices “Land, then, is not merely soil; it is a fountain of energy flowing through a circuit of soils, plants, and animals.” -Aldo Leopold Land use breakdown of 1st priority Unknown Management Appendix B – Subwatershed Prioritization 135 Appendix B. First Biennium Priorities This section summarizes where to work first and what will be done first during implementation (first biennium priorities) (Figures 8-1, 8-2, Table 8-1). Priority Funding Projects for 2021-2022* *These are Level 2 and 3 projects above the current core programs and funding. Implementation Action Applicable Goals Program Funding Level Implementation Partners Design and maintain a method to inventory current practices and track new practices. All 2 SWCDs Technical Assistance for land management programs (crops, pasture, and forest) (1 FTE) All 2 SWCDs Develop a media campaign for targeted outreach. All 2 SWCDs Implement soil health practices such as cover crops, reduced tillage, nutrient management, irrigation water management and precision technology in 1st Priority Acres (including Leaf Lake minor watershed and DWSMAs). 1, 2, 8 SWCDs, NRCS, MDA, Landowners Implement manure management BMPs and waste systems in priority feedlots. 4 SWCDs, NRCS Develop forest stewardship plans. 1 SWCDs, DNR, FRC, Forest Consultants Write and assist in rotational grazing plans, implement prescribed grazing, cattle fencing and watering facilities. 1, 4 SWCDs, NRCS Integrate forest health, water quality, and habitat benefits into Forest Stewardship Plan format. 1 SWCDs, DNR, BWSR Develop comprehensive individual farm plans that are resource driven and incorporate long-term management 1, 2 2 SWCDs, NRCS Increase the number of farms and acres with MN Ag Water Quality Certification Program. 1, 2 3 SWCDs, MDA Increase the acres of forest protection with the Sustainable Forest Incentive Act (SFIA) and conservation easements. 6 3 SWCD, DNR Long-term water quality monitoring on Leaf Lake Chain and Wolf Lake (phosphorus, chlorophyll a, transparency). 5 3 SWCDs, Lake Associations, COLA Complete the Geologic Atlas for the full watershed and utilize the contents. 8 3 MGS, DNR Estimated Funding Available, First Biennium SWCDs, Counties | Level 1 $800,000 Watershed-Based Funding, Cover Crop Grant | Level 2 $782,000 SFIA, State General Fund (SFIA), NRCS, MDA, DNR, FRC | Level 3 $1,360,000 Appendix B – Subwatershed Prioritization 136 Priority Areas to target in 2021-2022 Figure 8-1. Forest lands to target first are at the highest risk for conversion to agricultural practices and also priority areas from the Landscape Stewardship Plan. Figure 8-2. Priority lands to target first are the highest risk for soil loss in the LWR Watershed. This analysis identifies the top 25% of cultivated and pasture acres with the most erosion potential (HEI). Appendix B – Subwatershed Prioritization 137 Tracking Project Progress by HUC12 Table 8-1. Summary of acres in each management focus category by HUC12 subwatershed. Basics Protection Risk HUC12 # HUC12 NAME Acres of HUC12 Protected Lands (acres) Potential to Protect (acres, no wetlands) Acres Needed for Protection Goal (acres, from LSP) Private Forest Conversion Risk (acres) Critical Soil Loss (acres) High & Mod- High Nitrogen Infiltration Risk (acres) BOTH Critical Soil Loss & Nitrogen Infiltration Risk (acres) 70101070101 Willow Creek 30,175 10,398 9,379 3,181 4,133 7,754 13,379 5,887 70101070102 County Ditch No 49 11,468 3,925 2,170 89 1,115 3,510 3,326 2,150 70101070103 Leaf Lake 31,657 10,060 6,745 1,885 2,258 8,829 15,038 6,049 70101070104 South Bluff Creek 29,842 9,185 5,333 629 1,954 6,855 11,345 5,077 70101070105 Deer Creek-Leaf River 37,076 10,578 6,647 923 3,220 9,487 10,804 5,513 70101070201 Headwaters Bluff Creek 13,734 4,961 3,796 1,220 1,760 1,286 3,738 839 70101070202 Blue Creek 15,446 6,194 2,765 294 1,366 1,076 1,891 541 70101070203 Bluff Creek 20,127 4,544 2,345 906 1,274 3,933 2,806 1,718 70101070301 Oak Creek 25,733 8,807 6,464 1,550 1,889 3,492 10,278 2,852 70101070302 City of Wadena-Leaf River 30,783 8,183 8,321 866 3,490 4,061 7,046 2,545 70101070303 Union Creek 13,635 3,741 3,130 445 740 2,011 6,217 1,649 70101070304 County Ditch No 3-Leaf River 25,866 6,021 7,721 3,308 2,605 2,612 12,903 1,860 70101070401 County Ditch No 13 16,900 5,205 1,898 710 694 6,868 9,949 6,310 70101070402 Headwaters Wing River 31,982 10,834 10,090 4,069 3,450 9,073 16,636 8,127 70101070403 West Annalaide Lake 15,327 5,677 3,852 454 902 3,220 3,983 2,346 70101070404 Wing River 37,010 6,659 13,757 4,444 3,455 7,744 18,592 5,626 70101070501 Upper Redeye River 33,000 13,942 13,758 5,858 7,406 4,131 10,702 2,385 70101070502 Middle Redeye River 36,426 10,087 13,375 3,091 6,938 5,140 8,788 2,880 70101070503 Hay Creek 12,956 4,345 2,827 190 1,228 2,381 2,873 1,393 70101070504 Town of Blue Grass-Hay Creek 19,817 5,357 10,121 2,467 4,344 1,285 2,163 247 70101070505 Lower Redeye River 36,972 12,453 12,464 3,550 4,722 1,477 16,962 584 70101070601 County Ditch No 5 21,946 5,036 7,504 1,548 1,618 1,748 7,426 1,594 70101070602 Leaf River 24,191 7,430 8,846 3,045 1,793 2,660 16,564 2,543 Totals: 572,069 173,621 163,306 44,722 62,354 100,634 213,406 70,717 Overall % 30% 29% 8% 11% 18% 37% 12% Redeye River Watershed Landscape Stewardship Plan Key Concepts: •A forest resource plan to support the Redeye River 1W1P. •Keep forested lands forested. •Priority is the intersection of quality & risk—Private Lands. •Coordinate resilience with existing public forestlands. •Stack public benefits to maximize taxpayer investment—$$$. •Increase and enhance delivery of services to landowners. •Implementation based on landowners’ goals. What’s in the Plan? Part 1: Analysis of Forest and Water Resources •Resource Context •Risk/Quality Assessment •Forest Conservation Opportunity Areas •Key Observations and Conclusions Part 2: The Vision •Mission and Vision. •Two major goals: 1) increase forestland protection, 2) promote forest stewardship. •Subwatershed Action Plans – 7 subwatersheds – HUC 10 scale. •Ecological Guidance – potential native plant communities (NPC). Part 3: Making it Happen •Coordination strategies •10-year investment plan •Demonstration projects •Accomplishment reporting •Recommendations to local and state agencies Foundation Concept: Landowner’s Choose The Redeye River Watershed Landscape Stewardship Plan (LSP) is a 10-year tactical plan focused on guiding the protection and management of working forests on private lands on a watershed basis. The goal of this plan is to empower teams of service pro- viders to work together with private landowners and land managers to strategically protect working forest lands and promote private forest stewardship to enhance both private and public benefits that forests provide. 138 Appendix C. Redeye River Landscape Stewardship Plan: Where do we want to work? The overall Redeye River Major Watershed has a protection goal of 75%. Each of its six subwatersheds have their own pro- tection goals, which range from 37 to 43%. The subwatersheds have 5 to 16 minor watersheds, and each minor also has a protection goal that was determined by the Redeye River LSP Planning Team based on their best professional judgement on what is achievable for that minor watershed. Coordination Strategies : •Reconvene, support and sustain the Local Forestry Technical Team. •Confirm the project coordinator. •Clarify partner roles in serving private landowners. •Coordinate resources for Implementation. •Support accomplishment reporting. •Advocate recommendations to local and state agen- cies and programs. 139 Farming and water go hand in hand. Farmers are on the front lines of protecting soil and water resources while continuing to make improvements that increase farm profitability and sustainability. Over the course of the last several months, local farmers, agronomists, and industry professionals came together to: ▪List practices currently being used to improve efficiencies ▪Discuss practices local farmers are interested in trying and what they’d like their operations to look like in five years ▪Identify the barriers in the way of making those changes ▪Develop strategies to overcome those barriers and protect agricultural economies and groundwater supply at the same time Workshops hosting over 90 farmers and other members of the agriculture community were held in Perham, Parkers Prairie, and Osage with a follow-up meeting in New York Mills. Across all meetings, there were some unifying themes: a lot of good work is already happening, there is a strong desire to further improve on fiscal and environmental stewardship, and there are many creative solutions available to help producers make those desired changes. This comes as no surprise to producers or those who work with them, but two other things became clear in these workshops: ▪There is a need to capture the work farmers are already doing to protect groundwater and tell that story ▪Farmers are facing other structural barriers that will prevent them from doing more good work What’s currently working, and why We heard from farmers throughout this process that they understand they have a responsibility to protect groundwater. While economics, farm size and scale, farmer life stage, as well as vulnerable and variable soil conditions constrain which practices are feasible in their fields, farmers are already making sacrifices of time, resources, and money to implement practices that are environmentally beneficial. Many of the practices that are currently working are those that maximize input use efficiency – by aiming to make every ounce of fertilizer and drop of water productive and available for crops, farmers are protecting their bottom line and groundwater. In general, the practices that are working now to protect groundwater are focused on the annual management of irrigation and nitrogen to meet the unique conditions for each field, each farmer, and each growing season. We heard from participants that both economics and environmental considerations were important components of the decisions farmers are making to manage their fields. Participants said that they understood agriculture and water go hand-in-hand, and that they are already implementing practices on their fields that reflect this understanding. What future practices could look like Farmers already have a vision of the practices they want to incorporate into their fields over the next five years. We heard that there is a strong desire by farmers to shift towards a system that incorporates longer-term management practices that produce a more sustainable farming operation and better environmental outcomes. This includes reducing tillage, incorporating cover crops, and adding alternative cropping systems into their rotations. We also heard that farmers are interested in adopting precision irrigation and nitrogen management practices that could drastically improve the efficiency of the inputs they use. Barriers to progress In these meetings, farmers identified the following structural barriers impeding their desire to do more good work on their fields to protect groundwater and improve the sustainability of their farms: negative public perception; lack of Appendix D. Groundwater and Agriculture Workshop Summary 140 locally appropriate knowledge; long return on investment period for new practices; lack of technical expertise and actionable information; absence of markets for alternative crops and improved inputs; unpredictable and variable environmental conditions; restrictions from landowners, bankers, and government Above and beyond the limitations of time and money, other barriers can still limit what is possible in the future for farmers. This means that unless solutions to these structural barriers can be found, interest and effort by farmers alone will not be enough to get more practices adopted that will protect groundwater. Farmers are asking for help from outside groups, such as the SWCD, to realize their vision of how they want their fields to be managed. Strategies for success To overcome the identified barriers to progress, workshop participants suggested using the following strategies: Shift the public narrative: Farmers want to see changes in the public narrative because it does not accurately reflect the work they are doing to protect groundwater. These are the public relations strategies suggested: ▪Tell better stories of good work farmers are doing and of how farming practices have improved over time ▪Provide education on agricultural systems to those outside of the agriculture community ▪Connect members of the public with farmers to build relationships Promote improved regulations: Farmers are asking for common sense regulations that let them do more good work to protect groundwater and improve their bottom line – here are suggested strategies to do so: ▪Regulations should be rooted in common sense and locally controlled ▪Government conservation program should have increased flexibility and reduced paperwork ▪All levels of government should be working together Facilitate local information exchange: Farmers are looking for more sources of locally relevant information to evaluate the performance of management practices on fields like their own: ▪Regular publication of locally appropriate research results ▪Formal sharing of information between farmers on practices that are working their fields ▪Increased number of local field days and on-farm demonstrations Develop assistance programs: In some situations, there are certain resources or expertise that when provided by someone else can overcome a time, cost, or expertise barrier faced by a farmer. Suggested programs include: ▪In-season nitrogen management program, including tissue and soil nitrate testing ▪Training in new technologies, including how to use sensors and software ▪Application assistance for conservation programs Foster financial support: Targeted financial assistance could increase the adoption rate of management practices with a long-term ROI or high upfront cost. These are the programs to suggested by participants: ▪Incentives for adopting costly management practices with environmental benefits, such as cover crops ▪Cost-share for investments with long-term ROI or high upfront cost, such as variable-rate irrigation ▪Opportunity to “try out” or rent equipment, such as equipment for reduced tillage, before buying Encourage development of local markets: Developing new markets is a large task, but demonstrated demand by farmers is an important component of overcoming this systemic barrier – these are the suggested strategies: ▪Invest in local mills and end producers to support alternative cropping systems ▪Provide access to inputs such as climate hardy cover crops and precision agriculture technologies 141 Appendix E – NRCS Local Work Group Rankings 142 Appendix E. NRCS Local Work Group Rankings Wadena County Cropland Pasture Forest Associated Ag Land Farmstead Resource Concern NRCS Work Group Results •The numbers are the rank of that issue in each land category •Resource concerns listed in 3 land categories or more are bolded in blue Soil Erosion 9 7 6 Sheet and Rill 9 Concentrated flow erosion 9 10 Excessive bank erosion 3 3 8 Organic Matter Depletion Excessive Water 10 7 Ponding, flooding, high water table Water Quality Degradation 1 1 1 1 1 Excess nutrients in surface/ground waters 2 Excess pathogens/chemicals from manure, biosolids or compost 2 2 2 2 3 Excessive sediment in surface waters Degraded Plant Condition 10 4 4 3 Undesirable plant productivity and health 5 5 4 Inadequate structure and composition 6 5 Excessive plant pest pressure 10 Wildfire hazard, excessive biomass accumulation Inadequate Habitat for Fish & Wildlife 6 6 3 8 Habitat degradation Livestock Production Limitation 7 7 6 Inadequate feed and forage 8 8 5 Inadequate livestock water 9 4 Inadequate livestock shelter Air Quality Impacts 9 Objectionable odors 10 Emissions of greenhouse gasses Insufficient Water 4 Inefficient use of irrigation water 5 Inefficient moisture management Inefficient Energy Use 7 Farming/ranching practices & field operations 8 Equipment & facilities Appendix E – NRCS Local Work Group Rankings 143 Land Category Top 2 Conservation Practices that need to be implemented: Roadblocks Cropland 1. Conservation Cover (327) 2. Residue and Tillage Management- No Till/Strip Till (329) There is a need for additional "in the field" technical assistance. Timing of programs is poor with the way information is rolled out too late to complete proper planning since the economics of a plan are paramount for its success. Programs seem to be policy driven and not resource driven. Lastly, the cost and risk for a producer to do some of these practices is too high even with financial assistance. Pasture 1. Prescribed Grazing (528) 2. Pipeline (616) (provides water to every paddock) Same as cropland Forest 1. Forest Stand Improvement (666) 2. Tree Planting (612) Same as cropland for the most part, but also the time it takes to see results on forestland can make some landowners focus on other practices and land uses on their farm as they may not see the benefits of their efforts. Farmstead 1. Ag Waste System (313) 2. Vegetated Treatment System (635) Time is of biggest concern for ag waste systems on farmsteads having to do a complete CAP 102/CNMP prior to eligibility is a roadblock to producer's wanting or needing to complete a feedlot fix. Secondly is the cost to complete a system. Associated Ag Land 1. Conservation Cover (327) 2. Pasture and Hayland Seeding (512) In associated ag land the biggest roadblocks are likely access and site conditions as these areas are usually out of the way, small or odd shaped, may have limited or no water or electricity, and may be either gravelly/poor soils and droughty or muck or wet soils and hard to utilize for most of the year. Appendix E – NRCS Local Work Group Rankings 144 East Otter Tail SWCD Cropland Pasture Forest Associated Ag Land Farmstead Resource Concern NRCS Work Group Results • The numbers are the rank of that issue in each land category • Resource concerns listed in 3 land categories or more are bolded in blue Soil Erosion 6 7 7 Sheet and Rill 9 6 Concentrated flow erosion 9 Excessive bank erosion 5 Organic Matter Depletion Water Quality Degradation 1 2 2 Excess nutrients in surface/ground waters 10 5 1 1 Excess pathogens/chemicals from manure, biosolids or compost 2 Pesticides transported to surface & groundwaters 8 Elevated water temperature 8 5 8 8 Excessive sediment in surface waters 9 5 5 Petroleum, heavy metals and other pollutants transported Degraded Plant Condition 2 1 Undesirable plant productivity and health 7 2 Inadequate structure and composition 10 3 Excessive plant pest pressure 10 Wildfire hazard, excessive biomass accumulation Inadequate Habitat for Fish & Wildlife 8 4 Habitat degradation Livestock Production Limitation 1 10 10 Inadequate feed and forage 3 9 9 Inadequate livestock water 6 Inadequate livestock shelter Insufficient Water 3 Inefficient use of irrigation water 4 Inefficient moisture management Inefficient Energy Use 6 6 Farming/ranching practices & field operations 7 3 3 Equipment & facilities Soil Quality Degradation 4 7 4 4 Compaction Appendix E – NRCS Local Work Group Rankings 145 Land Category Top 2 Conservation Practices that need to be implemented: Roadblocks Cropland 3. Water management and variable rate irrigation for water/fertigation efficiency (442, 449) 4. Residue and Tillage Management- No Till/Strip Till (340, 329) The SWCD has heavy irrigation presence with specialty crops. Roadblocks are the cost of upgrading irrigation systems for water/fertigation efficiencies. Pasture 3. Fencing (382) 4. Pipeline (616) (provides water to every paddock) There have been livestock conversions from dairy to beef operations. Proper management of grazing land to move livestock based on soil condition and other factors will improve forages to treat other high priority RCC's. Potable water on pastureland provide options to producers for year-round management. Forest 3. Forest Stand Improvement (666) 4. Brush Management (314) Control of undesirable woody plants will aid in re-establishment of desirable species and provide additional water quality and wildlife habitat benefits. Ability for producers to access technical/financial resources to manage forest resources on expired CRP & other forestland through FSI will improve plant condition RCC's and provide adequate economic return to avoid conversion to cropland. Farmstead 3. CAP (102) 4. CAP (128) Energy audits have potential to improve efficiencies of irrigation systems and livestock facilities if implemented. Common sense CNMP's have potential to improve water quality if implemented. At this time, CNMP's are too cumbersome for producers to understand if they plan to implement the nutrient management portion of the plan. Associated Ag Land NA NA What is the best way to advertise ALL conservation activities and opportunities in your county (radio, newspaper, flyers, mailings, other)? The Local Work Group discussed outreach. It is understood most producers have limited knowledge of opportunities with USDA programs as a whole. Some revolves around USDA regulation (FSA said they need national office approval for any media they create). Coordination among agencies will help with synergies. Word of mouth is best advertisement. Members suggested ‘café talk’ type events held across the county. Timing of applications (and waiting times) was brought up. The group suggested an ACP-like fund allocation on a portion of EQIP to use on shovel ready projects. Appendix E – NRCS Local Work Group Rankings 146 Becker SWCD Cropland Pasture Forest Farmstead Resource Concern NRCS Work Group Results • The numbers are the rank of that issue in each land category • Resource concerns listed in 3 land categories or more are bolded in blue Soil Erosion 5 7 Sheet and Rill 4 9 6 Concentrated flow erosion 9 9 Excessive bank erosion Water Quality Degradation 8 2 Excess nutrients in surface/ground waters 5 1 Excess pathogens/chemicals from manure, biosolids or compost 7 Pesticides transported to surface & groundwaters 8 Elevated water temperature 6 5 8 Excessive sediment in surface waters 5 Petroleum, heavy metals and other pollutants transported Degraded Plant Condition 2 1 Undesirable plant productivity and health 6 2 Inadequate structure and composition 10 3 Excessive plant pest pressure 10 Wildfire hazard, excessive biomass accumulation Inadequate Habitat for Fish & Wildlife 10 8 4 Habitat degradation Livestock Production Limitation 1 10 Inadequate feed and forage 3 9 Inadequate livestock water 7 Inadequate livestock shelter 3 Inefficient moisture management Inefficient Energy Use 6 Farming/ranching practices & field operations 3 Equipment & facilities Soil Quality Degradation 1 4 7 4 Compaction 2 Organic Matter Depletion Appendix E – NRCS Local Work Group Rankings 147 Land Category Top 2 Conservation Practices that need to be implemented: Explanation and Roadblocks Cropland 5. Residue and Tillage Management- No Till/Strip Till, Cover Crop (340, 329) 6. Water and sediment control basin (638) 329 & 638 & supporting practices that decrease surface runoff, increase infiltration and keep water & soil on cultivated cropland. Properly implemented, these have direct effects on concentrated flow, moisture management, nutrient & sediment loading to surface and ground waters, compaction and organic matter depletion, each of which rank among the top priorities identified by the workgroup. Roadblocks are costs, commitment to change, practices that fall short of ranking cutoffs for funding. Pasture See prioritization above. Costs, commitment to change, practices that fall short of ranking cutoffs for funding. Forest See prioritization above. Barriers are costs, commitment to change, practices that fall short of ranking cutoffs for funding. Farmstead See prioritization above. Barriers are costs, commitment to change, practices that fall short of ranking cutoffs for funding. Associated Ag Land NA NA Appendix E – NRCS Local Work Group Rankings 148 Todd SWCD Cropland Pasture Forest Farmstead Assoc. Ag Land Resource Concern NRCS Work Group Results • The numbers are the rank of that issue in each land category • Resource concerns listed in 3 land categories or more are bolded in blue Soil Erosion 3 9 7 Sheet and Rill 5 10 8 7 8 Concentrated flow erosion 6 6 8 9 Excessive bank erosion Water Quality Degradation 2 8 7 1 1 Excess nutrients in surface/ground waters 2 Excess pathogens/chemicals from manure, biosolids or compost 1 7 5 4 2 Excessive sediment in surface waters 6 Petroleum, heavy metals and other pollutants transported Degraded Plant Condition 8 3 2 4 Undesirable plant productivity and health 4 4 5 Inadequate structure and composition 9 5 3 6 Excessive plant pest pressure Inadequate Habitat for Fish & Wildlife 1 3 Habitat degradation Excessive Water 10 Ponding, flooding, seasonal high Livestock Production Limitation 10 1 5 10 Inadequate feed and forage 2 Inadequate livestock water 10 3 Inadequate livestock shelter Soil Quality Degradation 7 9 9 Compaction 4 6 Organic Matter Depletion Appendix E – NRCS Local Work Group Rankings 149 Land Category Top 2 Conservation Practices that need to be implemented: Explanation and Roadblocks Cropland 7. Conservation crop rotation (328) 8. Nutrient management (590) Poor ag prices and availability of cost share. Timing of financial assistance does not match landowner schedules. Pasture 1. Conservation crop rotation (328) 2. Nutrient management (590) Poor ag prices and availability of cost share. Timing of financial assistance does not match landowner schedules. Forest 1. Forest Stand Improvement (666) 2. Tree Planting (612) Same as cropland for the most part, but also the time it takes to see results on forestland can make some landowners focus on other practices and land uses on their farm as they may not see the benefits of their efforts. Farmstead 1. Ag Waste System (313) 2. Vegetated Treatment System (635) Time is of biggest concern for ag waste systems on farmsteads having to do a complete CAP 102/CNMP prior to eligibility is a roadblock to producer's wanting or needing to complete a feedlot fix. Secondly is the cost to complete a system. Associated Ag Land 1. Conservation Cover (327) 2. Pasture and Hayland Seeding (512) In associated ag land the biggest roadblocks are likely access and site conditions as these areas are usually out of the way, small or odd shaped, may have limited or no water or electricity, and may be either gravelly/poor soils and droughty or muck or wet soils and hard to utilize for most of the year. Comments on remaining Farm Bill programs not already addressed: Need more forestry enhancements in CSP. More priority for HUP and organic transition farmers. What is the best way to advertise ALL conservation activities and opportunities in your county (radio, newspaper, flyers, mailings, other)? Word of mouth is the best and 1:1 work with landowners. Work to create networking opportunities within county. Additional information the State Office could provide to assist with outreach: Ensure that NRCS staff are trained and have the information about programs and opportunities prior to news releases and program deadlines. Appendix F – Public Survey Summary 150 Appendix F. Public Survey and Citizen Feedback Public Survey Summary On June 6, 2019 the local community was invited to the Redeye, Leaf and Wing River Watershed Community Discussion at Burlington Northern Park in Wadena. The purpose of the event was to inform the public of the beginning of the One Watershed One Plan process, engage them in discussion, and gather their input on what is important to them. A paper survey was completed by participants, with 26 total surveys turned in. The results are summarized below and will be used when evaluating priorities for the plan. 0 2 4 6 8 10 12 14 16 18 Leaving a legacy Strong community connection Helping farmers irrigate crops Maximize profits Sound land stewardshipNumber of Responses1.What do you value most? 0 2 4 6 8 10 12 14 16 Groundwater Leaf River Wetlands Redeye River Wing River Leaf LakesNumber of Responses2.What's the most important natural resource to you in your area? Appendix F – Public Survey Summary 151 Additional write-ins: • Prime tillable farmland • Prime grazing land 0 2 4 6 8 10 12 14 16 18 20 Drinking water Irrigation Hunting and Recreational Land Biodiversity Fishing AllNumber of Responses3. Why is that natural resource important to you? 0 2 4 6 8 10 12 Middle Leaf Redeye Wing Middle and Upper Leaf Redeye and Wing Upper LeafNumber of Responses4. Which planning region do you live in? Appendix F – Public Survey Summary 152 Additional issues written in: • Soil health • Economics of dairying 0 2 4 6 8 10 12 14 16 18 20 Issues Scoring -sorted by "high" responses High Medium Low 0 2 4 6 8 10 12 14 16 18 Farm Rural TownNumber of Responses5. Where do you live? Appendix F – Public Survey Summary 153 • More row crops • Ditches need re-establishing Organizations represented: • Sustainable Farming Association • Wadena County • City of Sebeka • Otter Tail Coalition of Lake Associations • Otter Tail County 0 0.5 1 1.5 2 2.5 3 Issues Scoring -Average Score Appendix F – Public Survey Summary 154 Issues Ranking from Citizen Advisory Committee, June 24, 2019 On June 24 a meeting was held with the Citizen Advisory Committee for the Redeye, Leaf and Wing River Watershed One Watershed One Plan. There were eight attendees representing different stakeholder groups. During the meeting, issues collected from existing plans, the Advisory Committee, and the public kickoff were presented and discussed in four categories. Then attendees were each given 5 sticky dots to put next to the issues that were most important to them. They could spread out their dots or put more than one dot on one issue. The total dot scores are shown in the tables on pages 2-3. Overall, the top scoring issues in each category are shown below. Participants were also asked about what they value in the watershed. Responses were: •Large quantity of water (surface and ground) •Clean water benefits to people, animals and plants •Diverse area in land use and land features •Low population density A watershed vision was discussed, and participants offered the following sentiments to consider while crafting a vision •Diversity of nature, rural character, and cultural history SURFACE WATER •Degradation of wetlands providing water retention and storage. •Excess nutrients in lakes and streams from runoff. •E.coli impairments in streams. •Increased drainage and flow alterations are causing streambank erosion and sediment in stream (altered hydrology). GROUND WATER •Poor management of nutrients on agricultural fields causing nitrate contamination of surficial sand aquifer. •Understanding the hidden resource (outreach). •Surficial sand aquifer is vulnerable to contamination at wellheads and Drinking Water Supply Management Areas. LAND STEWARDSHIP •Changing land use in the watershed (forests to agriculture or development, agriculture to development). •Soil health and agricultural land productivity. HABITAT & RECREATION •Upland habitat (grasslands) are being fragmented by roads and conversion to urban and agricultural land uses. •Beaver dams are affecting stream flow and connectivity in streams. •Forest are being fragmented by roads and conversion to urban and agricultural land uses. Appendix F – Public Survey Summary 155 •Environmental, water and land use •United effort to steward our large quantity of clean water for agricultural, economic, and environmental use SURFACE WATER Issues (combined from existing plans, Advisory Committee, and Public Input) Number of dots Degradation of wetlands providing water retention and storage. 6 Excess nutrients in lakes and streams from runoff. 6 E.coli impairments in streams can make them unsafe for recreation.5 Increased drainage and flow alterations are causing streambank erosion and sediment in stream (altered hydrology). 4 Declining water quality trend on West Leaf Lake. •Could be combined under “Excess nutrients” above 3 Low dissolved oxygen levels are unsuitable to aquatic life. 3 Flooding (Sebeka, Wadena). 2 Judicial drainage system instability and inadequacy. 2 Out of date judicial drainage system records and benefit determinations. 2 Insufficient stormwater management and urban best management practices. 1 Development pressure on large lakes. Aquatic invasive species threaten lake water quality and habitat. Pasture management and livestock grazing in riparian areas can impact water and habitat quality. GROUNDWATER Issues (combined from existing plans, Advisory Committee, and Public Input) Number of dots Poor management of nutrients on agricultural fields causing nitrate contamination of surficial sand aquifer. 12 Understanding the hidden resource (outreach). 9 Surficial sand aquifer is vulnerable to contamination at wellheads and Drinking Water Supply Management Areas. 8 Pesticide contamination of the aquifer can make it unsafe for drinking. 2 Groundwater withdrawal for irrigation is increasing. 2 Arsenic contamination in wells can make it unsafe for drinking. Lack of groundwater monitoring data coordination. Appendix F – Public Survey Summary 156 LAND STEWARDSHIP Issues (combined from existing plans, Advisory Committee, and Public Input) Number of dots Changing land use in the watershed (forests to agriculture or development, agriculture to development). 10 Soil health and agricultural land productivity. 9 Parcelization of large tracts of land into smaller tracts (fragmentation). •Note: could combine with “Changing land use” 7 Soil erosion on agricultural land (water and wind). 5 Loss of perennial vegetative cover (including loss of CRP land). 4 Limited public land. Inconsistent zoning across the watershed. HABITAT & RECREATION Issues (combined from existing plans, Advisory Committee, and Public Input) Number of dots Upland habitat (grasslands) are being fragmented by roads and conversion to urban and agricultural land uses. 11 Beaver dams are affecting stream flow and connectivity in streams.* 8 Forests are being fragmented by roads and conversion to urban and agricultural land uses. 6 Connectivity barriers in streams (culverts & dams) are impacting fish habitat. 4 Pollinator habitat is fragmented and decreasing. 3 There is a need for increased public access to hunting lands. 2 Wild rice and shallow lakes may not be sufficiently protected, which affects fish and wildlife habitat quality. 1 There is a need for increased public access to water bodies. Limited public land. *This issue statement was added by the stakeholders. Appendix G – Potential Protection Table (Redeye Watershed Landscape Stewardship Plan) 157 Appendix G. Potential Protection Table (Redeye Watershed Landscape Stewardship Plan) These data were provided from the Redeye Watershed Landscape Stewardship Plan (2020). A reference map that shows the location of each of the minor watersheds listed is provided at the end of this section. Minor wshd # Planning Region Primary Lake(s) Acres of Minor Watershed Current % Protection (incl. SFIA) Protection Goal (%) Acres Needed for Goal Potential to Protect (20+ Acre, forested, upland) Land Value (>20 acre tracts) Total Cost to Achieve Protection Goal (incl SFIA for 100 years) Cost for Easements only Cost for SFIA for only 10 years 13013 Upper Leaf River 9789 23.8% 20% 0 1,048 $1,413 Goal Met $0 $0 13018 Upper Leaf River 6839 21.4% 20% 0 806 $1,453 Goal Met $0 $0 13019 Upper Leaf River 8837 38.4% 35% 0 1,083 $961 Goal Met $0 $0 13021 Upper Leaf River 5403 22.9% 20% 0 146 $881 Goal Met $0 $0 13028 Upper Leaf River 3706 12.2% 10% 0 435 $1,048 Goal Met $0 $0 13001 Wing River W. Annalaide, Mary, Rice, Unnamed 15327 37.0% 40% 454 3,852 $1,255 $457,499 $170,791 $28,671 13002 Wing River N.,S. Maple, Adley, Cora, Horsehead, Clarno, Augusta 16900 30.8% 35% 710 1,898 $1,192 $702,424 $253,849 $44,857 13003 Wing River 37010 18.0% 30% 4,444 13,757 $1,101 $4,276,341 $1,467,963 $280,838 13004 Wing River Wing River L. 12232 45.8% 50% 511 2,115 $1,037 $481,528 $158,792 $32,274 13005 Wing River Curtis 4352 23.8% 25% 54 884 $1,233 $53,639 $19,804 $3,383 13006 Wing River Snow, Perch, Unnamed 15398 27.2% 50% 3,505 7,091 $1,372 $3,657,788 $1,442,443 $221,535 13007 Upper Leaf River Stony, Inman, Unnamed 30175 34.5% 45% 3,181 9,379 $1,315 $3,265,414 $1,255,115 $201,030 13008 Upper Leaf River North Lemmerhirt 10378 42.7% 45% 236 2,509 $1,010 $220,981 $71,606 $14,937 13009 Middle Leaf River 16064 32.8% 40% 1,152 3,869 $1,066 $1,096,181 $368,260 $72,792 Appendix G – Potential Protection Table (Redeye Watershed Landscape Stewardship Plan) 158 Minor wshd # Planning Region Primary Lake(s) Acres of Minor Watershed Current % Protection (incl. SFIA) Protection Goal (%) Acres Needed for Goal Potential to Protect (20+ Acre, forested, upland) Land Value (>20 acre tracts) Total Cost to Achieve Protection Goal (incl SFIA for 100 years) Cost for Easements only Cost for SFIA for only 10 years 13010 Middle Leaf River 5862 21.2% 25% 220 1,230 $1,060 $208,885 $69,916 $13,897 13011 Middle Leaf River 7773 32.1% 35% 226 1,900 $969 $208,172 $65,604 $14,257 13012 Upper Leaf River 4220 38.3% 40% 71 852 $1,149 $69,764 $24,625 $4,514 13014 Upper Leaf River 11468 34.2% 35% 89 2,170 $1,389 $93,433 $37,125 $5,631 13015 Upper Leaf River Leaf Chain, Portage, Donalds, Long, Pickerel 10381 29.2% 35% 597 1,864 $1,814 $702,677 $325,085 $37,759 13016 Upper Leaf River Gourd, Grass 7367 35.2% 45% 719 2,204 $1,487 $774,757 $320,622 $45,413 13017 Upper Leaf River Tamarack 7070 42.0% 50% 569 1,871 $1,455 $607,903 $248,358 $35,954 13020 Upper Leaf River 4825 15.7% 20% 209 723 $1,461 $223,928 $91,683 $13,225 13022 Upper Leaf River 5016 22.8% 25% 112 1,103 $1,313 $114,555 $43,976 $7,058 13023 Middle Leaf River 4202 31.7% 35% 137 970 $1,436 $145,424 $58,951 $8,647 13024 Middle Leaf River 6795 13.1% 15% 126 514 $1,560 $138,725 $59,028 $7,970 13025 Middle Leaf River 9497 28.6% 35% 603 3,287 $760 $518,758 $137,485 $38,127 13026 Upper Leaf River 4658 56.0% 60% 186 991 $1,079 $177,583 $60,131 $11,745 13027 Upper Leaf River 10085 17.7% 25% 737 3,090 $1,220 $735,604 $269,832 $46,577 13029 Middle Leaf River 6894 22.5% 25% 172 1,257 $1,177 $169,818 $60,885 $10,893 13030 Middle Leaf River 4873 23.1% 25% 95 646 $1,364 $98,415 $38,675 $5,974 13031 Middle Leaf River 12100 29.8% 30% 28 3,949 $1,044 $26,003 $8,618 $1,739 13032 Middle Leaf River 15446 40.1% 42% 294 2,765 $1,119 $284,055 $98,533 $18,552 13034 Middle Leaf River 13734 36.1% 45% 1,220 3,796 $1,108 $1,176,244 $405,440 $77,080 13035 Middle Leaf River 8360 22.4% 30% 639 442 $1,101 $614,892 $211,008 $40,388 13036 Redeye River 12956 33.5% 35% 190 2,827 $1,063 $180,489 $60,537 $11,995 Appendix G – Potential Protection Table (Redeye Watershed Landscape Stewardship Plan) 159 Minor wshd # Planning Region Primary Lake(s) Acres of Minor Watershed Current % Protection (incl. SFIA) Protection Goal (%) Acres Needed for Goal Potential to Protect (20+ Acre, forested, upland) Land Value (>20 acre tracts) Total Cost to Achieve Protection Goal (incl SFIA for 100 years) Cost for Easements only Cost for SFIA for only 10 years 13037 Redeye River Bear, Edna, Mud, Unnamed 11250 37.4% 50% 1,412 3,092 $1,437 $1,501,567 $608,998 $89,257 13038 Redeye River 12831 21.6% 30% 1,076 4,777 $1,141 $1,048,163 $368,221 $67,994 13039 Redeye River 6294 25.9% 30% 260 3,150 $1,344 $268,701 $104,636 $16,407 13040 Redeye River 6050 24.3% 30% 343 2,356 $1,343 $355,022 $138,204 $21,682 13042 Redeye River Wolf, Pickerel 33000 42.2% 60% 5,858 13,758 $1,442 $6,236,770 $2,534,320 $370,245 13043 Middle Leaf River 5468 40.2% 45% 261 1,624 $1,023 $245,076 $80,124 $16,495 13044 Middle Leaf River 2524 28.1% 50% 553 77 $139 $372,450 $23,034 $34,942 13045 Middle Leaf River 7749 18.1% 25% 533 2,293 $1,050 $504,757 $167,922 $33,683 13046 Middle Leaf River 7994 26.2% 40% 1,102 1,743 $801 $961,399 $264,799 $69,660 13047 Middle Leaf River 5341 30.0% 38% 426 2,141 $640 $350,804 $81,756 $26,905 13048 Redeye River 3727 24.8% 30% 192 1,106 $561 $153,966 $32,359 $12,161 13049 Redeye River 5399 25.5% 45% 1,054 3,473 $686 $883,128 $216,917 $66,621 13050 Redeye River 27813 31.0% 40% 2,492 10,747 $737 $2,126,151 $551,203 $157,495 13051 Redeye River 10692 28.6% 40% 1,221 5,542 $701 $1,027,963 $256,545 $77,142 13052 Middle Leaf River 2258 9.2% 40% 695 1,468 $874 $621,215 $182,211 $43,900 13053 Redeye River 5973 42.5% 55% 744 725 $604 $605,237 $134,794 $47,044 13054 Wing River 6095 66.1% 70% 239 1,107 $626 $195,552 $44,809 $15,074 13055 Redeye River 3187 40.2% 50% 314 991 $528 $247,921 $49,695 $19,823 13056 Wing River 9767 15.8% 30% 1,389 5,298 $1,200 $1,377,829 $500,112 $87,772 13057 Wing River 3544 16.8% 25% 291 424 $686 $244,046 $59,923 $18,412 13058 Wing River 4784 26.4% 50% 1,127 2,017 $748 $965,086 $252,994 $71,209 13059 Wing River 21946 22.9% 30% 1,548 7,504 $1,204 $1,537,316 $559,038 $97,828 13060 Middle Leaf River 2391 40.4% 45% 109 571 $892 $98,375 $29,273 $6,910 Totals for the Redeye Watershed 37% 44,721 163,306 $43,410,373 $15,146,629 $2,826,374 Appendix G – Potential Protection Table (Redeye Watershed Landscape Stewardship Plan) 160 Appendix H – PTMApp Benefits Summary 161 Appendix H. PTMApp Benefits Summary Introduction The Prioritize, Target, and Measure Application (PTMApp) is a program that can be used by practitioners to provide the technical bridge between the general description of the types of strategies in a local water plan and the identification of implementable on-the-ground Best Management Practices (BMPs) and Conservation Practices (CPs). PTMApp can be used in a workshop environment by Soil and Water Conservation Districts (SWCD), watershed districts, county local water planning, agency staff and decision-makers to interactively and in real-time, PRIORITIZE resources and the issues impacting them, TARGET specific fields to place CPs and BMPs, and MEASURE water quality improvement by tracking the expected nutrient and sediment load reductions delivered to priority resources. The tool enables practitioners to build prioritized and targeted implementation scenarios, measure the cost-effectiveness of the scenario for improving water quality, and report the results to pursue funds for project implementation. Redeye Watershed Approach The Redeye Watershed has >80% remaining historical wetlands and no phosphorus or turbidity impairments, so the focus of the Leaf, Wing, Redeye One Watershed One Plan (WLR1W1P) is increasing stewardship practices on the landscape. PTMApp outputs were used to understand where areas within the watershed were most at risk of adding nutrient pollution and sediment to waterbodies and rivers. Using PTMApp outputs, critical soil loss areas were able to be identified. This process includes locating the top 25% of parcels which are most likely to be contributing the most sediment to the field edge. This analysis only used landscapes that are considered agriculture or pasture by the National Land Cover Database in 2016. Once these parcels were located, source reduction BMPs that were outputted from PTMApp were overlaid on the priority parcels and clipped to the extent of the parcel boundary. PTMApp provides estimated benefits from implementing the BMP. After discussion with the project team, it was decided the BMPs were to be split into their respective parcel feature and the benefit from the BMP would be fractionated by the amount that fell within the parcel (Figure 8-3). Each parcel was provided a total benefit of nutrient and sediment reduction by summing the benefits of Appendix H – PTMApp Benefits Summary 162 the fractionated BMP benefits per parcel. Using these totals, the parcels were weighted based on which ones reduced the most sediment by mass. Any parcels that currently have BMPs on them that are registered in the EQIP database were removed from the pool of parcels for targeting after the critical soil loss analysis was performed. The first quartile, median, and third quartile benefits for the long-term goal (Goal 1, page 65) were summarized for each planning region (page 163). In order to summarize benefits for the short-term goal, all the source reduction practices were ranked per planning region based on median sediment benefit. Practices were summed until they met the acreage of the short-term goal. Short-term goal benefits are summarized on page 67. Data Deliverables The PTMApp analyses yielded data deliverables that will be useful during implementation, including: 1. Excel spreadsheets that list each parcel in the long-term goal 1st Priority Acres (page 66) and the edge of field water quality benefits from identified BMPs on each parcel. 2. Excel spreadsheets that list each parcel in the short-term goal 1st Priority Acres (page 66) and the edge of field water quality benefits from identified BMPs on each parcel. 3. Excel spreadsheet with parcels and related benefits for reductions to Priority Resource points 5 (watershed pour point), 13 (East/Middle Leaf Lake) and 14 (West Leaf Lake). These spreadsheets can be used to target landowners to gage their interest in land management practices. Implementation of the LWR1W1P is voluntary, and outreach and incentives will be used to assist with voluntary implementation on private lands. Appendix H – PTMApp Benefits Summary 163 Figure 8-3. Illustration of BMPs on parcels and how they were clipped to parcel lines Appendix H – PTMApp Benefits Summary 164 Appendix I – Local Ordinances and Standards 165 Appendix I. Local Ordinances and Standards As part of the planning process, watershed partners completed a comparison of local ordinances and standards for each participating county. Those comparisons are summarized in the table below. Table continued on the next page… General Ordinance Standards Otter Tail County Local Responsibility (Ordinance) Wadena County Local Responsibility (Ordinance) Todd County Local Responsibility (Ordinance) Becker County Local Responsibility (Ordinance) State Standard Aggregate Management Land and Resource Dept. (Shoreland Management Ordinance) Planning and Zoning Dept. (Ordinance #1 – County Zoning Ordinance Section 15d) Planning and Zoning Dept. (Ordinance Section 9.12) Planning and Zoning Dept. (Extraction of materials and minerals ordinance) Aquatic Invasive Species Land and Resource Dept. (Dock and Riparian Use Ordinance)1 SWCD (no ordinance) SWCD (no ordinance) SWCD (no ordinance) Minn. Stat. 84D 1Regulates the movement of docks and lifts from one water body to another in accordance with Minn. Stat. 84D Bluffland Protection Land and Resource Dept. (Shoreland Management Ordinance – exceeds state standards) Planning and Zoning Dept. (More stringent setbacks, part of shoreland ordinance) Planning and Zoning Dept. (No specific ordinance but Todd County has rules protecting bluffs) Planning and Zoning Dept. (County Zoning Ordinance) Minn. Stat. 6120.3300 Buffers SWCD, Land and Resource Dept. (Buffer Ordinance)2 SWCD, Planning and Zoning Dept. (Ordinance #1- County Zoning Ordinance Section 15b) SWCD (Ordinance Section 9.22) Planning and Zoning Dept. (County Zoning Ordinance, Chapter 10) Minn. Stat.103B and 103F.48, subd. 4 2 Regulates the establishment of a buffer in accordance with Minn. Stat. 103F.48 Construction Erosion Control Land and Resource Dept. (Shoreland Management Ordinance) Planning and Zoning Dept. (writes conditions in as part of permitting) Planning and Zoning Dept. (writes conditions in as part of permitting) Planning and Zoning Dept. (County Zoning Ordinance, Chapter 6) Minn. Stat. 103F.441 Feedlots No ordinance or local responsibility. SWCD (Ordinance #1 – County Zoning Ordinance Section 7-8) SWCD (Ordinance Section 9.11) Planning and Zoning Dept. (County Zoning Ordinance, Chapter 8) Minn. R. 7020 Floodplain Management No ordinance or local responsibility. Planning and Zoning Dept. (Ordinance #13 – Flood Plain Ordinance) Planning and Zoning Dept. (Article VIII) Planning and Zoning Dept. (County Zoning Ordinance, Chapter 6) Minn. Stat. 104 Forestland Management Shoreland Management Ordinance (Shoreland District only) Shoreland Management Ordinance (Shoreland District only) Planning and Zoning (Ordinance Section 7.12) Natural Resources Mgmt. (County Zoning Ordinance) Appendix I – Local Ordinances and Standards 166 General Ordinance Standards Otter Tail County Local Responsibility (Ordinance) Wadena County Local Responsibility (Ordinance) Todd County Local Responsibility (Ordinance) Becker County Local Responsibility (Ordinance) State Standard Groundwater use Delegation agreement with MDH Public Health Dept. (Public Water Supply Ordinance) No ordinance or local responsibility. No ordinance or local responsibility. No ordinance or local responsibility. Minn. Stat. 103G, 103H, 1989 Groundwater Act Hazard Management Emergency Management Dept. (no ordinance) Sheriff’s Dept.7 (no ordinance) -- Emergency Mgmt. 7 Use Emergency Management Plan Noxious Weed Law SWCD (no ordinance) SWCD (no ordinance) Public Works Department (no ordinance) SWCD (no ordinance) The entity listed is the Ag inspector for the county. Public Drainage Systems: establishment, improvement, rerouting, repairs, impoundments, buffer compliance Highway Dept., Land and Resource (Buffer Ordinance)4 Highway Dept. (no ordinance) Public Works Dept. (Drainage System Mgmt. Policy) Highway Dept. (County Zoning Ordinance, Chapter 10) 4 Covers buffers only, not the remaining parts of public drainage systems Shoreland Management Land and Resource Dept. (Ordinance of Otter Tail County – exceeds state standards) 5 Planning and Zoning Dept. (Ordinance #1 – County Zoning Ordinance Section 14) Planning and Zoning Dept. (Article VII) Planning and Zoning Dept. (County Zoning Ordinance, Chapters 3-6, 8) Minn. Stat. 103F, 394; Minn. R. 6120.2500-3900 5 Governs the building and earth moving within the Shoreland District of OTC Solid Waste Management Solid Waste Dept. (Solid Waste Ordinance) Solid Waste Dept. (Ordinance #3 – Solid Waste Mgmt.) 8 Public Works Dept. (Solid Waste Mgmt. Ordinance) Environmental Services Minn. R. 7002, 7035, 7045, 7150, 7151, 9215, 9220 8 Chris McConn is Director of both Wadena and Otter Tail Counties. Stormwater Runoff Shoreland Management Ordinance (in Shoreland District only). Planning and Zoning Dept. Shoreland Management Ordinance (in Shoreland District only). Planning and Zoning Dept. (Ordinance Section 7.09) Planning and Zoning (County Zoning Ordinance, Chapter 6) Subsurface Sewage Treatment Systems Land and Resource Dept. (Subsurface Sewage Treatment Systems – exceeds State’s standards)3 Planning and Zoning Dept. (Ordinance #1 – County Zoning Ordinance Section 17) Planning and Zoning Dept. (Ordinance Section 9.08) Planning and Zoning (County Zoning Ordinance, Chapter 4) Minn. Stat. 115.55 and 115.56; Minn. R. 7080, 7081, 7082, 7083 3Maintenance of SSTS in all of OTC in accordance with Minn. Stat. 115.55 and 115.56 and Minn. R. 7080-7083. Wellhead Protection Delegation agreement with MDH. (Public Water Supply Ordinance) No ordinance or local responsibility. No ordinance or local responsibility. No ordinance or local responsibility. Wetland Conservation Act SWCD, Land and Resource Dept. SWCD (no ordinance) SWCD (no ordinance) SWCD (no ordinance) MN Rule 8420 Appendix J. Memorandum of Agreement 167 Appendix J – Glossary of Terms 177 Appendix J. Glossary of Terms HSPF (Hydrological Simulation Program – FORTRAN): A model for simulation of watershed hydrology and water quality for pollutants. This model was run for the Pine River Watershed during the 2017 Watershed Restoration and Protection Strategy (WRAPS). Impairment: Waterbodies are listed as impaired if they do not meet the state water quality standard for designated uses including aquatic life, aquatic recreation, and aquatic consumption. Index of Biological Integrity (IBI): A way of measuring the biological community (fish and aquatic macroinvertebrates) in the water body. The index is a scale of 0 to 100 with 0 being the lowest quality and 100 being the highest quality. Judicial Ditch: A ditch that crosses county lines. Known Management: Acres that have known BMPs on them from eLINK, NRCS and local data sources. Phosphorus Sensitivity: The lake’s sensitivity to phosphorus as determined by the DNR. Sensitivity means that added phosphorus would affect the clarity in these lakes the most (Radomski 2018). Protect (management focus): A minor or subwatershed where the natural resources are generally in good condition, risks to natural resources are low, and the management focus is to maintain and increase protection levels with strategies such as private forest stewardship and conservation easements. Protected: Protected land uses include public lands, public waters, wetlands on private lands, buffers required through the buffer law, easements, other conservation lands, Sustainable Forest Incentive Act (SFIA). PTMApp: The Prioritize, Target, Measure Application is a tool that enables practitioners to build prioritized and targeted implementation scenarios, measure the cost-effectiveness of the scenario for improving water quality, and report the results to pursue funds for project implementation. Secchi Depth: A measure of water clarity that can indicate the overall health of a lake. A black and white metal disc is lowered into the water on a rope until it can’t be seen anymore and raised to the point it can be seen. The depth of the disk to the surface of the water is the Secchi Depth. Trend Analysis (Mann Kendall statistic): A way to test the probability of a trend in data being real versus just happening by chance. TMDL (Total Maximum Daily Load): The amount of a particular pollutant that a body of water can handle without violating state water quality standards. Appendix J – Glossary of Terms 178 Unknown Management: Acres where management is unknown. There could be BMPs present but there is no record of it in eLINK or NRCS. This term is meant to give credit landowners who are doing the right thing but not using cost share programs. Watershed: A land area that channels rainfall and snowmelt to creeks, streams, and rivers, and eventually to outflow points such as reservoirs, bays, and the ocean. WRAPS: (Watershed Restoration and Protection Strategy): A watershed approach to restoring and protecting Minnesota's rivers, lakes, and wetlands implemented by the Minnesota Pollution Control Agency on a 10-year cycle (https://www.pca.state.mn.us/water/watershed-approach-restoring-and- protecting-water-quality). References 179 Appendix L. References Anderson and Kean. 2004. Red River Basin Flood Damage Reduction Framework. Technical paper 11. Red River Basin Flood Damage Reduction Work Group. Board of Water and Soil Resources (BWSR). 2019. Climate Change Trends and Action Plan. Becker Soil and Water Conservation District. January 2017. Becker County Water Plan 2017-2026. Detroit Lakes, MN. East Otter Tail Soil and Water Conservation District and West Otter Tail Soil and Water Conservation District. Amended August 2014. Otter Tail County Water Plan 2009-2019. Perham and Fergus Falls, MN. Emmons & Olivier Resources, Inc. September 2016. Redeye River Watershed Pollutant Reduction Project (Total Maximum Daily Load Study) for Bacteria. Minnesota Pollution Control Agency. Emmons & Olivier Resources, Inc. October 2016. Redeye River WRAPS. Minnesota Pollution Control Agency (MPCA) Evans, R. G., J. LaRue, K. C. Stone, and B. A. King. 2013. Adoption of site-specific variable-rate sprinkler irrigation systems. Irrigation Science 31(4): 871-887, doi: 10.1007/s00271-012-0365-x. Freshwater Society, St. Paul, MN and East Otter Tail SWCD. 2018. Groundwater and Agriculture. Perham, MN. Johnson, Chuck. May 2014. Redeye River Watershed Stressor Identification Report. Minnesota Pollution Control Agency (MPCA). Lark, T. J., J Meghan Salmon, and Holly K Gibbs. 2015. Cropland expansion outpaces agricultural and biofuel policies in the United States. Environ. Res. Lett. 10 044003. Minnesota Pollution Control Agency (MPCA). May 2014. Redeye River Watershed Monitoring and Assessment Report. Merritt, R.W. and K. W. Cummins. 1979. An Introduction to the Aquatic Insects of North America. Third Edition. Kendall/Hunt Publishing Company, Dubuque, Iowa. Nordquist, D and Van Nurden P. FINBIN. 2018. Report on Minnesota Farm Finances. University of Minnesota Center for Farm Financial Management. Todd County Soil and Water Conservation District. 2016. Todd County Water Plan 2016-2021. Long Prairie, MN. References 180 TNC, 2019. Freshwater Restoration and Protection Strategy. The Nature Conservancy. Wadena County Soil and Water Conservation District, 2016. Wadena County Water Plan 2016-2026. Wadena, MN. Zaimes, George & Emanuel, Robert. 2006. STREAM PROCESSES PART I: BASICS. Streams Processes for Watershed Stewards. University of Arizona, Tucson, Arizona. OTTER TAIL COUNTY SHERIFF’S OFFICE RESOLUTION AUTHORIZING EXECUTION OF AGREEMENT Be it resolved that the Otter Tail County Sheriff’s Office enter into a grant agreement with the Minnesota Department of Public Safety, for traffic safety enforcement projects during the period from October 1, 2020 through September 30, 2021. The Otter Tail County Sheriff’s Office is hereby authorized to execute such agreements and amendments as are necessary to implement the project on behalf of the Otter Tail County Sheriff’s Office and to be the fiscal agent and administer the grant. I certify that the above resolution was adopted by the Otter Tail County Board of Commissioners of Otter Tail County, Fergus Falls, MN on ___________________ (Date) SIGNED: WITNESSETH: (Signature) (Signature) (Title) (Title) (Date) (Date) Otter Tail County Adult Mental Health Local Advisory Council Local Advisory Council on Mental Health Serving Adults in Otter Tail County Mental Health Advisory Council Mission Statement Otter Tail County Mental Health Local Advisory Council “It shall be our mission to advocate for a full array of accessible services including education, prevention, intervention, coordination and treatment to all Otter Tail County residents with mental illness and mental health needs. We shall review and evaluate existing services within the county; advise County Commissioners about policies, programs and unmet needs; and promote family and community involvement in the delivery of services.” Reporting Period: 2020 (Otter Tail County Adult Mental Health LAC met from 11:30am-1pm the 4th Wednesday of every month except July and December) Speakers on a wide variety of topics offered educational presentations at LAC meeting: *Due to COVID no speakers have been represented at the LAC meetings in 2020 Reviewed Subjects that the Otter Tail County Adult Mental Health LAC note as issues and actions from OTC LAC: 1. Mental Health Public Education – 2020 Action: Due to COVID we were unable to continue our process of out sourcing information at local businesses as in the past. We did out source information through the Little Libraries located in Fergus Falls and worked with the Together We Thrive Initiative on a mental health week. Crisis Services worked with Otter Tail County and Leighton Broadcasting on getting crisis information out to the public. We are looking at needs at our public libraries for mental health materials that we can purchase for public use. 2. Housing – 2020 Issue: Continued from 2018 and 2019: obtainment of housing is still an issue. Poor credit, rental and criminal history’s continue to be barriers for housing which increases homelessness and the ability for a person to obtain stability. Otter Tail County is working on a supportive housing grant through the state. 3. Jail – 2020 Issue: continued from 2018 and 2019: There are still concerns about inmates obtaining prescribed medications for medical/mental health needs while in our Otter Tail County Jail. Reports from Otter Tail County Human Services is that Otter Tail County is working with the Jail on referrals for supports. 4. LAC family and consumer membership increase – Action: We are at a strong census in 2020. Due to COVID we have gone to meeting every other month by zoom. 5. Access to Mental Health services – Issue: Due to COVID we have seen an increase of creative opportunities to deliver services such as the increase in telehealth. This is a wonderful option though does not fit all. We do note that due to the lack of face to face some of our most vulnerable populations have been falling through the cracks. Recommendations to the Otter Tail County Commissioners The Otter Tail County Adult Mental Health Local Advisory Committee recommends the following: 1. 2018/2019/2020: Medication/Therapeutic Coordination in our Jail: We recommend that there is medication and therapeutic coordination with the community providers such as mental health centers and primary care. Update: continued need for work in this area 2. 2018/2019/2020: Early Intervention in the Jail: We support the subcommittee on early intervention which includes: a. Non-disruption of Medical Assistance while incarcerated and/or assistance with getting insurance by use of community supports such as Mahube otwa and/or county social workers. b. Discharge planning for inmates to include community resources to reduce recidivism. Update: Continued need for work in this area. 3. 2018/2019/2020 Housing: We support efforts in planning for transitional housing in Otter Tail County to assist the homelessness issue in our county. Update: Otter Tail County Human Services and HRA grant submission completed 4. Mental Health Emergency Department: We continue to support efforts in investigating need for a dedicated mental health emergency department in our county emergency rooms which is dedicated to the safety, staff training, medication protocol and resources to best serve this population. Update: Please note: In 2019 we submitted to the commissioners an idea for Behavioral Health Urgent Care in a handout. The county brought this forward to LRH after our 2019 submission to the county. No word yet from LRH. 5. Psychiatry: We recommend active recruitment and to retain psychiatric providers for our whole county. Update: This continues to be huge need in our area. 6. We recommend community development of mental health staff including rehabilitation workers, mental health practitioners, mental health professionals, and psychiatry. Uniting with our educational systems to create and promote educational tracks to develop these areas of need. Including mental health provider assistance and input. Update: No known movement in this area Respectfully, Otter Tail County Local Advisory Council September 22, 2020 Page | 1 Tuesday, September 22, 2020 Agenda Items Informational/Reminders 1. The Otter Tail County License Center (Motor Vehicle and Driver’s License) will be closed Thursday, November 12 and Friday, November 13 as the vehicle portion of MNDRIVE is implemented and driver’s license portion is updated. Non-Consent Items 1. Motion by , second by and unanimously carried, to authorized the Chair of the County Board of Commissioners, the County Administrator and the County Auditor-Treasurer to sign the management representation letter in connection with the audit for the year-ended December 31, 2019 (copy attached) 2. Motion by , second by and unanimously carried, to approve payment in the amount of $3,160.00 to Perham Health for costs incurred under the provisions of Minnesota Statute 609.35. 3. Motion by , second by and unanimously carried, to approve a transfer, in the amount of $406,569.83, from the Capital Improvements Fund to the Road and Bridge Fund for the following previously approved capital expenditures purchases: 2020 Carlson Model CP100-11 Asphalt Paver Vendor – Ruffridge Johnson 184,793.00 Approval Code – 202015 John Deere 614R Tractor with Loader Vendor – Deer & Company 145,829.25 Approval Code – 202007 Two – 2020 Dodge Ram 2500 4 by 4 Crew Cab 8’ Box with Tommy Gate Vendor – Nelson Auto Center 75,947.58 Approval Code – 202010 Grand Total 406,569.83 4. Motion by , second by and unanimously carried to appoint Commissioner __________ and Commissioner __________ to the canvassing board for the November 3, 2020 State General Election. The canvassing board will meet on Friday, November 13, 2020. 5. On July 14, 2020, the Otter Tail County Board of Commissioner decided that at their September 22, 2020 County Board meeting they would discuss and consider a possible date and time for a public hearing for County Ditch 45. News release Contact: Stephanie Hoff shoff@otpco.com 218-739-8535 (office) 218-205-6179 (after hours) Otter Tail Power Company developing solar project, continuing plans for cleaner energy future Fergus Falls, MN, September 8, 2020: Otter Tail Power Company plans to build a nearly 50-megawatt (MW) solar farm on land around the soon-to-be-retired Hoot Lake Plant in Fergus Falls, Minnesota. Hoot Lake Solar will include around 170,000 solar panels, generating enough energy to power approximately 10,000 homes every year. Construction may start as early as 2021. “We have an exciting window of opportunity to add a renewable resource and affordably interconnect the electricity from that resource to the energy grid,” said Otter Tail Power Company President Tim Rogelstad. “Solar generation has advantages that make it the right energy resource for us at this time and at this location. Over the past few years, the costs of solar energy have significantly decreased and efficiency has increased. Using the area around Hoot Lake Plant allows us to be resourceful with our property in Fergus Falls and to smartly use existing transmission infrastructure. I’m proud of our engineers and our project leads for developing a solid plan that makes sense for our customers.” Planning solar energy The existing Hoot Lake substation will connect electricity produced by the solar farm to customers across Otter Tail Power Company’s service area. “Not only are we adding another renewable resource for our customers, we’re doing it at a time when we can keep the price they pay for electricity lower than they’d find almost anywhere else,” said Rogelstad. Before construction can begin for Hoot Lake Solar, Otter Tail Power Company will seek required approvals from state regulatory agencies and local government, and the Midcontinent Independent System Operator, Inc., will need to authorize interconnection to the transmission system. “We’re excited to work with the City of Fergus Falls and Otter Tail County to complete this important project,” said Rogelstad. “Both have been supportive partners for us throughout our operations of the existing Hoot Lake Plant— and our entire history—and we look forward to maintaining and growing those partnerships.” Powering the future Otter Tail Power Company projects that with the completion of Hoot Lake Solar, up to 35 percent of its energy will come from renewables, while ensuring electric service continues to be safe, reliable, and economical. The company also recently completed two nearly 40-kilowatt solar projects: Blue Jay Solar in Jamestown, North Dakota, and Blue Heron Solar near Ottertail, Minnesota. Construction continues at the Merricourt Wind Energy Center, a 150-MW wind generation facility in southeast North Dakota—the first complete wind turbine stands tall as of July 28—and at Astoria Station, a 245-MW simple-cycle natural gas combustion turbine in east central South Dakota, where the company recently energized the transmission substation. Astoria Station will have flexible operating options, providing energy during periods of high demand, with low emissions. Both projects are scheduled for completion before the end of this year. This news release and a photo are available on our website at otpco.com/newsroom. Otter Tail Power Company, a subsidiary of Otter Tail Corporation (Nasdaq Global Select Market: OTTR), is headquartered in Fergus Falls, Minnesota. With a balanced commitment to environmental, economic, and community stewardship, the company provides electricity and energy services to approximately 230,000 people in Minnesota, North Dakota, and South Dakota. To learn more about Otter Tail Power Company visit otpco.com. To learn more about Otter Tail Corporation visit ottertail.com. ### 10 71 71 59 59 1094 210 210 227 32 78 87 228 106 34 108 29 78 ALDRICH BATTLE LAKE BERTHA BLUFFTON BROWERVILLE CLARISSA CLITHERALL DALTON DEER CREEK DENT ELIZABETH ERHARD FOXHOME HENNING HEWITT MENAHGA MILLERVILLE NEW YORKMILLS NIMROD OTTERTAIL PARKERSPRAIRIE PELICANRAPIDS PERHAM RICHVILLEROTHSAY SEBEKA UNDERWOOD URBANK VERGAS VERNDALE VINING WADENA FRAZEE FERGUS FALLS ASHBY STAPLES EAGLE BEND Project Area PATH: \\MSPE-GIS-FILE\GISPROJ\OTTERTAIL\10220617_HOOTLAKESOLAR\7.2_WIP\MAP_DOCS\ENVIRO\HOOTLAKE_LL_COUNTY_LOCATION.MXD - USER: JWALTER - DATE: 9/3/2020 PROJECT LOCATOIN (FIGURE #1) OTTER TAIL COUNTY, MN (REPORT NAME) 0 10 20 Miles LEGEND Study Area Municipality Railway Township MN DNR Management Aquatic ManagementArea - AMA Fish Management Area -FMA Scientific and NaturalArea - SNA State Forest Land Other Forest Land State Parks State Park RecreationAreas State Park Waysides Wildlife ManagementArea - WMA Project Area 59 10 59 94 55 210 32 87 79 210 228 54 9 78 34 108 78 ALEXANDRIA BARRETT BATTLE LAKE BRANDON CLITHERALL DALTON DENT ELBOW LAKE ELIZABETH ERHARD EVANSVILLE FOXHOME GARFIELD HENNING MILLERVILLENASHUA NEW YORKMILLS NORCROSS OTTERTAIL PELICANRAPIDS PERHAM RICHVILLEROTHSAY TINTAH UNDERWOOD URBANK VERGAS VINING WENDELL FRAZEE FERGUS FALLS ASHBY Project Area PATH: \\MSPE-GIS-FILE\GISPROJ\OTTERTAIL\10220617_HOOTLAKESOLAR\7.2_WIP\MAP_DOCS\ENVIRO\HOOTLAKE_LP_WESTHALF_COUNTY_LOCATION.MXD - USER: JWALTER - DATE: 9/3/2020 PROJECT LOCATION (FIGURE 1) OTTER TAIL COUNTY, MN PROJECT OVERVIEW 0 5 10Miles LEGEND Study Area Municipality Railway Township MN DNR Management Aquatic Management Area -AMA Fish Management Area - FMA Scientific and Natural Area -SNA Other Forest Land State Parks State Park Waysides Wildlife Management Area -WMA Project Area Psick Capitol Solutions, Inc. 6 West Fifth Street, 7th Floor, Saint Paul, MN 55102 Telephone (952) 200-4499 spsick@psickcapitolsolutions.com September 16, 2020 Mr. Lee Rogness, Board Chair Otter Tail County Board of Commissioners Otter Tail County Government Services Center 520 West Fir Avenue Fergus Falls, MN 56537 RE: Legislative Representation Proposal Dear Commissioner Rogness, I am pleased to submit the following proposal to you and the Otter Tail County Board of Commissioners to provide legislative representation for the 2021-2022 legislative biennium. It has been a pleasure to represent Otter Tail County for the past two years and I look forward to the opportunity to continue that relationship. On behalf of Psick Capitol Solutions, Inc., I will represent Otter Tail County before the Minnesota Legislature during the 2021-2022 legislative biennium, as well as with the Governor, Lt. Governor and staff, Executive Branch Agencies, Legislative Commissions and other governmental bodies as needed. I will work with you and other members of the Otter Tail County Board of Commissioners and staff to determine the exact scope of work and legislative priorities for the County. However, legislative representation will include, at a minimum: attendance at relevant House and Senate committee hearings, drafting of legislation and amendments as needed, securing bill authors, monitoring bill introductions, weekly communication and Capitol Update Reports during the legislative session, monitoring House and Senate Floor debates, scheduling and participating in legislator meetings, strategic advice regarding legislation, attending County Board meetings as requested and other activities mutually agreed upon. Many factors are considered when proposing a legislative representation fee and I propose maintaining the monthly fee at the same level as the last two years. As such, I propose a fee of $3,000.00 a month, billable over 24-months beginning January 1, 2021 through December 31, 2022. The flat fee retainer will include out-of-pocket expenses such as parking, milage, cellular phone usage and miscellaneous office expenses. Any directly related expenses incurred on behalf of the Otter Tail County must be approved in advance. Sarah J. Psick Psick Capitol Solutions, Inc. 6 West Fifth Street, 7th Floor, Saint Paul, MN 55102 Psick Capitol Solutions, Inc. 6 West Fifth Street, 7th Floor, Saint Paul, MN 55102 Telephone (952) 200-4499 spsick@psickcapitolsolutions.com Mr. Lee Rogness, Board Chair Otter Tail County Board of Commissioners September 16, 2020 Page 2 As required by law, I will register with the Minnesota Campaign Finance Board as representing Otter Tail County and will abide by all professional rules, regulations, and responsibilities. If the terms set out above meet with your approval, please sign one copy of this letter, and return to me. If you have further questions, please feel free to contact me. I very much look forward to continuing representing Otter Tail County and working with you and the members of the Otter Tail County Board of Commissioners and staff. Thank you. Sincerely, Sarah J. Psick, President Psick Capitol Solutions, Inc. OTTER TAIL COUNTY By: Commissioner Lee Rogness, Chair Dated: cc: Nicole Hansen, County Administrator Nick Leonard, Deputy County Administrator